    Burns Quality Manual

    Revision H

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 1 of 30

  • 7/28/2019 Burns Quality Manual

    2/30

    TABLE OF CONTENTS

    Change Control 3

    Management Endorsement 4

    4.0 System Summary (4.10) 5

    4.1 Organization (4.1) 6

    4.2 Quality System 7

    4.3 Documentation Control (4.3) 8

    4.4 Contract Review (4.4) 10

    4.5 Design Control 11

    4.6 Purchasing 12

    4.7 Control of Customer Supplied Product 13

    4.8 Product Identification and Traceability 14

    4.9 Process Control 15

    4.10 Inspection and Testing 18

    4.11 Control of Inspection Measuring and Test Equipment 19

    4.12 Inspection and Test Status 20

    4.13 Control of Nonconforming Product (4.9) 21

    4.14 Corrective and Preventive Action (4.11) (4.12) 224.15 Handling, Storage, Packaging, and Delivery 23

    4.16 Control of Quality Records (4013) 24

    4.17 Quality Audits (4.14) 25

    4.18 Training 26

    4.19 Servicing 27

    4.20 Statistical Techniques 28

    4.21 Agency Approvals 29

    * Items in parentheses are cross referencing NIST Handbook 150 Checklist sections.

    NOTE: Hyperlinks within this document are available internal to Burns Engineeringonly and are active based on the network access of the person opening the document.

    Contact the Quality Manger if question or issues regarding hyperlinks.

    NOTE: For additional information refer to the Calibration Laboratory Quality Manual.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 2 of 30

  • 7/28/2019 Burns Quality Manual

    3/30

    Change Control Procedure

    The Management Team is responsible for making changes to the QualityManual. Suggestions for changes are presented to the Engineering & QualityManager for incorporation into the document. All changes are reviewed andapproved by the President and the Burns Engineering Management Team.

    Date Rev Description Approvals

    President Eng Mgr Controller Mfg Mgr

    Sales/Mkt

    Mgr1-25-01 A New Release

    JWB WHB LJK JDB KE

    8-9-01 BRevised Design Control and addedFormal Process Training Program

    JWB WHB LJK JDB KE

    6-26-02

    C

    Added Design Control,

    Manufacturing, Capital Equipment,and PC Support procedures, and

    revised Management Reviewparagraph on page 6 JWB WHB LJK JDB KE

    9-13-04 DAll sections revised for Sytelineupdates and other process changes

    JWB WHB LJK JDB N/A

    4-19-05 E NVLAP changes

    JWB WHB LJK JDB N/A

    6-13-06 FAdded detail to paragraph 4.3

    regarding change control of SOPs.JWB WHB LJK JDB ST

    3-31-08G Update conflict statement for

    clarity and repair all hyperlinks JWB CJB LJK JDB ST

    6-21-10 H

    Update document review,

    document retention times and Org.Chart references.. JWB CJB JWB JDB CJB

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 3 of 30

  • 7/28/2019 Burns Quality Manual

    4/30

    Management Endorsement

    Management supports all efforts required to comply with this Quality Manual. Thedocumentation of our quality system in this manual is Burns Engineerings commitment

    to implement and achieve customer satisfaction, continuous improvement and employeeempowerment.

    Jim Burns

    President

    J.D. Burns

    Manufacturing Manager

    Chuck Bragg

    Engineering & Quality Manager

    Jim Burns (acting)

    Controller

    Chuck Bragg

    Sales & Marketing Manager

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 4 of 30

  • 7/28/2019 Burns Quality Manual

    5/30

    4.0 System Summary

    Quality Policy

    Burns Engineering, Inc. is committed to designing and manufacturing high-quality

    temperature measurement products with industry leading performance and reliability.

    We have a focus on and a commitment to high quality products, customerresponsiveness, and on-time delivery. We will accomplish this by fostering an

    environment of continuous improvement using a team approach and an empowered

    workforce.

    Quality Philosophy

    Burns Engineering, Inc. is a continuous improvement manufacturer. The quality system

    is the foundation of our management system and is integrated throughout the organizationand applies to all aspects of our operations.

    Quality Objectives

    High quality producto Engineeredo High reliabilityo Repeatableo Stable

    Superior customer serviceo Custom engineered solutionso Applications supporto Order accuracyo Responsive to customer needs

    Organization

    All personnel manage, perform, and verify work that affects quality. Their responsibility,authority, and interrelation is defined and documented by the Burns Organization Charts

    and individual job descriptions. Details of responsibilities for each position listed are

    maintained and stored on the Burns network drive in the HR folder. These documents areavailable upon request.

    Management Representative

    The Engineering & Quality Manager has been granted authority by the President to:

    Ensure that a quality system is established, implemented, and maintained.

    Report on the performance of the quality system to the Burns Engineering ManagementTeam for review and as a basis for improvement of the quality system.

    Management Review

    The Burns Engineering Management Team performs a monthly operations review

    including a review of the quality system to ensure continuing suitability and effectiveness

    in satisfying customer requirements, and conformance to the Burns Engineering qualitypolicy and objectives. The Controller maintains records of the operations review.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 5 of 30

  • 7/28/2019 Burns Quality Manual

    6/30

    4.1 Organization

    Organization

    All personnel manage, perform, and verify work that affects quality. Their responsibility,

    authority, and interrelation is defined and documented by the Burns Organization Charts

    and individual job descriptions. Details of responsibilities for each position listed aremaintained and stored on the Burns network drive in the HR folder. These documents are

    available upon request.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 6 of 30

    http://../Organization%20Chart/Current-controlled%20Org%20Chartshttp://../Organization%20Chart/Current-controlled%20Org%20Charts
  • 7/28/2019 Burns Quality Manual

    7/30

    4.2 Quality System

    Quality System

    4.2.1 General

    The Burns Quality Manual shall be the controlling document for the quality system at

    Burns Engineering. The Burns Cal Lab Quality Manual shall be a supplement to theBurns Quality Manual in the Calibration area. The documentation hierarchy is shown

    below in a graphic format. In the case of conflict between Quality manuals on

    Calibration Laboratory specific topics, the Calibration Lab. Quality Manual shall govern.

    QualityManual

    Cal Lab

    Quality Manual

    Procedures

    SOPs, RIPs, IPIPs FIPs

    (Work Instructions, Inspection Plans)

    Quality Records

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 7 of 30

    http://quality%20manuals/http://quality%20manuals/
  • 7/28/2019 Burns Quality Manual

    8/30

    4.3 Documentation Control

    Quality System Documentation

    4.3.1 GeneralAll the documentation included in the quality system shall be maintained per therequirements of the Quality Manual. The Cal Lab Quality Manual may add other

    requirements but will apply to documents in the Cal Lab only. Printed copies of the

    online documentation shall be consider uncontrolled. Printed master copy and approved

    controlled copies shall be marked to indicate the status of each document. Duplicatecopies of the printed master copies or other controlled copies shall be considered

    uncontrolled.

    4.3.2 Document Approval and Issue

    All documents issued as part of the quality system shall be reviewed and approved for

    use by authorized personnel prior to use. Approvals required shall be noted on eachdocument by job title. Individuals or alternates if unavailable with the title noted shall

    make documentation approvals.

    A master list of current approved documentation shall be available through the Burns

    computer network or in work instruction books in various departments. See the tablebelow for more information.

    Type Location Master file

    Manuals Burns Network; Quality Manuals Yes, online

    Procedures Burns Network; Procedures Yes, online

    SOPs Burns Network; SOPs Yes, master copy inbooks

    RIPs, FIPs,IPIPs Burns Network; Inspection Plans Yes, online

    Approved Drawings Burns Network; Approved Drawings See ECO process

    Other Burns Network; Quality System Yes, online

    4.3.3 Document Review and Obsolete

    Documents will be reviewed biennially for suitability and revised as necessary per SOP

    G108 Document Review Procedure. Obsolete revisions of documents will be removed

    from the active areas and moved to a location identified for old or obsolete documents.

    4.3.4 Calibration DocumentsQuality system documents generated in the Cal Lab shall be uniquely identified and

    include the following;Date of issue

    Revision identification

    Page numberingTotal number of pages

    Issuing authority

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 8 of 30

    http://quality%20manuals/http://../Procedureshttp://../SOP'shttp://../Inspection%20Planshttp://../drawings/PDF%20Drawingshttp://../Quality%20Systemhttp://../Quality%20Systemhttp://../drawings/PDF%20Drawingshttp://../Inspection%20Planshttp://../SOP'shttp://../Procedureshttp://quality%20manuals/
  • 7/28/2019 Burns Quality Manual

    9/30

    4.3.5 Documentation Changes

    Documentation changes shall be evaluated and approved in the same manner the originalreview was done or as otherwise documented. Changes being proposed will be

    communicated to authorizing personnel. To prevent unauthorized changes to SOPs, the

    on-line SOPs shall be located in a secure folder that is read-only for all users except those

    that are authorized by management to make changes. Anyone may request a change to anSOP but the only positions authorized by management to make and approve these

    changes are Metrology and Design Engineer, Design Engineering Supervisor,

    Manufacturing Engineer, and the Engineering and Quality Manager.

    Any changes made to quality documentation shall comply with the requirements of the

    Quality Manual.

    4.3.6 Software

    Software shall be approved and issued prior to use. Appropriate individuals shall review

    the release to verify proper operation. Testing will be done as necessary to determine the

    proper operation. New releases shall be made available to users.

    4.3.7 Software Changes

    Software changes shall be evaluated and approved in the same manner the original

    review was done or as otherwise controlled. Changes being proposed will be

    communicated to authorizing personnel. Testing will be done as necessary to verifycontinued proper operation. Obsolete or old versions will be removed from service and

    stored in a location to prevent accidental usage and archived for future reference if

    significant revisions were made.

    4.3.8 Drawings

    Drawings shall be created and revised per the ECO procedure.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 9 of 30

  • 7/28/2019 Burns Quality Manual

    10/30

    4.4 Contract Review

    4.4.1 General

    Contracts or requests for quote of temperature products and services shall be adequately

    defined by both Burns and the customer. Resources and processes to meet the

    requirements shall be reviewed and found to be adequate before beginning any work.

    4.4.2 Responsibility for contract reviews (customer order or request for quotation)

    and contract review process

    Sales and Marketing department is responsible for reviewing contracts. Process is

    controlled by the Order Entry and Contract Review procedures located within theBurns network.

    4.4.3 Control of product prices (software and printed)

    Customer Service controls product pricing through printed price sheets, Syteline system

    and with the SOPL software program. Master copies of printed price sheets Syteline data

    and the SOPL program are stored on the Burns computer system.

    4.4.4 Control of standard and custom product specifications

    Product specifications are created and controlled by the Engineering department through

    the use of ECO controlled Mounting and Outline drawings and the software and literature

    list located on the Burns Network as Catalog and Software List

    4.4.5 New Calibration Requests

    Special calibrations shall be reviewed by appropriate staff to assure that the request willbe satisfied through the current or new processes. Uncertainty ranges and capabilities

    shall be considered in developing any new calibration process.

    4.4.6 Deviations/Amendments

    Any variation from the specifications of products or services established in a request or

    contract shall be reviewed with the customer and informed on the impact of the deviationon the stated specifications. Any amendments to the contract or quote shall be

    reevaluated as a new one if work has started. These amendments shall be communicated

    to affected staff.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 10 of 30

    http://../Sales%20and%20Marketing/Procedures/Order%20Entry/Order%20Entry%20Procedures.dochttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Procedure%20for%20Contract%20Review.dochttp://../Catalog%20and%20Software%20Listhttp://../Catalog%20and%20Software%20Listhttp://../Catalog%20and%20Software%20Listhttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Procedure%20for%20Contract%20Review.dochttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Order%20Entry%20Procedures.doc
  • 7/28/2019 Burns Quality Manual

    11/30

    4.5 Design Contro l

    4.5.1 General

    The following describes the requirements for design control at Burns.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 11 of 30

  • 7/28/2019 Burns Quality Manual

    12/30

    4.6 Purchasing

    4.6.1 General

    The following describes the process for purchasing at Burns.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 12 of 30

  • 7/28/2019 Burns Quality Manual

    13/30

    4.7 Control of Customer Supplied Products

    4.7.1 General

    The following describes the process for handling parts supplied to Burns as a raw

    material or a sub assembly.

    4.7.2 Responsible party and process

    Customer Service is responsible for coordinating shipment of no-cost parts from the

    customer. The receiving dock will deliver the parts to Receiving Inspection. Receiving

    Inspection will coordinate the receipt of parts with Purchasing. In most cases a dummyPO will be created to receive the parts and X-ref, associate to a specific requirement,

    them to the appropriate job. After receipt, parts and packing slip are sent to thestockroom. Parts are then issued as any other material per job order BOMs paperwork.

    4.7.3 Handling and storage of product

    Customer supplied parts are stored in the stockroom or in Receiving Inspection on thestaged job shelf with the associated job paperwork.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 13 of 30

  • 7/28/2019 Burns Quality Manual

    14/30

    4.8 Product Identi fication and Traceability

    4.8.1 General

    The following describes the process for identifying Burns products and traceability of

    materials used in Burns products. See also Lot Tracking and Documentation Procedure

    4.8.2 Raw Material and Service Job Identification and Traceability

    Packing slip and PO Receiving List identifies incoming parts. Parts will be inspected to

    the requirements of the drawing as necessary. Certificates must be provided by supplier

    for some items with traceable material or similar traceable characteristics per thedrawing. Certificates will be stored and associated to the item, lot number and purchase

    order. After receipt of material into stock it will be identified and segregated to maintaintraceability. Stockroom, material transactions and X-refs within Syteline system will

    associate and maintain lot and serial numbers of raw material to finished goods.

    4.8.3 In-process Material IdentificationJob materials will be segregated to maintain traceability as material passes toWIP. Parts

    may be etched or permanently marked and have tags to identify traceability.

    4.8.4 Completed Product Identification

    Finished assemblies will be segregated to maintain traceability. Job packages andmaterial transactions will provide a traceability path back to raw material. Assemblies

    will have an identification tag attached if required.

    4.8.5 Information Recorded and Storage of Records

    See section 4.16

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 14 of 30

    http://../Procedures/Engineering/Procedure%20for%20Lot%20tracking%20and%20Documentation.dochttp://../Procedures/Engineering/Procedure%20for%20Lot%20tracking%20and%20Documentation.doc
  • 7/28/2019 Burns Quality Manual

    15/30

    4.9 Process Control

    4.9.1 General

    The following describes the method for manufacturing and service process control at

    Burns.

    4.9.2 Responsibility for process control

    Manufacturing Manager is responsible for insuring that the process control procedures

    and instructions are followed. Procedures and instructions (SOP) are created andcontrolled by the Engineering Department.

    4.9.3 Standard Operating Procedures (SOPs)

    SOPs are created and controlled by the Engineering department. Revision history is

    recorded on the individual SOP cover sheet. Masters are stored in binders in the

    Engineering office area with current copies maintained on the Production floor.

    4.9.4 Assembly instructions and manufacturing drawings

    Engineering drawings control specifications and assembly instructions for all parts

    produced. The ECO process (reference section 4.5) controls released drawings.

    4.9.5 Control of special processes

    Special processes are controlled by SOPs.

    4.9.6 Monitoring of product characteristics during production

    The lead person in each assembly area monitors product quality during production.

    Examples include checks of resistance at 0C, insulation resistance, and temperaturecoefficient in addition to workmanship standards.

    4.9.7 Criteria for workmanship

    Workmanship standards are defined by the assembly drawings and SOPs.

    4.9.8 Maintenance of equipment

    Equipment maintenance is performed on an as needed basis. There is no formal program

    except for equipment in the Calibration Lab see section 4.10.

    4.9.9 Welding operations - Personnel and equipment

    SOPs control welding operations for each type of weld made. Designated assemblytechnicians trained on the equipment perform the welds.

    4.9.10 Records made and storage of records

    Completed job packages are filed for up to two years in the Customer Service area and

    then are moved to the cage and retained for a total of 10 years. Master copies of SOPs

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 15 of 30

  • 7/28/2019 Burns Quality Manual

    16/30

    are stored in binders in the Engineering office area with current copies maintained on the

    Production floor.

    Process flow diagrams

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 16 of 30

  • 7/28/2019 Burns Quality Manual

    17/30

    Process control of standard products - Element 4.9

    Contact with customer or representative

    1.) Customer special job

    service

    stock item 2.) Applications3.) Order

    entry

    element needed 4.) J obprocessing

    5.) Element No element neededroom

    6.) Stockroom

    7.) Shop 8.) Productionfloor transmitter or

    stock item needing

    a reportred dot

    items needing marking 9.) Calibration stock itemLab

    Productionfloor

    10.) Final

    assembly

    11.) Final Inspection anddocumentation check

    12.) Shipping

    Reference element 4.12 for rejected product.1.) Customer service - customer service personnel answer questions, take orders, pass orders to order entry

    2.) Applications - Applications engineers answer questions, work on special applications, take orders, pass orders to order entry3.) Order entry - Order entry personnel enter the order into the database

    4.) J ob processing - job processing personnel take order off database and print out the production package,

    work up pick lists for special jobs5.) Element room - element room personnel manufacture elements per SOP's for each production package

    6.) Stockroom - Stockroom attendant gathers up necessary pieces specified in production package

    7.) Shop - Shop personnel manufacture subassemblies using SOP's as required in production package

    8.) Production floor - Production floor personnel assemble subassemblies and pieces per SOP's

    9.) Calibration Lab - Calibration technicians perform necessary procedures per SOP's as required in production package.10.) Final Assembly - Final assemblers perform necessary procedures per SOP's as required in production package.11.) Final Inspection - Quality technician performs necessary inspections per FIP's

    12.) Shipping - Shipping clerk documents, packages, and ships product.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 17 of 30

  • 7/28/2019 Burns Quality Manual

    18/30

    Process control of select OEM productElement 4.9 Order placed

    CustomerService

    Shop

    rework or reuse ProductionFloor

    Scrap MRB

    failed calibration CalibrationLab

    Product passing+Replacements

    failed in-process In ProcessInspection

    Stockroom

    failed final insp Final 100% IR & hi-potInspection

    use as is Shipping

    4.10 Inspection and Testing

    4.10.1 General

    The following describes the process for inspection and test of products and services

    supplied by Burns.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 18 of 30

  • 7/28/2019 Burns Quality Manual

    19/30

    4.10.2 Calibration Laboratory

    The calibration lab technicians perform the calibration lab procedures. The calibration

    lab is organized per ANSI/NCSL Z-540 and NVLAP Handbook 150. Calibrationprocedures are documented in SOP's.

    Calibration certifications are stored in the fire safe cabinet. Typical certifications stored

    are for resistors, ASL Bridge, and SPRT data. Customer equipment calibrations includeitems such as probes, transmitters, etc.

    4.10.3 Final Inspection

    The Quality Assurance Technician performs final inspection. Final inspection is done

    per FIP's, requirements on the job package drawing, part number drawing, and Customer

    Acknowledgement sheet. Non-conformances and defects are documented in the Sytelineor documented in the Inspection Defect Database.

    4.10.4 Receiving Inspection

    The Quality Assurance Technician performs receiving inspection. Inspection is

    performed per RIP's, SOP's, and drawing specifications. If a RIP is required, the RIPnumber is specified on the PO Receiving List.Inspection stores hard copies of electropolish certifications, material certifications, and

    test information for platinum wire, elements, thermocouple wire, and MI cable. The

    calibration lab stores the raw data on the server of tests performed as required per theincoming inspection SOP's.

    4.10.5 In-Process Inspection

    In process inspection is done by both QA and the Calibration Lab per SOP's, IPIP's and

    per the route sheet. The production package has checklists of dated and signed-off

    processes and in-process and final inspections.

    4.10.6 Records made and storage of records

    Production job packages are stored in Customer Service area files for one year. Afterthis, they are stored in archive boxes in the cage.

    4.11 Control of Inspection and Test Equipment

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 19 of 30

  • 7/28/2019 Burns Quality Manual

    20/30

    4.11.1 General

    The following describes the general process for controlling inspection and test equipment

    used at Burns. The Burns Calibration Quality Manual adds additional detail forequipment used in the Lab.

    4.11.2 Measurement

    Inspection, measuring and test equipment (including test software) shall be controlled,

    calibrated, and maintained to assure conformance of material and product to the specifiedrequirements. The calibration system is designed to meet the requirements of

    ANSI/NCSL Z-540 and NVLAP Handbook 150. The system is open for customer

    verification and audit.

    4.11.3 Traceability

    Probes and equipment shall be traceable directly back to NIST or by a report from thecalibration vendor or internal calibration process.

    4.11.4 Identification

    Equipment requiring calibration shall be identified by a calibration sticker or engraved

    number or similar identification mark and referenced to the tool calibration software.

    The tool software program on the computer system maintains the calibration scheduleand uses the tool identification number. Any new equipment that requires calibration

    shall be added to the computer system.

    4.11.5 Out-of-Calibration Assessment

    A periodic review or report shall be run to maintain calibration of tools. Tools identified

    on the report shall be recalibrated as necessary. If tools are found out-of-calibration they

    shall identified as out of calibration and isolated if possible to prevent use untilrecalibrated. Calibrations shall be done internally per SOP's or by external calibration

    service companies.

    4.11.6 Environmental Control

    Temperature and humidity in the Calibration Lab shall be monitored, recorded, and kept

    on file in the Calibration Lab. (see Calibration Quality Manual for more details) The

    environment of other areas shall be maintained to minimize, any measurement inaccuracyor adversely affect the quality of the measurement.

    4.11.7 Records and Storage of Records

    Equipment Calibration Certifications shall be filed and stored per section 4.16 or section12 of the Calibration Quality Manual.

    4.12 Inspection and Test Status

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 20 of 30

  • 7/28/2019 Burns Quality Manual

    21/30

    4.12.1 General

    The following describes the process for Inspection of products and services at Burns. A

    checklist on the job package identifies inspection and test status of production parts.Nonconforming parts are labeled with a tag indicating the problem. Rejected parts shall

    placed on the; reject shelf in Production, Cal Lab and the MRB shelf in QA. The reject

    information shall be entered into the business system. Anyone can reject a part, typicallyproduction personnel, quality technician, or calibration technician.

    4.13 Control of Non-Conforming Product

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 21 of 30

  • 7/28/2019 Burns Quality Manual

    22/30

    4.13.1 General

    The following describes the process for

    4.13.2 Responsibility for Review/Disposition of Nonconforming Product

    RMA Team and MRB Team along with the QA Manager shall have the responsibilityand authority for review and disposition of nonconforming product. Periodically,

    annually at a minimum, a review of reject data shall be done and take action as

    appropriate to resolve problems.

    4.13.3 Identification, Documentation, Evaluation, Segregation, and Disposition of

    Nonconforming Products

    Reject/Rework from Production floor

    Parts rejected shall be labeled with tag or segregated. A reject number may be assigned

    and parts placed on reject shelves in Production or Calibration area. The reject shall bereviewed by designated Engineering representative to determine disposition in a timely

    manner. A reject job may be entered with parts required list created. The reworkpackage sent to shop.

    Customer returns

    Products returned from customers shall be processed per the RMA Procedures. Customerapproval shall be obtained for out-of-warranty products that are reworked, repaired, or

    scrapped. Product returns having a potential product safety concern are brought to the

    attention of the quality manager for appropriate action.

    4.13.4 Records made and storage of records

    Reject data shall be stored on the computer system. Records of the rework jobs are

    stored in business system as any other job. RMA data is entered and stored on businesssystem. See section 4.16 for additional details on records.

    4.14 Corrective and Preventative Action

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 22 of 30

    http://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.doc
  • 7/28/2019 Burns Quality Manual

    23/30

    4.14.1 General

    The following describes the process for preventative and corrective actions at Burns.

    4.14.2 PCAR System

    Preventive and Correction Action Request (PCAR) Form #347 shall be used to record

    and assign action items as required to resolve the problem. Forms are filled out asspecified in PCAR Procedure. QA manager or designee shall be responsible for ensuring

    PCAR is completed.

    4.12.3 Records Made and Storage of Records

    Completed forms are assigned a number and filed. Action taken is at discretion of the

    QA manager.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 23 of 30

    http://../Forms/Approved%20Forms/Form%20347%20PCAR%20Form.dochttp://../Quality%20Procedures/PCAR%20Procedure%20Rev%20C.dochttp://../Quality%20Procedures/PCAR%20Procedure%20Rev%20C.dochttp://../Forms/Approved%20Forms/Form%20347%20PCAR%20Form.doc
  • 7/28/2019 Burns Quality Manual

    24/30

    4.15 Handling, Storage, Packaging, Preservation andDelivery

    4.15.1 General

    The following describes the methods to preserve material used with in Burns.

    4.15.2 Handling

    Purchasing may verbally communicate any special handling requirements of purchased

    material to the vendor. Information may also be listed on the piece-part or assembly

    drawing for material in stock or WIP.

    4.15.3 Storage

    Designated storage areas and stockroom are used for storage of parts. Some items maybe staged near assembly areas. If necessary, to maintain the quality of the material it may

    be stored in special conditions such as a freezer, sealed container, or at elevated

    temperature.

    4.15.4 Packaging

    Shipping staff is trained in standard packaging procedures for each type of assembly.Customer Service advises shipping department of special packaging procedures as

    specified by the purchase order.

    4.15.5 Preservation

    If necessary the shelf life of materials shall be controlled to ensure the quality of the

    material at the time of use. If necessary, to maintain the quality of the material it may bestored in special conditions such as a freezer, sealed container, or at elevated temperature.

    4.15.6 Delivery

    Delivery of materials shall be arranged by Purchasing and be communicated verbally or

    on PO documents to the vendors.

    4.15.7 Records made and Storage of Records

    The Purchase Order shall be stored for three years minimum. See also section 4.16

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 24 of 30

  • 7/28/2019 Burns Quality Manual

    25/30

    4.16 Control of Quality Records

    4.16.1 General

    The following describes the duration for storing records at Burns.

    Record Location Retention Time

    Calibration Calibration computer and backed Indefinite

    up on server. Electronic copy of

    report also on server.

    Receiving Inspection Purchasing area file cabinet Min. 5yrs

    (Data also stored in computer system)

    Calibration Lab Standards Cabinet in Engineering area 3 Years

    Purchasing

    Certificates (material, etc.) Cabinet in Engineering area Indefinite(Data also stored in computer system)

    POs Purchasing area file cabinet Min 3 yrs(Data also stored in computer system)

    Engineering Change Order Fire safe in Engineering area 5 Years

    Test & Measurement Calibration Final Inspection area 5 Years(Non-calibration equipment)

    Agency Approvals, FM, CSA, UL Fire safe in Engineering area Indefinite

    Closed jobs Computer system 5 years

    In-process/Final Inspection Computer system 2 years

    Alpha Data from Element Room Computer system 2 years

    HR Records Human Resources office Indefinite

    Financial Accounting Office Indefinite

    Time Cards Accounting Office 2 years(Data also stored in computer system)

    4.16.2 Disposal of Records

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 25 of 30

  • 7/28/2019 Burns Quality Manual

    26/30

    Periodically, approximately 2 year period, records will be evaluated for disposal per the

    above retention periods. Electronic records will be deleted. Hard copy documents will beremoved and destroyed in an appropriate manner.

    4.17 Quality Audits4.17.1 General

    The following describes the process for conducting internal audits and being audited byoutside agencies or customers.

    4.17.2 Responsibility and Authority for Conducting Internal Audits

    The Quality department as directed by QA Manager will periodically, annually at aminimum, conduct internal audits. It will have the responsibility and authority to audit

    and review corrective actions generated by the audits. It will also have the

    responsibility and authority to identify areas of concern. Results will be communicated

    to the management team following the audit and review.

    4.17.3 Selection of Internal Audit Area and preparation

    Areas to be audited shall be selected to comply with; agency approvals, to monitor areas

    with special concerns, verify previous audit issues, or randomly. An auditor shall be

    selected that is independent of the area, knowledgeable of the area and with good audit

    techniques. Audit questions shall be formally or informally prepared before the audit atthe auditors discretion. The internal audit schedule will be maintained by the Mr. Tool

    program. The details of this recall system are available upon request. Contact a

    member of the Quality team for assistance.

    4.17.4 Records and Storage of RecordsAudit findings and concerns shall be documented in an Audit Report. Audit reports willbe stored on the server for a minimum of 2 years in the Internal Audits subfolder of the

    Quality System folder. Audit corrective actions shall also be recorded on the Audit

    Report.

    4.17.5 External Audits

    Customers or their representatives shall be given access to audit the quality system and

    relevant areas at Burns. Burns shall cooperate to offer information on the performance of

    quality system, products and services.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 26 of 30

    http://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reports
  • 7/28/2019 Burns Quality Manual

    27/30

    4.18 Training4.18.1 General

    The following describes the process for training of personnel at Burns.

    4.18.2 Training

    Aformal process-training program is used to train employees and to maintain theirproficiency. Regular audits of each employee shall be performed to insure proficiencyand currency with processes.

    Human Resources and the relevant department supervisor or manager administers the

    training program and insures that each employee is properly trained.

    4.18.3 Records Made and Storage of Records

    Upon satisfactory completion of training a Certificate of Achievement is issued. Mastercopy is issued to the trainee and a copy is filed with Human Resources. Successful

    completion of an audit is noted on the master and Human Resources copy of the

    Certificate of Achievement. Training documents are stored on the computer system and a

    hard copy is stored by Human Resources.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 27 of 30

    http://../Process%20Training%20Programhttp://../Process%20Training%20Programhttp://../Process%20Training%20Program/Certified%20Employeeshttp://../Process%20Training%20Program/Certified%20Employeeshttp://../Process%20Training%20Program
  • 7/28/2019 Burns Quality Manual

    28/30

    4.19 Servicing

    4.19.1 General

    The following describes the process for service support by Burns. Servicing consists of

    items returned to Burns Engineering Inc. for calibration or returned for other reasons.

    4.19.2 Returned Material Procedure

    Parts returned from customers shall be handled according to the RMA procedure locatedon the computer system. Return numbers and return information are maintained through

    the Syteline system on the server. Username and password control access to the Syteline

    system and information in the policy and procedure controls who may issue RMAs.

    4.19.3 Probes Returned for Calibration

    Probes returned for calibration are handled with the same RMA method. However aseparate Recalibration procedure covers the process as it arrives on the dock at Burns.

    4.19.4 Records Made and Storage of Records

    Records of returns are stored on the server and are backed up daily by the computer

    system. Calibration information is retained as specified in section 4.11 and 4.16. The

    Quality Manager reviews return information periodically.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 28 of 30

    http://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/Recalibration%20Procedure%20Rev%20C.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/Recalibration%20Procedure%20Rev%20C.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.doc
  • 7/28/2019 Burns Quality Manual

    29/30

    4.20 Statistical Techniques4.20.1 General

    The following describes the process for using statistical methods to maintain and improvequality at Burns.

    4.20.2 Sensing Element Production Tracking

    Statistical techniques shall be used for control of certain characteristics of the sensingelement. SOPs define the specific procedures that are followed.

    Test data is entered and stored on the computer system and to determine acceptance of

    the lot. Engineering and or the Quality manger shall be consulted for questions regarding

    acceptance.

    4.20.3 Test program for All Probes

    Each temperature probe produced shall be 100% checked for accuracy at 0C andinsulation resistance as a minimum. Additional tests and calibration may be done as

    required.

    4.20.4 Other Test Plans

    Problem solving or quality improvement efforts shall make use of statistical methods.

    These methods can be used to identify trends, variation and uncertainty of measurement.

    BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H

    ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 29 of 30

  • 7/28/2019 Burns Quality Manual

    30/30

    4.21 Agency Approvals4.21.1 General

    The following describes the process for dealing with external agencies at Burns.

    4.21.2 Commitment to Various Agency Approvals

    Burns Engineering is committed to delivering high levels of quality in design, materials,

    fabrication processes, calibration services and finished products. Burns is also committedto ethical practices to meet or exceed the requirements of outside approval bodies.

    Internal processes and procedures will be followed to comply with the approval bodys

    rules and guidelines. Those processes and procedures may include drawings, purchasedmaterials, manufacturing techniques, and test or inspection processes. Any changes

    made to approved items will be changed in a documented and appropriate manner.

    Efforts will be made to ensure this is consistently done to prevent any deficiencies.Agency auditors will be given access to review Burns practices as necessary.

    4.21.3 Customers and Customer Representatives

    The same commitment to outside agency shall apply to Burns customers and

    representatives of Burns customers. See also section 4.17.5 External Audits

    4.21.4 Corrective actionsIn the event a deficiency is found in Burns with regard to an outside approval agency, itwill become a priority of the Management Team to identify the cause, implement a

    corrective action, and monitor for continued compliance.