Leading Electrical and Instrumentation Construction Company
COMPANYPROFILE
Leading Electrical and Instrumentation Construction Company
Leading Electrical and Instrumentation Construction Company
Company OverviewB&W have been established in the electrical and instrumentation (E&I) construction industryfor 42 years. B&W are one of the largest specialist E&I contractors in South Africa.
B&W has worked and gained valuable experience in mining, oil & gas, chemical, utilities,renewable energy, power generation, industrial process plants and infrastructure. Thestandard of electrical and instrumentation construction varies from industry to industry andB&W have developed highly qualified teams to cater for the needs of our clients.
B&W hosts numerous complementary services ranging from field engineering, equipmentprocurement, material supply, testing and commissioning and maintenance services.
B&W acquired Pontins in 2009, one of the largest specialist suppliers of earthing andlightning protection services and have been in business for 43 years.
B&W’s commitment to providing a professional service, economically, timeously and withconsistency is the key to our enviable growth record.
B&W are a wholly owned subsidiary of the ELB Group.
Leading Electrical and Instrumentation Construction Company
Company StructureB&W Group
Mozambique
Swaziland
Kenya
Registered Offices
Namibia
South Africa
Company Services
Health, safety and environment
Marketing and proposals
Financial Procurement
Quality assurance Planning
HR skills development and training
Company Operations
E&I installations process plants
Regions
Maintenance and shutdowns Special services
Pontins
Earthing and Lightning Protection Specialists
Conductor Systems
Electrification Systems for Mobile Equipment
B&W Instrumentation and Electrical SA (Pty) Ltd
46.69%Equity
Level 4 B-BBEE Status
Leading Electrical and Instrumentation Construction Company
ELB Engineering Solutions (Pty) Ltd
Group Structure
ELB Equipment Holdings (Pty) Ltd
B&W Instrumentation and Electrical (Pty) Ltd
ELB Group Ltd
ELB Educational Trust
ELB International (Pty) Ltd
ELB Intelligent Solutions (Pty) Ltd
ELB Engineering (Pty) Ltd
Pontins (Pty) Ltd BWIE Properties (Pty) Ltd
B-Quip (Pty) LtdH&S Training
Academy (Pty) LtdConductor Systems
B&W Instrumentation and Electrical SA (Pty) Ltd
B&W Instrumentation and Electrical Kenya Ltd
BWIE Instrumentation and Electrical Swaziland
B&W ElectricidadeLda (Mozambique)
B&W Instrumentation and Electrical Namibia (Pty) Ltd
Leading Electrical and Instrumentation Construction Company
Manpower Resources
Administration & Accounting 29
Construction Management 15
Quality Control 7
Planners 3
Junior Planners 2
Engineers & Technicians 22
Site Managers & Supervisors 38
Professional Project Managers 10
Foremen 20
Artisans 95
Learners 31
Semi-Skilled 250 – 400
Field Labour 600 - 1800
Leading Electrical and Instrumentation Construction Company
Corporate Social Responsibility
In B&W Southern Africa Corporate Social Responsibility is an important business priority and integral to our overall business strategy.
Corporate Social Responsibility (CSR) projects are selected on social need and the extent to which they are aligned with our business and can add value to our clients and our communities.
Our policy is to identify worthy Social Economic Development (SED) projects in the areas in which we work. Our projects have proved highly successful, making a meaningful difference.
CSR to us is about building relationships with our customers, attracting and retaining talented staff, managing risk and building reputation.
Leading Electrical and Instrumentation Construction Company
Training
In response to the skills shortage in SouthAfrica B&W has invested substantially in thetraining of field labour to increase its skillspool. B&W has its own fully equipped in-housetraining centre based in Alberton and is anaccredited service provider throughConstruction SETA.
B&W has implemented training programmesin line with accredited SAQA unit standards toadvance employee skills and ensure traineesreceive an accredited qualification. Todetermine the appropriate skills developmentrequired B&W provides ongoing on-the-jobassessments. In addition long-term incentivesensure retention of core staff.
Leading Electrical and Instrumentation Construction Company
Typical Training CoursesApproved Unit Standards
• 229998 Explain and perform fall arrest techniques when working at heights
• 9964 Apply health and safety to a work area
• 12484 Perform basic fire fighting
• 120344 Demonstrate knowledge and understanding of relevant current occupational health and safety legislation
• 12878 Use and maintain power hand tools on a construction site
• 116999 Apply accurate information about HIV & AIDS to everyday life
Unit Standards Awaiting Approval
• Hazard identification and risk assessment
• First aid (Level 1–3)
• Fire fighting
• Occupational health and safety rep
Leading Electrical and Instrumentation Construction Company
Quality Statement
It is a prime management objective of B&W Instrumentation andElectrical to supply products and services with a high level of qualityand reliability for the realisation of our clients requirements.
It is the objective to effectively complete contracts with the followingcriteria as our primary requirements:
• To minimise all Quality complaints• To maximise client confidence in our competence• The improvement of the profit objectives of the company by
adherence to the above
Leading Electrical and Instrumentation Construction Company
ISO 9001:2008
B&W operates in accordance with proceduresestablished to comply with the strenuous ISO9001:2008 quality requirements.
B&W are currently one of the only ISO9001:2008 accredited electrical andinstrumentation contractors in Sub-SaharanAfrica.
This accreditation not only provides newclients with the comfort that our existingclients have come to expect from us, butaffords us the opportunity of outside auditsby the SABS to ensure that the standards setare not only maintained, but continuallyimproved where possible.
Leading Electrical and Instrumentation Construction Company
CIDB Certification
B&W has an 8EP and 8EB grading. This would include major public sector projects such as those for Eskom.
Due to new regulations by the CIDB, certificates are no longer issued.
B&W CIDB number: 149138
Leading Electrical and Instrumentation Construction Company
BBBEE Status
B&W aims to bring about true broadbased empowerment. An Employee Trustestablished in September 2006 owns a7% stake in the company benefitingemployees with more than four yearsuninterrupted service, with an emphasison black staff (75% of benefits).
B&W is a comfortable ‘Level 4’contributor in terms of the draftDepartment of Trade & Industry’s BBBEECodes of Good Practice. Accordingly100% of client spend can be counted asspend with a BEE company.
Leading Electrical and Instrumentation Construction Company
Health and Safety
Leading Electrical and Instrumentation Construction Company
Project Footprint
Leading Electrical and Instrumentation Construction Company
Current Projects
OWNER EPCM CONTRACTOR PROCESS LOCATION CURRENT VALUE MONTH OF COMPLETION
Aquarius Aquarius E&I Installation RustenburgRSA R20 million / year On Going
Sasol Sasol E&I Installation SecundaRSA R28 million / year On Going
Jindal S&P B&W Plant 33kV Reticulation Mozambique R13,5 million Dec 2014
Kumba ELBKolomela & Sishen Iron Ore Mine -
DMS PlantsE&I Installation
Kolomela / SishenRSA R24 million Mar 2015
Xtrata DRA Tweefontein Collieries Coal MineE&I Installation
TweefonteinRSA R144 million Mar 2015
Sasol Sastech New Pre-Coat Tank Unit 219E&I Installation
SecundaRSA R6,4 million Mar 2015
Sasol Sasol Coal TweedraaiElectrical Infrastructure
SecundaRSA R11,2 million Apr 2015
Sasol BET TweedraaiE&I Installation & Material Handling
SecundaRSA R15,6 million May 2015
Sasol Coal Worley Parsons Shondoni Phase I & II
Sub-stations & cablingSecunda
RSA R86 million May 2015
ABB ABB Coal mineE&I Installation Mozambique R123 million Jul 2015
Swakop Uranium Amec / Bateman Husab Uranium MineE&I Installation Namibia R179 million Mar 2016
Leading Electrical and Instrumentation Construction Company
Current Projects
OWNER EPCM CONTRACTOR PROCESS LOCATION CURRENT VALUE MONTH OF COMPLETION
Eskom ELB MedupiE&I Installation & Material Handling
EllisrasRSA R9 million Jan 2017
Exxaro Bateman KusileE&I Installation
OgiesRSA R27 million Jan 2017
Leading Electrical and Instrumentation Construction Company
Oil & Gas
OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
Fina Fluor Daniel Crude Unit Revamp Angola R8 million 6 months
Mosgas / Petrosa Foster Wheeler Low Aromatic Distillation Unit Mossel BayRSA R12,7 million 6 months
Sasol Foster Wheeler Temane Pande Central Processing Facility Mozambique R48 million 17 months
Sasol Foster Wheeler Waste Recycle E&I Installation
Secunda RSA R35 million 11 months
Sasol Veolia / Proconics Veolia Water Treatment Plant Secunda RSA R38,2 million 14 months
Sasol Foster Wheeler Gas Engine Power Plant E&I Installation
SasolburgRSA R22,4 million 7 months
Sasol VGI Consulting Inc.Contractor for Alrode
Depot Wholesale Logistics ProjectE&I Installation
AlbertonRSA R60 million 13 months
Sasol Foster Wheeler Sasol Utilities Expansion ProjectE&I Installation
SasolburgRSA R29 million 8 months
Leading Electrical and Instrumentation Construction Company
ChemicalOWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
Bayer Chemicals Foster Wheeler Chrome Chemical Plant NewcastleRSA R23,4 million 9 months
Indian Ocean Fertilizers
Sulphos (EMS / SNC Lavalin)
IOF Sulphuric & Phosphoric Acid Plant
Richards Bay RSA R22 million 8 months
Lafarge ICER Electrical Upgrade(Labour only)
LichtenbergRSA R10,1 million 5 months
Amplats (ACP) Stein Muller Acid Plant RustenburgRSA R15,5 million 8 months
PPC Krupp UHDE Slagment Plant SaldanhaRSA R14 million 14 months
PPC Kentz / TWP PPC Hercules Expansion ProjectE&I Installation
PretoriaRSA R27 million 8 months
Leading Electrical and Instrumentation Construction Company
Industrial PlantsOWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
PFG Glass PFG PFG GlassE&I Installation
SpringsRSA R21,4 million 4 months
Transnet Hatch Coega Infrastructure
Port ElizabethRSA R68 million 14 months
Transnet Transnet Port Link Line & Salkor Yard Electrical Services
SaldanhaRSA R11 million 6 months
Ubombo Sugar BoschUbombo Sugar Mill Factory
ExpansionE&I Installation
Swaziland R44 million 5 months
Sappi AMEC E&I Installation NelspruitRSA R58 million 14 months
Air Products Air Products G-Plant E&I Installation
VanderbijlparkRSA R14,5 Million 6 months
Leading Electrical and Instrumentation Construction Company
Renewable EnergyOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Eskom Comycento LesediRenewable Energy
KathuRSA R40 million 10 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
Aquarius DRA E&I Construction Concentrator Everest South Platinum
LydenburgRSA R13,4 million 3 months
Amplats WatervalSmelter Hatch ACP Stage B
E&IRustenburg
RSA R16,5 million 7 months
Xstrata J.V DRAMototolo Concentrator & Spiral
PlantE&I Installation
LydenburgRSA R23,1 million 7 months
Nkomati DRA ConcentratorE&I Installation
MachadadorpRSA R16,4 million 6 months
De Beers BatemanFinsch Mine Treatment Plant
Upgrade E&I Installation
Lime AcresRSA R46.3 million 20 months
Aflease Bateman Uranium PlantE&I Installation
KlerksdorpRSA R68 million 11 months
Amplats DRA / Vhumbanani ConcentratorE&I Installation
PotgietersrusRSA R149 million 13 months
Amplats Vhumbanani Amandelbult ConcentratorE&I Installation
NorthemRSA R48 million 6 months
ARM / Assmang DRA Iron OreE&I Plant & Infrastructure
SishenRSA R105 million 14 months
Amplats Vhumbanani Pilanesberg ConcentratorE&I Installation
RustenburgRSA R34 million 4 months
Anglo Coal / BHP Billiton DRA Phola Coal
E&I InstallationOgiesRSA R32 million 6 months
Leading Electrical and Instrumentation Construction Company
Mining
OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
BHP Billiton DRA DMO Washing PlantE&I Installation
MiddelburgRSA R88 million 14 months
Amplats Hatch PMR Effluent Treatment PlantE&I Installation
RustenburgRSA R26 million 7 months
BHP Billiton Bateman ET DMO Materials HandlingE&I Installation
MiddelburgRSA R156 million 16 months
Nkomati DRA Nkomati Phase IIBE&I Installation
MachadadorpRSA R26 million 6 months
Sasol RSV Installation of 11kV Power Lines SecundaRSA R13 million 7 months
Douglas Colliery Bateman Water Reticulation ProjectE&I Installation
WitbankRSA R17 million 5 months
Kumba Iron Ore Hatch Sishen South E&I Installation
PostmasburgRSA R84 million 16 months
Assmang DRA KEP ProjectE&I Installation
KathuRSA R148 million 22 months
Assmang Chrome NAC E&I Installation Machadodorp
RSA R11,5 million 7 months
Sasol RSVThubelisha Mine Project
Electrical Installation, Termination for Plant Wide & OHL
SecundaRSA R34 million 15 months
Whims BKM DRA Iron OreE&I Installation
SishenRSA R64 million 8 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION
Kasese Bateman Kasese Cobalt ProjectE&I Installation Uganda R14,6 million 5 months
Namdeb Bateman DMS Plant – Elizabeth Bay E&I Installation Namibia R28 million 7 months
Kenmare Resources Bateman Moma Mineral SandsOHL and E&I Installation Mozambique R34 million 20 months
LetsengDiamonds Bateman E&I Installation Lesotho R16 million 6 months
African Mining Sennet / Logichem Process PlantE&I Installation Botswana R22,4 million 6 months
Albidon Zambia Limited GRC Minproc Munali Process PlantE&I Installation Zambia R16 million 4 months
Equinox Ausenco / Bateman Lumwana Copper MineE&I Installation Zambia R14,9 million 9 months
Dynatec SNC Lavalin AmbatovyOHL & Early Works Madagascar R96 million 18 months
Hulletts PGBIXinavane 380 TCH Factory
ExpansionElectrical Installation
Mozambique R33 million 6 months
Amplats VhumbananiUnki Mine Platinum
Concentrator E&I Installation
Zimbabwe R67 million 10 months
Sasol Thyssenkrupp Uhde Temane ExpansionE&I Installation Mozambique R58 million 25 months
Leading Electrical and Instrumentation Construction Company
MiningOWNER EPCM
CONTRACTOR PROCESS LOCATION VALUE DURATION
Vale ABB
Moatize CoalInfrastructure OHL &
SubstationsE&CI Installation
Mozambique R233 million 30 months
Dynatec SNC Lavalin Ambatovy Process PlantE&I Installation Madagascar R414 million 30 months
Rio Tinto Rio Tinto LV & MV Reticulation Mozambique R6,8 million 7 months
Riversdale SedgemanCoal Handling & Preparation
Plant E&I Installation
Mozambique R53 million 12 months
Vale Vale 66kV OHL Repairs Mozambique R5,6 million 2 months
Assmang DRA KOP E&I Installation
KathuRSA R44 million 16 months
Base Minerals Ausenco Kwale Mineral Sands ProjectE&I Installation Kenya R94 million 9 months
Rio Tinto Rio Tinto Various E&I Installation Mozambique R12 million 24 months
Leading Electrical and Instrumentation Construction Company
Site Photos – Cable Rack and Cable
Installation Scope of Work
Leading Electrical and Instrumentation Construction Company
Installation Scope of WorkSite Photos – Cable Terminations
Leading Electrical and Instrumentation Construction Company
Site Photos – MCC Installations
Installation Scope of Work
Leading Electrical and Instrumentation Construction Company
Installation Scope of WorkSite Photos – Fieldbus Installations
Leading Electrical and Instrumentation Construction Company
Installation Scope of WorkSite Photos – Instrument Installations
Leading Electrical and Instrumentation Construction Company
Installation Scope of WorkSite Photos – Solar Photovoltaic
Leading Electrical and Instrumentation Construction Company
Tel: +27 11 907 1663
Fax: +27 11 907 1957
E-mail: [email protected]
Website: www.bwie.co.za
Leading Electrical and Instrumentation Construction Company
THANK YOU
Contact Details