by: david andrews faculty advisor: michael carter current date: october 27, 2010
DESCRIPTION
Python Board. By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010 Project Completion Date: May 2011. General Overview. UNH InterOperability Lab (UNH-IOL ) What is Auto-Negotiation ? Link Speed and Duplex mode NLPs FLPs and Link Code Words. Overview. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/1.jpg)
By: David AndrewsFaculty Advisor: Michael CarterCurrent Date: October 27, 2010Project Completion Date: May
2011
Python Board
![Page 2: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/2.jpg)
General Overview
UNH InterOperability Lab (UNH-IOL) What is Auto-Negotiation?
• Link Speed and Duplex mode• NLPs• FLPs and Link Code Words
![Page 3: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/3.jpg)
Overview Python Board
![Page 4: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/4.jpg)
Overview Aneg Main
![Page 5: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/5.jpg)
General Problem Definition
Improve the Python Board by:• Removing useless features• Improving existing features• Add new features
![Page 6: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/6.jpg)
Obsolete Features
Pulse Width Controller
![Page 7: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/7.jpg)
Existing Features
Positioning of Potentiometers Cross-over cable to connect sides Combining Components 10 gig trigger
![Page 8: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/8.jpg)
New Features
On Board Crossover switch LEDs for 4,5 and 7,8 Switch to allow 100BASE-TX and
1000BASE-T signaling.
![Page 9: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/9.jpg)
Implimentation and Testing Plan
Design Order Parts Aneg Main redesign Build Board Overall testing OpenProj
![Page 10: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/10.jpg)
Budget Components $125
• OpAmps• Comparators• One-Shots• Etc.
Printed Circuit Board Fabrication $100
Total $225
![Page 11: By: David Andrews Faculty Advisor: Michael Carter Current Date: October 27, 2010](https://reader035.vdocuments.site/reader035/viewer/2022062802/56814524550346895db1eafd/html5/thumbnails/11.jpg)
Questions?