TABLE OF CONTENTS
Change Control 3
Management Endorsement 4
4.0 System Summary (4.10) 5
4.1 Organization (4.1) 6
4.2 Quality System 7
4.3 Documentation Control (4.3) 8
4.4 Contract Review (4.4) 10
4.5 Design Control 11
4.6 Purchasing 12
4.7 Control of Customer Supplied Product 13
4.8 Product Identification and Traceability 14
4.9 Process Control 15
4.10 Inspection and Testing 18
4.11 Control of Inspection Measuring and Test Equipment 19
4.12 Inspection and Test Status 20
4.13 Control of Nonconforming Product (4.9) 21
4.14 Corrective and Preventive Action (4.11) (4.12) 224.15 Handling, Storage, Packaging, and Delivery 23
4.16 Control of Quality Records (4013) 24
4.17 Quality Audits (4.14) 25
4.18 Training 26
4.19 Servicing 27
4.20 Statistical Techniques 28
4.21 Agency Approvals 29
* Items in parentheses are cross referencing NIST Handbook 150 Checklist sections.
NOTE: Hyperlinks within this document are available internal to Burns Engineeringonly and are active based on the network access of the person opening the document.
Contact the Quality Manger if question or issues regarding hyperlinks.
NOTE: For additional information refer to the Calibration Laboratory Quality Manual.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 2 of 30
-
7/28/2019 Burns Quality Manual
3/30
Change Control Procedure
The Management Team is responsible for making changes to the QualityManual. Suggestions for changes are presented to the Engineering & QualityManager for incorporation into the document. All changes are reviewed andapproved by the President and the Burns Engineering Management Team.
Date Rev Description Approvals
President Eng Mgr Controller Mfg Mgr
Sales/Mkt
Mgr1-25-01 A New Release
JWB WHB LJK JDB KE
8-9-01 BRevised Design Control and addedFormal Process Training Program
JWB WHB LJK JDB KE
6-26-02
C
Added Design Control,
Manufacturing, Capital Equipment,and PC Support procedures, and
revised Management Reviewparagraph on page 6 JWB WHB LJK JDB KE
9-13-04 DAll sections revised for Sytelineupdates and other process changes
JWB WHB LJK JDB N/A
4-19-05 E NVLAP changes
JWB WHB LJK JDB N/A
6-13-06 FAdded detail to paragraph 4.3
regarding change control of SOPs.JWB WHB LJK JDB ST
3-31-08G Update conflict statement for
clarity and repair all hyperlinks JWB CJB LJK JDB ST
6-21-10 H
Update document review,
document retention times and Org.Chart references.. JWB CJB JWB JDB CJB
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 3 of 30
-
7/28/2019 Burns Quality Manual
4/30
Management Endorsement
Management supports all efforts required to comply with this Quality Manual. Thedocumentation of our quality system in this manual is Burns Engineerings commitment
to implement and achieve customer satisfaction, continuous improvement and employeeempowerment.
Jim Burns
President
J.D. Burns
Manufacturing Manager
Chuck Bragg
Engineering & Quality Manager
Jim Burns (acting)
Controller
Chuck Bragg
Sales & Marketing Manager
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 4 of 30
-
7/28/2019 Burns Quality Manual
5/30
4.0 System Summary
Quality Policy
Burns Engineering, Inc. is committed to designing and manufacturing high-quality
temperature measurement products with industry leading performance and reliability.
We have a focus on and a commitment to high quality products, customerresponsiveness, and on-time delivery. We will accomplish this by fostering an
environment of continuous improvement using a team approach and an empowered
workforce.
Quality Philosophy
Burns Engineering, Inc. is a continuous improvement manufacturer. The quality system
is the foundation of our management system and is integrated throughout the organizationand applies to all aspects of our operations.
Quality Objectives
High quality producto Engineeredo High reliabilityo Repeatableo Stable
Superior customer serviceo Custom engineered solutionso Applications supporto Order accuracyo Responsive to customer needs
Organization
All personnel manage, perform, and verify work that affects quality. Their responsibility,authority, and interrelation is defined and documented by the Burns Organization Charts
and individual job descriptions. Details of responsibilities for each position listed are
maintained and stored on the Burns network drive in the HR folder. These documents areavailable upon request.
Management Representative
The Engineering & Quality Manager has been granted authority by the President to:
Ensure that a quality system is established, implemented, and maintained.
Report on the performance of the quality system to the Burns Engineering ManagementTeam for review and as a basis for improvement of the quality system.
Management Review
The Burns Engineering Management Team performs a monthly operations review
including a review of the quality system to ensure continuing suitability and effectiveness
in satisfying customer requirements, and conformance to the Burns Engineering qualitypolicy and objectives. The Controller maintains records of the operations review.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 5 of 30
-
7/28/2019 Burns Quality Manual
6/30
4.1 Organization
Organization
All personnel manage, perform, and verify work that affects quality. Their responsibility,
authority, and interrelation is defined and documented by the Burns Organization Charts
and individual job descriptions. Details of responsibilities for each position listed aremaintained and stored on the Burns network drive in the HR folder. These documents are
available upon request.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 6 of 30
http://../Organization%20Chart/Current-controlled%20Org%20Chartshttp://../Organization%20Chart/Current-controlled%20Org%20Charts -
7/28/2019 Burns Quality Manual
7/30
4.2 Quality System
Quality System
4.2.1 General
The Burns Quality Manual shall be the controlling document for the quality system at
Burns Engineering. The Burns Cal Lab Quality Manual shall be a supplement to theBurns Quality Manual in the Calibration area. The documentation hierarchy is shown
below in a graphic format. In the case of conflict between Quality manuals on
Calibration Laboratory specific topics, the Calibration Lab. Quality Manual shall govern.
QualityManual
Cal Lab
Quality Manual
Procedures
SOPs, RIPs, IPIPs FIPs
(Work Instructions, Inspection Plans)
Quality Records
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 7 of 30
http://quality%20manuals/http://quality%20manuals/ -
7/28/2019 Burns Quality Manual
8/30
4.3 Documentation Control
Quality System Documentation
4.3.1 GeneralAll the documentation included in the quality system shall be maintained per therequirements of the Quality Manual. The Cal Lab Quality Manual may add other
requirements but will apply to documents in the Cal Lab only. Printed copies of the
online documentation shall be consider uncontrolled. Printed master copy and approved
controlled copies shall be marked to indicate the status of each document. Duplicatecopies of the printed master copies or other controlled copies shall be considered
uncontrolled.
4.3.2 Document Approval and Issue
All documents issued as part of the quality system shall be reviewed and approved for
use by authorized personnel prior to use. Approvals required shall be noted on eachdocument by job title. Individuals or alternates if unavailable with the title noted shall
make documentation approvals.
A master list of current approved documentation shall be available through the Burns
computer network or in work instruction books in various departments. See the tablebelow for more information.
Type Location Master file
Manuals Burns Network; Quality Manuals Yes, online
Procedures Burns Network; Procedures Yes, online
SOPs Burns Network; SOPs Yes, master copy inbooks
RIPs, FIPs,IPIPs Burns Network; Inspection Plans Yes, online
Approved Drawings Burns Network; Approved Drawings See ECO process
Other Burns Network; Quality System Yes, online
4.3.3 Document Review and Obsolete
Documents will be reviewed biennially for suitability and revised as necessary per SOP
G108 Document Review Procedure. Obsolete revisions of documents will be removed
from the active areas and moved to a location identified for old or obsolete documents.
4.3.4 Calibration DocumentsQuality system documents generated in the Cal Lab shall be uniquely identified and
include the following;Date of issue
Revision identification
Page numberingTotal number of pages
Issuing authority
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 8 of 30
http://quality%20manuals/http://../Procedureshttp://../SOP'shttp://../Inspection%20Planshttp://../drawings/PDF%20Drawingshttp://../Quality%20Systemhttp://../Quality%20Systemhttp://../drawings/PDF%20Drawingshttp://../Inspection%20Planshttp://../SOP'shttp://../Procedureshttp://quality%20manuals/ -
7/28/2019 Burns Quality Manual
9/30
4.3.5 Documentation Changes
Documentation changes shall be evaluated and approved in the same manner the originalreview was done or as otherwise documented. Changes being proposed will be
communicated to authorizing personnel. To prevent unauthorized changes to SOPs, the
on-line SOPs shall be located in a secure folder that is read-only for all users except those
that are authorized by management to make changes. Anyone may request a change to anSOP but the only positions authorized by management to make and approve these
changes are Metrology and Design Engineer, Design Engineering Supervisor,
Manufacturing Engineer, and the Engineering and Quality Manager.
Any changes made to quality documentation shall comply with the requirements of the
Quality Manual.
4.3.6 Software
Software shall be approved and issued prior to use. Appropriate individuals shall review
the release to verify proper operation. Testing will be done as necessary to determine the
proper operation. New releases shall be made available to users.
4.3.7 Software Changes
Software changes shall be evaluated and approved in the same manner the original
review was done or as otherwise controlled. Changes being proposed will be
communicated to authorizing personnel. Testing will be done as necessary to verifycontinued proper operation. Obsolete or old versions will be removed from service and
stored in a location to prevent accidental usage and archived for future reference if
significant revisions were made.
4.3.8 Drawings
Drawings shall be created and revised per the ECO procedure.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 9 of 30
-
7/28/2019 Burns Quality Manual
10/30
4.4 Contract Review
4.4.1 General
Contracts or requests for quote of temperature products and services shall be adequately
defined by both Burns and the customer. Resources and processes to meet the
requirements shall be reviewed and found to be adequate before beginning any work.
4.4.2 Responsibility for contract reviews (customer order or request for quotation)
and contract review process
Sales and Marketing department is responsible for reviewing contracts. Process is
controlled by the Order Entry and Contract Review procedures located within theBurns network.
4.4.3 Control of product prices (software and printed)
Customer Service controls product pricing through printed price sheets, Syteline system
and with the SOPL software program. Master copies of printed price sheets Syteline data
and the SOPL program are stored on the Burns computer system.
4.4.4 Control of standard and custom product specifications
Product specifications are created and controlled by the Engineering department through
the use of ECO controlled Mounting and Outline drawings and the software and literature
list located on the Burns Network as Catalog and Software List
4.4.5 New Calibration Requests
Special calibrations shall be reviewed by appropriate staff to assure that the request willbe satisfied through the current or new processes. Uncertainty ranges and capabilities
shall be considered in developing any new calibration process.
4.4.6 Deviations/Amendments
Any variation from the specifications of products or services established in a request or
contract shall be reviewed with the customer and informed on the impact of the deviationon the stated specifications. Any amendments to the contract or quote shall be
reevaluated as a new one if work has started. These amendments shall be communicated
to affected staff.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 10 of 30
http://../Sales%20and%20Marketing/Procedures/Order%20Entry/Order%20Entry%20Procedures.dochttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Procedure%20for%20Contract%20Review.dochttp://../Catalog%20and%20Software%20Listhttp://../Catalog%20and%20Software%20Listhttp://../Catalog%20and%20Software%20Listhttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Procedure%20for%20Contract%20Review.dochttp://../Sales%20and%20Marketing/Procedures/Order%20Entry/Order%20Entry%20Procedures.doc -
7/28/2019 Burns Quality Manual
11/30
4.5 Design Contro l
4.5.1 General
The following describes the requirements for design control at Burns.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 11 of 30
-
7/28/2019 Burns Quality Manual
12/30
4.6 Purchasing
4.6.1 General
The following describes the process for purchasing at Burns.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 12 of 30
-
7/28/2019 Burns Quality Manual
13/30
4.7 Control of Customer Supplied Products
4.7.1 General
The following describes the process for handling parts supplied to Burns as a raw
material or a sub assembly.
4.7.2 Responsible party and process
Customer Service is responsible for coordinating shipment of no-cost parts from the
customer. The receiving dock will deliver the parts to Receiving Inspection. Receiving
Inspection will coordinate the receipt of parts with Purchasing. In most cases a dummyPO will be created to receive the parts and X-ref, associate to a specific requirement,
them to the appropriate job. After receipt, parts and packing slip are sent to thestockroom. Parts are then issued as any other material per job order BOMs paperwork.
4.7.3 Handling and storage of product
Customer supplied parts are stored in the stockroom or in Receiving Inspection on thestaged job shelf with the associated job paperwork.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 13 of 30
-
7/28/2019 Burns Quality Manual
14/30
4.8 Product Identi fication and Traceability
4.8.1 General
The following describes the process for identifying Burns products and traceability of
materials used in Burns products. See also Lot Tracking and Documentation Procedure
4.8.2 Raw Material and Service Job Identification and Traceability
Packing slip and PO Receiving List identifies incoming parts. Parts will be inspected to
the requirements of the drawing as necessary. Certificates must be provided by supplier
for some items with traceable material or similar traceable characteristics per thedrawing. Certificates will be stored and associated to the item, lot number and purchase
order. After receipt of material into stock it will be identified and segregated to maintaintraceability. Stockroom, material transactions and X-refs within Syteline system will
associate and maintain lot and serial numbers of raw material to finished goods.
4.8.3 In-process Material IdentificationJob materials will be segregated to maintain traceability as material passes toWIP. Parts
may be etched or permanently marked and have tags to identify traceability.
4.8.4 Completed Product Identification
Finished assemblies will be segregated to maintain traceability. Job packages andmaterial transactions will provide a traceability path back to raw material. Assemblies
will have an identification tag attached if required.
4.8.5 Information Recorded and Storage of Records
See section 4.16
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 14 of 30
http://../Procedures/Engineering/Procedure%20for%20Lot%20tracking%20and%20Documentation.dochttp://../Procedures/Engineering/Procedure%20for%20Lot%20tracking%20and%20Documentation.doc -
7/28/2019 Burns Quality Manual
15/30
4.9 Process Control
4.9.1 General
The following describes the method for manufacturing and service process control at
Burns.
4.9.2 Responsibility for process control
Manufacturing Manager is responsible for insuring that the process control procedures
and instructions are followed. Procedures and instructions (SOP) are created andcontrolled by the Engineering Department.
4.9.3 Standard Operating Procedures (SOPs)
SOPs are created and controlled by the Engineering department. Revision history is
recorded on the individual SOP cover sheet. Masters are stored in binders in the
Engineering office area with current copies maintained on the Production floor.
4.9.4 Assembly instructions and manufacturing drawings
Engineering drawings control specifications and assembly instructions for all parts
produced. The ECO process (reference section 4.5) controls released drawings.
4.9.5 Control of special processes
Special processes are controlled by SOPs.
4.9.6 Monitoring of product characteristics during production
The lead person in each assembly area monitors product quality during production.
Examples include checks of resistance at 0C, insulation resistance, and temperaturecoefficient in addition to workmanship standards.
4.9.7 Criteria for workmanship
Workmanship standards are defined by the assembly drawings and SOPs.
4.9.8 Maintenance of equipment
Equipment maintenance is performed on an as needed basis. There is no formal program
except for equipment in the Calibration Lab see section 4.10.
4.9.9 Welding operations - Personnel and equipment
SOPs control welding operations for each type of weld made. Designated assemblytechnicians trained on the equipment perform the welds.
4.9.10 Records made and storage of records
Completed job packages are filed for up to two years in the Customer Service area and
then are moved to the cage and retained for a total of 10 years. Master copies of SOPs
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 15 of 30
-
7/28/2019 Burns Quality Manual
16/30
are stored in binders in the Engineering office area with current copies maintained on the
Production floor.
Process flow diagrams
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 16 of 30
-
7/28/2019 Burns Quality Manual
17/30
Process control of standard products - Element 4.9
Contact with customer or representative
1.) Customer special job
service
stock item 2.) Applications3.) Order
entry
element needed 4.) J obprocessing
5.) Element No element neededroom
6.) Stockroom
7.) Shop 8.) Productionfloor transmitter or
stock item needing
a reportred dot
items needing marking 9.) Calibration stock itemLab
Productionfloor
10.) Final
assembly
11.) Final Inspection anddocumentation check
12.) Shipping
Reference element 4.12 for rejected product.1.) Customer service - customer service personnel answer questions, take orders, pass orders to order entry
2.) Applications - Applications engineers answer questions, work on special applications, take orders, pass orders to order entry3.) Order entry - Order entry personnel enter the order into the database
4.) J ob processing - job processing personnel take order off database and print out the production package,
work up pick lists for special jobs5.) Element room - element room personnel manufacture elements per SOP's for each production package
6.) Stockroom - Stockroom attendant gathers up necessary pieces specified in production package
7.) Shop - Shop personnel manufacture subassemblies using SOP's as required in production package
8.) Production floor - Production floor personnel assemble subassemblies and pieces per SOP's
9.) Calibration Lab - Calibration technicians perform necessary procedures per SOP's as required in production package.10.) Final Assembly - Final assemblers perform necessary procedures per SOP's as required in production package.11.) Final Inspection - Quality technician performs necessary inspections per FIP's
12.) Shipping - Shipping clerk documents, packages, and ships product.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 17 of 30
-
7/28/2019 Burns Quality Manual
18/30
Process control of select OEM productElement 4.9 Order placed
CustomerService
Shop
rework or reuse ProductionFloor
Scrap MRB
failed calibration CalibrationLab
Product passing+Replacements
failed in-process In ProcessInspection
Stockroom
failed final insp Final 100% IR & hi-potInspection
use as is Shipping
4.10 Inspection and Testing
4.10.1 General
The following describes the process for inspection and test of products and services
supplied by Burns.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 18 of 30
-
7/28/2019 Burns Quality Manual
19/30
4.10.2 Calibration Laboratory
The calibration lab technicians perform the calibration lab procedures. The calibration
lab is organized per ANSI/NCSL Z-540 and NVLAP Handbook 150. Calibrationprocedures are documented in SOP's.
Calibration certifications are stored in the fire safe cabinet. Typical certifications stored
are for resistors, ASL Bridge, and SPRT data. Customer equipment calibrations includeitems such as probes, transmitters, etc.
4.10.3 Final Inspection
The Quality Assurance Technician performs final inspection. Final inspection is done
per FIP's, requirements on the job package drawing, part number drawing, and Customer
Acknowledgement sheet. Non-conformances and defects are documented in the Sytelineor documented in the Inspection Defect Database.
4.10.4 Receiving Inspection
The Quality Assurance Technician performs receiving inspection. Inspection is
performed per RIP's, SOP's, and drawing specifications. If a RIP is required, the RIPnumber is specified on the PO Receiving List.Inspection stores hard copies of electropolish certifications, material certifications, and
test information for platinum wire, elements, thermocouple wire, and MI cable. The
calibration lab stores the raw data on the server of tests performed as required per theincoming inspection SOP's.
4.10.5 In-Process Inspection
In process inspection is done by both QA and the Calibration Lab per SOP's, IPIP's and
per the route sheet. The production package has checklists of dated and signed-off
processes and in-process and final inspections.
4.10.6 Records made and storage of records
Production job packages are stored in Customer Service area files for one year. Afterthis, they are stored in archive boxes in the cage.
4.11 Control of Inspection and Test Equipment
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 19 of 30
-
7/28/2019 Burns Quality Manual
20/30
4.11.1 General
The following describes the general process for controlling inspection and test equipment
used at Burns. The Burns Calibration Quality Manual adds additional detail forequipment used in the Lab.
4.11.2 Measurement
Inspection, measuring and test equipment (including test software) shall be controlled,
calibrated, and maintained to assure conformance of material and product to the specifiedrequirements. The calibration system is designed to meet the requirements of
ANSI/NCSL Z-540 and NVLAP Handbook 150. The system is open for customer
verification and audit.
4.11.3 Traceability
Probes and equipment shall be traceable directly back to NIST or by a report from thecalibration vendor or internal calibration process.
4.11.4 Identification
Equipment requiring calibration shall be identified by a calibration sticker or engraved
number or similar identification mark and referenced to the tool calibration software.
The tool software program on the computer system maintains the calibration scheduleand uses the tool identification number. Any new equipment that requires calibration
shall be added to the computer system.
4.11.5 Out-of-Calibration Assessment
A periodic review or report shall be run to maintain calibration of tools. Tools identified
on the report shall be recalibrated as necessary. If tools are found out-of-calibration they
shall identified as out of calibration and isolated if possible to prevent use untilrecalibrated. Calibrations shall be done internally per SOP's or by external calibration
service companies.
4.11.6 Environmental Control
Temperature and humidity in the Calibration Lab shall be monitored, recorded, and kept
on file in the Calibration Lab. (see Calibration Quality Manual for more details) The
environment of other areas shall be maintained to minimize, any measurement inaccuracyor adversely affect the quality of the measurement.
4.11.7 Records and Storage of Records
Equipment Calibration Certifications shall be filed and stored per section 4.16 or section12 of the Calibration Quality Manual.
4.12 Inspection and Test Status
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 20 of 30
-
7/28/2019 Burns Quality Manual
21/30
4.12.1 General
The following describes the process for Inspection of products and services at Burns. A
checklist on the job package identifies inspection and test status of production parts.Nonconforming parts are labeled with a tag indicating the problem. Rejected parts shall
placed on the; reject shelf in Production, Cal Lab and the MRB shelf in QA. The reject
information shall be entered into the business system. Anyone can reject a part, typicallyproduction personnel, quality technician, or calibration technician.
4.13 Control of Non-Conforming Product
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 21 of 30
-
7/28/2019 Burns Quality Manual
22/30
4.13.1 General
The following describes the process for
4.13.2 Responsibility for Review/Disposition of Nonconforming Product
RMA Team and MRB Team along with the QA Manager shall have the responsibilityand authority for review and disposition of nonconforming product. Periodically,
annually at a minimum, a review of reject data shall be done and take action as
appropriate to resolve problems.
4.13.3 Identification, Documentation, Evaluation, Segregation, and Disposition of
Nonconforming Products
Reject/Rework from Production floor
Parts rejected shall be labeled with tag or segregated. A reject number may be assigned
and parts placed on reject shelves in Production or Calibration area. The reject shall bereviewed by designated Engineering representative to determine disposition in a timely
manner. A reject job may be entered with parts required list created. The reworkpackage sent to shop.
Customer returns
Products returned from customers shall be processed per the RMA Procedures. Customerapproval shall be obtained for out-of-warranty products that are reworked, repaired, or
scrapped. Product returns having a potential product safety concern are brought to the
attention of the quality manager for appropriate action.
4.13.4 Records made and storage of records
Reject data shall be stored on the computer system. Records of the rework jobs are
stored in business system as any other job. RMA data is entered and stored on businesssystem. See section 4.16 for additional details on records.
4.14 Corrective and Preventative Action
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 22 of 30
http://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.doc -
7/28/2019 Burns Quality Manual
23/30
4.14.1 General
The following describes the process for preventative and corrective actions at Burns.
4.14.2 PCAR System
Preventive and Correction Action Request (PCAR) Form #347 shall be used to record
and assign action items as required to resolve the problem. Forms are filled out asspecified in PCAR Procedure. QA manager or designee shall be responsible for ensuring
PCAR is completed.
4.12.3 Records Made and Storage of Records
Completed forms are assigned a number and filed. Action taken is at discretion of the
QA manager.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 23 of 30
http://../Forms/Approved%20Forms/Form%20347%20PCAR%20Form.dochttp://../Quality%20Procedures/PCAR%20Procedure%20Rev%20C.dochttp://../Quality%20Procedures/PCAR%20Procedure%20Rev%20C.dochttp://../Forms/Approved%20Forms/Form%20347%20PCAR%20Form.doc -
7/28/2019 Burns Quality Manual
24/30
4.15 Handling, Storage, Packaging, Preservation andDelivery
4.15.1 General
The following describes the methods to preserve material used with in Burns.
4.15.2 Handling
Purchasing may verbally communicate any special handling requirements of purchased
material to the vendor. Information may also be listed on the piece-part or assembly
drawing for material in stock or WIP.
4.15.3 Storage
Designated storage areas and stockroom are used for storage of parts. Some items maybe staged near assembly areas. If necessary, to maintain the quality of the material it may
be stored in special conditions such as a freezer, sealed container, or at elevated
temperature.
4.15.4 Packaging
Shipping staff is trained in standard packaging procedures for each type of assembly.Customer Service advises shipping department of special packaging procedures as
specified by the purchase order.
4.15.5 Preservation
If necessary the shelf life of materials shall be controlled to ensure the quality of the
material at the time of use. If necessary, to maintain the quality of the material it may bestored in special conditions such as a freezer, sealed container, or at elevated temperature.
4.15.6 Delivery
Delivery of materials shall be arranged by Purchasing and be communicated verbally or
on PO documents to the vendors.
4.15.7 Records made and Storage of Records
The Purchase Order shall be stored for three years minimum. See also section 4.16
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 24 of 30
-
7/28/2019 Burns Quality Manual
25/30
4.16 Control of Quality Records
4.16.1 General
The following describes the duration for storing records at Burns.
Record Location Retention Time
Calibration Calibration computer and backed Indefinite
up on server. Electronic copy of
report also on server.
Receiving Inspection Purchasing area file cabinet Min. 5yrs
(Data also stored in computer system)
Calibration Lab Standards Cabinet in Engineering area 3 Years
Purchasing
Certificates (material, etc.) Cabinet in Engineering area Indefinite(Data also stored in computer system)
POs Purchasing area file cabinet Min 3 yrs(Data also stored in computer system)
Engineering Change Order Fire safe in Engineering area 5 Years
Test & Measurement Calibration Final Inspection area 5 Years(Non-calibration equipment)
Agency Approvals, FM, CSA, UL Fire safe in Engineering area Indefinite
Closed jobs Computer system 5 years
In-process/Final Inspection Computer system 2 years
Alpha Data from Element Room Computer system 2 years
HR Records Human Resources office Indefinite
Financial Accounting Office Indefinite
Time Cards Accounting Office 2 years(Data also stored in computer system)
4.16.2 Disposal of Records
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 25 of 30
-
7/28/2019 Burns Quality Manual
26/30
Periodically, approximately 2 year period, records will be evaluated for disposal per the
above retention periods. Electronic records will be deleted. Hard copy documents will beremoved and destroyed in an appropriate manner.
4.17 Quality Audits4.17.1 General
The following describes the process for conducting internal audits and being audited byoutside agencies or customers.
4.17.2 Responsibility and Authority for Conducting Internal Audits
The Quality department as directed by QA Manager will periodically, annually at aminimum, conduct internal audits. It will have the responsibility and authority to audit
and review corrective actions generated by the audits. It will also have the
responsibility and authority to identify areas of concern. Results will be communicated
to the management team following the audit and review.
4.17.3 Selection of Internal Audit Area and preparation
Areas to be audited shall be selected to comply with; agency approvals, to monitor areas
with special concerns, verify previous audit issues, or randomly. An auditor shall be
selected that is independent of the area, knowledgeable of the area and with good audit
techniques. Audit questions shall be formally or informally prepared before the audit atthe auditors discretion. The internal audit schedule will be maintained by the Mr. Tool
program. The details of this recall system are available upon request. Contact a
member of the Quality team for assistance.
4.17.4 Records and Storage of RecordsAudit findings and concerns shall be documented in an Audit Report. Audit reports willbe stored on the server for a minimum of 2 years in the Internal Audits subfolder of the
Quality System folder. Audit corrective actions shall also be recorded on the Audit
Report.
4.17.5 External Audits
Customers or their representatives shall be given access to audit the quality system and
relevant areas at Burns. Burns shall cooperate to offer information on the performance of
quality system, products and services.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 26 of 30
http://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reportshttp://../Internal%20Audits/Audit%20Reports -
7/28/2019 Burns Quality Manual
27/30
4.18 Training4.18.1 General
The following describes the process for training of personnel at Burns.
4.18.2 Training
Aformal process-training program is used to train employees and to maintain theirproficiency. Regular audits of each employee shall be performed to insure proficiencyand currency with processes.
Human Resources and the relevant department supervisor or manager administers the
training program and insures that each employee is properly trained.
4.18.3 Records Made and Storage of Records
Upon satisfactory completion of training a Certificate of Achievement is issued. Mastercopy is issued to the trainee and a copy is filed with Human Resources. Successful
completion of an audit is noted on the master and Human Resources copy of the
Certificate of Achievement. Training documents are stored on the computer system and a
hard copy is stored by Human Resources.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 27 of 30
http://../Process%20Training%20Programhttp://../Process%20Training%20Programhttp://../Process%20Training%20Program/Certified%20Employeeshttp://../Process%20Training%20Program/Certified%20Employeeshttp://../Process%20Training%20Program -
7/28/2019 Burns Quality Manual
28/30
4.19 Servicing
4.19.1 General
The following describes the process for service support by Burns. Servicing consists of
items returned to Burns Engineering Inc. for calibration or returned for other reasons.
4.19.2 Returned Material Procedure
Parts returned from customers shall be handled according to the RMA procedure locatedon the computer system. Return numbers and return information are maintained through
the Syteline system on the server. Username and password control access to the Syteline
system and information in the policy and procedure controls who may issue RMAs.
4.19.3 Probes Returned for Calibration
Probes returned for calibration are handled with the same RMA method. However aseparate Recalibration procedure covers the process as it arrives on the dock at Burns.
4.19.4 Records Made and Storage of Records
Records of returns are stored on the server and are backed up daily by the computer
system. Calibration information is retained as specified in section 4.11 and 4.16. The
Quality Manager reviews return information periodically.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 28 of 30
http://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/Recalibration%20Procedure%20Rev%20C.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/Recalibration%20Procedure%20Rev%20C.dochttp://../Sales%20and%20Marketing/Procedures/RMA's/RMA%20Procedure.doc -
7/28/2019 Burns Quality Manual
29/30
4.20 Statistical Techniques4.20.1 General
The following describes the process for using statistical methods to maintain and improvequality at Burns.
4.20.2 Sensing Element Production Tracking
Statistical techniques shall be used for control of certain characteristics of the sensingelement. SOPs define the specific procedures that are followed.
Test data is entered and stored on the computer system and to determine acceptance of
the lot. Engineering and or the Quality manger shall be consulted for questions regarding
acceptance.
4.20.3 Test program for All Probes
Each temperature probe produced shall be 100% checked for accuracy at 0C andinsulation resistance as a minimum. Additional tests and calibration may be done as
required.
4.20.4 Other Test Plans
Problem solving or quality improvement efforts shall make use of statistical methods.
These methods can be used to identify trends, variation and uncertainty of measurement.
BURNS ENGINEERING QUALITY MANUAL FORM 1102372 REVISION H
ANY PRINTED COPY OF THIS DOCUMENT IS CONSIDERED UNCONTROLLED 29 of 30
-
7/28/2019 Burns Quality Manual
30/30
4.21 Agency Approvals4.21.1 General
The following describes the process for dealing with external agencies at Burns.
4.21.2 Commitment to Various Agency Approvals
Burns Engineering is committed to delivering high levels of quality in design, materials,
fabrication processes, calibration services and finished products. Burns is also committedto ethical practices to meet or exceed the requirements of outside approval bodies.
Internal processes and procedures will be followed to comply with the approval bodys
rules and guidelines. Those processes and procedures may include drawings, purchasedmaterials, manufacturing techniques, and test or inspection processes. Any changes
made to approved items will be changed in a documented and appropriate manner.
Efforts will be made to ensure this is consistently done to prevent any deficiencies.Agency auditors will be given access to review Burns practices as necessary.
4.21.3 Customers and Customer Representatives
The same commitment to outside agency shall apply to Burns customers and
representatives of Burns customers. See also section 4.17.5 External Audits
4.21.4 Corrective actionsIn the event a deficiency is found in Burns with regard to an outside approval agency, itwill become a priority of the Management Team to identify the cause, implement a
corrective action, and monitor for continued compliance.