BWR Vessel and Internals Project (BWRVIP) Update Jeff Landrum PDI Meeting November 2007

Upload: others

Post on 18-Jun-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

BWR Vessel and Internals Project (BWRVIP)

Update

Jeff LandrumPDI Meeting

November 2007

Page 2: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

2© 2006 Electric Power Research Institute, Inc. All rights reserved.

Topics of Discussion

• BWRVIP Symposium

• 2008 BWRVIP IVVI Training Courses

• BWRVIP-03, Rev. 10

• Other Inspection Activities

Page 3: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

3© 2006 Electric Power Research Institute, Inc. All rights reserved.

BWRVIP Symposium

• December 13 – 14, 2007 Orlando, FL– Agenda Highlights

• Wednesday, December 12, 2007– 7:00 PM - 9:00 PM Registration

• Thursday, December 13, 2007– BWRVIP Utility Executive Perspective– Regulatory Perspective on BWRVIP– INPO BWRVIP Review Visits– Committee Reports– Plant OE

• Friday, December 14, 2007– Inspection Activities

– Panel Session – Feedback on BWRVIP

Page 4: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

4© 2006 Electric Power Research Institute, Inc. All rights reserved.

2008 IVVI Training Course

• 2008 Training Schedule

– February 26 – 28, 2008

– July 15 – 17, 2008

– August 26 – 28, 2008

– November 10 – 13, 2008 *

* November course added in 2008 to support international BWRVIP membership

Page 5: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

5© 2006 Electric Power Research Institute, Inc. All rights reserved.

BWRVIP-03, Revision 10

• Scheduled to be published in December 2007

• Summary of proposed changes

– Update vendor demonstrations

– Changes to Visual Standard• Change requirement for ½ mil wire standard to ASME Code Section

XI VT-1 Characters

• Change camera angle to 30 degrees from perpendicular to surface

• Add requirement for maximum camera motion during examination not to exceed ½ inch/sec

• Related Topic – RAI on BWRVIP-03, Rev. 6

– BWRVIP response submitted to NRC

– No formal feedback from NRC has been received

Page 6: BWR Vessel and Internals Project (BWRVIP) Update · • Designing and fabricating mockups for vendor – Access Hole Cover Mockups – Top Guide Mockups – Core Spray Mockups –

6© 2006 Electric Power Research Institute, Inc. All rights reserved.

Other Inspection Activities

• Designing and fabricating mockups for vendor

– Access Hole Cover Mockups

– Top Guide Mockups

– Core Spray Mockups

– CRD Mockups

• Update on Jet Pump Beam NDE

– Still waiting BWRVIP assessment of GE report on new guidance for inspection and assessment• Do not expect resolution until 2008

• EVT-1

– New experiments planned for 1st quarter of 2008