Waterfront Substation

October 29, 2015

Page 2: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Project Update

2

Page 3: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Waterfront Substation

Impacted d St<eets

-"' . G-, .. l- )

"O C

N

QStSW

nc

S St SW ..... VI ..... ~ Buzzard Pt ~ Substation

W;

Waterfront Substation

• Project Phase Progress

• Phase 1: Regulatory authorization and zoning

• BZA approval received in March 2015 and DC PSC

approval in April 2015

• Phase 2: Substation site preparation

• Environmental assessment finished and demolition

will complete in early November 2015

• Phase 3: Design & construction of the substation,

transmission and distribution lines

• Detail engineering and permitting is underway

• Distribution construction beginning Nov 2015

• Transmission construction beginning Dec 2015

• Substation construction beginning Jan 2016

3

Page 4: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Waterfront Substation Project Schedule

Prepare Waterfront Site for Construction June – November 2015

Award EPC Contract; Perform Detail Engineering July 2015 – July 2016

Obtain Building Permit January 2016

Construct Substation Building January 2016 – April 2017

Install Electrical Equipment August 2016 – April 2017

Initial Transfer of Electrical Load May 2017 – June 2017

4

Page 5: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Demolition Update

5

Page 6: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Demolition Update

• Pepco contractor Northstar

performed demolition of

existing Lyon Bakery and ANA

towing office buildings

• Demolition phase is nearing

completion

6

Page 7: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Demolition – Measures & Controls

• Water spraying mounted hose and nozzles for dust suppression

• Continuous humidity/moisture content in the construction debris

• Prevention of dust from becoming airborne

• Portable water tanks cover smaller blanket of airborne dust areas without blowing any water or dust laden mist outside the property limits

Construction vehicles cleaned prior

to departing construction site

7

Page 8: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

Pepco Holdings nc

Demolition – Vector Control & Abatement

• Northstar placed ten bait stations around the perimeter of the site prior to demolition

• Department of Health bureau of community hygiene and rodent control division inspected the site on July 28th 2015 and issued clearance certification

• The contractor also hired Critter Control (Rodent Control company) as secondary measures

• Bait stations inspections reveal no evidence of rodents

• Northstar has requested follow up DOH site inspection post demolition

8

Page 9: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Demolition – Site Controls

• Installation of Stabilized Construction Entrance, silt fence and super silt fence

as part of the Erosion and Sediment control measures

• Construction debris and Asbestos containing building material segregated,

covered and hauled off site for disposal

9

Page 10: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Substation Engineering & Construction Update

10

Page 11: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Waterfront Substation Construction

January 2016 - April 2017

• 60% detail design complete

• Pepco will install up to 20,000 sf of PV Panels on the roof of the substation for station service

11

Page 12: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

About ABB USA

• ABB USA is a world leader in power

technology

• ABB is working with Pepco to enhance

Pepco’s transmission network in

Washington DC – improving reliability and

efficiency with this advanced substation

12

Page 13: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

About Coakley & Williams Construction, Inc.

Founded in 1961

CREBA Recently Ranked Us Best Contractor

Award Winning Technology Services

Sustainable Construction

215 Industry Awards

Strong, Local Relationships

2

13

Page 14: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

2

About Coakley & Williams Construction, Inc.

14

Page 15: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

i t:i ~ (J)

0 z N

PEPCO WATERFRONT SUBSTATION #223

Waterfront

Substation

Landscape

15

Page 16: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

SlR((T mr

IIMNO)

1• 1''• 1" -r- •. -+- 6'

l PLA~T!NG AIIEA Sl()(WAI.IC TREE 10Nr ,. ..•. '

APPROX -LOCATIOt~

OFPOW£R u~u

"-NCilt CAOltUGttr

11· s·

lRSTP.Ul.SW

' \

.J

f)I (l(C llM

' Ul"4WArtP.LINt. U. 4' GAS I.IN( (ABNO I (X 1\"SI.NIT,U't'UNf

tlt!UC UN(

, STREETSCAPE SECTION · 1ST STREET, SW - SOUTH 0 1" 00 , 1,lfl·. 1·.o·

DIST MANtlOLF (SU UT1ll1" OAAWINGS)

PLANTING NOOk SJOl WAUC

STRUT TR((

(BEVONOt

s· .. - , . .. •· -I

\ '"5Tflll5U110N LINt I.SU UTIUfY PlAAS)

CONCR[T( l)UCT BAN• cm VTIIJTV.._.N~)

STREETSCAPE SECTION · 1ST STREET, SW · NORTH 0 1<• 001 119· • 1· o·

I Pepco Holdings Inc

APPROX l,OCAllON

0,POW(R UNO

SI..C.(E Gl06C LIGHT

lM"

I.MSJIIIHT, SW

' rx.a~wAm~w..ir

()( IS~SANITAAYUkE.

II' 8IOR(TE,,,.10N

P\ANllt.G a·, .. '

APPROX LOCATION

Of POWCR UN(S

Jl'.!,''

In STRUT.SW

' lX-EUtLINE

()C rl[C.UNf

' ()( l"WATEl\llNl

2 STREETSCAPE SECTION - 1ST STREET, SW - MIOBLOCK 014001 118"• t',O"

S[CURfT'Y FENC(

\

APPAO)( --. LOCATION or POWER

LINtS

.,. ..

CONCIIICT!' oucr flANl(S fl'YPJ j5£[ UllllTYPIANS)

• STREETSCAPE SECTION · 0 STREET, SW 0t4 001 1,r • 1'• O"

JJ' f,"

QSTRUI SW

,, ' ' \

lX. I" WAftfl LINE (X, 21" $A.~n'AA'f llNt E< 4" QA$ LINE (A81t01 £)( . 2•" SANlf.U.Y UN!

Waterfront Substation Landscape

16

Page 17: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

.. _.;r P,1.V1~

-111tr IBffl>NDI

ft.OYo"ER~ TI!H

,OU'DNDI

Slll([T

TR(£ IIICYONOI

- ~ - 8' -+- 6' -

'

'

- lAANSMrWDNllNCS. 1su unurr PIAN~

""""°' lOCATIOff ()fl'()W(O

UNU

lndSTREET,SW

... ' U.2.I4Y-.hJTAATural: EX t2•SAJrcfTAAVU,ME cx.a•wATLllUNI

0. •J• SANllu." UNC £X EUCTlllCU"-£

STREETSCAPE SECTION· 2ND STREET, SW· NORTH

ii • I

OMOQZ 118' • 1'·0"

! """'°' I

lOCAnON or POwfA

"""

n• ,~

- 9'·.J~ 10

PR[{AST PloV(llS

.....

MfM,IM 'ff"-rn 811ClllACK

"'" t8CVONOt 14'

P.:,U~rrr. SW [)( [LCC.UN(

TIW,SMISSIC>N Ui;fS iSHU'f11WfPI.AN1)

I ,.

I [lC.Jt•~ITAII.VUN( tll J"C,ASLIN(

, STREETSCAPE SECTION· R STREET, SW · WEST 0 14001 111' • 1'·0"

I Pepco Holdings Inc

~ APPfK>)I, ~

! UXATION

orPQWc11

i UNB '

I MCDIUMS'TIIEIT l~H ltlfVOND)

rLOW(rtlNG Sl"KiUGLOM T"1£ UGHT

(IE'f'ONDI ,s·r ....

IIAl'ito PlANTlll

- 10 ·· - ---:,. T] M

SIO[WAL( 110.C U111UT.1W CX (t£C,U.N(

""'' " I ' \'AULl TIIANSMoSSIONLINfS EX. ll"SAN lAScV UN[

I (\H UIH,H\' PLAN$~ IX 1"0.UUN~

, STREETSCAPE SECTION • R STREET, SW · WEST 0 14002 , •••• 1'·0"

'

1ndSTRE.ET S.W

' fX CO¥M.l1Nl

' ut 2l"SNtl1AA¥U,.,_t. EX Jl"'S,,tJt1T4RYU~E cx.rwAtutUNr

ot CZ'"SAkrTNIT IJ..HE U ELKTRICLNE

STREETSCAPE SECTION· 2ND STREET. SW· SOUTH 014 0Q2 111"'•1'·0'

24'1' PR[CA!.TPA'/[RS

[I m,o, ~,~ J~~~

llN[S .....

I ~~~'~'?°''" c-~ I ~;:;-

4,.,.ux,

.. - • TR[( .. ,

--1

• STREETSCAPE SECTION • R STREET, SW • EAST 01•00:l ,..-. 1·.o·

lllitkm,!.w

' (X.[l{C.L,H(

' Cx. ll"SAM'TMV UN[ ltl'G.ASI.IN(

rMHs~,s~HUNf. C!.E£Ulllll'fPV.Nli)

Waterfront Substation Landscape

17

Page 18: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Waterfront Substation Landscape Plant Palette

18

Page 19: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Transmission Engineering & Construction Update

19

Page 20: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Overall Underground Transmission and Distribution

Map on slide 20 was removed

from the original presentation

for publication on website

• Underground Transmission (Under

Construction)

• Underground Transmission Lines Phase 1

• Underground Transmission Lines Phase 2

• Future Ductbank on New Bridge

• Underground Distribution Lines

20

Page 21: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Underground Transmission Lines

138kV Underground Lines

between Buzzard Point

Substation and Waterfront

Map on slide 21 was removed from

the original presentation for

publication on website

Substation.

Construction:

December 2015 March 2017

Ductbank for future

Underground Transmission

Feeders

Construction:

March 2016 July 2017

21

Page 22: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Underground Transmission Installation Video www.pepco.com/Underground-Construction.aspx

22

Page 23: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Distribution Engineering & Construction Update

23

Page 24: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Distribution Conduit Phase 1: November 2015 - April 2016

Map on slide 24 was removed from the

original presentation for publication on

website

24

Page 25: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

·­-~

Traffic Control

25

Page 26: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdings Inc

Potential Yard Disturbance

Map on slide 26

was removed from

the original

presentation for

publication on

website

26

Page 27: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Distribution Conduit Phase 2: 2017 and beyond

Map on slide 27 was removed from the

original presentation for publication on

website

27

Page 28: CAG Presentation Draft 10.29 Final Public - Pepco · CAG Presentation Draft 10.29 Final Public Author: Andrukaitis , Robert J Created Date: 1/14/2016 6:19:24 PM

I Pepco Holdinqs Inc

Questions

28