by anthony moody rhys porter nicolas wilson. background objectives design normal operation ...
TRANSCRIPT
Project 1 – Level Crossing
By Anthony MoodyRhys Porter
Nicolas Wilson
Background Objectives Design Normal Operation Logic Failure Issues and solutions Improvements
Overview
Level Crossing: Flags as indicators Patent of Level Crossing Electronic Bells Cross-Buck “X” sign
Background
12 Digital Inputs 4 Inputs able to run as analog 6 Relay Outputs LCD Display Operating Buttons
Moeller 719-DC-RC
Functions:
Design and Implement a Level crossing using analogues available in the lab and Moeller
Fail safely and appropriately handle exceptional cases
Objectives
Fail Safe Moeller Easy “PLC” Power Supply Strobe Light as bells
Design
Proximity Based Train Detection Safety Conscious Design Verbose Fault/Warning Memory for
Diagnosis and Reporting Some Automatic Fault Recovery Intersection Obstruction Detection 10 effective outputs from 6 SSRs Emergency Stop Fail Safe on Controller Power Loss
Key Features
Output Wiring Diagram
Normal Operation Wait for train Trigger warning lights Lower boom gates Set train lights accordingly throughout As train leaves do in reverse order
Logic
Zone Based pseudoLogic
Simplified Underlying Logic
Loss of power to controller Sensor failure (boom gates) Emergency switch Obstructed intersection Train detection failure Erroneous train signals to boom gate
Failure & Exceptional Cases
Issue & Solutions Issue:
Limited outputs Solution:
Use external transistor with diode or gate
Issue: Potentiometer too sensitive
Solution: Use rheostat in series with resistor
Moeller Expansion Module if required Active monitoring to larger control system
Possible Improvements
HHSF & Questions