Waterfront Substation
October 29, 2015
I Pepco Holdinqs Inc
Project Update
2
I Pepco Holdings Inc
Waterfront Substation
Impacted d St<eets
-"' . G-, .. l- )
"O C
N
QStSW
nc
S St SW ..... VI ..... ~ Buzzard Pt ~ Substation
W;
Waterfront Substation
• Project Phase Progress
• Phase 1: Regulatory authorization and zoning
• BZA approval received in March 2015 and DC PSC
approval in April 2015
• Phase 2: Substation site preparation
• Environmental assessment finished and demolition
will complete in early November 2015
• Phase 3: Design & construction of the substation,
transmission and distribution lines
• Detail engineering and permitting is underway
• Distribution construction beginning Nov 2015
• Transmission construction beginning Dec 2015
• Substation construction beginning Jan 2016
3
I Pepco Holdinqs Inc
Waterfront Substation Project Schedule
Prepare Waterfront Site for Construction June – November 2015
Award EPC Contract; Perform Detail Engineering July 2015 – July 2016
Obtain Building Permit January 2016
Construct Substation Building January 2016 – April 2017
Install Electrical Equipment August 2016 – April 2017
Initial Transfer of Electrical Load May 2017 – June 2017
4
I Pepco Holdinqs Inc
Demolition Update
5
I Pepco Holdings Inc
Demolition Update
• Pepco contractor Northstar
performed demolition of
existing Lyon Bakery and ANA
towing office buildings
• Demolition phase is nearing
completion
6
I Pepco Holdings Inc
Demolition – Measures & Controls
• Water spraying mounted hose and nozzles for dust suppression
• Continuous humidity/moisture content in the construction debris
• Prevention of dust from becoming airborne
• Portable water tanks cover smaller blanket of airborne dust areas without blowing any water or dust laden mist outside the property limits
Construction vehicles cleaned prior
to departing construction site
7
Pepco Holdings nc
Demolition – Vector Control & Abatement
• Northstar placed ten bait stations around the perimeter of the site prior to demolition
• Department of Health bureau of community hygiene and rodent control division inspected the site on July 28th 2015 and issued clearance certification
• The contractor also hired Critter Control (Rodent Control company) as secondary measures
• Bait stations inspections reveal no evidence of rodents
• Northstar has requested follow up DOH site inspection post demolition
8
I Pepco Holdings Inc
Demolition – Site Controls
• Installation of Stabilized Construction Entrance, silt fence and super silt fence
as part of the Erosion and Sediment control measures
• Construction debris and Asbestos containing building material segregated,
covered and hauled off site for disposal
9
I Pepco Holdinqs Inc
Substation Engineering & Construction Update
10
I Pepco Holdings Inc
Waterfront Substation Construction
January 2016 - April 2017
• 60% detail design complete
• Pepco will install up to 20,000 sf of PV Panels on the roof of the substation for station service
11
I Pepco Holdings Inc
About ABB USA
• ABB USA is a world leader in power
technology
• ABB is working with Pepco to enhance
Pepco’s transmission network in
Washington DC – improving reliability and
efficiency with this advanced substation
12
About Coakley & Williams Construction, Inc.
Founded in 1961
CREBA Recently Ranked Us Best Contractor
Award Winning Technology Services
Sustainable Construction
215 Industry Awards
Strong, Local Relationships
2
13
2
About Coakley & Williams Construction, Inc.
14
I Pepco Holdings Inc
i t:i ~ (J)
0 z N
PEPCO WATERFRONT SUBSTATION #223
Waterfront
Substation
Landscape
15
SlR((T mr
IIMNO)
1• 1''• 1" -r- •. -+- 6'
l PLA~T!NG AIIEA Sl()(WAI.IC TREE 10Nr ,. ..•. '
APPROX -LOCATIOt~
OFPOW£R u~u
"-NCilt CAOltUGttr
11· s·
lRSTP.Ul.SW
' \
.J
f)I (l(C llM
' Ul"4WArtP.LINt. U. 4' GAS I.IN( (ABNO I (X 1\"SI.NIT,U't'UNf
tlt!UC UN(
, STREETSCAPE SECTION · 1ST STREET, SW - SOUTH 0 1" 00 , 1,lfl·. 1·.o·
DIST MANtlOLF (SU UT1ll1" OAAWINGS)
PLANTING NOOk SJOl WAUC
STRUT TR((
(BEVONOt
s· .. - , . .. •· -I
\ '"5Tflll5U110N LINt I.SU UTIUfY PlAAS)
CONCR[T( l)UCT BAN• cm VTIIJTV.._.N~)
STREETSCAPE SECTION · 1ST STREET, SW · NORTH 0 1<• 001 119· • 1· o·
I Pepco Holdings Inc
APPROX l,OCAllON
0,POW(R UNO
SI..C.(E Gl06C LIGHT
lM"
I.MSJIIIHT, SW
' rx.a~wAm~w..ir
()( IS~SANITAAYUkE.
II' 8IOR(TE,,,.10N
P\ANllt.G a·, .. '
APPROX LOCATION
Of POWCR UN(S
Jl'.!,''
In STRUT.SW
' lX-EUtLINE
()C rl[C.UNf
' ()( l"WATEl\llNl
2 STREETSCAPE SECTION - 1ST STREET, SW - MIOBLOCK 014001 118"• t',O"
S[CURfT'Y FENC(
\
APPAO)( --. LOCATION or POWER
LINtS
.,. ..
CONCIIICT!' oucr flANl(S fl'YPJ j5£[ UllllTYPIANS)
• STREETSCAPE SECTION · 0 STREET, SW 0t4 001 1,r • 1'• O"
JJ' f,"
QSTRUI SW
,, ' ' \
lX. I" WAftfl LINE (X, 21" $A.~n'AA'f llNt E< 4" QA$ LINE (A81t01 £)( . 2•" SANlf.U.Y UN!
Waterfront Substation Landscape
16
.. _.;r P,1.V1~
-111tr IBffl>NDI
ft.OYo"ER~ TI!H
,OU'DNDI
Slll([T
TR(£ IIICYONOI
- ~ - 8' -+- 6' -
'
'
- lAANSMrWDNllNCS. 1su unurr PIAN~
""""°' lOCATIOff ()fl'()W(O
UNU
lndSTREET,SW
... ' U.2.I4Y-.hJTAATural: EX t2•SAJrcfTAAVU,ME cx.a•wATLllUNI
0. •J• SANllu." UNC £X EUCTlllCU"-£
STREETSCAPE SECTION· 2ND STREET, SW· NORTH
ii • I
OMOQZ 118' • 1'·0"
! """'°' I
lOCAnON or POwfA
"""
n• ,~
- 9'·.J~ 10
PR[{AST PloV(llS
.....
MfM,IM 'ff"-rn 811ClllACK
"'" t8CVONOt 14'
P.:,U~rrr. SW [)( [LCC.UN(
TIW,SMISSIC>N Ui;fS iSHU'f11WfPI.AN1)
I ,.
I [lC.Jt•~ITAII.VUN( tll J"C,ASLIN(
, STREETSCAPE SECTION· R STREET, SW · WEST 0 14001 111' • 1'·0"
I Pepco Holdings Inc
~ APPfK>)I, ~
! UXATION
orPQWc11
i UNB '
I MCDIUMS'TIIEIT l~H ltlfVOND)
rLOW(rtlNG Sl"KiUGLOM T"1£ UGHT
(IE'f'ONDI ,s·r ....
IIAl'ito PlANTlll
- 10 ·· - ---:,. T] M
SIO[WAL( 110.C U111UT.1W CX (t£C,U.N(
""'' " I ' \'AULl TIIANSMoSSIONLINfS EX. ll"SAN lAScV UN[
I (\H UIH,H\' PLAN$~ IX 1"0.UUN~
, STREETSCAPE SECTION • R STREET, SW · WEST 0 14002 , •••• 1'·0"
'
1ndSTRE.ET S.W
' fX CO¥M.l1Nl
' ut 2l"SNtl1AA¥U,.,_t. EX Jl"'S,,tJt1T4RYU~E cx.rwAtutUNr
ot CZ'"SAkrTNIT IJ..HE U ELKTRICLNE
STREETSCAPE SECTION· 2ND STREET. SW· SOUTH 014 0Q2 111"'•1'·0'
24'1' PR[CA!.TPA'/[RS
[I m,o, ~,~ J~~~
llN[S .....
I ~~~'~'?°''" c-~ I ~;:;-
4,.,.ux,
.. - • TR[( .. ,
--1
• STREETSCAPE SECTION • R STREET, SW • EAST 01•00:l ,..-. 1·.o·
lllitkm,!.w
' (X.[l{C.L,H(
' Cx. ll"SAM'TMV UN[ ltl'G.ASI.IN(
rMHs~,s~HUNf. C!.E£Ulllll'fPV.Nli)
Waterfront Substation Landscape
17
I Pepco Holdings Inc
Waterfront Substation Landscape Plant Palette
18
I Pepco Holdinqs Inc
Transmission Engineering & Construction Update
19
I Pepco Holdings Inc
Overall Underground Transmission and Distribution
Map on slide 20 was removed
from the original presentation
for publication on website
• Underground Transmission (Under
Construction)
• Underground Transmission Lines Phase 1
• Underground Transmission Lines Phase 2
• Future Ductbank on New Bridge
• Underground Distribution Lines
20
I Pepco Holdinqs Inc
Underground Transmission Lines
138kV Underground Lines
between Buzzard Point
Substation and Waterfront
Map on slide 21 was removed from
the original presentation for
publication on website
Substation.
Construction:
December 2015 March 2017
Ductbank for future
Underground Transmission
Feeders
Construction:
March 2016 July 2017
21
I Pepco Holdinqs Inc
Underground Transmission Installation Video www.pepco.com/Underground-Construction.aspx
22
I Pepco Holdinqs Inc
Distribution Engineering & Construction Update
23
I Pepco Holdinqs Inc
Distribution Conduit Phase 1: November 2015 - April 2016
Map on slide 24 was removed from the
original presentation for publication on
website
24
·-~
Traffic Control
25
I Pepco Holdings Inc
Potential Yard Disturbance
Map on slide 26
was removed from
the original
presentation for
publication on
website
26
I Pepco Holdinqs Inc
Distribution Conduit Phase 2: 2017 and beyond
Map on slide 27 was removed from the
original presentation for publication on
website
27
I Pepco Holdinqs Inc
Questions