Weighted Average Item Price Report By Item, Region and Quarter US Customary Contracts Let July 1, 2014 to June 30, 2015 Engineering Division Design Quality Assurance Bureau New York State Department of Transportation

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Weighted Average Item Price Report

    By Item, Region and Quarter

    US Customary Contracts Let July 1, 2014 to June 30, 2015

    Engineering Division Design Quality Assurance Bureau

    New York State Department of Transportation

  • INTRODUCTION The Weighted Average Item Price Report (WAIPR) is a standard report produced using NYSDOT’s Trns*Port BAMS/DSS. It is a numerical listing of all items used in Department contracts that have been let within the time period indicated on the report. The report shows quarterly statistics for each item in each Region, as well as overall averages and totals for each item. Included in the report are the number of contract occurrences, total quantity, total dollars, weighted average awarded price, and weighted average price for the low three bidders. The WAIPR is prepared in March and September of each year by the Office of Engineering, Design Quality Assurance Bureau. The March report includes contracts let between January 1 and December 31 of the previous year. The September report includes contracts let between July 1 and June 30. An ADOBE ACROBAT document version of the WAIPR is available for download on the NYSDOT Internet Web Page. GENERAL INFORMATION Lump sum items, fixed price items and contracts with less than 3 bidders are excluded from the report. The weighted average prices are calculated as total dollars awarded divided by total quantity used. For statistics dealing with the low three bidders, the Bid positions are calculated from the contract bid totals, and the three unit bid prices are simply averaged to produce a single 'Low three bidders' value. Questions regarding the WAIPR should be directed to Arvind K. Salgam, Design Quality Assurance Bureau (518)-457-9773.

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 1 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / ACRE ------- -------- 201.07 01 2015Q2 1 3.00 $5,241 $1,747.03 $2,582.34 02 2014Q3 1 1.00 $4,000 $4,000.00 $14,666.67 03 2014Q4 1 1.00 $1,000 $1,000.00 $4,000.00 05 2014Q3 1 2.00 $17,000 $8,500.00 $8,500.00 09 2014Q4 1 1.00 $15,000 $15,000.00 $10,666.67 10 2014Q4 1 1.00 $20,000 $20,000.00 $14,833.33 11 2014Q3 1 4.00 $120,000 $30,000.00 $25,333.33 2014Q4 1 1.00 $50,000 $50,000.00 $50,000.00 2015Q2 1 5.00 $25,000 $5,000.00 $11,500.00 --------- ------------ --------------- ---------- ---------- 9 19.00 $257,241 $13,539.00 $14,618.26 ---------------------------------------------------------------------------------------------------------------------------------- CLEARING AND GRUBBING / SY 201.07000004 03 2015Q1 1 250.00 $1,300 $5.20 $7.40 04 2015Q1 1 200.00 $1,000 $5.00 $12.50 2015Q2 2 200.00 $2,000 $10.00 $13.33 05 2014Q4 1 3,861.00 $11,583 $3.00 $2.17 2015Q1 1 1,558.00 $7,790 $5.00 $2.34 11 2015Q1 1 336.00 $8,400 $25.00 $31.45 --------- ------------ --------------- ---------- ---------- 7 6,405.00 $32,073 $5.01 $4.62 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 2 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CLEAR GRUBBING, EM/STBY, R 3 (1.1 - 3.0) / ACRE ------- -------- 201.07030063 01 2014Q3 1 2.00 $100 $50.00 $525.00 2015Q2 1 2.00 $8,000 $4,000.00 $1,520.67 07 2015Q2 1 1.00 $300 $300.00 $1,400.00 --------- ------------ --------------- ---------- ---------- 3 5.00 $8,400 $1,680.00 $1,098.27 ---------------------------------------------------------------------------------------------------------------------------------- REM DISP OF ASB SHEET PACK MAT-ABUTMENTS / SY 202.03000016 04 2015Q2 1 12.00 $8,604 $717.00 $733.50 --------- ------------ --------------- ---------- ---------- 1 12.00 $8,604 $717.00 $733.50 ---------------------------------------------------------------------------------------------------------------------------------- REMOVAL OF SUBSTRUCTURES / CY 202.19 01 2014Q3 1 612.00 $110,160 $180.00 $190.00 2014Q4 1 595.00 $83,300 $140.00 $135.00 2015Q1 3 2,778.00 $277,800 $100.00 $109.61 02 2015Q2 2 1,864.00 $142,720 $76.57 $64.74 03 2014Q4 1 199.00 $17,910 $90.00 $95.00 04 2014Q4 1 1,050.00 $68,250 $65.00 $84.33 2015Q1 1 340.00 $15,130 $44.50 $77.17 2015Q2 1 79.00 $4,819 $61.00 $79.92 05 2014Q3 2 10,486.00 $258,446 $24.65 $12.82 2014Q4 2 577.00 $42,285 $73.28 $92.98 2015Q1 2 480.00 $45,900 $95.63 $101.35 06 2014Q3 1 86.00 $8,600 $100.00 $124.00 2014Q4 2 508.00 $35,206 $69.30 $76.80 2015Q1 1 82.00 $17,220 $210.00 $220.42 07 2014Q4 1 14.00 $3,080 $220.00 $341.27 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 3 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS REMOVAL OF SUBSTRUCTURES / CY ------- -------- 202.19 07 2015Q1 2 1,562.00 $153,404 $98.21 $94.60 08 2014Q4 1 598.00 $49,634 $83.00 $169.33 2015Q1 1 88.00 $13,200 $150.00 $250.00 09 2014Q4 1 175.00 $28,700 $164.00 $119.67 2015Q1 1 500.00 $22,500 $45.00 $50.83 2015Q2 1 8.00 $24,000 $3,000.00 $1,556.67 11 2014Q4 1 38.00 $38,000 $1,000.00 $526.67 --------- ------------ --------------- ---------- ---------- 30 22,719.00 $1,460,264 $64.27 $62.54 ---------------------------------------------------------------------------------------------------------------------------------- REMOVING OLD BITUMINOUS CONCRETE OVERLAY / SY 202.20 08 2015Q2 1 1,200.00 $54,000 $45.00 $31.67 10 2014Q3 7 21,790.00 $222,000 $10.19 $13.10 2014Q4 1 5,755.00 $57,550 $10.00 $31.33 2015Q1 1 725.00 $18,125 $25.00 $38.67 2015Q2 2 14,770.00 $61,600 $4.17 $4.32 11 2014Q3 1 3,972.00 $198,600 $50.00 $33.00 --------- ------------ --------------- ---------- ---------- 13 48,212.00 $611,875 $12.69 $15.08 ---------------------------------------------------------------------------------------------------------------------------------- DEBRIS REM (UNCONTAM), HAUL WITHIN 15 MI / CY 202.25000163 11 2015Q1 1 1.00 $200 $200.00 $2,340.77 --------- ------------ --------------- ---------- ---------- 1 1.00 $200 $200.00 $2,340.77 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 4 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS DEBRIS REMOVAL FOR SPECIAL AREAS / EACH ------- -------- 202.28000110 11 2015Q1 1 5.00 $10,000 $2,000.00 $4,209.30 --------- ------------ --------------- ---------- ---------- 1 5.00 $10,000 $2,000.00 $4,209.30 ---------------------------------------------------------------------------------------------------------------------------------- REMOVING SHEETING / SF 202.82000017 05 2014Q3 1 1,360.00 $6,800 $5.00 $5.00 --------- ------------ --------------- ---------- ---------- 1 1,360.00 $6,800 $5.00 $5.00 ---------------------------------------------------------------------------------------------------------------------------------- REMOV OF EXIST 3 PILE CLUST TIMB DOLPHIN / EACH 202.83030010 11 2014Q4 1 8.00 $80,000 $10,000.00 $7,666.67 --------- ------------ --------------- ---------- ---------- 1 8.00 $80,000 $10,000.00 $7,666.67 ---------------------------------------------------------------------------------------------------------------------------------- REMOV OF EXIST 7 PILE CLUST TIMB DOLPHIN / EACH 202.83070010 11 2014Q4 1 8.00 $120,000 $15,000.00 $11,333.33 --------- ------------ --------------- ---------- ---------- 1 8.00 $120,000 $15,000.00 $11,333.33 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT REMOVAL / SY 202.97000001 01 2015Q2 1 734.00 $11,377 $15.50 $17.32 06 2015Q2 2 11,177.00 $411,430 $36.81 $33.32 11 2015Q2 1 100.00 $2,800 $28.00 $37.00 --------- ------------ --------------- ---------- ---------- 4 12,011.00 $425,607 $35.43 $32.37 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 5 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS PAVEMENT EXCAVATION / SY ------- -------- 202.99010010 10 2014Q3 1 324.00 $111,132 $343.00 $269.33 11 2014Q3 1 780.00 $84,240 $108.00 $62.67 --------- ------------ --------------- ---------- ---------- 2 1,104.00 $195,372 $176.97 $123.32 ---------------------------------------------------------------------------------------------------------------------------------- REMOVE STONE ASPH CON SIDEWALKS BIKEWAY / SY 202.99020011 09 2014Q3 1 220.00 $8,067 $36.67 $25.89 11 2015Q1 1 256.00 $38,400 $150.00 $84.33 --------- ------------ --------------- ---------- ---------- 2 476.00 $46,467 $97.62 $57.32 ---------------------------------------------------------------------------------------------------------------------------------- WETLAND RESTORATION / CY 203.01920007 01 2015Q2 1 50.00 $4,000 $80.00 $83.00 --------- ------------ --------------- ---------- ---------- 1 50.00 $4,000 $80.00 $83.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLASSIFIED EXCAVATION AND DISPOSAL / CY 203.02 01 2014Q3 2 559.00 $19,225 $34.39 $29.77 2014Q4 3 66,412.00 $935,524 $14.09 $13.74 2015Q1 4 32,925.00 $481,835 $14.63 $16.46 2015Q2 7 92,778.00 $1,022,347 $11.02 $14.06 02 2014Q3 1 1,670.00 $25,050 $15.00 $15.17 2014Q4 2 1,778.00 $31,320 $17.62 $18.76 2015Q1 5 1,343.00 $28,158 $20.97 $22.86 2015Q2 5 23,338.00 $350,727 $15.03 $16.15 03 2014Q4 6 4,167.00 $127,283 $30.55 $26.67 2015Q1 2 1,707.00 $56,860 $33.31 $134.44 2015Q2 7 27,901.00 $236,180 $8.46 $11.97 04 2014Q3 1 18,010.00 $229,628 $12.75 $13.75 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 6 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- -------- 203.02 04 2014Q4 2 6,616.00 $68,810 $10.40 $15.17 2015Q1 5 9,799.00 $99,654 $10.17 $12.98 2015Q2 8 4,811.00 $160,463 $33.35 $34.55 05 2014Q3 5 244,282.00 $3,038,498 $12.44 $34.54 2014Q4 5 20,714.00 $370,258 $17.87 $18.29 2015Q1 4 18,467.00 $391,797 $21.22 $13.60 2015Q2 4 6,132.00 $70,725 $11.53 $13.94 06 2014Q3 4 1,157.00 $27,157 $23.47 $25.78 2014Q4 5 4,292.00 $121,647 $28.34 $19.77 2015Q1 4 500.00 $19,500 $39.00 $52.65 2015Q2 7 21,997.00 $249,319 $11.33 $16.46 07 2014Q3 1 5.00 $365 $73.08 $71.03 2014Q4 1 850.00 $15,300 $18.00 $20.30 2015Q1 3 36,304.00 $430,285 $11.85 $11.37 2015Q2 1 165.00 $1,716 $10.40 $26.13 08 2014Q3 6 7,515.00 $352,350 $46.89 $52.32 2014Q4 6 22,313.00 $532,505 $23.87 $31.38 2015Q1 5 18,329.00 $525,196 $28.65 $27.00 2015Q2 5 4,786.00 $214,169 $44.75 $48.22 09 2014Q3 1 50.00 $2,017 $40.33 $55.11 2014Q4 4 3,741.00 $68,634 $18.35 $17.07 2015Q1 6 10,694.00 $191,918 $17.95 $16.03 2015Q2 3 4,162.00 $86,560 $20.80 $20.51 10 2014Q3 9 2,230.00 $171,684 $76.99 $82.63 2014Q4 5 3,502.00 $212,289 $60.62 $70.75 2015Q1 6 30,260.00 $1,060,404 $35.04 $43.83 2015Q2 4 832.00 $63,915 $76.82 $65.35 11 2014Q3 2 740.00 $81,400 $110.00 $93.02 2014Q4 3 3,917.00 $528,070 $134.81 $106.49 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 7 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- -------- 203.02 11 2015Q1 2 503.00 $54,500 $108.35 $101.65 2015Q2 2 3,002.00 $120,190 $40.04 $50.62 --------- ------------ --------------- ---------- ---------- 173 765,255.00 $12,875,431 $16.83 $25.21 ---------------------------------------------------------------------------------------------------------------------------------- UNCLASSIFIED EXCAVATION AND DISPOSAL / CY 203.020000AA 01 2015Q2 1 6,460.00 $51,680 $8.00 $10.27 --------- ------------ --------------- ---------- ---------- 1 6,460.00 $51,680 $8.00 $10.27 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 1 / CY 203.02010063 01 2014Q3 1 50.00 $2,600 $52.00 $42.01 2015Q2 1 50.00 $2,250 $45.00 $46.67 07 2015Q2 1 1.00 $80 $80.00 $90.00 --------- ------------ --------------- ---------- ---------- 3 101.00 $4,930 $48.81 $44.79 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 2 / CY 203.02020063 01 2014Q3 1 375.00 $13,125 $35.00 $28.33 2015Q2 1 375.00 $13,125 $35.00 $35.67 07 2015Q2 1 101.00 $3,030 $30.00 $32.50 --------- ------------ --------------- ---------- ---------- 3 851.00 $29,280 $34.41 $32.06 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 3 / CY 203.02030063 01 2014Q3 1 651.00 $13,020 $20.00 $17.60 2015Q2 1 975.00 $24,375 $25.00 $23.33 07 2015Q2 1 656.00 $11,808 $18.00 $18.00 --------- ------------ --------------- ---------- ---------- 3 2,282.00 $49,203 $21.56 $20.16 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 8 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS ICE DRILL AND BLASTING, EM/STBY R 1 / CRWD ------- -------- 203.02950163 07 2015Q2 1 1.00 $3,000 $3,000.00 $4,000.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $3,000 $3,000.00 $4,000.00 ---------------------------------------------------------------------------------------------------------------------------------- ICE DRILL AND BLASTING, EM/STBY R 2 / CRWD 203.02950263 07 2015Q2 1 3.00 $7,500 $2,500.00 $2,500.00 --------- ------------ --------------- ---------- ---------- 1 3.00 $7,500 $2,500.00 $2,500.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 1 (0 TO 50) / LB 203.02960163 07 2015Q2 1 2.00 $200 $100.00 $175.00 --------- ------------ --------------- ---------- ---------- 1 2.00 $200 $100.00 $175.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 2 (51 TO 150) / LB 203.02960263 07 2015Q2 1 51.00 $510 $10.00 $25.00 --------- ------------ --------------- ---------- ---------- 1 51.00 $510 $10.00 $25.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 3 (151 TO 300) / LB 203.02960363 07 2015Q2 1 151.00 $76 $0.50 $10.25 --------- ------------ --------------- ---------- ---------- 1 151.00 $76 $0.50 $10.25 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT EXCAVATION / SF 203.02990006 06 2015Q2 1 28,764.00 $97,798 $3.40 $2.73 --------- ------------ --------------- ---------- ---------- 1 28,764.00 $97,798 $3.40 $2.73 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 9 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS EMBANKMENT IN PLACE / CY ------- -------- 203.03 01 2014Q3 1 1,215.00 $7,290 $6.00 $8.00 2014Q4 2 106,066.00 $1,494,110 $14.09 $13.72 2015Q1 4 18,521.00 $324,385 $17.51 $15.92 2015Q2 6 4,218.00 $40,944 $9.71 $12.34 02 2014Q3 1 550.00 $9,900 $18.00 $18.25 2014Q4 1 1,036.00 $8,806 $8.50 $12.25 2015Q1 3 6,454.00 $102,759 $15.92 $15.46 2015Q2 2 22,569.00 $279,717 $12.39 $11.38 03 2014Q4 5 2,081.00 $28,650 $13.77 $13.75 2015Q1 2 45.00 $1,148 $25.52 $40.17 2015Q2 4 14,513.00 $49,833 $3.43 $4.98 04 2014Q3 1 490.00 $3,308 $6.75 $10.25 2014Q4 1 11,746.00 $93,968 $8.00 $14.33 2015Q1 3 27,199.00 $374,964 $13.79 $12.65 2015Q2 3 161.00 $5,258 $32.66 $47.94 05 2014Q3 3 33,822.00 $419,191 $12.39 $16.17 2014Q4 4 3,560.00 $50,007 $14.05 $11.81 2015Q1 4 24,824.00 $484,883 $19.53 $11.44 2015Q2 3 4,624.00 $45,588 $9.86 $9.74 06 2014Q3 3 584.00 $6,609 $11.32 $13.17 2014Q4 2 2,399.00 $10,400 $4.34 $9.71 2015Q1 3 84.00 $3,210 $38.21 $37.13 2015Q2 2 10,581.00 $62,488 $5.91 $9.40 07 2014Q3 1 49.00 $1,919 $39.16 $38.72 2014Q4 1 158.00 $2,370 $15.00 $20.75 2015Q1 3 16,840.00 $75,801 $4.50 $7.52 2015Q2 1 325.00 $1,723 $5.30 $24.43 08 2014Q3 4 3,005.00 $137,825 $45.87 $38.03 2014Q4 3 9,973.00 $179,700 $18.02 $15.04 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 10 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS EMBANKMENT IN PLACE / CY ------- -------- 203.03 08 2015Q1 4 10,544.00 $131,259 $12.45 $17.59 2015Q2 2 567.00 $30,590 $53.95 $45.07 09 2014Q4 2 1,960.00 $47,520 $24.24 $26.37 2015Q1 5 2,904.00 $46,250 $15.93 $13.60 2015Q2 2 880.00 $10,200 $11.59 $10.72 10 2014Q3 3 50.00 $6,500 $130.00 $205.67 2014Q4 3 468.00 $13,761 $29.40 $60.79 2015Q1 4 8,016.00 $156,872 $19.57 $19.67 11 2014Q4 1 10.00 $1,000 $100.00 $95.00 2015Q1 1 155.00 $15,500 $100.00 $65.00 2015Q2 1 800.00 $32,000 $40.00 $71.00 --------- ------------ --------------- ---------- ---------- 104 354,046.00 $4,798,206 $13.55 $13.70 ---------------------------------------------------------------------------------------------------------------------------------- EMBANK IN PLACE, EM/STBY S R 1 / CY 203.03010063 01 2014Q3 1 50.00 $1,250 $25.00 $23.86 2015Q2 1 50.00 $1,250 $25.00 $25.00 07 2015Q2 1 1.00 $80 $80.00 $90.00 --------- ------------ --------------- ---------- ---------- 3 101.00 $2,580 $25.54 $25.08 ---------------------------------------------------------------------------------------------------------------------------------- EMBANK IN PLACE, EM/STBY S R 2 / CY 203.03020063 01 2014Q3 1 375.00 $5,625 $15.00 $11.17 2015Q2 1 375.00 $5,625 $15.00 $14.67 07 2015Q2 1 101.00 $1,818 $18.00 $23.00 --------- ------------ --------------- ---------- ---------- 3 851.00 $13,068 $15.36 $14.11 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 11 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS EMBANK IN PLACE, EM/STBY S R 3 / CY ------- -------- 203.03030063 01 2014Q3 1 651.00 $7,812 $12.00 $9.46 2015Q2 1 975.00 $11,700 $12.00 $11.33 07 2015Q2 1 651.00 $7,812 $12.00 $16.00 --------- ------------ --------------- ---------- ---------- 3 2,277.00 $27,324 $12.00 $12.13 ---------------------------------------------------------------------------------------------------------------------------------- EMBANK IN PLACE, EM/STBY W R 1 / CY 203.03040063 01 2014Q3 1 50.00 $1,250 $25.00 $34.45 07 2015Q2 1 1.00 $80 $80.00 $90.00 --------- ------------ --------------- ---------- ---------- 2 51.00 $1,330 $26.08 $35.54 ---------------------------------------------------------------------------------------------------------------------------------- EMBANK IN PLACE, EM/STBY W R 2 / CY 203.03050063 01 2014Q3 1 375.00 $5,625 $15.00 $21.76 07 2015Q2 1 101.00 $1,818 $18.00 $28.50 --------- ------------ --------------- ---------- ---------- 2 476.00 $7,443 $15.64 $23.19 ---------------------------------------------------------------------------------------------------------------------------------- EMBANK IN PLACE, EM/STBY W R 3 / CY 203.03060063 01 2014Q3 1 651.00 $6,510 $10.00 $18.76 07 2015Q2 1 651.00 $7,812 $12.00 $18.50 --------- ------------ --------------- ---------- ---------- 2 1,302.00 $14,322 $11.00 $18.63 ---------------------------------------------------------------------------------------------------------------------------------- EXPANDED POLYSTYRENE FILL / CF 203.03950017 05 2015Q1 1 86,365.00 $233,186 $2.70 $3.95 11 2014Q4 1 17,700.00 $123,900 $7.00 $5.05 --------- ------------ --------------- ---------- ---------- 2 104,065.00 $357,086 $3.43 $4.14 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 12 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SELECT FILL / CY ------- -------- 203.06 04 2015Q1 1 1,031.00 $53,303 $51.70 $39.23 05 2015Q1 1 24.00 $960 $40.00 $50.00 07 2015Q2 1 35.00 $1,540 $44.00 $63.00 10 2015Q1 1 30.00 $1,500 $50.00 $96.67 11 2015Q1 1 13.00 $13,000 $1,000.00 $533.90 --------- ------------ --------------- ---------- ---------- 5 1,133.00 $70,303 $62.05 $47.39 ---------------------------------------------------------------------------------------------------------------------------------- SELECT GRANULAR FILL / CY 203.07 01 2014Q3 1 77.00 $3,080 $40.00 $37.67 2014Q4 2 32.00 $2,210 $69.08 $79.69 2015Q1 2 2,709.00 $37,991 $14.02 $16.74 2015Q2 5 6,342.00 $81,586 $12.86 $34.12 02 2014Q3 1 222.00 $10,212 $46.00 $53.00 2014Q4 1 119.00 $6,545 $55.00 $53.50 2015Q1 2 190.00 $6,840 $36.00 $36.69 2015Q2 2 1,950.00 $88,508 $45.39 $43.81 03 2014Q4 3 68.00 $5,565 $81.84 $65.65 2015Q1 1 200.00 $15,130 $75.65 $46.88 2015Q2 2 1,289.00 $28,083 $21.79 $29.42 04 2014Q3 1 2,600.00 $59,800 $23.00 $35.33 2014Q4 1 101.00 $5,656 $56.00 $55.33 2015Q1 1 258.00 $6,502 $25.20 $31.40 2015Q2 3 154.00 $7,145 $46.40 $47.13 05 2014Q3 3 9,827.00 $586,092 $59.64 $58.02 2014Q4 3 646.00 $40,570 $62.80 $53.98 2015Q1 2 2,692.00 $126,448 $46.97 $40.66 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 13 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SELECT GRANULAR FILL / CY ------- -------- 203.07 05 2015Q2 3 1,551.00 $68,917 $44.43 $50.41 06 2014Q3 1 110.00 $3,960 $36.00 $41.50 2015Q1 2 820.00 $32,604 $39.76 $57.36 2015Q2 2 222.00 $7,683 $34.61 $47.63 07 2014Q4 1 240.00 $10,800 $45.00 $33.33 2015Q1 2 604.00 $18,866 $31.23 $22.45 08 2014Q3 2 2,988.00 $236,520 $79.16 $72.77 2014Q4 4 3,297.00 $225,210 $68.31 $64.56 2015Q1 3 996.00 $29,724 $29.84 $38.06 2015Q2 2 378.00 $19,890 $52.62 $55.40 09 2014Q4 2 620.00 $37,420 $60.35 $44.03 2015Q1 3 117.00 $5,730 $48.97 $50.00 2015Q2 1 330.00 $16,170 $49.00 $38.47 10 2014Q3 2 193.00 $9,950 $51.55 $49.59 2014Q4 2 453.00 $27,645 $61.03 $64.42 2015Q1 3 10,455.00 $231,800 $22.17 $21.63 11 2014Q3 1 211.00 $22,155 $105.00 $86.67 2014Q4 2 2,965.00 $62,500 $21.08 $37.99 2015Q1 1 35.00 $1,750 $50.00 $63.33 --------- ------------ --------------- ---------- ---------- 75 56,061.00 $2,187,256 $39.02 $41.95 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN FILL, EM/STBY R 1 (0.0 TO 1.0) / CY 203.07010063 01 2014Q3 1 5.00 $250 $50.00 $48.97 2015Q2 1 5.00 $220 $44.00 $45.33 07 2015Q2 1 1.00 $80 $80.00 $90.00 --------- ------------ --------------- ---------- ---------- 3 11.00 $550 $50.00 $51.04 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 14 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SEL GRAN FILL, EM/STBY R 2 / CY ------- -------- 203.07020063 01 2014Q3 1 80.00 $2,400 $30.00 $30.74 2015Q2 1 80.00 $2,320 $29.00 $29.67 07 2015Q2 1 11.00 $440 $40.00 $39.50 --------- ------------ --------------- ---------- ---------- 3 171.00 $5,160 $30.18 $30.80 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN FILL, EM/STBY R 3 / CY 203.07030063 01 2014Q3 1 151.00 $3,775 $25.00 $26.10 2015Q2 1 400.00 $10,400 $26.00 $25.33 07 2015Q2 1 151.00 $3,020 $20.00 $23.50 --------- ------------ --------------- ---------- ---------- 3 702.00 $17,195 $24.49 $25.10 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRANULAR FILL, SLOPE PROT (STRUC) / CY 203.08010017 04 2015Q1 1 27.00 $1,704 $63.10 $88.70 --------- ------------ --------------- ---------- ---------- 1 27.00 $1,704 $63.10 $88.70 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN FILL - TY B, EM/STBY R 1 / CY 203.08020163 01 2014Q3 1 5.00 $75 $15.00 $37.20 --------- ------------ --------------- ---------- ---------- 1 5.00 $75 $15.00 $37.20 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN FILL - TY B EM/STBY R 2 / CY 203.08020263 01 2014Q3 1 80.00 $960 $12.00 $27.89 --------- ------------ --------------- ---------- ---------- 1 80.00 $960 $12.00 $27.89 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 15 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SEL GRAN FILL -TY B,EM/STBY R3(151-650) / CY ------- -------- 203.08020363 01 2014Q3 1 151.00 $1,208 $8.00 $21.93 --------- ------------ --------------- ---------- ---------- 1 151.00 $1,208 $8.00 $21.93 ---------------------------------------------------------------------------------------------------------------------------------- SURFACE SETTLEMENT GAGES / EACH 203.10 04 2015Q1 1 4.00 $1,200 $300.00 $516.67 --------- ------------ --------------- ---------- ---------- 1 4.00 $1,200 $300.00 $516.67 ---------------------------------------------------------------------------------------------------------------------------------- APPLYING WATER / PDD 203.1601 01 2015Q1 1 92.00 $92 $1.00 $1.00 02 2015Q1 1 10.00 $1,734 $173.40 $96.47 --------- ------------ --------------- ---------- ---------- 2 102.00 $1,826 $17.90 $10.36 ---------------------------------------------------------------------------------------------------------------------------------- SELECT GRANULAR SUBGRADE / CY 203.20 01 2015Q2 1 16,129.00 $225,806 $14.00 $20.43 03 2015Q2 1 1,200.00 $60,000 $50.00 $40.33 --------- ------------ --------------- ---------- ---------- 2 17,329.00 $285,806 $16.49 $21.81 ---------------------------------------------------------------------------------------------------------------------------------- SELECT STRUCTURE FILL / CY 203.21 01 2014Q3 1 2,540.00 $88,900 $35.00 $35.00 2014Q4 1 2,902.00 $87,060 $30.00 $31.67 2015Q1 4 3,017.00 $137,450 $45.56 $43.07 02 2015Q1 2 59.00 $3,700 $62.71 $67.00 2015Q2 2 2,307.00 $110,196 $47.77 $46.26 03 2014Q4 4 470.00 $27,473 $58.45 $62.68 (item continued)

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 16 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SELECT STRUCTURE FILL / CY ------- -------- 203.21 03 2015Q2 2 145.00 $6,440 $44.41 $58.58 04 2014Q4 1 1,339.00 $52,221 $39.00 $45.17 2015Q1 3 1,944.00 $85,334 $43.90 $39.40 2015Q2 1 52.00 $2,600 $50.00 $81.45 05 2014Q3 2 9,509.00 $366,513 $38.54 $40.27 2014Q4 2 740.00 $21,650 $29.26 $42.82 2015Q1 3 2,001.00 $62,376 $31.17 $43.21 2015Q2 1 350.00 $20,650 $59.00 $47.50 06 2014Q3 2 616.00 $29,829 $48.42 $58.20 2014Q4 4 833.00 $50,163 $60.22 $52.10 2015Q1 2 190.00 $10,350 $54.47 $59.29 07 2014Q4 1 90.00 $4,950 $55.00 $56.27 2015Q1 2 6,007.00 $198,799 $33.09 $35.56 08 2014Q4 1 785.00 $33,755 $43.00 $59.00 2015Q1 1 83.00 $4,150 $50.00 $70.00 09 2015Q1 2 385.00 $15,880 $41.25 $47.21 2015Q2 1 6.00 $900 $150.00 $301.67 10 2014Q4 1 8.00 $1,200 $150.00 $101.67 2015Q1 1 425.00 $6,800 $16.00 $98.67 11 2014Q3 1 24.00 $2,880 $120.00 $108.33 2014Q4 2 569.00 $66,432 $116.75 $68.86 2015Q1 1 3,080.00 $308,000 $100.00 $105.00 --------- ------------ --------------- ---------- ---------- 51 40,476.00 $1,806,651 $44.64 $47.13 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 17 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SHOULDER BACKUP MATERIAL / TON ------- -------- 203.24010017 01 2014Q3 3 1,051.00 $39,113 $37.22 $31.43 2014Q4 1 1,000.00 $20,000 $20.00 $19.33 2015Q1 3 410.00 $38,000 $92.68 $60.92 2015Q2 6 3,723.00 $85,609 $22.99 $33.49 02 2015Q1 2 230.00 $7,659 $33.30 $30.68 2015Q2 3 2,955.00 $95,834 $32.43 $30.61 03 2014Q4 2 38.00 $735 $19.34 $64.58 2015Q1 1 4.00 $280 $70.00 $70.00 2015Q2 1 10.00 $300 $30.00 $81.67 04 2014Q4 1 100.00 $1,250 $12.50 $30.83 2015Q1 2 28.00 $1,288 $46.00 $45.52 2015Q2 2 537.00 $31,725 $59.08 $48.03 05 2014Q4 3 6,656.00 $102,399 $15.38 $21.33 2015Q1 1 23.00 $920 $40.00 $51.67 2015Q2 2 140.00 $4,826 $34.47 $39.20 06 2014Q4 3 150.00 $6,443 $42.95 $51.68 2015Q1 2 65.00 $3,390 $52.15 $48.52 2015Q2 4 6,698.00 $39,182 $5.85 $16.69 07 2014Q3 1 2,736.00 $121,232 $44.31 $43.17 2015Q1 1 155.00 $5,425 $35.00 $28.33 2015Q2 1 34.00 $1,494 $43.95 $62.98 08 2014Q3 7 8,752.00 $338,360 $38.66 $44.89 2014Q4 1 40.00 $3,200 $80.00 $91.33 2015Q1 1 75.00 $3,750 $50.00 $50.00 2015Q2 2 650.00 $28,250 $43.46 $48.54 09 2014Q3 1 70.00 $4,200 $60.00 $100.37 2015Q1 1 3,072.00 $61,440 $20.00 $32.48 2015Q2 1 120.00 $3,600 $30.00 $39.90 --------- ------------ --------------- ---------- ---------- 59 39,522.00 $1,049,904 $26.57 $32.20 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 18 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SAND BACKFILL / CY ------- -------- 203.25 01 2015Q1 1 55.00 $2,750 $50.00 $31.94 02 2015Q2 1 150.00 $6,000 $40.00 $44.00 04 2015Q1 1 13.00 $637 $49.00 $40.67 05 2014Q3 1 45.00 $1,634 $36.30 $58.15 06 2014Q3 1 25.00 $1,025 $41.00 $54.33 08 2014Q4 1 430.00 $18,490 $43.00 $84.33 2015Q2 1 538.00 $37,660 $70.00 $58.33 11 2015Q2 1 50.00 $2,500 $50.00 $49.83 --------- ------------ --------------- ---------- ---------- 8 1,306.00 $70,696 $54.13 $63.55 ---------------------------------------------------------------------------------------------------------------------------------- FILTER SAND FOR SAND FILTERS / CY 203.28000009 01 2015Q1 1 139.00 $3,823 $27.50 $23.33 08 2014Q3 1 180.00 $10,800 $60.00 $71.00 2014Q4 1 655.00 $45,850 $70.00 $94.33 --------- ------------ --------------- ---------- ---------- 3 974.00 $60,473 $62.09 $79.89 ---------------------------------------------------------------------------------------------------------------------------------- EXCAV AND DISP OF ROCK, EM/STBY R 1 / CY 203.30010063 01 2014Q3 1 65.00 $3,900 $60.00 $73.52 2015Q2 1 65.00 $4,875 $75.00 $75.00 07 2015Q2 1 10.00 $1,200 $120.00 $185.00 --------- ------------ --------------- ---------- ---------- 3 140.00 $9,975 $71.25 $82.17 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 19 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS EXCAV AND DISP OF ROCK, EM/STBY R 2 / CY ------- -------- 203.30020063 01 2014Q3 1 400.00 $18,000 $45.00 $43.60 2015Q2 1 390.00 $25,350 $65.00 $55.33 07 2015Q2 1 131.00 $3,275 $25.00 $32.50 --------- ------------ --------------- ---------- ---------- 3 921.00 $46,625 $50.62 $46.99 ---------------------------------------------------------------------------------------------------------------------------------- EXCAV AND DISP OF ROCK, EM/STBY R 3 / CY 203.30030063 01 2014Q3 1 651.00 $13,020 $20.00 $25.86 2015Q2 1 975.00 $43,875 $45.00 $31.67 --------- ------------ --------------- ---------- ---------- 2 1,626.00 $56,895 $34.99 $29.34 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN SUBGRADE, EM/STBY R 1 / CY 203.31010063 07 2015Q2 1 1.00 $60 $60.00 $80.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $60 $60.00 $80.00 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN SUBGRADE, EM/STBY R 2 / CY 203.31020063 07 2015Q2 1 51.00 $1,275 $25.00 $32.50 --------- ------------ --------------- ---------- ---------- 1 51.00 $1,275 $25.00 $32.50 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRAN SUBGRADE, EM/STBY R 3 / CY 203.31030063 07 2015Q2 1 151.00 $2,265 $15.00 $20.50 --------- ------------ --------------- ---------- ---------- 1 151.00 $2,265 $15.00 $20.50 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 20 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SAW CUT ASPH AND CONC PAVE,EM/STBY R 1 / LF ------- -------- 203.50140163 01 2014Q3 1 25.00 $500 $20.00 $16.75 2015Q2 1 25.00 $450 $18.00 $19.33 07 2015Q2 1 5.00 $75 $15.00 $27.50 --------- ------------ --------------- ---------- ---------- 3 55.00 $1,025 $18.64 $18.90 ---------------------------------------------------------------------------------------------------------------------------------- SAW CUT ASPH AND CONC PAVE,EM/STBY R 2 / LF 203.50140263 01 2014Q3 1 75.00 $900 $12.00 $10.55 2015Q2 1 75.00 $900 $12.00 $12.00 07 2015Q2 1 51.00 $459 $9.00 $9.50 --------- ------------ --------------- ---------- ---------- 3 201.00 $2,259 $11.24 $10.82 ---------------------------------------------------------------------------------------------------------------------------------- SAW CUT ASPH AND CONC PAVE,EM/STBY R 3 / LF 203.50140363 01 2014Q3 1 101.00 $808 $8.00 $7.45 2015Q2 1 300.00 $2,400 $8.00 $8.00 07 2015Q2 1 101.00 $606 $6.00 $7.00 --------- ------------ --------------- ---------- ---------- 3 502.00 $3,814 $7.60 $7.69 ---------------------------------------------------------------------------------------------------------------------------------- ESTABLISHING NEW DITCHES AND SLOPES / LF 203.51990006 01 2014Q4 1 107.00 $2,140 $20.00 $18.00 02 2015Q1 2 10,900.00 $33,950 $3.11 $4.36 05 2015Q2 1 485.00 $7,833 $16.15 $19.38 --------- ------------ --------------- ---------- ---------- 4 11,492.00 $43,923 $3.82 $5.12 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 12:42 Tuesday, January 26, 2016 21 US Customary Contracts Let July 1, 2014 to June 30, 2015 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CONTROLLED LOW STRENGTH MATERIAL (CLSM) / CY ------- -------- 204.01 01 2014Q4 1 24.00 $4,560 $190.00 $201.67 2015Q1 1 26.00 $3,250 $125.00 $116.67 2015Q2 4 382.00 $62,916 $164.70 $172.89 03 2015Q2 1 12.00 $3,120 $260.00 $264.00 04 2015Q1 2 26.00 $2,973 $114.35 $124.10 05 2014Q3 2 220.00 $20,931 $95.14 $122.57 2014Q4 1 60.00 $20,400 $340.00 $240.00 06 2014Q3 1 5.00 $1,000 $200.00 $197.33 2015Q1 1 6.00 $696 $116.00 $206.33 2015Q2 1 39.00 $6,552 $168.00