    Bundle Pipeline Systems

    & Shell FRAM DevelopmentIain Watson & Peter Walker

    March 21st, 2012

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    2/62

    Bundle Technologies

    Advantages of Bundle Systems

    Agenda

    27.1.11 2Page

    2Page27.1.11

    Shell Fram Bundle FEED

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    3/62

    Bundle Technologies

    Agenda

    27.1.11 3Page

    3Page27.1.11

    Shell Fram FEED

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    4/62

    What is a Bundle / Towed Pipeline Solution? A Pipeline Bundle is a carrier pipe within which any combination of

    individual pipelines and umbilical components is carried.

    The individual components terminate in Towheads within which

    manifolding may take place. A Towed Pipeline Solution provides a low stress installation method

    where-by a pipeline bundle is towed and installed using the ControlledDepth Tow Method.

    27.1.11 4Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    5/62

    Subsea 7 Installed Bundles

    sgard

    Heidrun

    NorwayNorway

    Osprey

    Cormorant

    Frigg East

    Murchison

    GullfaksBruce

    65 bundles in 33 years

    Up to 7.6km length

    Up to 28.7km in series

    Up to 320m water depth

    Shallowest 42m

    27.1.11 5Page

    Claymore

    PiperSaltire Thelma

    Cyrus, FarragonScapa

    Alba

    Gannet

    Embla

    Dan DenmarkDenmark

    WickWick

    ScotlandScotland

    Buckland Leadon

    Skene

    Longest tow 1000 km Up to 49.5 carrier

    Up to 545 te towhead

    Heaviest bundle 9154 te

    Up to 3 PiP flowlines

    U-value

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    6/62

    Bundle Components

    Flowlines

    Insulation

    Sleeve Pipe

    Control/Chemical Tubes

    27.1.11 6Page

    , ,

    Main Spacer

    Centraliser Pipe-in-Pipe Spacer

    Bulkheads

    Ballast Chains

    Anodes

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    7/62

    What exactly is a Pipeline Bundle?

    27.1.11 7Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    8/62

    Typical Bundle Layout

    BP Machar

    27.1.11 8Page

    BP Andrew

    Kerr McGee Leadon

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    9/62

    Materials

    Flowline Materials

    Carbon steel - X52, X65, X70 with SS or

    Alloy Liners

    Corrosion Resistant Alloys - 13% 22% & 25%

    Cr Steels

    27.1.11 9Page

    Plastic (HDPE) Liners for Water Injection Lines

    Controls

    Hard Pipe Hydraulic and Chemical Systems -

    316 SS, 25% Cr Duplex to Carbon Steel

    Electrical & Fibre Optic Control Systems

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    10/62

    The Long Trek West

    27.1.11 10Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    11/62

    Wester Fabrication Facility

    27.1.11 11Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    12/62

    Hastigrow Fabrication Facility

    27.1.11 12Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    13/62

    Welding Firing Lines

    27.1.11 13Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    14/62

    Inner Bundle Fabrication

    27.1.11 14Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    15/62

    Insulation Type

    Passive Insulation System

    27.1.11 15Page

    Pipe-in-Pipe System

    Electrical Active/Trace Heating

    Indirect Hot Water Heating

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    16/62

    Production Line Insulation

    27.1.11 16Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    17/62

    Applying ITP Izoflex Insulation

    27.1.11 17Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    18/62

    Applying ITP Izoflex Insulation

    27.1.11 18Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    19/62

    Spot Welding Steel Sheet Over ITP Izoflex

    27.1.11 19Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    20/62

    Spot Welding Steel Sheet Over ITP Izoflex

    27.1.11 20Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    21/62

    Bundle System Applicability

    1500

    2000

    m)

    Wet Insulation

    27.1.11 21Page

    0

    500

    1000

    0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

    WaterDep

    th(

    U-Value (W/m2K)

    Pipe-in-Pipe

    Bundles - Towed Pipeline Systems

    Flexibles

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    22/62

    Flow Assurance Geometry of Pipelines

    The environment within the carrier pipe provides an ideal opportunity forinnovative solutions in Flow Assurance.

    The pipelines can be arranged to facilitate heat transfer between product linesor from dedicated heating lines.

    Heat transfer analysis confirmed by experimental results.

    27.1.11 22Page

    Active Heating Systems

    Warm-up before Start-up

    Increase Temperatures for Low Production Rates

    Keep System Temperature High during Shutdowns

    Reduce Chemical Injection

    Six Active Heating Systems installed in the North Sea

    Hot Water Circulation over distances of 15 km

    Electric Heat Transfer

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    23/62

    Carrier Sheathing

    27.1.11 23Page

    27m lengths welded into 500-1000m trains All production operations on line

    Trains sheathed to final location

    Final field joint tie-ins

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    24/62

    Towheads

    27.1.11 24Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    25/62

    Jura Manifold Beach Landing

    27.1.11 25Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    26/62

    Jura Manifold Beach Landing

    27.1.11 26Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    27/62

    Bulkheads

    27.1.11 27Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    28/62

    Bulkheads

    27.1.11 28Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    29/62

    Towhead Tie-In

    27.1.11 29Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    30/62

    Bundle Launch

    Structures greater than 500Te

    Tidal currents monitored & tug

    locations altered accordingly

    Tug bollard pull up to 400Te

    Capstan winch providing

    27.1.11 30Page

    o ac tens on up to e

    A99 road bridge opens to allow

    large structures to pass through

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    31/62

    Launch

    27.1.11 31Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    32/62

    Control Depth Tow Method Chains attached at regular intervals along the

    bundle.

    Ensures accurate weight control to

    approximately 0.5%.

    Weight of chain links on seabed is submergedweight of bundle.

    27.1.11 32Page

    for tow if required.

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    33/62

    CDTM in Practice

    27.1.11 33Page

    A data highway runs thelength of the bundle andallows acoustic commandsmade at one end of thebundle to be implemented atthe other, for example forvalve actuation or acousticspool metrology.

    Towmasters real-time display of bundle shape and water depth

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    34/62

    What We Can Do

    Field Concept Development, FEED Studies

    Tender Engineering

    Detailed Design & Fabrication Launch, Tow & Installation Analysis

    Dynamic & Fatigue Analysis

    27.1.11 34Page

    Regional Support (Bundles), Norway & Asia Pacific

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    35/62

    Bundle Technologies

    Advantages of Bundle Systems

    Agenda

    27.1.11 35Page 35Page27.1.11

    Shell Fram Bundle FEED

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    36/62

    Why Bundles? - Advantages

    Eliminate the requirement for heavy lift vessels by incorporating Subsea Structures within a

    Towed Production System (Maximum to date 545te).

    Testing and commissioning of complete system onshore therefore reducing offshore time: -

    Hydro testing, dewatering, drying, control fluid flushing, valve operations etc.

    Fast hook up and commissioning for early first oil dates.

    Installation under existing or temporary floating assets.

    27.1.11 36Page

    Reduced number of subsea tie-ins and spool installations.

    Seabed stability using Gravity Based or Piled design.

    Protection incorporated in structure design.

    Improved Flow Assurance / thermal Management (Heated Hot Water, Trace Heating).

    Leak mitigation in case of internal flowline failure (maintain leaked oil within Carrier Annulus) -

    Flowline safety class can be reduced when using DNV-OS-F101 Design Code.

    Use of CRA Lined pipe in place of Clad pipe or solid CRA pipe.

    High Temperature Flowline Design (up to 160C curre ntly).

    Turn out cost more predictable (reduced exposure to weather/soils risk).

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    37/62

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    38/62

    Fram Field Location

    27.1.11 38Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    39/62

    Fram Field Location

    27.1.11 39Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    40/62

    Fram Development Proposed Field Concept

    27.1.11 40Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    41/62

    Fram Development Proposed Field Layout (Xodus)

    27.1.11 41Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    42/62

    Fram Infield Layout

    27.1.11 42Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    43/62

    Fram FPSO Approaches (Xodus)

    27.1.11 43Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    44/62

    Fram Drill Centre East Towhead & Well Tie-ins (Xodus)

    27.1.11 44Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    45/62

    Fram Drill Centre West Towhead & Well Tie-ins (Xodus)

    27.1.11 45Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    46/62

    Fram Bundle FEED - Principal Design Assumptions

    Principal Design Data / Assumptions for Fram FEED:

    8 Slot towhead manifold at DCE (5 wells initially).

    6 Slot towhead manifold at DCW (3 wells initially).

    2 midline SSIV structures required at FPSO (out with swing circle).

    14 NB Gas Export SSIV located in Midline Towhead (East).

    Shared services between drill centres sin le test riser as lift riser & riser umbilical .

    27.1.11 46Page

    Mixture of Oil & Gas Wells at both drill centres. 345 Barg Design Pressure / 110C Design Temperature (Production/Test).

    Max CO2 content ~1.1 mol.% in produced fluids.

    Max. H2S ~6 ppmv in produced fluids.

    ~47,000 mg/l Chlorides in produced water.

    Water depth infield ~ 95 m (wrt LAT).

    20 year system design life

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    47/62

    Fram Bundle Cross Section Designs

    DCE & DCW Bundle Cross Sections

    27.1.11 47Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    48/62

    Midline Bundle Cross Section (Shared Services)

    Fram Bundle Cross Section Designs

    27.1.11 48Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    49/62

    Fram Bundle Cross Section Designs

    Pipe-in-pipe Insulation System Performance (both options)

    27.1.11 49Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    50/62

    CRA Lined Pipe (Butting) Mechanically Bonded (BuBi)

    Fram Bundle Production & Test Line Linepipe Design

    27.1.11 50Page

    The Mechanically bonded Butting Bimetal Pipe (BuBi Linepipe)

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    51/62

    Fram Bundle Simplified Configuration (P&ID)

    27.1.11 51Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    52/62

    Fram Bundle - DCE Towhead Pipework (General Assembly)

    27.1.11 52Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    53/62

    Fram Bundle - DCW Towhead (General Assembly)

    27.1.11 53Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    54/62

    Fram Bundle - Midline Structure East (GA)

    27.1.11 54Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    55/62

    Fram Bundle - Midline Structure West (GA)

    27.1.11 55Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    56/62

    Bundle Launch at Subsea 7s Wester Site

    27.1.11 56Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    57/62

    Bundle Tow Route

    27.1.11 57Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    58/62

    Bundle Tow Configuration

    27.1.11 58Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    59/62

    Bundle Tow Route

    27.1.11 59Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    60/62

    Control Depth Tow Method

    Chains attached at regular intervals along thebundle.

    Ensures accurate weight control toapproximately 0.5%.

    Weight of chain links on seabed is submergedweight of bundle.

    27.1.11 60Page

    for tow if required.

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    61/62

    Questions?

    27.1.11 61Page

  • 8/12/2019 Bundles Subsea Uk Lunch and Learn 2012

    62/62

    27.1.11 62Page

    seabed-to-surface

    www.subsea7.com