    FLOW SHEET OF SEWAGE TREATMENT PLANT

    MBR pre Collection tankInflow

    Sludge digester

    Bar Screen Equalization Recycle

    Filter Press

    Final water tank ChlorinationDual Media Filter

    (PSF & ACF)

  • 8/22/2019 Calculation STP MBR 50KLD

    2/13

    SPECIFICATION FOR 50 KLD STP (Membrane Bio Reactor System)

    Details of STP units

    It is proposed to install STP of capacity 50,000 litres/day. Following is the

    scheme for treating 50,000 Litres/day capacity sewage. The treated water can be

    utilized for gardening, etc. Various treatment units which have been envisaged in

    this sewage treatment plant are explained below.

    Characteristics considered:

    Flow : 50KL/day

    PH : 6 - 8

    TSS : 600 mg/l

    BOD : 350 mg/l

    COD : 600 mg/l

    Oil & Grease : 50 to 75 mg / Ltr.

    No. of Hrs. operation: 24

    1. Bar Screen

    2. Collection Sump cum Equalization unit

    3. Raw Sewage Pump

    4. Membrane Bio Reactor system

    5. Sludge Recycling Pump

    6. Sludge collection tank7. Sludge Dewatering

    8. Pre collection tank

    9. Filter feed pump

    10. Pressure sand filter

    11. Activated carbon filter

    2

  • 8/22/2019 Calculation STP MBR 50KLD

    3/13

    12. Chlorine Doser

    13. Final Collection Tank

    14. Treated water transfer pump

    15. Blower Capacity

    16. Inter Plant Piping

    17. Electrical

    1. Bar Screen

    * Size of the Unit : 0.5m x 0.5m x 2.4m long

    * Function : To separate coarse matter

    from the raw sewage.

    2. Equalization tank

    * Size of the unit : 2.4m x 3.5m x 3.5m SWD

    * Volume of the Tank : 25m3* Detention time available : 12 Hr.s during Average flow

    * Function : Equalizing the flow dampen

    the possible variation in the

    characteristics of the sewage and

    also to reduce initial organic load.

    3. RAW SEWAGE PUMP

    The equalised and neutralised waste together with return sludge shall be

    pumped at a uniform rate of 5.0 Cu.m / Hr. into the Membrane bio-reactor

    tank.

    *Quantity : 2 no. (1w + 1s)

    *Duty : To transfer Raw effluent from Equalisation tank to

    Membrane Bio Reactor Tank

    *Type : Vertical submersible pump.

    3

  • 8/22/2019 Calculation STP MBR 50KLD

    4/13

    *Motor : TEFC Motor with IP-55 protection and suitable for

    400 / 440 V, 50 HZ A/c supply of Kirloskar.

    *Material : CI Body and impeller in Bronze.

    *Accessories : Air cock with priming funnel, Flexible Coupling with

    guard, Base frame, foundation bolts etc.

    *Flow rate : 5.0 Cu.m / hr

    *Head : 15 mtr

    *Solids : 35 mm maximum

    *Temperature: Ambient

    4. Membrane Bio Reactor tank

    * Flow : 50 m3 / day or 2.0833 m3/Hr

    * F/M : 0.08

    * MLSS : 13,000 mg/ Litre

    * MOC : RCC

    (i) Calculation of volume of the tank:

    BOD X Flow rate

    Volume = --------------------------------

    F/M X MLSS

    Assume F/M = 0.08 & MLSS = 13,000 mg/l

    350 x 50

    * Therefore Volume of the Tank required: -----------------=16.83m3 say 17m3

    0.08 x 13,000

    Assume SWD to be 3.0m

    Therefore plan area required = 17/3.0 m = 5.66 m2 say 5.7m2

    * Size of Aeration Tank required = 2.387m x 2.387 m x 3.0m SWD

    4

  • 8/22/2019 Calculation STP MBR 50KLD

    5/13

    (ii) Calculation of total organic load :

    * Average BOD of sewage at the inlet of Aeration tank neglecting BOD

    Reduction with pre-aeration: 350 mg/lit

    * Total organic load with 10% BOD reduction considered.

    : 315mg/lit.

    315 x Flow rate

    Organic load : ----------------------

    1000

    * Total organic load in the system : 315 X 50/1000 = 15.75 Kgs/day.

    * Total oxygen required assuming that

    2 Kgs of O2 /Kg of BOD Removed : 2 X 15.75 = 31.5 Kg/day

    (iii) Calculation of diffuser required:

    Assume alpha = 0.6 & =0.7

    Consider oxygen transfer at 3.0 SWD depth = 0.15%

    Density of Air: 1.2 Kg/m3

    Percentage of Oxygen in Atmospheric air 2331.5

    Actual Air required for pre aeration : ------------------------------------

    1.2x0.23x0.6x0.7x0.15x20

    Assuming duration of air supply as 20 hours per day

    Air required = 90.579 m3/hr

    (iv) Calculation of diffuser required:

    Consideration 10 m3/hour diffusion of air through the diffuser 1 /m length.

    Number of diffusers required = 90.579 /10

    = 9.0579 or Say 9 diffusers.

    5

  • 8/22/2019 Calculation STP MBR 50KLD

    6/13

    * Type of aeration = Membrane fine pore

    diffused aeration system.

    * Function = to aerate the contents of the

    MBR tank and to sustain the

    biological activity so as to reduce

    the organic load.

    * Size of the unit : 2.387m x 2.387 m x 3.0m SWD

    2.387m x 2.387 m x 3.5m

    (Actual Size)

    * Volume of the Tank : 19.94m3* Detention time available : 9.57 Hr.s during Average flow

    * Function : to aerate and filter the sewage

    through the membrane hollow fibre modules

    and hold the contents of the MBR tank and to

    sustain the biological activity so as to reduce

    the organic load.

    Hollow-fibre modules used are characteristically 4 inch (10cm) in diameter and 6

    (1.83 m) feet long. Hollow-fibre units are almost always run with the feed streamon the outside of the fibre. Water passes through the membrane into the inside or

    "lumen" of the fibre. A number of hollow-fibres are collected together and "potted"

    in an epoxy resin at both ends and installed into an outer shell. The equivalent

    hollow-fibre module filled with fibres of 100-mm diameter X 5 No.s in each set

    (total 3 sets); with 0.08m Gap between each will provide an approximately 3000

    m2 X 3 of membranearea.

    5. SLUDGE RECYCLE PUMP

    * Volume of Sludge : 17.5 m3/Day

    * Discharge rate : 2 m3/Hr @ 8-10m head

    (25 mm pipe dia)

    6

  • 8/22/2019 Calculation STP MBR 50KLD

    7/13

    * Function : To re-circulate the return

    Sludge to MBR tank to

    maintain the required MLSS

    & transfer excess sludge to

    filter press.

    The wastewater after biological treatment still contains some solids,

    colour, odour and harmful micro-organisms. The pressure sand filter and

    activated carbon filter are used to remove the solids and colour. The disinfection

    process is used to remove the micro-organisms and odour.

    6. SLUDGE HOLDING TANK

    Flow x BOD

    Bio-sludge produced /day : ------------------------------

    Sludge concentration

    50 x 350

    = ------------------------------

    10,000

    = 1.75 cum/day @ 1.0% concentration

    20% of the sludge to be wasted

    Excess sludge to be wasted : 0.35 m3/day @ 1%

    Volume of sludge holding tank : 2 m3

    Size of the tank : 0.9 m x 0.9 m x 2.5 m SWD

    7. SLUDGE DEWATERING

    Flow x BOD

    Bio-sludge produced /day : ------------------------------

    Sludge concentration

    50 x 350

    = ------------------------------

    10,000

    7

  • 8/22/2019 Calculation STP MBR 50KLD

    8/13

    = 1.75 cum/day @ 1.0% concentration

    20% of the sludge to be wasted

    Excess sludge to be wasted : 0.35 m3/day @ 1%

    Total sludge to be dewatered : 350 Lts/day @ 1%

    Filter press of size 14 x 14 x 8 chambers provided.

    Filter press feed pump provided = 2 m3/hr @ 6.0 Kilogram/Sq.Cms (KSC)

    8. TREATED SEWAGE COLLECTION / PREFILTRATION TANK

    * Size of the unit : 3.0m x 3.0m x 3.0m SWD* Volume of the unit : 27 m3

    * Detention time available : 13 hours

    * Function : To collect & store the settled

    supernatant / treated sewage from

    the tank.

    9. FILTER FEED PUMP 2 Nos. (1W + 1 SB)

    * Pumping Rate : 6 m3/hr

    * Pumping Head : 23-25m

    * Function : To pump the output water of MBR tank

    through Pressure sand & carbon

    filters.

    * Type : Horizontal centrifugal non-clog Self

    priming, open impeller pumps of

    Kirloskar, Beacon make.

    * Motor : TEFC Motor, with IP-55 protection and

    suitable for 400 / 440 V, 50 HZ A/c

    supply of Kirloskar make.

    * Material : CI Body and impeller in Bronze

    8

  • 8/22/2019 Calculation STP MBR 50KLD

    9/13

    * Accessories : Air cock with priming funnel, Flexible

    Coupling with guard, Base frame,

    foundation bolts etc.

    10. PRESSURE SAND FILTER

    Vertical down flow type with graded gravel with polystyrenes strainers.

    * Diameter : 600 dia

    * Depth of media : 600 mm

    * Test Pressure : 5 Kg. / Sq.cm

    * Velocity of filtration : 8 cum / Sq. m / Hr.

    * Flow rate : 6.0 Cu.m / hr

    * Quantity : 1 no

    * Duration of pumping considered : 8.2 hr / day

    * Make : Ion exchange or equivalent

    * Material : Shall made out of 6 mm thick MS plate and

    dish end made out of 8 mm thick end plate

    whole unit shall be given 2 Coats for internal

    and external with epoxy/enamel-based paint

    over a coat of epoxy based primer.* Under drain : Perforated bottom plate with plastic

    strainers or central headers and laterals.

    * Media : Graded River sand and Gravel

    * Flow direction : Down flow.

    11. CARBON FILTER

    Vertical down flow type with graded gravel with polystyrenes strainers.

    * Diameter : 600 dia

    * Depth of media : As per requirements

    * Test Pressure : 5 Kg. / Sq.cm

    * Velocity of filtration : 8 cum / Sq. m / Hr.

    9

  • 8/22/2019 Calculation STP MBR 50KLD

    10/13

    * Flow rate : 6.0 Cu.m / hr

    * Quantity : 1 no

    * Duration of pumping considered : 8.2 hr / day

    * Make : Ion exchange or equivalent

    * Material : Shall made out of 6 mm thick MS plate and

    dish end made out of 8 mm thick plate, whole

    unit shall be given 2 Coats for internal and

    external with epoxy / enamel - based paint over

    a coat of epoxy based primer.

    * Under drain : Perforated bottom plate with plastic

    strainers or central headers and laterals.

    * Media : Ionized Activated carbon with Gravel support

    * Flow direction : Down flow.

    12. CHLORINE DOSER

    In order to disinfect the treated effluent various disinfection methods like

    chlorination, ozonation, etc can be used. However chlorination is proved to be

    cheaper and relatively effective. Hence the same system is adopted. The

    Chlorine can be administered in the form of liquid or solid (bleaching powder) into

    the treated effluent channel. An automatic electronic metering system can be

    adopted. The chlorine demand is calculated based on the break point

    chlorination and to allow residual chlorine of more than 1 mg/l in the treated

    effluent.

    * Quantity : 1 no.

    * Make : Asia LMI / Ion exchange

    * Flow : 0 4 Litres / Hour

    * Material : FRP

    * Accessories : Foot valve with strainer, Electronic diaphragm typemetering Pump

    10

  • 8/22/2019 Calculation STP MBR 50KLD

    11/13

    Detention time = 30 minutes

    Volume required = 17.5 X (0.5/24) = 0.365m3

    Provide chlorine contact tank of size, Length= 1.0 m & width of the tank= 0.456m

    and depth of 1.0m (1m including a free board of 0.2 m)

    * Total flow : 17.5 m3/day

    * Duration of pumping considered : 24 hr / day

    * Pumping rate : 0.729 m3/hr

    13. TREATED WATER SUMP

    * Stone of the unit : 4.16 m x 4.16 m x 3.0m SWD

    4.16 m x 4.16 m x 3.5m (Actual Size)

    * Volume of the unit : 52 m3

    * Detention time available : 25 Hours

    * Function : To collect & store the final

    treated (after disinfection) water

    to pump to either garden or

    toilet flushing.

    14. TREATED WATER TRANSFER PUMP

    * Volume of Treated water : 50 m3/day

    * Discharge rate : 10.0 m3/Hr @ 10-12m head

    (50mm pipe dia)

    * Function : To pump the treated water from

    the treated water collection sump

    to Garden and also to toilet

    flushing over head tank.

    15. BLOWER CAPACITY :

    Blower capacity required : 76 x 1.25

    (For MBR tank) = 95 m3/hr (4.5% extra)

    11

  • 8/22/2019 Calculation STP MBR 50KLD

    12/13

    Blower capacity required : 60.5 x 1.25

    (For equalization + Sludge Holding Tank + Treated Water tank) = 75.625m3/hr.

    Note: The capacity of twin lobe roots air blower suitable to discharge about

    85m3/hr @ 0.5 KSC 2 Nos. (1W + 1SB) is provided for MBR. The common

    blower of twin lobe roots air blower suitable to discharge about 68m3/hr @ 0.5

    KSC 2 Nos. (1W + 1SB) is provided for supply of the air required for other

    primary, intermittent & final storage units of the treatment plant (Equalisation

    Tank, Pre-filtration & Filtered Water tank+ Sludge Holding Tank).

    16. INTER PLANT PIPING

    Provide PVC pipes of 4-6 Kilogram/sq.cm.s pressure rating including necessary

    specials like tees, bends, elbows, flanges etc.

    17. ELECTRICALS:

    Provide & install motor control centre with necessary cabling, earthing etc.

    complete.

    CIVIL STRUCTURE WITH DIMENSION

    Sl.

    No.

    Civil Structure Dimension Units

    1. Bar Screen 0.5m x 0.5m x 2.4m long 1

    2. Equalization tank 2.4m x 3.5m x 3.5m SWD 1

    3. MBR Tank 2.387m x 2.387 m x 3.0m SWD 1

    4. Sludge holding tank 0.9 m x 0.9 m x 2.5 m SWD

    5. Prefilteration tank 3.0m x 3.0m x 3.0m SWD 1

    6. Pressure sand D =0.6m, Ht= 0.6m 1

    7. Carbon filter D =0.6m, Ht= 0.6m 1

    8. Treated Water tank 4.16m x 4.16m x 3.5m 1

    9. Filter press 14x14x7 1

    18. Characteristics of treated effluent

    12

  • 8/22/2019 Calculation STP MBR 50KLD

    13/13

    As the design includes tertiary treatment units also, the treated sewage

    characteristics will be well within the standards prescribed by Karnataka State

    Pollution Control Board specified norms for sewage as follows.

    BOD(5 day 200 C) < 10 mg/l

    Turbidity < 2 NTU

    pH = 6.5 to 7.5

    E-coli = Absent

    Residual chlorine > Min 1 or >1, but