Note: Unless otherwise specified rates quoted for all
excavation shall include the following: a) Site clearance such
as clearing shrubs undergrowth, roots and small trees brush
wood, etc., b) Setting out the work to profile etc, c) Bailing or
otherwise removing all water may accumulate in the
excavation from all causes. d) Cutting out and throwing soil
clear of area excavated or depositing clear of edge of
foundation to avoid fall in. e) Trimming all sides to plumb or
otherwise as instructed at site and square leveling all bottoms.
Clearing out all loose earth etc., f) Disposing surplus soil as
directed within the site or outside and dressing to proper level
and grade as required. g) Dismantling, removing and stacking
as directed existing water pipe and /or soil pipes within the
excavated portion. h) Providing shoring and strutting for
protecting the sides of foundation where required.
1.1
Earth work in excavation by mechanical means (Hydraulic
excavator/manual means) including disposal of excavated
earth, lead upto 50m and lift upto 1.5m; disposed earth to
be levelled and neatly dressed
In all kinds of soils - soft, hard
Depth upto 1.5 mtr
F1 5 1.85
F2 4 1.6
1.2
Filling in plinth or wherever called for as per
directions of the Engineer-in-charge , in layers not
exceeding 150mm thick (compacted) including
watering, ramming, consolidating and dressing etc.
a)
Soling with stone aggregates upto 40mm size including
watering ramming consolidating and filling voids with fine
sand etc com lete.
1
b)
With river sand brought from outside including loading,
unloadin and handlin
2.1
Providing & laying PCC in foundation 1:4:8 (1 cement : 4
coarse sand : 8 graded stone aggregate 40mm nominal
size) including cost of centering, shuttering, mechanically
mixing, vibrating, curing etc. complete as per the drawings
and the directions of Engineer- In-charge
F1 5 1.4
F2 4 1.15plinth beam PB1 1 9.6
plinth beam PB2 1 5.792
95.904
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 2/74
26OD NB PIPE, 2.3mm thk.
Nos Length
Section 55 3 13.1
Section 56 3 14.28
Section 57 3 15.42
Section 58 3 16.58
Section 59 3 20.45
Section 60 3 25.48
Section 61 3 26.72
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 3/74
132*132*5.4mm
Nos Length
Section B1 1 7.66
Section B2 1 7.27
Section B3 1 7.15
Section B4 1 7.08
Section B5 1 6.88
Section B6 1 6.64
Section B7 1 6.41
Section B8 1 5.79
Section B9 1 5.35
Section B10 1 4.73
Section B11 1 3.67
Section B12 1 2.74
Section B13 1 1.62
12mm thk, Insert plate nos
Section B1 2 0.25 0.2
Section B2 2 0.25 0.2
Section B3 2 0.25 0.2
Section B4 2 0.25 0.2
Section B5 2 0.25 0.2
Section B6 2 0.25 0.2
Section B7 2 0.25 0.2
Section B8 2 0.25 0.2
Section B9 2 0.25 0.2
Section B10 2 0.25 0.2
Section B11 2 0.25 0.2
Section B12 2 0.25 0.2
Section B13 2 0.25 0.2
Nos Length
132*132*5.4mm, vert strut
Section B1
Section B2 1 0.33
Section B3 1 0.37
Section B4 1 0.40
Section B5 1 0.54
Section B6 1 0.71
Section B7 1 0.96
Section B8 1 0.89
Section B9 1 0.91
total steel
6mm bar
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 4/74
Sl No Description Bar Descrip.Dia of
bars(mm) (No)
Steel calculated is only for general estimation purposes and can not be used for Bar B
FOUNDATION
F1 14 NOS-10 DIA Bothways 10 5
10 5
F2 11 NOS-10 DIA Bothways 10 5
10 5
PLINTH BEAM
PB1
TOP 3-12DIA 12 1
BOTTOM 3-12DIA 12 1
EXTRA AT top 2-12DIA 12 2
RINGS 6-150 c/c 6 6
250
80
400
PB2
TOP 2-12DIA 12 1
BOTTOM 2-12DIA 12 1
EXTRA AT top 2-12DIA 12 2 extra at edges 2-12DIA 12 1
2-12DIA 12 1
RINGS 6-150 c/c 6 2
250
80
400
N
Project Name Drwg. No.
Consultant Drwg. Title
Location Revision
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 5/74
6-150 c/c 6 1
BEAMS
B1 300*450
TOP 3-12DIA 12 1
BOTTOM 3-12DIA 12 1
EXTRA AT top 2-12DIA 12 4
RINGS 6-150 c/c 6 6
250
80
400
Columns
C1, as per section A
long. Reinf 10-16 tor 16 5
+4-20tor 20 5
ties for 1m ties, 8@250C/C 8 5
250
80
400
ties upto +.25-1m ties, 8@250C/C 8 5
diag. ties, 8@250C/C 8 5
C1, as per section B
long. Reinf 6-16 tor 16 5
+4-20tor 20 5
ties upto +.25-1m ties, 8@250C/C 8 5
ties upto +.25-1m ties, 8@250C/C 8 5
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 6/74
C1, upto roof
long. Reinf 4-16 tor 16 5
+4-20tor 20 5
ties for 1m ties, 8@250C/C 8 5
250
80
250
diag. ties, 8@250C/C 8 5
C2 upto plinth 4-16 tor 16 5
4-12tor 12 5
ties upto 00 lvl ties, 8@200C/C 8 5
diag. ties, 8@250C/C 8 5
TOTAL
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 22/74
Total
Nos
Cut
Length(No) (No) (m) 6 8 10 12 16
ending
- - - -
14 70 1.700 - - 73.423 - -
14 70 1.700 - - 73.423 - -
11 55 1.400 - - 47.509 - -
11 55 1.400 - - 47.509 - -
-
- - - - - - -
- - - - - -
- - - - - -
3 3 21.310 - - - 56.90 -
3 3 21.310 - - - 56.90 -
2 4 2.000 - - - 7.12 -
-
-
18 110 1.460 35.561 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3 3 9.040 - - - 24.14 -
3 3 9.040 - - - 24.14 -
2 4 2.000 - - - 7.12 - 2 2 2.350 - -
2 2 1.927 - -
18 37 1.460 11.854 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
os Wt (kg) Diameter wise
Qty take-
Date
Checked
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 23/74
8 8 1.460 2.661 - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3 3 21.310 - - - 56.90 -
3 3 21.310 - - - 56.90 -
2 8 2.000 - - - 14.24 -
- - - - -
18 110 1.460 35.561 - - - -
- - - - - -
- - - - - -
- - - - - - - - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
10 50 1.000 - - - - 79.00
4 20 1.000 - - - - -
-
4.000 20 1.460 - 11.534 - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3.700 19 0.960 - 7.015 - - -
3.700 19 0.740 - 5.408 - - -
- - - - - - - - - - - -
- - - - - -
6 30 1.125 - - - - 53.33
4 20 1.125 - - - - -
- - - - - -
3.700 19 1.460 - 10.669 - - -
3.700 19 0.960 - 7.015 - - -
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 24/74
- - - - - -
- - - - - -
- - - - - -
4 20 3.050 - - - - 96.38
4 20 3.050 - - - - -
- - - - - -
13.200 66 1.160 - 30.241 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
13.200 66 0.740 - 19.292 - - -
- - - - -
- - - - -
4 20 2.125 - - - - 67.15
4 20 2.125 - - - 37.83 -
7 34 1.160 - 15.350 - - -
7 34 0.740 - 9.792 - - -
- - - - - -
116.316 241.864 342.17 295.86
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 40/74
Qty Remarks
20 25 32 (Kg) (if any)
- - - -
- - - 73.42
- - - 73.42
- - - 47.51
- - - 47.51
- - - -
- - - -
- - - -
- - - 56.90
- - - 56.90
- - - 7.12
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - 24.14
- - - 24.14
- - - 7.12 - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Break up
off by
by
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 42/74
- - - -
- - - -
- - - -
- - - 96.38
150.37 - - 150.37
- - - -
- - - 30.24
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - 19.29
- - - -
- - - -
- - - 67.15
- - - 37.83
- - - 15.35
- - - 9.79
- - - -
255.13 - - 1,251.33 -
add 2% for laps and 3 % FOR WASTAGES
1,314
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 61/74
10.1 : Structural steel work in single section
fixed with or without connecting plate
including cutting, hoisting, fixing in
position and applying coat of approved
steel primer all complete.
Description Unit Quantity
Details of cost for one quintal
Materials
Steel = 1.00q
Add wastage @ 15%
1.15q
Steel quintal 1.15
Carriage tonne .105
Labour:Fitter (Grade I) day .5
Blacksmith 2nd class day .75
Beldar day 1.
(A) Priming cost-(Rate vide sqm 3.
item no. 13.50.3 finishing)
Sundries L.S 34.1055
TOTAL
Add 1% for water charges on all except ‘A’
TOTAL
Add 15% for contractor’s profit and
overheads on all except ‘A”
Cost of 1 qunital
Cost of 1 kg.
SS bench
2370 mm length x 500mm wide
Material Rate
kg length kg/m kg
125mm NB pipe , 4.5mm thk. 2.37 15 35.55
65mm NB pipe , 4.5mm thk. 2.37 7.93 18.79
insert plate thk.
2 0.3 0.3 0.01 14.13
MS flat 25x4mm thk
2 0.025 2.37 0.004 3.7209
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 65/74
S. No Description
1 EARTH WORKEarth work in excavation by mechanical means (Hydraulic
excavator/manual means) including disposal of excavated earth, lead
upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly
dressed
1.1 In all kinds of soils - soft, hard
a) Depth upto 1.5 mtr
b) Extra for additional lift of 1.5m or part thereof
c) Hard Rock without blasting upto 1.5 mtr
d) Extra for additional lift of 1.5m or part thereof
1.2
Filling in plinth or wherever called for as per directions of the Engineer-in
charge , in layers not exceeding 150mm thick (compacted) including
watering, ramming, consolidating and dressing etc.
a)Soling with stone aggregates upto 40mm size including watering
ramming consolidating and filling voids with fine sand etc complete.
b)With river sand brought from outside including loading, unloading and
handling
1.3
BackFilling available excavated earth ( excluding rock ) in sides of
foundations upto plinth in layers not exceeding 20cms. In depth,
compacting each deposited layer by ramming after watering with lead
upto 50cm and lift upto 1.5m including cost of all labour complete as per
specifications
1.4
Providing and injecting,chemical emulsion for Pre-constructional Anti
termite Treatment creating continous chemical barrier under and around
the column pits, walls, trenches, basement excavation, top surface of
plinth filling, junction of wall and floor, along the external perimeter of
building, expansion joints, over the top of pipes and conduits, with
chloropyriphos emulsifiable concentrates of 20% concentration, including
the cost of chemical, diluting in water to one percent concentration ,
labour, HOM of equipments all complete as per specifications. Onlyplinth area shall be measured
TOTAL TO SUMMARY
2 CONCRETE WORKS
Construction of BUS Stop
at ZGC
ESTIMATE FOR CIVIL WORKS
All the rates should be inclusive of scaffolding, curing at all levels and heigh
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 66/74
2.1
Providing & laying PCC in foundation 1:4:8 (1 cement : 4 coarse sand : 8
graded stone aggregate 40mm nominal size) including cost of
centering, shuttering, mechanically mixing, vibrating, curing etc.
complete as per the drawings and the directions of Engineer- In-charge
2.2
Providing & laying Lean concrete 1:3:6 (1 cement : 3 coarse sand : 6
graded stone aggregate 20 mm nominal size) in foundation and plinthncluding cost of centering, shuttering, mechanically mixing, vibrating,
curing etc. complete as per the drawings and the directions of Engineer-
In-charge
2.3
Providing & laying cement concrete M 25 excluding cost of centering,
shuttering and reinforcement but including mechanically mixing,
vibrating, curing etc. complete as per the drawings and the directions of
Engineer- In-charge
a)In Sub- structure ( Till Plinth Lvl. Top) - Foundations, Plinth beams
Column etc.
b)In Superstructure ( Above Plinth lvl) - Columns, Beams, Slabs, staircase,steps Lintel, chajja etc.
2.4
Providing & Laying reinforcements ribbbed tor/ TMT Bars of various
diameters of various gradeconforming to IS code 1786 - 2008 for
reinforced concrete work at all Height/ Levels including cutting, bending,
binding with annealed 18G MS binding wire, placing in position as IS
2502
a) Fe 500D
2.5Providing centering & shuttering including strutting and propping etc. and
removal of form work at all depths, heights and shapes
a)In Sub- structure ( Till Plinth Lvl. Top) - Foundations, Plinth beams
Column etc.
b)In Superstructure ( Above Plinth lvl) - Columns, Beams, Slabs, Lintel,
chajja etc.
TOTAL TO SUMMARY
3 MASONARY WORKS
3.1
Providing and laying Solid Concrete block masonary of crushing strength
4 Mpa 200 & 300mm thk. in CM 1:4 (1 cement :4 coarse sand) at all
floors and levels. The rate shall include scaffolding & curing etc.complete. The work shall be done in acordance with IS 2185 - Part1
and as per the drawings and the directions of Engineer- In-charge
.
4 FLOORING WORKS
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 67/74
4.1
Providing and fixing 20mm thk, prepolished Shahderali Stone in coping
laid over base of 20mm thk in CM 1:4 & joints neatly finished with
cement of matching colour including chamfering and polishing of edges
etc. as per drawing. (Rate shall include chamfering, levelling and
polishing of edges) Basic Rate - Rs. 625/ sq.m
4.2
Providing and laying at or near ground level factory made kerb stone of
M-25 grade cement concrete in position to the required line, level andcurvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand),
including making joints with or without grooves (thickness of joints
except at sharp curve shall not to more than 5mm), including making
drainage. The rate shall be inclusive of providing and laying PCC 1:4:8
including centering.
4.3
Providing and fixing 80mm thk. M30 Concrete pavers made by block
making machine with strong vibratory compaction and of approved size,
design and colour, pattern laid over compacted bed of 50mm thick
course sand cushion laid to required slope. levels and filling the joints
with coarse sand. Basic Rate - Rs. 755/ sq.mTOTAL TO SUMMARY
5 FINISHING WORKS
Note: -Plastering rates shall include hacking surfaces, corner guards.
For painting works the specification as manufacturer shall be final which
includes sand paper, illusion sealer , primer etc.
5.3
Providing and fixing of wall cladding using 20mm thick Granite in CM 1:3
proportion cut to required shape, pattern, grooves ( as shown in the
drawings ) finished with cement mortar using white cement and color
pigments to match the colour of stone slab making through joinitngthrough sealing all height and levels including curing etc. all complete,
Basic cost Rs. 1800/sq.m
TOTAL TO SUMMARY
6 STEEL AND RAILING WORKS
Note: The contractor shall submit fabrication drawings and sample for all
the work involved based on construction drawings (that may be issued
during construction period) for approval. The fabrication work shall start
only after approval of the fabrication drawings. Any change required in
the fabrication drawings shall be carried out at no extra cost. All quoted
items shall be inclusive of making and approval of fabrication drawings,snap beadings, gasket, hold fast, cleats, patch fiitngs, pins , self
adhesive non staining tapes for protection,etc.
6.1
Providing and fixing mild steel work in built up sections / framed work
including cutting, hoisting, fixing in position using structural steel etc. as
given in the drawings. The rate shall be inclusive of welding, applying
two coats of approved ICI red oxide steel primer, providing and fixing
nut, bolts etc. all complete etc
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 68/74
6.2
Providing and fixing SS Bench made up of 2mm thk. Perforated SS
sheet welded on 125mm NB and 50mm NB MS pipe. The rate shall be
inclusive of MS plates, flats, SS sheet all complete. The contractor shall
submit shop drawings before the start of work.
TOTAL TO SUMMARY
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 69/74
Qty Unit Rate Amount in Rs.
34.87 Cum 225 7,846.75
RO Cum 50
6.15 Cum 800 4,923.45
RO Cum 120
14.39 Cum 1194 17,176.41
14.39 Cum 930 13,378.61
Cum 80 0.00
Sq.m 145 0.00
43,325.21
t
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 71/74
5.22 Sq.m 1100 5,738.70
46.481 metre 500 23,240.50
95.90 Sq.m 1230 117,961.92
146,941.12
65.01 Sq.m 3500 227,535.00
227,535.00
2400 kg 400 960,000.00
7/28/2019 Bus Stop REV.
http://slidepdf.com/reader/full/bus-stop-rev 73/74
Bus Stop Costing
Aluminium Sheet
2mmSS Sheet
Other items as per BOQ Rs. 770,000.00 Rs. 770,000.00
Signages Rs. 88,000.00 Rs. 88,000.00
LED Rs. 100,000.00 Rs. 100,000.00
MS Frame work Rs. 1,080,000.00 Rs. 1,080,000.00
Sheeting Rs. 955,000.00 Rs. 3,140,000.00
Rs. 2,993,000.00 Rs. 5,178,000.00
add for approx. taxes @
12.5+4.944 -- 18 %Rs. 488,340.00 Rs. 881,640.00
Rs. 3,201,340.00 Rs. 5,779,640.00