By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System Operations - AIM Group March 2009

Upload: isabella-blair

Post on 25-Dec-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

By:

Date:

Federal AviationAdministrationAeronautical

Information Management (AIM) Modernization

For DATWG

Brett BrunkArchitecture and Planning System Operations - AIM Group

March 2009

Page 2: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

2 2Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Topics

• Vision for Aeronautical Information Management

• AIM Modernization Architecture– Performance, business, information and technology

• Current Activities– Federal NOTAM System initial deployment– SUA

• Consolidation of web sites• Information exchange

– AIXM 5

Page 3: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

3 3Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Topics

• Vision for Aeronautical Information Management

• AIM Modernization Architecture– Performance, business, information and technology

• Current Activities– Federal NOTAM System initial deployment– SUA

• Consolidation of web sites• Information exchange

– AIXM 5

Page 4: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

4 4Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

From AIS to AIMAIM as a core ATM enabler

• Traditional AIS– AIS is a set of paper products and manual

processes

• Aeronautical Information Management– System to system exchange of aeronautical

information– Global interoperability– Integrated data sets– Single entry multiple views

• Customer Service (Civil and military)– Flight planning and briefing– Aircraft– ATC automation– Traffic management– Notice to Airmen

Page 5: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

5 5Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Global ATM Vision• Provide “a holistic, cooperative and collaborative

decision-making environment, where the diverging expectations and interests of all members of the ATM community are balanced to achieve equity and access.”

• “Information management provides accredited, quality-assured and timely information used to support ATM operations.”

From ICAO Doc 9854 Global ATM Operational Concept (1.9.1)

From ICAO Doc 9854 Global ATM Operational Concept (2.15)

Page 6: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

6 6Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

What does the Global ATM Operational Concept tell us?• Need a move to seamless global air traffic management

– Internationally harmonized and globally interoperable ATM system

• ATM includes seven capabilities– Manage airspace– Demand and capacity balancing– Aeronautical operations– Traffic synchronization– Conflict management– Airspace user operations– ATM service delivery management

• AIM/Information Services– Provide the information services necessary to support the seven ATM

capabilities

Page 7: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

7 7Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Role of AIM in supporting ATM

• Enabling flight operations

• Provide common operating picture of aeronautical situation– Monitor quality

– Control quality

– Provide information sharing

– Integrate data (historical, planning and operational)

– Provide decision information support

ATM AIM

AeronauticalCommonOperating

Picture

Page 8: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

8 8Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

What is missing in AIM today?

– Manage airspace– Demand and capacity

balancing– Aerodrome operations– Traffic synchronization– Conflict management– Airspace user operations– ATM service delivery

management

How should AIM support these

ATM capabilities?

Global ATM capabilities

Page 9: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

9 9Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Supporting all phases of flight

Page 10: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

10 10Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Topics

• Vision for Aeronautical Information Management

• AIM Modernization Architecture– Performance, business, information and technology

• Current Activities– Federal NOTAM System initial deployment– SUA

• Consolidation of web sites• Information exchange

– AIXM 5

Page 11: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

11 11Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

The AIM Modernization Concept

Collect Evaluate Distribute

Data Management

Core Aeronautical Information Services

Airport Evaluation Airspace Design GeodecticsCommon Operating Picture for Aeronautical

Information

Surface Evaluation

SWIM, DataComm, FTI

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

NAS ATM Support ServicesSystem Forecast Planning Performance

Enabling NextGen Capabilities

Full Flight Plan

Airspace Status Situational Awareness4D Trajectory

On-Demand NASFlight data management

* Requirement to be validated and/or reallocated

Global ATM Operations

Terminal En RouteSystem OperationsAircraft

Charting

Performance

Business Services

Information

Standards & Technologies

Page 12: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

12 12Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

The AIM Modernization Concept

Collect Evaluate Distribute

Data Management

Core Aeronautical Information Services

Airport Evaluation Airspace Design GeodecticsCommon Operating Picture for Aeronautical

Information

Surface Evaluation

SWIM, DataComm, FTI

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

NAS ATM Support ServicesSystem Forecast Planning Performance

Enabling NextGen Capabilities

Full Flight Plan

Airspace Status Situational Awareness4D Trajectory

On-Demand NASFlight data management

* Requirement to be validated and/or reallocated

Global ATM Operations

Terminal En RouteSystem OperationsAircraft

Charting

Performance

Business Services

Information

Standards & Technologies

Page 13: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

13 13Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Diverse customer community

• Airport operators• Forest service• Procedure developers• Military airfield

operators• Air Traffic Control

• Dispatchers• Pilots• General Aviation• Business Jets• Military• Military dispatch• Air Traffic Control

Originators Customers

Page 14: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

14 14Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Product-driven policyChallenges facing AIM

Flight Restrictions(Flow constraint rules, SOP, LOA)

Airport Field Conditions (FICONS)

National (FDC) NOTAM(IAPs, NAVAID,TFR)

Regional (Domestic)NOTAM

(SID, STAR, Airport)

Weather data products

Special Activity Airspace (SAA) Activation

Page 15: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

15 15Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

NOTAM User – Lessons Learned*• User Studies

– Dispatchers

– Pilots

– Timeliness, consistency

– Single location

• Usability issues– Confusing Q-Codes

– Cognitive problems with free text

– Cognitive problems with UPPERCASE and ABBRV *Kelley Krokos, Ph.D., American Institutes of Research

Florian Jentsch, Ph.D., University of Central Florida (UCF)

Page 16: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

16 16Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Program strategic deliverables

• Improve Safety– Timely and accurate distribution of aeronautical

information– Capturing and distributing digital aeronautical

information• Improve efficiency

– Digital capture and delivery– Streamlined information management

• International Leadership– “Digital AIM”– ICAO compliance

• Supporting NextGen– Single Authoritative Source (i.e. Common

Operating Picture)– Infrastructure for 4D flight planning, shared

situational awareness, …

NOTAMAdvisoriesSpecial Use AirspaceAirport Field ConditionsSNOWTAMSFlow Constraints

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Page 17: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

17 17Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Expected Benefits

• Decrease in incidents where NOTAMs are a contributing factor

• Decrease data collection and interpretation costs– Approximately $2M annually for major US carriers

• Decrease system operations costs– Approximately $4M annually for US government

• Timely, accurate and complete aeronautical information benefits flight operations– Improvements for controllers and pilot situational awareness

Page 18: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

18 18Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

The AIM Modernization Concept

Collect Evaluate Distribute

Data Management

Core Aeronautical Information Services

Airport Evaluation Airspace Design GeodecticsCommon Operating Picture for Aeronautical

Information

Surface Evaluation

SWIM, DataComm, FTI

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

NAS ATM Support ServicesSystem Forecast Planning Performance

Enabling NextGen Capabilities

Full Flight Plan

Airspace Status Situational Awareness4D Trajectory

On-Demand NASFlight data management

* Requirement to be validated and/or reallocated

Global ATM Operations

Terminal En RouteSystem OperationsAircraft

Charting

Performance

Business Services

Information

Standards & Technologies

Page 19: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

19 19Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Example of the legacy AIS challengesNOTAM entry pathways today

AirportMilitary

Forest ServiceSecurityFacilities

Procedures

Text EntryFax

Digital EntryPhone

System Interface ManualValidation

Distribution of NOTAM is equally complicatedtoday!

PublishNOTAMDatabases

Page 20: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

20 20Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

New Concept of Operations

AIM

DATALINK

Originator

Validate and Publish by an FAA Authoritative Source

Integrated permanent and temporary information

Computer readableElectronic distribution to customers

Accountable Sources

Digital Capture (AIXM via templates)

Web

Web service (AIXM)

AIM Modernization System

Web PageService (AIXM)Legacy Formats

Page 21: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

21 21Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Digital capture and delivery

Entry

Plain Language

ChartsAIXM XML

Page 22: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

22 22Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Capability roadmap

2008 2010 2012 2014+

AIM Modernization “Capital Investment Program”

Initial Segment 1 Final

Digital NOTAM Concept Development

Segment 2 Final

EUROCONTROL xNOTAM trials

Federal NOTAM System(FNS 1)

•Tower Lights

•Field Conditions

•ICAO

FNS 2

•digital

•TFRs

Advanced DynamicAirspace Management (ADAM 1)

•ALTRV (CARF)

•TFR

ADAM 2•SUA

•digital•Create Airspace

AIS-Modernization (AIS-M)

AIMCommonOperating

Picture (COP)

NextGen Common Status and Structure Data (CSSD)

•FDCs

•Center NOTAMs

•ATCAA

•Digital flow constraints

•briefing •flight planning submission

•LOA/SOP

Page 23: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

23 23Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Strategic Plan

AIM Modernization

Policy- ICAO compliance- Digital capture and delivery

Safety- Minimize stakeholder impacts- System transitions

Outreach- Education

- Human factors analysis- Stakeholder working group

Technical- Future Systems

- SWIM compliance- Legacy support

Page 24: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

24 24Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Monday – 28 January 2008 0500 UTC

Page 25: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

By:

Date:

Federal AviationAdministration

25Management Confidential

NAV CANADA – FAAICAO NOTAM Harmonization

Charles MontgomeryNAV CANADA Director, AIS & Flight Operations

Barry Davis, FAA Manager, Aeronautical Information Management

Page 26: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

26 26Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

FAA-NAV CANADA Workgroup Objectives……

• Work together to achieve seamless ICAO NOTAMs between both states

• Facilitate a modernization movement from legacy NOTAMs to ICAO formatted NOTAMs

• Enable the transition to digital NOTAMs

• Use AIXM technology (version 5 and beyond)

Page 27: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

27 27Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Joint System Harmonization

• Direct entry by NOTAM authority• ICAO NOTAM format for both states• Common Series to be used by both states• Automation for upfront quality checks• Continue legacy system support• Transition activities required

Page 28: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

28 28Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

ICAO NOTAM Series/1

• Series A – Aerodrome/Movement or Landing Area• Series B – ATC Facilities and Services • Series C – Special Use Airspace• Series D – Obstruction• Series E – Airspace NOTAMs• Series F – 2nd Language Translations (e.g., French)• Series G – GNSS NOTAMs (GPS, WAAS, LAAS)• Series H – Chart Corrections

Page 29: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

29 29Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

ICAO NOTAM Series/2

• Series J – Special Notices and Advisories• Series L – Limited Distribution NOTAMs • Series M – Military

• Series N – NAVAID NOTAMs

• Series O – Other Aeronautical Information• Series P – Procedural• Series V – Military Procedures• Series W – Database Corrections• Series Y – Test NOTAMs• Series Z – Airway NOTAMs

Page 30: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

30 30Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

The AIM Modernization Concept

Collect Evaluate Distribute

Data Management

Core Aeronautical Information Services

Airport Evaluation Airspace Design GeodecticsCommon Operating Picture for Aeronautical

Information

Surface Evaluation

SWIM, DataComm, FTI

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

NAS ATM Support ServicesSystem Forecast Planning Performance

Enabling NextGen Capabilities

Full Flight Plan

Airspace Status Situational Awareness4D Trajectory

On-Demand NASFlight data management

* Requirement to be validated and/or reallocated

Global ATM Operations

Terminal En RouteSystem OperationsAircraft

Charting

Performance

Business Services

Information

Standards & Technologies

Page 31: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

31 31Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Digital Aeronautical InformationDigital NOTAM

Page 32: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

32 32Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Aeronautical Information Exchange Model Enabling AIM Modernization

Others…

Uses XML and GMLIs modular and extendable

Accommodates ICAO standards and recommendations: Annex 4 and 15

Accommodates industry requirements: ARINC 424/EUROCAE ED-99/RTCA DO-272

Provides globally applicable conceptual model and exchange format for aeronautical

informationModels temporality

More information at www.aixm.aero

•Complete data model (Airport AC 150/5300-18B)

•OGC GML 3.2 Compliant

•Static and dynamic data

•Common meanings and definitions

•Eliminate free form text

Page 33: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

33 33Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Web Sitewww.aixm.aero

•Design Documents•Model Details•AIXM 5 Forum•Digital NOTAM

•Design Documents•Model Details•AIXM 5 Forum•Digital NOTAM

Page 34: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

34 34Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

The AIM Modernization Concept

Collect Evaluate Distribute

Data Management

Core Aeronautical Information Services

Airport Evaluation Airspace Design GeodecticsCommon Operating Picture for Aeronautical

Information

Surface Evaluation

SWIM, DataComm, FTI

Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

NAS ATM Support ServicesSystem Forecast Planning Performance

Enabling NextGen Capabilities

Full Flight Plan

Airspace Status Situational Awareness4D Trajectory

On-Demand NASFlight data management

* Requirement to be validated and/or reallocated

Global ATM Operations

Terminal En RouteSystem OperationsAircraft

Charting

Performance

Business Services

Information

Standards & Technologies

Page 35: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

35 35Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Federal NOTAM System SWIM architecture

NOTAM/CARFOrigination

Users

User entry

User query

System to System

FNS

System to System

NOTAM/CARFCollection

NOTAM/CARFProcessing

NOTAM/CARFDistribution

FAA Facilities

DOD

Airports

External Systems

CARF/NOTAMUsers

External Systems

Service Bus

Page 36: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

36 36Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

System Architecture• Open

Geospatial Consortium compliant– GML, WFS,

WMS

• AIXM• SWIM Web

Services– SOAP, XML

• Extensible and Modular

Page 37: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

37 37Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Topics

• Vision for Aeronautical Information Management

• AIM Modernization Architecture– Performance, business, information and technology

• Current Activities– Federal NOTAM System initial deployment– SUA

• Consolidation of web sites• Information exchange

– AIXM 5

Page 38: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

38 38Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Federal NOTAM System2009 operational demonstrations

• Digital Entry– AIXM Event Specifications– SNOW, Runways and Obstacles

• Web site concepts– Airport NOTAM summary– NOTAM queries

• Concept validation– Technology, Policy, Safety and

Outreach• Field studies• Limited deployment

demonstrations

2008 2010 2012 2014+

Federal NOTAM System(FNS 1)

Digital NOTAM Entry

US NOTAM System Database of Record

NOTAM Query and NOTAM Summary

Legacy UsersDigital Consumers

Tower Operators and Airports

System and Web Interfaces

Page 39: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

39 39Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Direct NOTAM entry at Denver Airport

ATCT Air Traffic

TRACON

ARTCC

Airline/Public

Flight Services

FNS Server

Phone

Passur Systems

eNOTAM

FNS Digital protopype

USNS

Phone/fax

DEN Airport

FTI OPS IP

https

InternetPhoneor

NOTAM Position

NOTAM Desk

Internet

FTI OPS IP

eNOTAMSIDS4PassurFSN

Airport personnel

DEN Airport Operations

FTI MS IPhttps

Phone/fax/ Coordination

FS21

NADIN

Bac

k u

p to

FN

S

ERIDSAIS-R, etc

Internet

•Safety risk analysis identified no significant hazards associated with direct entry at Denver Airport

•NOTAM coordination with local ATC facilities

•Training and compliance with policies and advisory circulars

•Safety risk analysis identified no significant hazards associated with direct entry at Denver Airport

•NOTAM coordination with local ATC facilities

•Training and compliance with policies and advisory circulars

Page 40: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

40 40Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Digital NOTAM Capture Demonotamdemo.aim.nas.faa.gov

Page 41: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

41 41Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Field Summary Demonotams.aim.faa.gov

Page 42: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

42 42Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

System to System NOTAM Entry

• “Lights out” NOTAM Capture (42% of all NOTAMs, 75% of D NOTAMs)• NavAid Capture• Procedures Capture• Airports Capture

– Electronic System Interface Capture for large airports (SWIM compliant web services)– Web Capture as backup and other airports

“Lights Out” Entry Sample Airport Entry

Page 43: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

43 43Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

TFR and SUA web site merge

• One stop shop• Situational awareness issues• Explore concepts for spatial-temporal

representation of aeronautical information

• One stop shop• Situational awareness issues• Explore concepts for spatial-temporal

representation of aeronautical information

TFR.FAA.GOV SUA.FAA.GOV

Page 44: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

44 44Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

SUA Information Exchange• Improve scheduling• Information dissemination• SWIM Service Oriented Architecture

NASR SAMS ERAM

Service Oriented Architecture (SOA)

DOD• Single authoritative sources• Eliminate manual entries• AIXM-compliant• Consistent with AIM Modernization and

Federal NOTAM System!

Page 45: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

45 45Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

AIXM/WXXM Conference

• AIXM 5 Information• Results of the OGC test bed

– Demonstration of AIXM to the cockpit

• Keynote speakers– David Lewtas, ICAO– Vicki Cox, FAA VP (NextGen)– Ken Reid (Eurocontrol)– Many others!

• Vendor booths May 12-14, 2009

Washington DC

Register at www.aixm.aero

Page 46: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

46 46Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

DOD Coordination

• The Value Proposition– Well-established standards for accessing aeronautical data– Digital data access– Timeliness and quality improvements

• For your consideration– Transition from analog to digital products– Network enabled operations (SWIM)– Security and Access– Transition to military systems

Acknowledgements: DOD NOTAM officeNGAUS AF AMC

Page 47: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

47 47Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Conclusions and Questions

• AIM is about– Digital capture and delivery of aeronautical information– Timely and high quality access to information for all customers– Information necessary to support future ATM

• AIM Modernization– Customer focus– System designed for interoperability

• Key short term initiatives– Federal NOTAM System trials – Denver– SUA– AIXM Conference – May 12-14

Page 48: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

48 48Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Thank you

• Information on AIM modernization– Nfdc.faa.gov/aimnews– www.aixm.aero– Notams.aim.faa.gov– Notamdemo.aim.nas.faa.gov

• Contacts– Brett Brunk

• AIM Architecture and Planning• [email protected]

– Barry C Davis• Manager of AIM• [email protected]

Page 49: By: Date: Federal Aviation Administration Aeronautical Information Management (AIM) Modernization For DATWG Brett Brunk Architecture and Planning System

49 49Federal AviationAdministration

AIM Modernization – JRC BriefingMarch 2009

Benefits for customersProvide new digital capabilities while maintaining legacy support

Federal NOTAM System

Format

Benefit

End Date

Traditional (Legacy)RWY 4/22 CLSD EXC TAXI

FasterStandardized Terms

Approx. 2015

ICAOQMRLC… A) B) C) D) E) F)

Some filtering

Following ICAO SARPS

Digital (AIXM)<RUNWAY>…</RUNWAY>

GraphicalData fusionAdvanced filteringComputer readable