2019 RHCCC PresentationBy: Joshua Nelson, City of Industry City Engineer

Page 2: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Industry Business Center

Page 3: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Industry Business Center

Page 4: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Industry Business Center

Page 5: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Industry Business Center

Page 6: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Pomona (60) Freeway On

and Off Ramps

Page 7: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

57/60

• $256 Million Project

• $35 Million Contributed by the City of Industry

• Phase II B completed in Fall of 2018

• The project is relieving one of the worst bottlenecks in the West Coast

Page 8: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

$37.5 Billion

Eases congestion for the estimated $37.5 billion worth of

goods that move through the corridor from the Ports.

5,148 Jobs

Generated approximately 5,148 jobs.

725,000 Hours

Phases I and II will save truckers and commuters 725,000 hours per year.

5,050 tons

Reduced congestion from Phase I and II will save

5,050 tons of CO2 emissions per year.

2019 RHCCC Presentation

Page 9: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Lemon Ave

On/Off Ramp

Page 10: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

2019 RHCCC Presentation

Industry Business Center

Lemon Ave

On/Off Ramp

Page 11: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Fairway Drive Grade Separation

• Four-lane roadway underpass• Four-track railroad bridge• Construction 35% Complete• Recently completed 10-week

work on Fairway Dr./ Walnut Dr. N intersection

• Anticipated completion: Spring 2022

2019 RHCCC Presentation

Page 12: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Fairway Drive Grade Separation

• Four-lane roadway underpass• Four-track railroad bridge• Construction 35% Complete• Recently completed 10-week

work on Fairway Dr./ Walnut Dr. N intersection

• Anticipated completion: Spring 2022

2019 RHCCC Presentation

Page 13: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Fullerton Road Grade Separation

• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on

September 19 (next week)• Anticipated Completion Early

2022

2019 RHCCC Presentation

Page 14: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Fullerton Road Grade Separation

• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on

September 19 (next week)• Anticipated Completion Early

2022

2019 RHCCC Presentation

Page 15: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Fullerton Road Grade Separation

• Four-track Railroad Bridge• Two-lane Roadway Bridge• Pedestrian Bridge• Six-lane Depressed Roadway• Construction Completion 30%• Closing Half of Gale on

September 19 (next week)• Anticipated Completion Early

2022

2019 RHCCC Presentation

Page 16: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Turnbull Canyon Road Grade Separation

• Separates Roadway from UPRR tracks

• Grading is from Salt Lake Ave. to Clark Ave.

• Currently at 65% design phase

2019 RHCCC Presentation

Page 17: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Capital Improvement Projects

Arenth Avenue Reconstruction, Anaheim-Puente Road to Phillips Drive Business Parkway Reconstruction San Jose Avenue Reconstruction Walnut Drive South, Storm Drain Improvements and Street Widening City Wide Sign Replacement City Wide Street Light Purchase Don Julian Road and Sixth Avenue Traffic Signal Valley Boulevard from Old Valley Boulevard to Azusa Avenue ADA Transition plan Nelson Avenue and Sunset Avenue Traffic Signal and Intersection Improvements Azusa Avenue Bridge Painting

2019 RHCCC Presentation

Page 18: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Expo Center and Industry Hills

Trail Lighting, Trail Grading and Exercise Equipment

Grand Arena Parking Lot Improvements & Pavilion Parking Expansion

Grand Arena Painting

Avalon Room and Patio Café

2019 RHCCC Presentation

Page 19: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

El Encanto Convalescent Hospital

Completed Projects: Roof Repair Parking Lot Lighting Vault Repair

Future Projects: Carpet Moulding and Wall Coverings Licensure Change for Sub-Acute Dialysis Center

2019 RHCCC Presentation

Page 20: By: Joshua Nelson, City of Industry City Engineerhhia.net/wp-content/uploads/RHCCC-Presentation-2019_9-9... · 2019-09-15 · 2019 RHCCC Presentation Industry Business Center 57/60

Annual Slurry Seal Annual Pavement Rehab Albatross Rd Almahurst Street Canada Court Capitol Avenue Castleton Street Chestnut Street El Encanto Road Faure Avenue Garcia Lane Hatcher Avenue Keystone Street Parriott Place Radecki Court Stoner Creek Road Walnut Hall Road

Old Ranch Road Green Drive Currier Road Mayo Avenue Crossroads

Parkway South Canal Place

Benton Court Castleton Street Hanover Road Kaplan Avenue Loukelton Street Nelson Avenue Newquist Place Salt Lake Avenue Hurley Street John Reed Court Evergreen Place Long Lane Willow Avenue Orange Avenue California Avenue

2019 RHCCC Presentation