  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    1/13

    Texas Clean Energy Project

    RECS Birmingham, ALJune 2013

    1

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    2/13

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    3/13

    3

    TCEPOverview

    An integrated gasification combined cycle (IGCC) fertilizer and power plantsited in West Texass Permian Basin

    Relies completely on technologies and components already proven incommercial operation

    Will integrate proven gasification and carbon capture technologies to achieve acarbon capture rate of 90%

    Will achieve state-of-the-art reduction in conventional pollutants such as Hg,NOx, SOx and particulate matter

    The Project utilizes every component of the coal and atmospheric air runthrough the plant to create revenues

    The Department of Energy granted TCEP a total of $450 million as acompetitive cash award

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    4/13

    WhatMakesaProject

    Financeable

    4

    Project Finance:

    Non-recourse debt financing of thedevelopment, construction or operation ofa project where such debt is:(i) typically of a substantial tenor;(ii) fully amortized over the life of thecontract (loan tenor may be shorter thancontract

    tenor); and(iii) secured by a 1st lien priority on allproject assets.

    Contractual Risk Mitigation- Revenue-

    Expenses- ConstructionOther Risk Mitigation

    - Proven Technologies- Minimized Regulatory Risk

    - (e.g., permits)- Cashflow Certainty

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    5/13

    55

    TexasCleanEnergy

    Project

    Coal 1.8mmtpy Coal Gasification and

    Gas Cleanup

    Water

    PRB Coal via RailroadHigh Hydrogen Power

    Turbine

    2/3 ofSyngas

    1/3 ofSyngas

    Coal, Steam andOxygen Input. MainOutputs are Syngas

    (Hydrogen and CarbonMonoxide) and Pure

    CO2

    1/6 ofCO2

    5/6 ofCO2

    Ammonia / UreaComplex

    CO2 Delivered to OilFields via Pipeline

    195 MW lowcarbon power

    delivered to Cityof San Antonio

    710,000 tons/yrdelivered to CHS

    Inc.

    2.5mm tons peryear delivered toOil Companies

    Brackish Water Purifiedvia Reverse Osmosis

    OxygenAir Separation Unit

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    6/13

    6

    Siemens Gasifiers (SFG-500)basic design from 1984

    Source: Summit Power Group

    Air Separation UnitCarl von Linde 1895, 2,800 since

    Source: Linde

    Linde RECTISOL CO2 Unitdates from 1955

    Source: Linde

    Ammonia-Casale Haber NH3 Processdates from 1913

    Source: Linde

    Old Technology;Blue Chip Suppliers

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    7/13

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    8/13

    8

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    9/13

    CCSinthe

    PermianBasinCO2demandoutstripssupply

    4yearsofconnuousoperaonswithoutincident

    NewCO2demand=37MT/Yr,51fields

    EconomicallyviableCO2demand=116MT/Yr,139fields

    3,milesofCO2/EORpipelinenetwork

    Naturalsourcesareindecline CO2ispricedas%ofWTI

    Project location at center ofpipeline system

    9

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    10/13

    US/China

    CollaboraGon NegoangEPCagreementwithSinopecEngineeringGroupforChemicalBlockEPC

    GatewayforChinaEXIMtoprovide1%oflongtermprojectdebt

    Sinopecalsoexpectedtoprovideequity SiemensremainsasthePowerBlockEPCcontractor LindeandSiemensremainasoperators

    10

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    11/13

    1111

    TCEPStatus

    June2013Siteacquired&permiNng RecordofDecisionfromUSDOEon9/29/1(completesNEPA/EISprocess) Airpermitissued12/28/1(nogreenhousegasemissionslimits)

    FEEDstudyWaterrightsOakeagreements

    1%ofpowersoldtoCPSEnergyfor25years 1%ofCO2soldfor3years(threedifferentbuyers;marketverystrong) 1%ofureasoldtoCHS(BlueChipFerlizer/chemicalcompany)

    Engineering,Procurement&ConstrucGoncontracts Twocontractsworktogethertoensureintegrated,complete,highperformanceplant lump-sum,fixed-price,turnkey

    O&Magreement Provides15-yearwarranesforprojectperformance,reliability,availabilityandpolluon

    control

    JointventurefullplantoperaonsbyLindeandSiemens

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    12/13

    Hold Working Interest in large greenfield Permian CO2-EORfield

    Working on several early stage project developments Gasification (XCEP) Natural Gas Post Combustion Capture

    Partnerships with earlier stage next-gen technologies Further direct partnerships with oil producers

    OtherSummitCCS

    AcGviGes

    12

  • 7/28/2019 C. Tynan - Texas Clean Energy Project (TCEP)

    13/13

    Contact

    InformaGonChrisTynanDirector,ProjectFinance

    SummitPowerGroup,LLC

    (312)[email protected]