California Regional Water Quality Control Board San Diego Region
David Gibson, Executive Officer
Executive Officer’s Report
November 13, 2012
Table of Contents
Part A – San Diego Region Staff Activities ............................................................ 2
1. Presentation at the American Water Works Association 2012 Annual Fall Conference .........................................................................................................................2
2. La Jolla Cove Odor Abatement Measures .........................................................................2
Part B – Significant Regional Water Quality Issues ............................................. 3
1. Update on Expansion of Waste Disposal Operations at Sycamore Landfill (Attachment B1) .................................................................................................................3
2. Storm Drain Cleanout at Former Teledyne Ryan Aeronautical Site Completed ..............4 3. Stormwater BMP Violation Corrections by City of San Marcos ......................................5 4. Enforcement Actions for September 2012 ........................................................................5 5. Status of Recycled Water Policy Salt and Nutrient Management Plan: Lower Santa
Margarita River and Las Flores Creek Watersheds (Attachment B5) ...............................6 6. Clean Water Act Section 401 Water Quality Certification Actions Taken from July
to September 2012 (Attachment B6) ..................................................................................7
Part C – Statewide Issues of Importance to the San Diego Region ..................... 8
1. Clean Water Act Report (Attachment C1) .........................................................................8
Executive Officer’s Report November 13, 2012
2
The August report for the Tentative Schedule of Significant NPDES Permits, WDRs, and Actions and the attachments noted on page 1 are included at the end of the report.
Part A – San Diego Region Staff Activities
1. Presentation at the American Water Works Association 2012 Annual Fall Conference
Staff Contact: Bob Morris
Bob Morris, Senior Engineer in the Core Regulatory Unit made a presentation at the 2012 Annual Fall Conference of the California – Nevada Section, American Water Works Association (AWWA) on October 11, 2012. The purpose of his talk was to explain what categories of discharges are subject to National Pollutant Discharge Elimination System (NPDES) permits. Mr. Morris discussed the key terms contained in the federal Clean Water Act pertaining to the NPDES program and gave examples of NPDES general permits issued in California, Nevada and other states. The examples included permits that addressed discharges from groundwater extraction, utility vaults, water treatment processes, lake management, hydrostatic testing of pipelines, and storm water runoff. The session was well attended with AWWA members expressing interest in the topic by their questions throughout Mr. Morris’s presentation. Mr. Morris also participated in a session at the Conference regarding potable water discharges into municipal separate storm sewer systems (MS4s). The speaker for this session was Dr. David Kimbrough from the Pasadena Water & Power Department. Dr. Kimbrough discussed the concerns and involvement of water supply agencies in the Los Angeles area with the reissuance of the MS4 permit by the Los Angeles Water Board. Dr. Kimbrough asserted that water quality regulations are increasingly limiting the ability of community water systems to make periodic discharges into MS4s. Dr. Kimbrough, with support from Mr. Morris, explained the need for MS4 agencies to address all sources of pollutant leadings, including those resulting from potable water discharges, that are conveyed through their MS4s to the receiving waters. To address the concerns of the water supply agencies, the MS4 agencies have been working with the Los Angeles Water Board to develop language in the Los Angeles MS4 permit that provides for an exemption from the prohibition for potable water discharges. Mr. Morris clarified that no such change is necessary in the San Diego Region, where many of the potable water discharges by water supply agencies (such as discharges resulting from repair, maintenance, and disinfection of pipelines, tanks, and reservoirs) whether directly to a receiving water or to a MS4, are already subject to a general potable water NPDES permit.
2. La Jolla Cove Odor Abatement Measures Staff Contact: Bob Morris
San Diego Water Board staff met recently with several concerned citizens who want to abate odors emanating from bird guano deposited on the rocks along La Jolla Cove. Also attending the October 12, 2012 meeting were representatives from the California Coastal Commission, San Diego City Councilwoman Lightner’s office, City Park and Recreation Department, City Storm
Executive Officer’s Report November 13, 2012
3
Water Division, and BioOrganic Catalyst Technology, the company that manufactures a product proposed to be sprayed on the guano to abate the odors. The citizens noted that the odors have gotten progressively worse over recent years as a result of the shoreline being fenced to limit public access to the rocks. Whereas previously, birds perching on the rocks were disturbed by the public and flew off elsewhere, birds are now finding the area a comfortable spot to rest and deposit their droppings. The citizens appreciate the birds, but not the odors and want to take steps to address the odors in an environmentally friendly manner. The representatives from BioOrganic Catalyst Technology stated that it’s product creates a broad spectrum bio-organic catalyst enabling aerobic reactions to speed up the natural degradation process. The product has not been used in an application like that under consideration at La Jolla Cove, but is being used effectively at chicken ranches to control odors. BioOrganic indicated that a trial and error approach could be used to determine how much of the product was needed and the frequency of application. The rocks along La Jolla Cove shoreline are located immediately adjacent to coastal ocean waters. San Diego Water Board staff explained that if the project could result in a discharge of pollutants to ocean waters, the project would need to get prior coverage under a NPDES permit. It was suggested that the community, through Councilwoman Lightner’s office and with assistance from BioOrganic, develop an application plan that would avoid discharges to ocean waters by establishing setbacks, seasonal restrictions, procedures, and other measures to demonstrate that the project would not result in a discharge. Depending upon the complexity of the management measures, the project might still need coverage under an NPDES permit. The City of San Diego will continue to work with the community to seek a solution to the odor problem and will inform the San Diego Water Board on any proposal that potentially could affect the nearby ocean waters.
Part B – Significant Regional Water Quality Issues
1. Update on Expansion of Waste Disposal Operations at Sycamore Landfill (Attachment B1)
Staff Contacts: Carol Tamaki and John Odermatt At final build-out, the Sycamore Landfill will be one of the two largest landfills located within the San Diego Region. Republic Services/Allied Waste Industries (the Discharger) has submitted a Design Report for the Stage III-B expansion cell, with a proposed capacity of approximately 1,000,000 tons, at the Sycamore Canyon Landfill (Attachment 1). This relatively small scale expansion will require the San Diego Water Board to amend the waste discharge requirements (WDRs) for the landfill. The Discharger anticipates submitting a new Joint Technical Document (or JTD which includes a Report of Waste Discharge), for an additional large-scale lateral and vertical expansion of the landfill, which may increase capacity to over
Executive Officer’s Report November 13, 2012
4
100,000,000 tons. This large scale expansion of landfill operations will require a complete revision of the current WDRs and a Clean Water Act Section 401 water quality certification. According to an evaluation of capacity performed by the Discharger in 2011, the solid waste disposal operations at Sycamore Landfill are as follows: Parameter Design and Operating Parameters Areas of landfill operations Total final cover at build out
152.7 acres lined area 136.4 acres unlined area 289 acres
Permitted site capacity (Stages I – IV) Wastes in-situ (as of 2/28/2011) Remaining estimated capacity
71,233,171 cubic yards 28,986,620 cubic yards 40,355,079 cubic yards
52, 427,614 tons1 21,334,152 tons 29,701, 338 tons
Annual volume of solid waste accepted 1,950,177 cubic yards/yr 1,435,330 tons/yr Estimated closure date October 2031 1 = one cubic yard = 0.736 tons (or 1,471 lbs/cubic yard) The Sycamore Landfill is a 491-acre facility located in San Diego, California, adjacent to the City of Santee (see Attachment 1). The landfill is located north of Mast Boulevard and east of Freeway 5, where it occupies part of a canyon known as Little Sycamore Canyon. The landfill operations are subject to federal and State requirements regulating the management and disposal of solid wastes, which are currently implemented by the San Diego Water Board under Waste Discharge Requirements Order No. 99-74 (and addenda thereto).1 The facility is also subject to regulation by the San Diego Water Board under the Statewide Industrial Storm Water NPDES Permit and a Solid Waste Facility Permit issued by the City of San Diego Development Services Department, acting as the Local Enforcement Authority (LEA). The staff will continue to update the San Diego Water Board on this topic in future Executive Officer Reports.
2. Storm Drain Cleanout at Former Teledyne Ryan Aeronautical Site Completed
Staff Contact: Tom Alo
A significant milestone has been reached at the former Teledyne Ryan Aeronautical (TRA) site. Sediments containing polychlorinated biphenyls (PCBs) were recently removed from specific municipal storm drains beneath the site that drain into Convair Lagoon and San Diego Bay. This cleanout represents the final phase of PCB source removal from the former TRA site, and should mark the end of PCB-contaminated sediment discharges from the site to Convair Lagoon and San Diego Bay. The earlier cleanup phases, which primarily targeted land-side PCB sources, 1 Available on-line at: http://www.waterboards.ca.gov/sandiego/board_decisions/adopted_orders/1990/1999_0074.pdf
Executive Officer’s Report November 13, 2012
5
included excavating soils, demolishing buildings, removing concrete slabs, and removing all storm drain laterals that were connected to the main storm drains. Since PCB discharges from the site have been abated, the San Diego Water Board can shift focus to investigating and cleaning up the PCB-impacted sediments in Convair Lagoon and San Diego Bay. Details on the recent storm drain cleanouts will be provided in a future EO report once staff receives the cleanout completion report from TRA.
3. Stormwater BMP Violation Corrections by City of San Marcos Staff Contact: Laurie Walsh
On March 2, 2010, the San Diego Water Board issued Notice of Violation R9-2010-0022 (NOV) to the City of San Marcos for failure to verify, prior to occupancy, that constructed treatment control best management practices (BMPs) at Priority Development Projects (PDP) were in place and in compliance with all specifications, plans, permits, and ordinances as required by the Phase I Storm Water Permit, Order No. R9-2007-0001. In response to the NOV, the City of San Marcos took a pro-active comprehensive approach by developing and funding a Capital Improvement Project (CIP) to install all 125 post construction treatment control BMPs identified as missing during the San Diego Water Board’s fiscal year 2008/2009 site inspections. As part of the City’s aggressive response to the NOV, they also provided the San Diego Water Board with an installation schedule that identified when missing post construction treatment control BMPs at each of the thirty-seven (37) PDP sites would be installed. The work occurred in two phases. Phase I began in July 2010 and included installation of 71 treatment control BMPs along with work to request the bonds for those sites identified in the second Phase of work. Phase II began in July 2011 and included installation of all remaining 54 treatment control BMPs. Work to install all 125 missing treatment control BMPs was recently completed prior to June 30, 2012, in accordance with the City’s proposed schedule. Staff appreciates the Cities rapid and appropriate response to the NOV and expects other violators to respond similarly.
4. Enforcement Actions for September 2012 Staff Contact: Chiara Clemente
During the month of September 2012, the San Diego Water Board initiated the following enforcement actions:
August 2012 Enforcement Actions Number Notice of Violation 1 Staff Enforcement Letters 3
Total 4 A summary of recent regional enforcement actions is provided below. Additional information on violations, enforcement actions, and mandatory minimum penalties is available to the public from the following on-line sources: State Water Board Office of Enforcement webpage at: http://www.waterboards.ca.gov/water_issues/programs/enforcement/
Executive Officer’s Report November 13, 2012
6
California Integrated Water Quality System (CIWQS) http://www.waterboards.ca.gov/water_issues/programs/ciwqs/publicreports.shtml State Water Board GeoTracker database: https://geotracker.waterboards.ca.gov/ Notice of Violation S.C. Tile Company, Spring Valley On September 14, 2012, NOV No. R9-2012-0061 was issued to S.C. Tile Company for unauthorized storm water discharges from failure to implement structural BMPs in accordance with requirements in Order No. 97-03-DWQ, Waste Discharge Requirements for Discharges of Storm Water Associated with Industrial Activities Excluding Construction Activities. Staff Enforcement Letters (SEL) Encina Ocean Outfall, Encinitas On September 4, 2012, an SEL was issued to the Encina Wastewater Authority for two reporting violations due to missing monitoring data, and for unauthorized discharges of partially treated wastewater from the plant on February 29, and May 19, 2012. These are violations of NPDES Order No. R9-2011-0019. Ramona Landfill Inc., San Diego County An SEL was issued to Ramona Landfill Inc. on September 14, 2012 noting violations identified during a June 12, 2012 staff inspection. The inspection notes that contaminated green waste was observed on the landfill cover, in violation of 27 California Code of Regulations (CCR) section 21090(a)(3)(A)(1 )a. Ariel Suites, San Diego An SEL was issued to the Ariel Suites L.P. on September 25, 2012 for failure to record and report daily flow volumes of dewatered groundwater discharges in accordance with Order No. R9-2007-0034, General Waste Discharge requirements for Discharges From Temporary Groundwater Extraction and similar Waste Discharges to San Diego Bay, Tributaries Thereto Under Tidal influence, and Storm Drains or Other Conveyance Systems Tributary Thereto.
5. Status of Recycled Water Policy Salt and Nutrient Management Plan: Lower Santa Margarita River and Las Flores Creek Watersheds (Attachment B5)
Staff Contacts: Fisayo Osibodu and John Odermatt The U.S. Marine Corps (USMC) has taken a lead role in developing its plan for management of salt and nutrient loads within the lower Santa Margarita River and Las Flores Creek watersheds (Attachment A). The USMC released its draft Salt and Nutrient Management Plan, Southern
Executive Officer’s Report November 13, 2012
7
MCB Camp Pendleton (draft Plan), and convened a stakeholder meeting on October 11, 2012 at Camp Pendleton. Ms. Julie Chan and Messers. Fisayo Osibodu and John Odermatt of the Cleanup and Land Discharge Branch attended the meeting, hosted by the USMC at Camp Pendleton. The primary objective of the meeting was for stakeholders to discuss the important elements of the draft Plan, specifically its assessment of salt and nutrient loadings in the lower Santa Margarita River, evaluation of assimilative capacity in the groundwater basins (Upper Ysidora, Chappo and Lower Ysidora basins), potential management strategies, and recommendations for implementation of the draft Plan in the Santa Margarita River watershed. Attendees at the meeting included other stakeholder representatives from Rancho California Water District and the Fallbrook Public Utilities District. Localized Salt and Nutrient Management Plans are required by the Recycled Water Policy and the draft Plan for southern Camp Pendleton is a significant step toward achieving the goal of managing salt loads within the Santa Margarita River watershed. Key implementation measures, proposed in the draft Plan include: • using advanced water treatment technology as a source control measure - to reduce the
potable water concentrations of total dissolved solids (TDS) to approximately 300 mg/L, • salt source reduction – including a base wide ban on the use of water softeners, and • using recycled water to create a hydrologic barrier- to control salt/sea water intrusion in
the Lower Ysidora basin. Groundwater in the Santa Margarita River watershed is the primary source of potable water supplies for Camp Pendleton and a significant source of potable water supplies for the Cities of Temecula and Murrieta. As a result, the primary topics of discussion are the salt and nutrient management elements that affect the joint interests of the stakeholders located in the Santa Margarita River watershed. Upon receipt of the final plan, the San Diego Water Board will have one year to amend the Basin Plan to include the implementation provisions of the plan. The staff will continue to provide the San Diego Water Board with updates on recycled water and salt and nutrient planning issues in future Executive Officer Reports.
6. Clean Water Act Section 401 Water Quality Certification Actions Taken from July to September 2012 (Attachment B6)
Staff Contact: Kelly Dorsey
Section 401 of the Clean Water Act (CWA) requires that any person applying for a federal permit, which may result in a discharge of pollutants into waters of the United States, obtain a water quality certification that the specific activity complies with all applicable state water quality standards, limitations, requirements, and restrictions. The most common federal permit that requires a 401 Certification is a CWA Section 404 permit, most often issued by the Army Corps of Engineers, for the placing of fill (sediment, rip rap, concrete, pipes, etc.) in waters of the U.S. (i.e. ocean, bays, lagoons, rivers and streams).
Executive Officer’s Report November 13, 2012
8
Upon receipt of a complete 401 Certification application, the San Diego Water Board may either certify the project or deny certification, with or without prejudice. In cases where there are impacts to waters of the U.S., the San Diego Water Board may issue a conditional certification. The certification can be either in the form of a conditional certification document approved by the Executive Officer, or Waste Discharge Requirements (WDRs) adopted by the San Diego Water Board. In the case where a federal permit is not required because impacts have been determined to be only to waters of the State, the San Diego Water Board may adopt WDRs. Table B6 (attached) contains a list of actions taken during the months of July, August, and September 2012. The first page of the Table summarizes the total impacts to jurisdictional waters, and proposed mitigation, for the individual months and quarter. This information is an imprecise measure of the actual conditions. For example, the data can be skewed depending on what is considered “self-mitigating” and how mitigation is categorized (i.e. establishment, restoration, or enhancement). Another limitation is that the data relies on the assumption that all the mitigation required is implemented and successful, and does not take into consideration any additional impacts resulting from illegal fill activities. Public notification of pending 401 Water Quality Certification applications can be found on the San Diego Water Board’s web site at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/index.shtml . Certifications issued since January 2008 can also be found on the San Diego Water Board web site at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/401projects.shtml. For a complete list of State-issued general orders, please refer to http://www.waterboards.ca.gov/water_issues/programs/cwa401/generalorders.shtml.
Part C – Statewide Issues of Importance to the San Diego Region
1. Clean Water Act Report (Attachment C1) Staff Contact: Bruce Posthumus
The Clean Water Act, as the Federal Water Pollution Control Act Amendments of 1972 have come to be known, was enacted on October 18, 1972. The Southern California Coastal Water Research Project (SCCWRP) recently released a report entitled “Forty Years after the Clean Water Act: A Retrospective Look at the Southern California Coastal Ocean.” The report discusses changes in pollutant discharges to southern California coastal ocean waters, changes in conditions in those waters related to key beneficial use categories, costs and benefits, and future challenges. The report also includes the perspectives of several individuals with long-term experience in implementation of the Clean Water Act.
Executive Officer’s Report November 13, 2012
9
An executive summary of the report is attached. The executive summary and the full report are available at: ftp://ftp.sccwrp.org/pub/download/DOCUMENTS/TechnicalReports/727_CWA_ES.pdf. The San Diego Water Board is one of SCCWRP’s fourteen member agencies. David Gibson represents the San Diego Water Board on the SCCWRP Commission. David Barker serves as alternate commissioner. Additional information about SCCWRP is available at: http://www.sccwrp.org/AboutSCCWRP.aspx.
Executive Officer’s Report November 13, 2012
10
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD
SAN DIEGO REGION
Significant NPDES Permits, WDRs, and Actions of the San Diego Water Board
November 13, 2012
APPENDED TO EXECUTIVE OFFICER’S REPORT
DATE OF REPORTNovember 6, 2012
TENTATIVE SCHEDULESIGNIFICANT NPDES PERMITS, WDRS, AND ACTIONS
OF THE SAN DIEGO WATER BOARD
11 11/6/2012 3:04 PM
Action Agenda Item Action Type Draft Complete
Written Comments Due
Consent Item
December 12, 2012San Diego Water Board Office
Addendum to Waste Discharge Requirements for the San Elijo Water Reclamation Facility, (Osibodu ) WDR Addendum 100% 28-Nov-12 Yes
San Dieguito Lagoon: Restoration, Fill Removal and Storm Water BMPs (Dorsey) Information Item NA NA NA
Mitigated Negative Declaration for Leuthe Residence Onsite Wastewater Treatment System, Escondido (Osibodu)
Negative Declaration 100% 31-Oct-12 Yes
Waste Discharge Requirements for Leuthe Residence Onsite Wastewater Treatment System, Escondido (Osibodu) New WDRs 100% 31-Oct-12 Yes
Resolution in Support of the Regional Monitoring Framework (Posthumus)
Tentative Resolution 90% NA NA
New NPDES General Permit for the Application of Phoslock in the San Diego Region (Morris)
New NPDES Permit 100% 31-Oct-12 Maybe
Administrative Civil Liability for Mandatory Minimum Penalties against Ariel Suites, San Diego, CA (Melborn)
Administrative Civil Liability 95% 9-Nov-12 Yes
January, 2013No Meeting Scheduled
Februrary 13, 2013San Diego Water Board Office
City of San Diego South Bay Ocean Outfall Permit Reissuance (Lim)
NPDES Permit Reissuance 0% 3-Jan-13 No
JFK Park
JAMACHA ROAD
II) "-----'"__.....
~ N 2ND.....S~TRrnrE'i"'ETT--;::+--1I--~ ~
I/)
WOODGLEN -J
VISTA PARK ~ <=e -.Ia::
Santee Lakes C3 Regional Park And Camp
,., .~ ~
a::
t: 0
Q.
.... II)
Gil/espe Field Airport
CUYAMACA STREET
~ « >~ Cl «a:: (Il
Cl « oa::
~ « Cl U) ....J
I
t: o Cl Q. « oSYCAMORE ti a::
oo i::LANDFILL (!) a:: ~
II)
(3.9' ~ III «
z
II)
::: l: .... II)
l ~ CL
~ N ~
01 0 0 N
REVISION DESCRIPTION
SAN DIEGO LANDFILL SYSTEMS, INC. '- SYCAMORE LANDFILL N CL
<{ SAN DIEGO COUNTY, CALIFORNIA
TrTLE
~ '" -0
1;-SITE VICINITY MAP
:~ .>u
PROJECT No. FILE No
DESIGN SCALE REV.~ CADD0>
.~ " CHECK 1<I'~;: SUNNYVALE. CALIFORNIA REVIEW 0
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 14
-
Rep
ortin
g P
erio
d Pe
rman
ent I
mpa
cts7
(Acr
es)
Tem
pora
ry Im
pact
s7 (A
cres
) Es
tabl
ishm
ent
Miti
gatio
n8 (A
cres
)
Res
tora
tion
Miti
gatio
n9 (A
cres
)
Enha
ncem
ent
Miti
gatio
n10
(Acr
es)
Pres
erva
tion
Miti
gatio
n11
(Acr
es)
July
0
0.30
76
0 0
0 0
Aug
ust
0.57
07
0.06
3 0.
37
.020
1.
25
0 S
epte
mbe
r 2.
725
0.79
7 2.
3414
1.
2088
5.
39
4.91
Q
uart
erly
To
tal
3.29
57
1.16
76
2.71
14
1.22
88
6.64
4.
91
YTD
TO
TAL
27.4
168
31.1
382
32.3
014
42.1
852
24.1
4 5.
12
1.
C
ertif
icat
ions
can
be
low
impa
ct, c
ondi
tiona
l, or
pro
gram
mat
ic.
Low
impa
ct c
ertif
icat
ions
are
issu
ed to
pro
ject
s th
at h
ave
min
imal
pot
entia
l to
adve
rsel
y im
pact
w
ater
qua
lity.
Con
ditio
nal c
ertif
icat
ions
are
issu
ed to
pro
ject
s th
at h
ave
the
pote
ntia
l to
adve
rsel
y im
pact
wat
er q
ualit
y, b
ut b
y co
mpl
ying
with
tech
nica
l co
nditi
ons,
will
hav
e m
inim
al im
pact
s. P
rogr
amm
atic
cer
tific
atio
ns a
re c
ondi
tiona
l cer
tific
atio
ns is
sued
to p
roje
cts
with
like
, rec
urrin
g, o
r lon
g-te
rm im
pact
s,
ther
eby
requ
iring
con
tinuo
us o
vers
ight
. 2.
In
cas
es w
here
the
Sta
te W
ater
Res
ourc
es C
ontro
l Boa
rd h
as is
sued
a p
rogr
amm
atic
cer
tific
atio
n (S
tate
Cer
tific
atio
n), t
he R
egio
nal W
ater
Boa
rds
are
resp
onsi
ble
for r
evie
win
g pr
ojec
ts in
thei
r are
a to
con
firm
whe
ther
they
qua
lify
for e
nrol
lmen
t in
the
prog
ram
mat
ic c
ertif
icat
ions
.
3.
Tim
e E
xpire
d re
fers
to p
roje
cts
that
may
pro
ceed
due
to th
e la
ck o
f an
actio
n by
the
San
Die
go W
ater
Boa
rd w
ithin
spe
cifie
d re
gula
tory
tim
elin
es.
4.
Am
endm
ents
are
revi
sion
s to
cer
tific
atio
ns th
at h
ave
been
issu
ed.
5.
W
ithdr
awn
refe
rs to
pro
ject
s th
at th
e ap
plic
ant o
r San
Die
go W
ater
Boa
rd h
ave
with
draw
n du
e to
pro
cedu
ral i
ssue
s no
t cor
rect
ed w
ithin
one
yea
r. 6.
D
enia
ls a
re is
sued
whe
n a
proj
ect w
ill a
dver
sely
impa
ct w
ater
qua
lity
and
suita
ble
miti
gatio
n m
easu
res
are
not p
ropo
sed
or p
ossi
ble.
7.
P
erm
anen
t im
pact
s (P
) res
ult i
n a
perm
anen
t fill
or l
oss
of w
etla
nd fu
nctio
n an
d va
lue.
Tem
pora
ry im
pact
s (T
) are
exp
ecte
d to
retu
rn to
thei
r orig
inal
con
ditio
n w
ithin
one
yea
r. 8.
E
stab
lishm
ent i
s de
fined
as
the
crea
tion
of v
eget
ated
or u
nveg
etat
ed w
ater
s of
the
Uni
ted
Sta
tes
and/
or S
tate
whe
re th
e re
sour
ce h
as n
ever
pre
viou
sly
exis
ted
(e.g
. con
vers
ion
of n
onna
tive
gras
slan
d to
a fr
eshw
ater
mar
sh).
9.
R
esto
ratio
n is
div
ided
into
two
activ
ities
, re-
esta
blis
hmen
t and
reha
bilit
atio
n. R
e-es
tabl
ishm
ent i
s de
fined
as
the
retu
rn o
f nat
ural
/his
toric
func
tions
to a
site
w
here
veg
etat
ed o
r unv
eget
ated
wat
ers
of th
e U
nite
d S
tate
s an
d/or
Sta
te p
revi
ousl
y ex
iste
d (e
.g.,
rem
oval
of f
ill m
ater
ial t
o re
stor
e a
drai
nage
). R
ehab
ilita
tion
is d
efin
ed a
s th
e im
prov
emen
t of t
he g
ener
al s
uite
of f
unct
ions
of d
egra
ded
vege
tate
d or
unv
eget
ated
wat
ers
of th
e U
nite
d S
tate
s an
d/or
Sta
te (e
.g.,
rem
oval
of
a h
eavy
infe
stat
ion
or m
onoc
ultu
re o
f exo
tic p
lant
spe
cies
from
juris
dict
iona
l are
as a
nd re
plac
ing
with
nat
ive
spec
ies)
.
10.
Enh
ance
men
t is
defin
ed a
s th
e im
prov
emen
t to
one
or tw
o fu
nctio
ns o
f exi
stin
g ve
geta
ted
or u
nveg
etat
ed w
ater
s of
the
Uni
ted
Sta
tes
and/
or S
tate
(e.g
., re
mov
al o
f sm
all p
atch
es o
f exo
tic p
lant
spe
cies
from
an
area
con
tain
ing
pred
omin
antly
nat
ural
pla
nt s
peci
es).
11
. P
rese
rvat
ion
is d
efin
ed a
s th
e ac
quis
ition
and
lega
l pro
tect
ion
from
futu
re im
pact
s in
per
petu
ity o
f exi
stin
g ve
geta
ted
or u
nveg
etat
ed w
ater
s of
the
Uni
ted
Sta
tes
and/
or S
tate
(e.g
., co
nser
vatio
n ea
sem
ent).
Rep
ortin
g Pe
riod
Cer
tific
atio
n A
pplic
atio
ns
Rec
eive
d
Cer
tific
atio
ns
Issu
ed1
Enro
llmen
t In
Stat
e C
ertif
icat
ions
2 C
ertif
icat
ions
Ti
me
Expi
red3
Cer
tific
atio
n A
men
dmen
ts4
Cer
tific
atio
n W
ithdr
awal
s5 C
ertif
icat
ion
Den
ials
Issu
ed6
July
1
0 0
1 1
0 0
Aug
ust
12
3 0
8 2
0 0
Sep
tem
ber
8 2
1 4
1 0
0 Q
uart
erly
To
tal
21
5 1
13
4 0
0
YTD
TO
TAL
76
20
3 33
12
1
1
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 15
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
7/18
/201
2 Ci
ty o
f Esc
ondi
do
Esco
ndid
o Cr
eek
and
Harm
ony
Grov
e M
ater
ial R
emov
al
The
over
all n
eed
for t
he p
roje
ct is
the
rem
oval
of n
atur
al a
nd a
nthr
opog
enic
de
bris
(e.g
., se
dim
ent,
plan
t mat
eria
l, an
d tr
ash)
that
has
acc
umul
ated
nea
r the
en
dpoi
nt o
f the
con
cret
e tr
apez
oida
l ch
anne
l por
tion
of E
scon
dido
Cre
ek.
Even
th
ough
the
chan
nel i
s mea
nt to
con
vey
both
wat
er a
nd se
dim
ent,
the
City
feel
s th
at th
e am
ount
of m
ater
ial n
eeds
to b
e re
mov
ed to
hel
p pr
otec
t the
dow
nstr
eam
ha
bita
t and
resid
ents
.
Esco
ndid
o Cr
eek
and
San
Elijo
La
goon
(T):
0.30
76 a
cre
of
stre
ambe
d N
one
Prop
osed
12
C-00
5
Tim
e Ex
pire
d
7/23
/201
2 Ci
ty o
f Esc
ondi
do
Esco
ndid
o Se
wer
O
utfa
ll O
pera
tions
an
d M
aint
enan
ce
Activ
ities
This
amen
dmen
t ext
ende
d th
e te
rm o
f th
e Ce
rtifi
catio
n an
add
ition
al fi
ve y
ears
. Th
e Ce
rtifi
catio
n co
vers
the
cont
inue
d op
erat
ions
and
mai
nten
ance
(O&
M) o
f th
e 14
.2-m
ile tr
eate
d se
wag
e lin
e an
d in
fras
truc
ture
for t
he C
ity o
f Esc
ondi
do's
land
out
fall.
The
infr
astr
uctu
re in
clud
es
the
trea
ted
sew
er li
ne, 9
5 m
anho
les,
16
cath
odic
pro
tect
ion
test
stat
ions
, 4
cath
odic
pro
tect
ion
rect
ifier
stat
ions
, and
ac
cess
road
s for
veh
icle
s and
ped
estr
ians
.
Pere
nnia
l Es
cond
ido
Cree
k N
o ch
ange
s to
impa
cts
No
chan
ges t
o m
itiga
tion
05C-
118
Am
endm
ent
O
rder
for T
echn
ical
ly-
Cond
ition
ed C
ertif
icat
ion
8/6/
2012
Ci
ty o
f Miss
ion
Viej
o Je
roni
mo
Cree
k at
Si
llero
s Roa
d Th
e pr
opos
ed a
ctiv
ity in
clud
es re
stor
ing
func
tion
to th
e lo
w fl
ow in
take
stru
ctur
e an
d re
stor
ing
the
chan
nel b
anks
to th
eir
pre-
disa
ster
con
ditio
n. T
he sc
oure
d ch
anne
l will
be
repl
aced
from
the
grou
ted
ripra
p at
the
Sille
ros R
oad
culv
ert t
o th
e fir
st lo
w fl
ow in
take
stru
ctur
e ta
perin
g th
e ne
w fi
ll m
ater
ial t
o m
eet t
he e
xist
ing
chan
nel i
nver
t 25
feet
dow
nstr
eam
of t
he
stru
ctur
e.
Jero
nim
o Cr
eek,
O
so C
reek
, and
San
Ju
an C
reek
(P):
0.08
acr
e of
st
ream
bed
Non
e Pr
opos
ed
12C-
039
Ti
me
Expi
red
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 16
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
8/6/
2012
Ci
ty o
f Miss
ion
Viej
o Al
iso C
reek
Bik
eway
Br
idge
Rep
airs
Th
e pr
opos
ed a
ctiv
ity in
clud
es th
e or
igin
al ri
prap
alo
ng th
e w
est c
hann
el
bank
and
add
ing
addi
tiona
l rip
rap
to th
e er
oded
por
tion
of th
e ea
st c
hann
el b
ank.
Fi
lter f
abric
and
1/2
ton
of u
ngro
uted
rip
rap
wou
ld b
e pl
aced
alo
ng 2
0 fe
et o
f th
e w
est c
hann
el b
ank
to re
plac
e th
e pr
e-ex
istin
g gr
oute
d rip
rap
that
was
lost
du
ring
the
stor
ms.
Aliso
Cre
ek
(P):
0.08
acr
e of
st
ream
bed
Non
e Pr
opos
ed
12C-
040
Tim
e Ex
pire
d
8/6/
2012
Ci
ty o
f Miss
ion
Viej
o Je
roni
mo
Cree
k at
Ar
bolit
os R
oad
The
prop
osed
act
ivity
incl
udes
repa
iring
an
y da
mag
e to
the
Low
Flo
w S
torm
Dra
in
Repa
irs a
t Arb
olito
s Roa
d. T
he p
ropo
sed
activ
ity in
clud
es re
pairi
ng a
ny d
amag
e to
th
e ex
istin
g 30
-inch
RCP
, res
torin
g fu
nctio
n to
the
low
flow
inta
ke st
ruct
ure
and
rest
orin
g th
e ch
anne
l ban
ks to
thei
r pr
e di
sast
er c
ondi
tion.
The
are
a su
rrou
ndin
g th
e 30
-inch
RCP
will
be
dew
ater
ed to
faci
litat
e in
spec
tion
and
repa
ir of
the
subj
ect p
ipe.
San
Juan
Cre
ek. O
so
Cree
k. Je
roni
mo
Cree
k
(P):
0.04
acr
e of
st
ream
bed
Non
e Pr
opos
ed
12C-
041
Tim
e Ex
pire
d
8/7/
2012
N
aval
Bas
e Sa
n Di
ego
Repl
ace
Pier
1
Fres
hwat
er L
ines
, N
aval
Bas
e Sa
n Di
ego
The
prop
osed
act
ion
wou
ld re
plac
e th
e po
tabl
e w
ater
line
s con
sistin
g of
the
exist
ing
6-in
ch c
ast i
ron
fres
h w
ater
line
s to
be
repl
aced
with
6-in
ch H
DPE
lines
, se
ctio
nal i
sola
tion
valv
es, p
ipe
hang
ers,
an
d st
ainl
ess s
teel
pip
e su
ppor
t bra
cket
s th
at a
re d
amag
ed o
r det
erio
rate
d an
d ot
her i
ncid
enta
l wor
k on
or d
irect
ly
unde
rnea
th th
e pi
er d
eck.
San
Dieg
o Ba
y N
one
Non
e Pr
opos
ed
12C-
037
Ti
me
Expi
red
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 17
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
8/9/
2012
Ra
ncho
Cal
iforn
ia
Wat
er D
istric
t Re
cycl
ed W
ater
St
orag
e Po
nd N
o. 5
Th
e Re
cycl
ed W
ater
Sto
rage
Pon
d N
o. 5
pr
ojec
t (Pr
ojec
t) in
clud
es th
e co
nstr
uctio
n of
an
addi
tiona
l sto
rage
pon
d (c
apac
ity o
f ap
prox
imat
ely
335
acre
-feet
with
a
surf
ace
area
of a
ppro
xim
atel
y 25
acr
es),
two
24-in
ch d
iam
eter
pip
elin
es, p
avin
g th
e ex
istin
g ac
cess
road
alo
ng E
lm S
tree
t, lin
ing
the
exist
ing
Pond
No.
4, a
nd
cons
truc
ting
acce
ss ra
mps
with
tu
rnar
ound
s in
Pond
s No.
1, 2
and
3.
The
proj
ect a
lso in
clud
es tw
o bo
x cu
lver
ts to
ac
com
mod
ate
the
acce
ss ro
ads.
Seas
onal
wet
land
s an
d un
nam
ed
trib
utar
ies t
o M
urrie
ta C
reek
. Sa
nta
Mar
garit
a hy
drol
ogic
uni
t, M
urrie
ta h
ydro
logi
c ar
ea.
(P) 0
.09
acre
of
wet
land
s and
0.0
1 ac
re o
f str
eam
bed
(T
) 0.0
4 ac
re o
f st
ream
bed.
Esta
blish
men
t of 0
.27
acre
of w
etla
nd a
nd 0
.03
acre
of n
on-w
etla
nd
wat
ers o
f the
U.S
.
12C-
028
O
rder
for T
echn
ical
ly-
Cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B
GWDR
Ord
er N
o. 2
003-
017
DWQ
8/13
/201
2 Pu
blic
Wor
ks
Depa
rtm
ent C
ity
of P
oway
City
of P
oway
Co
ncre
te F
lood
Co
ntro
l Cha
nnel
M
aint
enan
ce a
nd
Clea
ning
This
amen
dmen
t ext
ende
d th
e te
rm o
f th
e Ce
rtifi
catio
n an
add
ition
al fi
ve y
ears
. Th
e Ce
rtifi
catio
n co
vers
ann
ual
mai
nten
ance
of c
oncr
ete
drai
nage
ch
anne
ls in
the
City
of P
oway
to re
mov
e se
dim
ent,
wee
ds, t
rash
, and
deb
ris
(con
cret
e ch
anne
ls on
ly; n
o na
tura
l ch
anne
ls).
Ratt
lesn
ake
Cree
k N
o ch
ange
s to
impa
cts
No
chan
ges t
o m
itiga
tion
07C-
068
Am
endm
ent
O
rder
for L
ow Im
pact
Ce
rtifi
catio
n
8/15
/201
2 SA
NDA
G
Cont
rol P
oint
(CP)
Sa
n O
nofr
e to
CP
Pulg
as D
oubl
e Tr
ack
Proj
ect
The
Cont
rol P
oint
(CP)
San
Ono
fre
to C
P Pu
lgas
Dou
ble
Trac
k Pr
ojec
t (Pr
ojec
t)
incl
udes
the
cons
truc
tion
of a
seco
nd
mai
nlin
e ra
ilroa
d tr
ack
adja
cent
to a
n ex
istin
g sin
gle
mai
nlin
e ra
ilroa
d tr
ack
alon
g ap
prox
imat
ely
4.3
mile
s of t
he L
os
Ange
les-
San
Dieg
o-Sa
n Lu
is O
bisp
o (L
OSS
AN) r
ail c
orrid
or in
nor
ther
n Sa
n Di
ego
Coun
ty.
Eigh
t (8)
unn
amed
ep
hem
eral
tr
ibut
arie
s to
the
Paci
fic O
cean
. Sa
n Ju
an h
ydro
logi
c un
it, S
an O
nofr
e hy
drol
ogic
are
a.
(P):
0.05
0-ac
re o
f no
n-w
etla
nd
wat
ers o
f the
U
nite
d St
ates
an
d/or
Sta
te
Esta
blish
men
t of
0.07
ac
re o
f non
-wet
land
w
ater
s of t
he U
nite
d St
ates
and
/or S
tate
12C-
018
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B GW
DR
Ord
er N
o. 2
003-
017
DWQ
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 18
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
8/15
/201
2 U
CSD
UCS
D Cl
inic
al a
nd
Tran
slatio
n Re
sear
ch
Inst
itute
This
proj
ect c
onsis
ts o
f con
stru
ctio
n of
an
appr
oxim
atel
y 36
0,00
0-gr
oss-
squa
re-fo
ot
rese
arch
bui
ldin
g, e
xpan
sion
of th
e ex
istin
g Ea
st C
ampu
s Util
ity P
lant
, ro
adw
ay im
prov
emen
ts a
long
Med
ical
Dr
ive
Nor
th a
long
the
proj
ect's
fron
tage
, ut
ility
con
nect
ions
, veh
icul
ar a
nd
pede
stria
n ci
rcul
atio
n im
prov
emen
ts,
cons
truc
tion
of tw
o pe
dest
rian
brid
ges,
as
soci
ated
land
scap
ing,
and
2 te
mpo
rary
ro
ad h
auls.
Unn
amed
tr
ibut
arie
s to
Rose
Cr
eek
(P) 0
.22
acre
of
wet
land
wat
ers o
f th
e U
.S. a
nd/o
r St
ate
Enha
ncem
ent o
f 1.
25
acre
s of w
ater
s of t
he
Uni
ted
Stat
es a
nd/o
r St
ate
11C-
082
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
En
rollm
ent i
n SW
RCB
GWDR
O
rder
No.
200
3-01
7 DW
Q
8/16
/201
2 Ci
ty o
f San
Die
go,
Engi
neer
ing
&
Capi
tal
Proj
ects
Div
ision
Via
Espr
illo
Emer
genc
y St
orm
Dr
ain
Repl
acem
ent
Proj
ect
The
proj
ect i
nvol
ves t
he e
mer
genc
y re
pair
of tw
o ex
istin
g st
orm
dra
in p
ipel
ines
and
ou
tfal
ls, a
nd a
s suc
h, im
pact
s ass
ocia
ted
with
con
stru
ctio
n ar
e te
mpo
rary
in
natu
re. W
ork
to re
pair
the
stor
m d
rain
an
d ad
jace
nt sl
ope
invo
lves
the
repl
acem
ent o
f cor
ruga
ted
met
al p
ipe
stor
m d
rain
with
rein
forc
ed c
oncr
ete
pipe
. The
pro
ject
also
incl
udes
inst
alla
tion
of e
ight
con
cret
e cu
toff
wal
ls, fo
ur
clea
nout
s, a
nd tw
o en
ergy
diss
ipat
ers.
Th
e pr
ojec
t are
a w
ill b
e re
vege
tate
d w
ith
an a
ppro
pria
te h
ydro
seed
mix
and
jute
m
attin
g.
High
ly d
istur
bed
head
wat
ers o
f an
unna
med
SE-
NW
ep
hem
eral
dr
aina
ge
that
disc
harg
es in
to
the
reac
h of
the
San
Dieg
uito
Riv
er th
at
occu
rs d
owns
trea
m
of
the
Lake
Hod
ges
dam
.
(P):
0.00
07 a
cre
of
stre
ambe
d Re
stor
atio
n of
0.0
20
acre
of s
trea
mbe
d 12
C-05
5
Tim
e Ex
pire
d
8/20
/201
2 N
aval
Bas
e Sa
n Di
ego
Pier
7 C
oncr
ete
Repa
irs
The
purp
ose
of th
e pr
ojec
t is t
o co
nduc
t ab
ove
deck
con
cret
e re
pairs
, und
er d
eck
conc
rete
repa
irs, p
ile re
pairs
, and
rub
strip
repl
acem
ent.
San
Dieg
o Ba
y N
one
Non
e Pr
opos
ed
12C-
044
Ti
me
Expi
red
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 19
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
8/21
/201
2 Sa
n Di
ego
Coun
ty
Regi
onal
Ai
rpor
t Aut
horit
y
Nor
th S
ide
Inte
rior
Road
way
Sys
tem
and
St
orm
Dra
in F
orce
M
ain
Out
fall
The
proj
ect c
onsis
ts o
f con
stru
ctio
n of
a
36 in
ch d
iam
eter
rein
forc
ed c
oncr
ete
pipe
st
orm
dra
in o
utfa
ll st
ruct
ure,
incl
udin
g a
10-fo
ot lo
ng b
affle
/ene
rgy
diss
ipat
er th
at
redu
ces t
he fl
ow v
eloc
ity, b
eyon
d w
hich
th
e flo
w w
ould
des
cend
alo
ng a
con
cret
e ch
anne
l tha
t is s
lope
d be
twee
n th
e m
ean
high
er w
ater
leve
l and
the
mea
n lo
wer
w
ater
leve
l with
in th
e N
avy
Boat
Cha
nnel
.
San
Dieg
o Ba
y (T
): 0.
013
acre
of
San
Dieg
o Ba
y N
one
Prop
osed
12
C-05
0
Tim
e Ex
pire
d
8/22
/201
2 Tr
ansp
orta
tion
Corr
idor
Age
ncie
s (T
CA)
FTC-
Nor
th (S
R 24
1)
Sout
hbou
nd
Wid
enin
g
The
prop
osed
pro
ject
will
impr
ove
capa
city
alo
ng th
e m
ost T
rans
port
atio
n Co
rrid
or-N
orth
) Tol
l Roa
d by
add
ing
one
gene
ral-p
urpo
se la
ne in
the
sout
hbou
nd
of S
anta
Mar
garit
a Pa
rkw
ay to
nor
th o
f th
e Ba
ke P
arkw
ay d
irect
ion
just
sout
h of
Sa
nta
Mar
garit
a Pa
rkw
ay to
nor
th o
f the
Ba
ke P
arkw
ay o
f San
ta M
arga
rita
Park
way
to
nor
th o
f the
Bak
e Pa
rkw
ay
unde
rcro
ssin
g. T
his i
nclu
des w
iden
ing
of
the
nort
hbou
nd a
nd so
uthb
ound
Upp
er
Oso
Res
ervo
ir Br
idge
and
the
Aliso
Cre
ek
Brid
ge a
nd c
onst
ruct
ion
of li
mite
d pa
vem
ent w
iden
ing
in th
e no
rthb
ound
di
rect
ion
betw
een
thes
e tw
o br
idge
s.
Aliso
Cre
ek
(P):
0.01
acr
e of
st
ream
bed
Non
e Pr
opos
ed
12C-
047
Ti
me
Expi
red
8/31
/201
2 W
ashi
ngto
n Ho
ldin
gs, L
LC
Mon
arch
Bea
ch
Man
agem
ent P
lan:
Sa
lt Cr
eek
Pilo
t Pr
ojec
t
This
amen
dmen
t allo
ws f
or th
e co
nstr
uctio
n of
a te
mpo
rary
‘san
d br
idge
’ at
the
base
of t
he v
ehic
le a
cces
s ram
p so
em
erge
ncy
vehi
cles
can
cro
ss to
the
beac
h w
hen
wat
er is
poo
led
at th
e ba
se
of th
e ra
mp.
The
orig
inal
pro
ject
is to
re
esta
blish
a w
estw
ard
flow
pat
h at
the
mou
th o
f Sal
t Cre
ek b
y co
nstr
uctin
g an
d m
aint
aini
ng te
mpo
rary
sand
ber
ms a
nd a
Mon
arch
Bea
ch a
nd
Coas
tal P
acifi
c O
cean
in D
ana
Poin
t
(T):
An a
dditi
onal
0.
01 a
cre
of b
each
N
one
Prop
osed
11
C-03
8
Am
endm
ent
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B GW
DR
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 20
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
shal
low
cha
nnel
to d
irect
cre
ek fl
ow
acro
ss th
e be
ach
from
the
outle
t st
ruct
ure
to th
e oc
ean.
Ord
er N
o. 2
003-
017
DWQ
9/10
/201
2 M
arin
e Co
rps B
ase
Cam
p Pe
ndle
ton
Red
Beac
h O
pera
tions
Acc
ess
Poin
ts (P
-159
)
The
Prop
osed
Act
ion
wou
ld w
iden
the
I-5
unde
rcro
ssin
g an
d im
prov
e an
d w
iden
th
e ap
proa
ch ro
ad b
etw
een
the
NC
TD
railr
oad
track
s an
d th
e I-5
. Wid
enin
g th
e I-5
und
ercr
ossi
ng w
ould
con
sist
of
clea
ring
the
soil
mat
eria
l and
con
cret
e fo
unda
tion
in fr
ont (
sout
h) o
f the
exi
stin
g ab
utm
ent a
nd in
stal
ling
a tie
d ba
ck
reta
inin
g w
all s
yste
m.
A tr
ibut
ary
to L
as
Flor
es C
reek
, the
Cr
eek
itsel
f and
Ri
paria
n ha
bita
t
(P):
0.06
4 ac
re o
f w
etla
nd a
nd 0
.013
ac
re o
f str
eam
bed
(T
): 0.
116
acre
of
wet
land
Rest
orat
ion
of 0
.154
ac
re o
f rip
aria
n w
etla
nd
12C-
049
Ti
me
Expi
red
9/13
/201
2 Sa
n Di
ego
Gas &
El
ectr
ic
(SD&
GE)
eTS#
2103
9 - G
as
Line
301
0 So
uth
Retr
ofit
- Sip
hon
Tee
Rem
oval
at M
aria
n Be
ar P
ark
Retr
ofitt
ing
is re
quire
d to
acc
omm
odat
e th
e pi
pelin
e in
tegr
ity te
stin
g ap
para
tus o
r "s
mar
t pig
" th
at w
ill b
e la
unch
ed th
roug
h th
e pi
pelin
e to
test
for p
ipe
anom
alie
s.
Retr
ofit
activ
ities
will
incl
ude
repl
acin
g M
ain
Line
Val
ves (
MLV
) tha
t are
too
smal
l fo
r the
smar
t pig
to p
ass t
hrou
gh.
San
Clem
ente
Ca
nyon
(T
): 0.
39 a
cre
of
wet
land
N
one
Prop
osed
12
C-04
5
Tim
e Ex
pire
d
9/18
/201
2 Ci
ty o
f Esc
ondi
do
Bent
on B
urn
Ash
Site
The
pro
ject
wou
ld c
onsis
t of c
onso
lidat
ing
was
te a
nd c
appi
ng th
e su
rfac
e w
ith a
n en
gine
ered
soil
cove
r. Th
e pr
imar
y ob
ject
ives
of t
he p
roje
ct a
re to
im
plem
ent r
emed
ial a
ctio
n in
ord
er to
m
eet t
he S
tate
Min
imum
Sta
ndar
ds fo
r fo
rmer
land
fill s
ites t
o co
mpl
y w
ith C
CR
Title
27
and
to re
duce
the
pote
ntia
l for
hu
man
exp
osur
e an
d he
alth
risk
rela
ted
to b
urn
ash-
cont
aini
ng w
aste
.
Trib
utar
y to
San
M
arco
s Cre
ek
(P):
0.06
acr
e of
un
vege
tate
d st
ream
bed
Non
e Pr
opos
ed
11C-
119
Ti
me
Expi
red
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 21
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
9/21
/201
2 Th
e Ch
apar
ral
Land
s Co
nser
vanc
y
Carm
el M
ount
ain
Vern
al P
ool
Rest
orat
ion
Proj
ect
The
proj
ect w
ill re
stor
e fiv
e ac
res o
f de
grad
ed v
erna
l poo
l wet
land
s and
ne
arby
wat
ersh
eds,
con
stru
ct v
erna
l poo
l in
terp
retiv
e bo
ardw
alk
pier
, and
inst
all
appr
oxim
atel
y 1,
000f
t. of
pro
tect
ive
fenc
ing
and
signs
.
Unn
amed
ver
nal
pool
s (P
): 0.
13 a
cre
of
wet
land
s Es
tabl
ishm
ent o
f 0.3
094
acre
of v
erna
l poo
ls an
d re
stor
atio
n of
.354
8 ac
re
of v
erna
l poo
ls
12C-
065
Enro
llmen
t in
Stat
e W
ater
Re
sour
ces C
ontr
ol B
oard
Ge
nera
l Wat
er Q
ualit
y Ce
rtifi
catio
n fo
r Sm
all
Habi
tat R
esto
ratio
n Pr
ojec
ts
9/21
/201
2 SA
NDA
G
Sorr
ento
Mira
mar
Do
uble
Tra
ck –
Ph
ase
I
The
San
Dieg
o As
soci
atio
n of
Go
vern
men
ts (S
ANDA
G) h
as p
ropo
sed
to
cons
truc
t a se
cond
railr
oad
trac
k pa
ralle
l to
an
exist
ing
trac
k to
redu
ce tr
ain
traf
fic.
The
prop
osed
pro
ject
are
a is
loca
ted
mos
tly p
aral
lel t
o an
d ov
er S
oled
ad V
alle
y Cr
eek,
par
alle
l and
sout
h-w
est o
f So
rren
to V
alle
y Ro
ad, s
tart
s at t
he
Sorr
ento
Val
ley
Coas
ter S
tatio
n, a
nd e
nds
at c
onflu
ence
of C
arro
ll Ca
nyon
and
So
leda
d Ca
nyon
Cre
eks (
appr
oxim
ate
½
mile
eas
t of I
-805
).
Sole
dad
Valle
y Cr
eek
(T):
An a
dditi
onal
0.
001
acre
of w
ater
of
the
U.S
./St
ate
Addi
tiona
l Est
ablis
hmen
t of
0.0
02 a
cre
of ri
paria
n ha
bita
t
10C-
088
Am
endm
ent
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B GW
DR
Ord
er N
o. 2
003-
017
DWQ
9/26
/201
2 Ci
ty o
f San
Juan
Ca
pist
rano
Su
n Ra
nch
Drai
nage
Im
prov
emen
ts
Proj
ect
The
prop
osed
pro
ject
will
con
sists
of
inst
allin
g ap
prox
imat
ely
1,50
0 lin
ear f
eet
of b
urie
d 48
-inch
dia
met
er re
info
rced
co
ncre
te p
ipe
(RCP
) sto
rm d
rain
pip
elin
e al
ong
a na
tura
l dra
inag
e co
urse
. The
pr
opos
ed p
ipel
ine
will
acc
omm
odat
e pe
ak st
orm
wat
er fl
ows.
Unn
amed
trib
utar
y to
San
Juan
Cre
ek
(P):
0.49
acr
e of
w
etla
nd a
nd 0
.02
acre
of s
trea
mbe
d
Res
tora
tion
of 0
.70
acre
of
nat
ive
wet
land
and
rip
aria
n ha
bita
t
12C-
013
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B
GWDR
Ord
er N
o. 2
003-
017
DWQ
Atta
chm
ent B
6
CL
EA
N W
AT
ER
AC
T S
EC
TIO
N 4
01 W
AT
ER
QU
AL
ITY
CE
RT
IFIC
AT
ION
AC
TIO
NS
FOR
TH
E P
ER
IOD
OF
JUL
Y 1
, 201
2 TH
RO
UG
H S
EPT
EMB
ER
30,
201
2
- 22
-
DAT
E A
PPLI
CA
NT
PRO
JEC
T TI
TLE
PRO
JEC
T D
ESC
RIP
TIO
N
WAT
ERB
OD
Y IM
PAC
T
(Acr
es)1
MIT
IGAT
ION
(A
cres
)1 C
ERTI
FIC
ATIO
N
AC
TIO
N2
9/28
/201
2 In
tegr
al
Com
mun
ities
Pa
lom
ar S
tatio
n Sm
art G
row
th
Inte
gral
Com
mun
ities
pro
pose
s a m
ixed
us
e de
velo
pmen
t site
com
prise
d of
370
re
siden
tial c
ondo
min
ium
uni
ts a
nd 4
9,00
0 sq
uare
feet
of c
omm
erci
al re
tail
use
whi
ch in
clud
es 5
,000
squa
re fe
et o
f re
stau
rant
s. T
he P
roje
ct in
clud
es 7
0,00
0 sq
uare
feet
of o
pen
spac
e th
at is
in
tegr
ated
th
roug
hout
the
Proj
ect.
San
Mar
cos C
reek
(P
): 1.
92 a
cres
of
wat
ers o
f the
U
.S./
Stat
e an
d 0.
008
acre
of v
erna
l po
ol h
abita
t
Esta
blish
men
t of 2
.00
acre
s of r
ipar
ian
scru
b,
Enha
ncem
ent o
f 0.5
9 ac
re o
f cism
onta
ne a
lkal
i m
arsh
hab
itat,
Pres
erva
tion
of 4
.91
acre
s of e
xist
ing
wet
land
s , E
stab
lishm
ent
of 0
.03
acre
of v
erna
l po
ols,
and
enh
ance
men
t of
4.8
acr
es o
f ver
nal
pool
s
11C-
015
O
rder
for T
echn
ical
ly-
cond
ition
ed C
ertif
icat
ion
Enro
llmen
t in
SWRC
B GW
DR
Ord
er N
o. 2
003-
017
DWQ
9/30
/201
2 U
.S. G
ener
al
Serv
ices
Ad
min
istra
tion
San
Ysid
ro L
and
Port
of
Ent
ry
Impr
ovem
ents
Pr
ojec
t
The
prop
osed
pro
ject
requ
estin
g au
thor
izatio
n en
tails
a si
ngle
pha
se o
f the
th
ree
phas
ed re
conf
igur
atio
n an
d ex
pans
ion
of th
e ex
istin
g La
nd P
ort o
f En
try
(LPO
E) to
impr
ove
oper
atio
nal
effic
ienc
y, se
curit
y, a
nd sa
fety
for c
ross
-bo
rder
trav
eler
s and
fede
ral a
genc
ies a
t th
e Sa
n Ys
idro
LPO
E.
An e
phem
eral
co
ncre
te c
hann
el,
whi
ch fo
rms a
hy
drol
ogic
al
conn
ectio
n w
ith th
e Ti
juan
a Ri
ver
(P) 0
.02
acre
of
stre
ambe
d (T
) 0.2
9 ac
re o
f st
ream
bed
Non
e Pr
opos
ed
12C-
057
Ti
me
Expi
red
1.
W
etla
nd re
fers
to v
eget
ated
wat
ers
of th
e U
nite
d S
tate
s an
d st
ream
bed
refe
rs to
unv
eget
ated
wat
ers
of th
e U
nite
d St
ates
(P) =
per
man
ent
impa
cts.
(T) =
tem
pora
ry im
pact
s.
2.
Low
impa
ct c
ertif
icat
ion
is is
sued
to p
roje
cts
that
hav
e m
inim
al p
oten
tial t
o ad
vers
ely
impa
ct w
ater
qua
lity.
Con
ditio
nal c
ertif
icat
ion
is is
sued
to
proj
ects
that
hav
e th
e po
tent
ial t
o ad
vers
ely
impa
ct w
ater
qua
lity,
but
by
com
plyi
ng w
ith te
chni
cal c
ondi
tions
, will
have
min
imal
impa
cts.
D
enia
ls a
re is
sued
whe
n th
e pr
ojec
t will
adve
rsel
y im
pact
wat
er q
ualit
y an
d su
itabl
e m
itiga
tion
mea
sure
s ar
e no
t pro
pose
d or
pos
sibl
e. T
ime
Expi
red
refe
rs to
pro
ject
s th
at m
ay p
roce
ed d
ue to
the
lack
of a
n ac
tion
by th
e Sa
n D
iego
Wat
er B
oard
with
in s
peci
fied
regu
lato
ry ti
mel
ines
. W
ithdr
awn
refe
rs to
pro
ject
s th
at th
e ap
plic
ant o
r San
Die
go W
ater
Boa
rd h
ave
with
draw
n du
e to
pro
cedu
ral i
ssue
s th
at h
ave
not b
een
corr
ecte
d w
ithin
one
yea
r.
i
Technical Report 0727 Forty Years after the Clean Water Act: A Retrospective Look at the Southern California Coastal Ocean K. Setty, K. Schiff and S. Weisberg, eds.
Southern California Coastal Water Research Project, Costa Mesa, CA
EXECUTIVE SUMMARY The ocean is a cornerstone of southern California’s environment, culture, and economy. Its complex ecosystem features a unique diversity of plants, invertebrates, fish, birds, and marine mammals. Southern California is also home to 21 million people, and its coastal waters serve as a repository for the pollutants produced by human activities. As local and national attitudes changed and concerns about natural resource protection grew through the 1960s, the resulting flurry of environmental legislative activity included passage of the federal Clean Water Act (CWA) in 1972. Since the CWA became law 40 years ago, tremendous effort has been devoted to managing and monitoring waste discharges and regional conditions in the southern California's coastal ocean. Even so, there has not been an integrated assessment of how ocean conditions have changed over that time period. This report summarizes a collaborative effort to assess historical data, the current status, and ongoing challenges to the integrity of the region’s marine environment. By addressing several critical questions about the core CWA goals, it intends both to synthesize knowledge of the early environmental pioneers and to guide those who follow in their footsteps. How Have Pollutant Inputs Changed? Pollutant inputs from wastewater treatment plants and industrial facilities have declined markedly over the last 40 years, in large part because these "end-of-pipe" facilities were a primary target of the CWA. Inputs of targeted toxic substances from these sources have decreased more than 95%, despite a doubling in southern California's coastal population. Widely dispersed and much harder to control, pollutant inputs from overland runoff have not seen similar reductions. Controlling pollutants in runoff is now a focal point for water quality management, but more time and additional monitoring are needed to determine the success of these efforts. Is It Safe to Swim? Recreational water quality has greatly improved over the last 40 years. This has resulted primarily from improvements in wastewater treatment, relocation of treated wastewater discharges further from shore, and diversion of runoff during dry weather. Visual evidence of sewage, commonplace prior to the CWA, is now rare. Water quality monitoring is frequent and indicates 95% of southern California beaches are safe for swimming during the summer. Recent beach advisories are almost exclusively associated with flowing storm drains or accidental sewage spills. Is It Safe to Eat Fish? Contaminant levels in fish tissue have declined as pollutant inputs have decreased. High levels of contaminants such as DDT (a pesticide) and PCBs (a group of industrial chemicals) in fish tissue are now observed mostly in hotspot areas where large quantities of those pollutants were once discharged. In contrast, moderate levels of mercury, which has more diffuse and difficult to manage sources, are still observed in fish throughout southern California coastal waters. As a result, fish consumption advisories
ii
due to mercury, particularly for children and women of childbearing age, can be found along large sections of the Los Angeles and Orange County coastlines. Is the Ecosystem Protected? By several measures, the health of southern California coastal ocean ecosystems has improved substantially over the last 40 years. Communities of bottom-dwelling invertebrates living near wastewater outfalls, once severely degraded, have rebounded. Fish communities in these areas have also shown improvement. In addition, fish diseases common in the early 1970s are no longer observed. California brown pelican and bald eagle populations, once endangered by DDT effects, show signs of recovery. Other ecosystem indicators, such as the extent of giant kelp forests and population size of some fish species, remain impacted. These trends are likely related to a combination of factors including habitat loss, natural climatic cycles, and overfishing. What Were the Costs and Benefits? Although no formal economic analysis has been performed to calculate total costs and benefits on a regional scale, both financial investments and economic benefits associated with southern California's coastal ocean are substantial. For example, ocean-dependent activities in California generate an estimated $22 billion annually, over half of which comes from tourism and recreation; however, it is unclear how much of that revenue is linked to water quality improvements. Although it is difficult to estimate total investments in ocean water quality improvement, large wastewater treatment plants in southern California currently spend as much as $600 million annually. In addition, county flood control agencies spend roughly $100 to $350 million each year managing runoff. A thorough cost-benefit analysis is recommended to inform future management directions. What Are the Future Challenges? Future water quality management efforts are faced with both technical and financial challenges. While end-of-pipe treatment methods were highly successful in the first 40 years following passage of the CWA, new contaminants, subtle toxicological effects, ocean acidification, pollution-related harmful algal blooms, marine debris, atmospheric deposition, and other emerging issues require novel technology and creative management approaches. Meanwhile, capacity to address both new and lingering issues continues to be constrained by decreased federal funding. Continued cooperation among dischargers, regulators, scientists, and others will be essential to understanding and addressing water quality problems over the next 40 years. Full Text http://ftp.sccwrp.org/pub/download/DOCUMENTS/TechnicalReports/727_CWA.pdf