Ken-v Ingredients Listowel
Bund Testing
1.0 Introduction
Malone ORegan McGillicuddy were commissioned by Kerry Ingredients to carry
out bund testing on the heavy fuel oil tank bund at their facility in Listowel at the
location shown on the attached site map.
The test consisted of a visual inspection
and a partial hydrostatic test which was carried out between the 27.09.2004 and
the 30.09.2004. The hydrostatic test procedure was similar to the test procedure
described in Section 9 of BS8007: 1987.
2.0 Bund Description
The bund is a reinforced concrete structure, sub divided by two crosswalk to form
three compartments which accommodate the following storage tanks:
l
2 no. Heavy Fuel Oil Storage Tanks of 340 m3 capacity eachpurposes
only.
quire
dfor
anyothe
ruse
.
-
8/12/2019 Bundwall Test
4/12
Keny Inmedients Listowel
Bund Testing
3.0 Bund Test
A seven day hydrostatic test with water filled to top of bund walls of the heavy
fuel oil tank bund was not practicable due to the following:
l the requirement to maintain heavy fuel oil at an ambient temperature of
approximately 3OOC.
l
the potential risk of damage to pipe insulation and mechanical/electrical
installations within the bund.
Our recommendation therefore in relation to testing of the heavy fuel oil tank
bund was for the following to be carried out:
l a partial hydrostatic test which would involve filling of the bund with water to
a minimum depth of 400 mm over an initial stabilisation period of one day
followed by a three day period of monitoring to test the water tightness of
floor slabs, floor joints and of wall kicker joints,
purposes
only.
quire
dfor
anyo
ther
use
.
-
8/12/2019 Bundwall Test
5/12
l
RECORD SHEET FOR BUND TESTING
I
ompany :
Kerry Ingredients
I
IPC Reference No. : 393
Site :
Tralee Road, &towel
IPC Category : Food & Drink
Bund Ref. No. :
Bund Type-Local, Remote, Combined:
Combined
Bund Location : See Site Map attached
Bund Dimensions :
31.1 m x 11.3 m x 1.35 m (depth)
Bund Materials of Construction :
Reinforced concrete
Bund Risk Classification 1,2 or 3 : ,
Primary Vessels -Materials of Construction : Steel
Primary Vessels -Total Storage Volume:
960 cu.m
Bund Lining Material :
ConcreCe surface
Bund Retention Volume (Local/Remote) :
380 cum (local)
Primary Vessels - 110% of Volume of Largest Vessel :
375 cu.m
Vessels - 25% of Total Storage Volume : ,
240 cu.m
I
Deemed practicable/safe to conduct hydrostatic test: Yes /No :
No
If no, give reasons : -
Full test not practicable due to risk of damage to existing mechanical and electrical
services and due to requirement to maintain temperature of storedfiei at approximately 30C.
,
Date of Hydrostatic test:
(Partial Test) 28.09.2004 to 30.09.2004purposes
only
.
require
dfora
nyothe
ruse
.
-
8/12/2019 Bundwall Test
6/12
Ken-v Inmedients L&towel
Bund Test&
purpo
seso
nly.
require
dfor
anyo
ther
use.
-
8/12/2019 Bundwall Test
7/12
I
I
Forinspe
ction
purpos
esonly.
Cons
ento
fcop
yrightow
nerr
equiredf
oranyo
ther
use.
-
8/12/2019 Bundwall Test
8/12
INGREDIENTS LTD.
LISTOWEL, CO. KERRY.
ALUMINIUM SULPHATE, ALUMINIUM CHLORIDE
& CAUSTIC TANK BUND TEST REPORTpurpo
seso
nly.
equiredf
oranyothe
ruse
.
-
8/12/2019 Bundwall Test
9/12
Kerrv Ingredients Listotvel Bund Testing
1.0
Introduction
Malone ORegan McGillicuddy were commissioned by Kerry Ingredients to carry
out a liquid retention test on a newly constructed bund at their facility in Listowel
at the location shown on the attached site map.
The test was carried out between
the 20.07.2004 and the 27.07.2004 in accordance with Section 9 of
BS8007: 1987
as described in the attached Record Sheet.
2.0 Bund Description
The bund is a newly constructed reinforced concrete structure, purpose-built to
accommodate the following storage tanks:
b
1 no. Aluminium Chloride Storage Tank of 50 m3 capacity.
a
1 no. Aluminium Sulphate Storage Tank of 50 m3 capacity.
b
2 no. Caustic Storage Tanks of 30 m3 capacity per tank.
npurpo
seso
nly.
rreq
uiredfora
nyother
use.
-
8/12/2019 Bundwall Test
10/12
RECORD SHEET FePR BUND TESTING
l
Company :
Site :
Kerry hzgredien s
Tralee Road, Listowel
IPC Reference No. : 393
IPC Category :
Food & Drink
Bund Ref. No. : Bund Type - Local, Remote, Combined:
Local
Bund Location : SeeSite Map attached
I
1 Bund Risk Classification 1,2 or 3 :
1
Bund Dimensions :
I
I
I
1 Primarv Vessels - Materials of Construction : Steel
9.75 m x 9.75 m x 0.8 m (depth)
Bund Materials of Construction :
Reinforced concrete
Bund Lining Material :
Concrete surface
I
Primary Vessels - Total Storage Volume:
16Ocu.m
Primary Vessels -
110% of Volume of Largest Vessel :
55 cu.m
Bund Retention Volume (Local/Remote) :
62 cu,m (local)
Vessels - 25% of Total Storage Volume :
40 cu.m
I
Deemed practicable/safe to conduct hydrostatic test: Yes /No : Yes
If no, give reasons : -
onpurpos
esonly.
rreq
uiredf
oranyo
ther
use.
-
8/12/2019 Bundwall Test
11/12purpo
seso
nly.
equiredf
oranyo
ther
use
.
-
8/12/2019 Bundwall Test
12/12
a l *
- .
I
b
location df chemical
tank
bund
/
I
mime ORegan McGillicuddy
Pnnsdmrc--r----
phone (066) 7123130
T .fa~ (oas) 71~
c a,-..
Kerry ingredients, Lisfowef
hemical
Tank Bund Test
---- .-_.-
Forins
pection
purpo
seso
nly.
Cons
ento
fcop
yright
ownerr
equiredfora
nyothe
ruse
.
EPA Export 25-07-2013:14:50:41