COLLABORATE. CONNECT. COMPLETE. Global Engineering Service Provider Energy. Environmental. Transportation. Water. CONNECT WITH US: www.stanleyconsultants.com Stanley Consultants is a consulting engineering- architectural firm with full-service capabilities including mechanical, electrical, environmental, civil, structural, architectural, cost estimating, specification, and construction engineering services. Stanley Consultants has over 1,000 members located throughout the United States and overseas offices. For 100 years, we have served more than 3,600 different educational, healthcare, utility, government agency, industrial, commercial, and private clients in all 50 states and 103 countries, representing more than 25,000 diverse engagements. We have provided services on over 900 engagements on over 140 college and university campuses. University of Colorado Boulder Experience We have had the pleasure of working on the University of Colorado Boulder campus since 1997 and have completed over 80 projects. Following is a select list of projects that we have completed: Regent Tunnel Structural Repairs Newton Court Truss Inspection Farrand Tunnel Hatch Replacement JILA Tunnel Hatch Replacement Rec Center Tunnel Hatch Replacement Tunnel Structural Evaluation Farrand Tunnel Shoring Farrand Tunnel Steam Line Replacement Steam Tunnel Repairs Williams Village Power House Boiler Controls Upgrade Building/Facilities Facts Business Building Tunnel Study Power House Structural Condition Assessment University Club Steam and Condensate Line Replacement Kittredge, Aden/Brackett, & Libby Tunnel Repairs Power House HVAC Unit Coil Freeze Analysis Tunnel Condensate Line Replacement Atlas Branch Steam Tunnel Power House Boiler Efficiency Analysis Power House Cooling Tower Addition Analysis Kittredge West Tunnel Steam Line Anchor Replacement SLHS Steam & Condensate Line Replacement Marine Court Stair Repair Power House Condenser Water System Hydraulic Analysis 13.2kV Switchgear Replacement 13.2kV Switchgear Vault Addition Marine Court Stair Analysis Power House Boiler Controls Upgrade Steam Tunnel Evaluation Power House Turbine Rotor Maintenance Pads Power House Turbine Maintenance Planning Power House HRSG Fresh Air Fire Efficiency Test Repair Tunnel Lid at Kittredge West Power House Screen Wall Design Power House Maintenance Platform Power House Temporary Boiler Power House Temporary Chiller Kittredge Commons Tunnel Repair University of Colorado Boulder campus

Upload: lamxuyen

Post on 16-Mar-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

COLLABORATE. CONNECT. COMPLETE.

Global Engineering Service Provider Energy. Environmental. Transportation. Water.

CONNECT WITH US: www.stanleyconsultants.com

Stanley Consultants is a consulting engineering-architectural firm with full-service capabilities including mechanical, electrical, environmental, civil, structural, architectural, cost estimating, specification, and construction engineering services. Stanley Consultants has over 1,000 members located throughout the United States and overseas offices. For 100 years, we have served more than 3,600 different educational, healthcare, utility, government agency, industrial, commercial, and private clients in all 50 states and 103 countries, representing more than 25,000 diverse engagements. We have provided services on over 900 engagements on over 140 college and university campuses. University of Colorado Boulder Experience We have had the pleasure of working on the University of Colorado Boulder campus since 1997 and have completed over 80 projects. Following is a select list of projects that we have completed: Regent Tunnel Structural Repairs Newton Court Truss Inspection Farrand Tunnel Hatch Replacement JILA Tunnel Hatch Replacement Rec Center Tunnel Hatch Replacement Tunnel Structural Evaluation Farrand Tunnel Shoring Farrand Tunnel Steam Line Replacement Steam Tunnel Repairs Williams Village Power House Boiler Controls Upgrade

Building/Facilities

Facts Business Building Tunnel Study Power House Structural Condition Assessment University Club Steam and Condensate Line

Replacement Kittredge, Aden/Brackett, & Libby Tunnel Repairs Power House HVAC Unit Coil Freeze Analysis Tunnel Condensate Line Replacement Atlas Branch Steam Tunnel Power House Boiler Efficiency Analysis Power House Cooling Tower Addition Analysis Kittredge West Tunnel Steam Line Anchor

Replacement SLHS Steam & Condensate Line Replacement Marine Court Stair Repair Power House Condenser Water System Hydraulic

Analysis 13.2kV Switchgear Replacement 13.2kV Switchgear Vault Addition Marine Court Stair Analysis Power House Boiler Controls Upgrade Steam Tunnel Evaluation Power House Turbine Rotor Maintenance Pads Power House Turbine Maintenance Planning Power House HRSG Fresh Air Fire Efficiency Test Repair Tunnel Lid at Kittredge West Power House Screen Wall Design Power House Maintenance Platform Power House Temporary Boiler Power House Temporary Chiller Kittredge Commons Tunnel Repair

University of Colorado Boulder campus

Page 2: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Power House Dealkalizer Study Campus Power Supply Study Campus Power Supply Study New Xcel Rates Campus Power Supply Study Commercial Gas Price Xcel Energy Reliability Assessment Chilled Water System O&M Savings Study Substation Conceptual Design Main Campus 13.2kV Electrical Distribution Study East Campus 13.2kV Electrical Distribution Study Power House HVAC Replacement Tunnel Piping System Support Replacement Power House Boiler Efficiency Test Campus Utility Tunnel Upgrade Brine Tank Construction Cristrol Chemistry Building HVAC Study Brine Tank Installation 4.16kV Electrical System Upgrade Recreation Center Pool Interior Power House Emergency Generator Electrical Operations Manual Main Campus 13.2 kV Switchgear ATO Improvements West District Plant Uninterruptible Power Supply Repl. 15 kV Electrical Distribution Resilency Impr. at Eng.

Bldg

Integrated Teaching & Learning Lab Conversion Mechanical Engineering Infill/HVAC Macky Water Line Engineering Center Domestic Hot Water System Condensate Study Williams Village Sewer Project Power Plant Roof Framing Power Plant Floor Framing Aerospace Engineering Infill and Renovation Ekeley Structural Analysis Koenig Alumina Center Steam Line Replacement Integrated Teaching & Learning Lab Ventilation,

Exhaust, Oil Project Oil Tank/Thermal Storage/Chilled Water Steam Distribution Improvements & Asbestos

Abatement Ekeley Chemistry Air Handling System Replacement Chilled Water Distribution System Improvements Power House Cooling Tower Replacement

UCB Power House UCB East Campus 13.2 kV Switchgear Replacement project

Page 3: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Additional Colorado Higher Education Experience

Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated Plumbing Pingree Park Lift Station Replace Deteriorated STM and CND North Line Hydrants Design Campus Flood Damage Repair Backflow Prevention Program Campus Street Improvements Hartshorn Student Health Center Remodeling Backflow Prevention Phase III Backflow Prevention Phase IV Colorado School of Mines Traditional Halls Steam Branch Repairs Heating Plant Steam Vent Silencer Heating Plant (Temporary) Boiler Replacement Guggenheim Hall Emergency Steam Line Replacement Campus Steam Distribution Study Campus Backflow Prevention Campus Steam Infrastructure Improvements University of Colorado Denver Utility Vault 3.2 Emergency Replacement Re-Route Steam to 400 Series Buildings Dravo Building Assessments Dravo Building Renovations Central Utility Plant RO System Evaluation RC 1&2 Power Management Control Systems Evaluation Anschutz Medical Center School of Nursing HVAC Improvement Anschutz Building 500 Electrical Switchgear Evaluation Anschutz Medical Center Mechanical Distribution Project Anschutz Medical Center Boiler Relocation and Restoration Anschutz Medical Center ED-1B Steam Condensate and Chilled Water Building Chiller Replacement Study Lawrence Center Chiller Replacement Parinatal Research Facility Chiller Vault Flange Bolts Replacement

University of Northern Colorado Replace Buried Hot Water Mains Morgan Community College Cottonwood Hall HVAC Units Fire Alarm System Integration Aspen Hall HVAC Replacement Fire Protection Williams Village Boiler Controls Upgrade Fire Alarm and Security Systems Electrical Audit/Media Distribution System Elevator/Restroom Remodeling Campus Utility Metering Welder Training/Campus Storage Facility Regis University Energy Audit Pavement Rehabilitation Mesa State College Conceptual Site Planning Western State College Steam Distribution System Renovation

Colorado School of Mines Heating Plant Temporary Boiler Replacement

Page 4: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

- Established Nearly 100 Years Ago in 1913

- Total Staff: 1,100

- 30 Major New & Retrofit Central Plants in the Past 7 Years

- Over 460,000 Tons of Chilled Water Projects

- Over 75 Chiller Projects Involving

2,000 Ton (or Greater) Chillers

- Boilers up to 250,000 pph

- Over 195 Boiler Projects

- 13 Heat Recovery Steam Generator (HRSG) Projects in the Past 4 Years

- Paralleling Generation up to 16 MW

- Hundreds of Miles of Chilled Water, Steam, High Temperature Hot Water & Electrical Distribution

- Utility Tunnels up to 12’ x 25’

CAMPUS UTILITY PLANNING Master Planning Energy Audits Life Cycle Cost Analysis Rate Studies Cogeneration Studies

CENTRAL PLANTS Central Cooling Central Heating High Temperature Hot Water Cogeneration Instrumentation & Controls Fuel Handling Permitting & Dispersion Modeling

UTILITY DISTRIBUTION Steam & Condensate High Temperature Hot Water 15kV & 5kV Electrical Emergency Distribution Communications Wastewater Systems

UTILITY TUNNEL Chilled Water Steam & Condensate Renovations & Repairs

BUILDING SERVICES HVAC Plumbing Electrical Fire Alarm & Fire Protection Communications & Security Architectural Civil StructuralCommissioning

CAMPUS UTILITY PLANNINGUNIVERSITY OF COLORADO BOULDER

Campus Power Supply StudyAssessed Reliability of Xcel Energy & Existing Cogeneration - Provided Risk Assessment Including System Stability -

Provided Life Cycle Cost Analysis -Provided Assessment of the Existing System -

Recommendations for System Reliability Improvement - Conceptual Substation Rendering -

UTILITY DISTRIBUTIONNORTHERN ARIZONA UNIVERSITY

12.47kV Elec & HTHW Replacement 4,600 LF of Electrical & Communication Duct bank -

12.47kV Double-Ended Switchgear - Ten PMH/PME Switches -

Ten Pad-Mounted Transformers - 1,700 LF of Direct-Buried, -

Gilsulate Insulated High Temperature Hot WaterFast-Track Schedule -

Excavation of Volcanic Rock -

CENTRAL PLANTS ARIZONA STATE UNIVERSITY Combined Heat & Power Plant

- Redundant 30MW Utility Feeders - 16 MW of Cogeneration Capacity - One 9.2 MW Single Shaft CT-ST - 160,000 pph of Steam Capacity - One 80,000 pph HRSG - 24,000 Tons of Chilled Water Capacity - Five 2,000 Ton Chillers Installed - 6 MW of Standby Diesel Generator Capacity - Two 2 MW Diesel Generators

UTILITY TUNNEL UTAH STATE UNIVERSITY Utility Infrastructure Replacement

- Utility Infrastructure Master Plan - 9,000 LF of Excavation Across Campus - Over 30 Vaults - Utility Tunnel up to 12’ x 25’ - 4.16kV Electrical & Communication Duct bank - Coordinated Over 500 Utility Relocates

Global Engineering Service ProviderEnergy. Environmental. Transportation. Water.

EnergyCOLLABORATE. CONNECT. COMPLETE.

Page 5: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

BRIGHAM YOUNG UNIVERSITY Central Heating Plant Modifications

COLORADO STATE UNIVERSITY Campus-Wide Backflow Prevention Upgrade

UNIVERSITY OF COLORADO DENVER ANSCHUTZ MEDICAL CENTERCentral Utility Plant

MONTANA STATE UNIVERSITYCentral Plant Improvements

UNIVERSITY OF WYOMINGBoiler Fan & VFD Replacement

NEW MEXICO STATE UNIVERSITYCogeneration Improvements

DENVER, COLORADO 8000 S. Chester St., Suite 500 Centennial, Colorado 80112

SALT LAKE CITY, UTAH 383 West Vine St., Suite 400 Murray, Utah 84123

PHOENIX, ARIZONA 1661 East Camelback Rd, Suite 400 Phoenix, Arizona 85016

OTHER LOCATIONS: Muscatine, IA (Headquarters)Austin, TXBaton Rouge, LA Chicago, ILDes Moines, IAHouston, TX

Iowa City, IA Las Vegas, NV Minneapolis, MNNaples, FLSarasota, FLTampa, FL West Palm Beach, FL

ARIZONA- Arizona State University

- Northern Arizona University

COLORADO- Adams State College- Auraria Higher Education Center- Colorado School of Mines- Colorado State University- Colorado State University Pueblo- Metro State University- Morgan Community College- Regis University- University of Colorado Boulder- University of Colorado Denver- University of Northern Colorado- Western State College

800.553.9694 www.stanleyconsultants.com

MONTANA- Montana State University- University of Montana

WYOMING- University of Wyoming

IDAHO - Boise State University

- Brigham Young University

UTAH- Brigham Young University- Southern Utah University

- University of Utah- Utah State University

- Weber State University NEW MEXICO- University of New Mexico- New Mexico State University

NEVADA - University of Nevada Las Vegas

- University of Nevada Reno

Global Engineering Service ProviderEnergy. Environmental. Transportation. Water.

Page 6: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. | Resume 1

-

Stan Worcester, P.E. Lead Electrical Engineer

Experience Summary Professional experience in the electric power generation, industrial/institutional campus, military facilities, switchyards/substations, water supply/distribution, wastewater, and overhead transmission line industries since 1988. Chief Electrical Engineer experience includes project management, project engineer, construction management, and project lead on several design projects for both domestic and international projects. Power generation projects include pulverized coal, combustion turbine, simple-cycle, combined-cycle, cogeneration, reciprocating engines, and hydroelectric generation. Engineer responsible for power plant designs and specifications for generators, transformers, isolated phase bus, generator breakers, medium and low voltage switchgear, MCCs, motors, batteries, UPS, panelboards, cathodic protection, lightning protection, and grounding. Other responsibilities include project one-line diagrams, wiring, schematics, protective relaying, computer modeling, team leadership, project budget and schedule control, contract negotiations, client liaison, field inspections, site construction, design quality assurance/quality control, change orders, claim mitigation, reports, and supervising of engineers and drafters .Construction management experience includes providing on-site field engineering, inspections, quality assurance/quality control, testing, start-up, and Owner's Engineer. All projects required interfacing and coordinating with client, contractors, subcontractors, manufacturers, and other engineering disciplines.

Representative Projects Combined Heat and Power Plant; University of Alaska Fairbanks; Fairbanks, AK, US--Lead Electrical Engineer responsible for providing the auxiliary electrical system design, including turbine generator, transformers, switchgear, MCC, UPS, and panelboards. Also developed specifications and design drawings. Stanley Consultants provided detailed engineering design for a replacement Combined Heat and Power Plant at the University of Alaska Fairbanks. The new plant will consist of one 240,000 lb/hr circulating fluidized bed boiler, one 22 MW extracting/condensing steam turbine, one air cooled condenser, and associated equipment. The boilers will be capable of burning coal from nearby Healy, Alaska. Up to 15 percent heat input can also be made up of biomass, such as green wood chips and pellets.

Arc Flash Study; Reed College, OR – Project Manager. In the initial planning phase, Stanley Consultants evaluated and assessed current conditions on the campus. The evaluation and assessment included attending a goal-setting kick-off meeting with stakeholders, reviewing record drawings for each building, survey of the campus distribution system up to building service entrances, and coordinating with the local utility. The evaluation and assessment culminated with a report detailing and estimating the work required by Stanley Consultants to complete a campus wide arc flash study for each building. Options were presented and discussed identifying top priorities for the campus resulting in a 3-year and 5-year phased approach to the study.

Years of Experience: 28

Location: Denver, CO

Education: Bachelor of Science, Kansas State University, Electrical Engineering, 1988

Registration/License: Electrical Engineering – CO – 36018

Others- KS, HI, NC, FL. MT, MN. NV, TX, PR, AK, WY, OK)

National Council of Examiners for Eng. & Surveying

Specialized Training: OSHA 10-Hour Training Course.

NACE International Certified Cathodic Protection Specialist, 4293, 03/21/94.

Page 7: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. 2

Chiller Replacement Phase 1; Arizona State University; Phoenix, AZ, US--Lead Electrical Engineer responsible for providing protective relaying setting for the motor protection and designing lightning protection for the building. Project consisted of design and construction administration services for the installation of one new 2,000-ton (refrigeration) chiller, one 2-cell, 2,000-ton cooling tower, one 200 hp condenser water pump, chilled water, condenser and refrigerant piping R-134a refrigerant storage tank, valves, new 4.16 kV and 480V switchgear, controls, instrumentation, etc. Design also included the conversion of existing Thermal Energy Storage (TES) system to DCS controls and instrumentation.

Science and Engineering Building; University of Nevada, Las Vegas; Las Vegas, NV, US--Project Manager/Lead Electrical Engineer responsible for providing campus study to optimize electrical, communication, and piping distribution. Discussed options with utility and client to determine best resolution. Stanley Consultants provided conceptual design and preliminary cost estimate for the building infrastructure (exterior of the building) alternates. The effort involved the collection of existing utility mapping and data, field review of major items, attendance at various meetings, development and analysis of alternates, and preliminary cost estimating for the utilities that would serve the building. Project included electrical distribution system; chilled and hot water systems; communication system; natural gas system; water and irrigation system; storm water drainage system; and sanitary sewer system. Several 11-inch x 17-inch colored maps were provided showing piping routes and sizes. Project used water distribution modeling with WaterCAD software, as well as sanitary sewer modeling with SewerCAD and storm sewer modeling with StormCAD.

Mechanical Distribution Project; University of Colorado Denver Health Sciences Center; Aurora, CO, US--Lead Electrical Engineer responsible for providing design of power distribution system for the mechanical vault lighting, receptacles, transformers, panelboards, and exhaust fans at existing plant. Coordinated alternatives with client for best design, specifications, and drawings. This mechanical distribution project involved extending the existing steam and chilled water distribution system to tie in the new Research Complex 2 Building (RC-2). Stanley Consultants provided design services for the installation of approximately 1,500 linear trench feet of pre-insulated, double-wall, direct-buried pipe along with two utility vaults.

Combined Heat and Power Plant; Arizona State University; Tempe, AZ, US--Lead Electrical Engineer responsible for designing electrical power distribution, medium voltage switchgear, medium voltage solid state starting analysis on chillers, diesel generators, 480V switchgear, 480V MCCs, DCS, and coordinating the cogeneration electrical design including the combustion and steam turbine, control system, and protective relaying settings. Also responsible for specifications, calculations, award of major electrical equipment, supervision of engineers, designers, and drafters. Provided budget, task lists, and scheduling for the electrical design. Also provided plant interface and coordination with the campus distribution system and the electric utility. Stanley Consultants provided design and construction administration services to APS Energy Services (APSES) for the construction of the Combined Heat and Power Plant (CHP) at Arizona State University's (University) Main Campus.

Stray Current Investigation; University of Texas/El Paso; El Paso, TX, US--Project Manager responsible for providing on-site testing and engineering support services to investigate pipe corrosion problems at the University of Texas El Paso (UTEP). The chilled water piping was investigated and a written report provided our findings and recommendations. Stanley Consultants was responsible for providing on-site testing and engineering support services to investigate pipe corrosion problems at the University of Texas El Paso. The chilled water piping was investigated and a written report provided our findings and recommendations.

138 kV Transformer T6 Installation; Texas A&M University; College Station, TX, US--QA/QC Electrical Engineer responsible for witnessing transformer factory acceptance testing to represent the client's interest to receive a quality product. Stanley Consultants recently performed a detailed review and evaluation of the Texas A&M University (TAMU) campus primary distribution system. Recommendations resulting from the evaluation and subsequent modeling of the system, taking into account campus load growth through the year 2011, included the addition of a 15/20/25 MVA transformer and associated circuit breaker at the existing 138 kV campus substation.

Page 8: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. | Resume 1

-

Chad Feuerstein, PE Sr. Mechanical Engineer / PM / Electrical QA/QC, Independent QA/QC

Experience Summary Professional experience since 2001, all with Stanley Consultants. Responsible for mechanical designs; preparing calculations, drawings, and specifications for complete design packages; technical reports; studies; master plans; construction cost estimates; schedules; and equipment selection for commercial, industrial, institutional, and energy projects. Professional experience encompasses the design of commercial, industrial, institutional, and power and energy HVAC systems involving chilled water coils, heating water coils, steam coils, direct expansion (DX) coils, ductwork systems, multi-zone systems, makeup air systems, exhaust air systems, humidification systems, reheat systems, constant air volume system, variable air volume systems, plumbing systems, chiller plants, chilled water systems, boiler plants, heating water systems, steam systems, condensate systems, chilled water, heating water, steam, condensate distribution piping systems, tunnels, vaults, direct buried infrastructure systems, cogeneration plants, simple cycle power plants, and combined cycle power plants. System design components include combustion turbine generators, heat recovery steam generators, steam turbines, fuel gas compressors, diesel generators, boilers, chillers, cooling towers, fans, pumps, heat exchangers, air compressors, storage tanks, HVAC equipment, plumbing equipment, pre-insulated piping, piping, valves and accessories, and ductwork and accessories.

Representative Projects East Campus 13.2 kV Electric Upgrade Study; University of Colorado; Boulder, CO, US--Mechanical Engineer responsible for supporting the mechanical design and coordinating with other disciplines. Stanley Consultants provided engineering services to the University of Colorado at Boulder (University) for the construction of the 13.2 kV electrical switchgear replacement on the East Campus. The existing switchgear is 45 years old and has reached the end of its useful life, is housed in a building not suitable for 15 kV switchgear, and cannot accommodate additional breakers for a second main feeder or to serve the new Systems Biotechnology Building.

Chilled Water System O&M Savings Study; University of Colorado; Boulder, CO, US--Mechanical Engineer responsible for supporting the mechanical design and coordinating with other disciplines. As part of the Campus Power Supply Study, Stanley Consultants provided evaluation of the chilled water distribution system as the majority of the chiller system is steam-driven from steam derived from waste heat of the cogeneration system.

Chiller #10 Replacement; Arizona State University; Tempe, AZ, US--Mechanical Engineer responsible for supporting the mechanical design and coordinating with other disciplines.

Years of Experience: 19

Location: Denver, CO

Education: M.S., University of Colorado-Denver, Mechanical Engineering

B.S., Rockhurst University, Mathematics

Registration/License: Mechanical Engineering:

CO: #41678

MN, ID, NM, UT, AZ

National Council of Examiners for Eng. & Surveying, 37803, USA

Specialized Training: OSHA 10-Hour Training Course. FLO-Master (PIPE-FLO). Thermoflow GT PRO and GT MASTER TRACE 700 Building Energy and Economic Analysis.

CAESAR II Pipe Stress Analysis.

Geothermal Heating and Cooling.

MSHA Mine Safety Training Program.

Page 9: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. 2

Design and construction administration services for the installation of a new 2,000-ton (refrigeration) chiller, four 150 hp condenser water pumps, 4.16 kV transformer, chilled water, condenser, and refrigerant piping, controls, instrumentation, valves, etc., at the Arizona State University Central Plant in Tempe, Arizona. High Temperature Hot Water Distribution Replacement; University of Northern Colorado; Greeley, CO, US--Project Manager/Lead Mechanical Engineer responsible for providing project management, detailed mechanical design, and construction administration services for replacement of approximately 4,220-feet of direct-buried 400°F at 400 psi high temperature hot water supply and return piping from the heating plant to the campus tunnel system located at 9th Avenue and 19th Street.

Utility Vault Repairs; University of Colorado Denver; Aurora, CO, US--Project Manager/Lead Mechanical Engineer responsible for providing mechanical design, budget and schedule control, contract tendering, client liaison, contract administration, quality assurance/quality control, bidding support, and construction administration. Managed all resources necessary to support project requirements. The project included the replacement of the steam and condensate piping systems and equipment in the vault and the replacement of the direct-buried pre-insulated piping systems on each side of the vault. The project also included the replacement of concrete anchor pedestals in the vault and the addition of a ventilation fan with a new electrical feed to the vault.

Lawrence Center Chiller Replacement; University of Colorado Denver; Aurora, CO, US--Project Manager/Lead Mechanical Engineer responsible for providing engineering services, budget and schedule control, contract tendering, client liaison, contract administration, quality assurance/quality control, bidding support, and construction administration. Provided Owner’s Engineer services to assist with overseeing the replacement of a 300-ton centrifugal chiller from the proposal phase through design, bidding, construction, and closeout.

Chiller Replacement; University of Colorado Denver Health Sciences Center; Aurora, CO, US--Project Manager/Lead Mechanical Engineer responsible for providing mechanical design, budget and schedule control, contract tendering, client liaison, contract administration, quality assurance/quality control, bidding support, and construction administration. Managed all resources necessary to support project requirements. The project included the replacement of the building 8th floor penthouse chiller and motor control center. The chilled water supply and return piping, and condenser water supply and return piping associated with the chiller, including valves, instrumentation, and piping specialties was replaced back to the nearest header or appropriate isolation point in the system.

Central Energy Plant Backup Power System Upgrade; University of Wyoming, Laramie, WY, US--Lead Mechanical Engineer responsible for providing mechanical design and cost estimate, and coordinating with other disciplines for the removal of one 930 kW diesel engine generator and remote radiator system, and the installation of two 1250 kW diesel engine generators and remote radiator systems at the Central Energy Plant to provide emergency back-up power to the facility.

Traditional Halls Steam Branch Repairs; Colorado School of Mines, CO, US--Project Manager/Lead Mechanical Engineer responsible for providing mechanical design, budget and schedule control, contract tendering, client liaison, contract administration, quality assurance/quality control, bidding support, and construction administration. Managed all resources necessary to support project requirements. The project included decommissioning the existing direct-buried and building tie-in steam and condensate piping systems, and the installation of new direct-buried pre-insulated piping systems and building tie-in piping systems. Stanley Consultants is providing engineering services for the construction of the Traditional Halls Steam Branch Repairs project. Colorado School of Mines (CSM) is decommissioning the deteriorating steam and condensate distribution system from the utility tunnel connection located under the sidewalk on the east side of Maple Street to five Traditional Hall buildings.

Page 10: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. | Resume 1

-

Steve Smith, PE Sr. Civil-Structural Engineer / PM / Electrical QA/QC, Independent QA/QC

Experience Summary Professional experience since 1985. Responsible for design, analysis, technical management, design supervision, and coordination of structural team with other disciplines. Project Manager responsibilities include budget and schedule control, contractor tendering, client liaison, contract administration, issuing change orders, preparing reports, and quality control/assurance. Professional experience encompasses layout, coordination, detailed structural design, and preparation of specifications. Field experience includes construction inspection and structural field investigations. Structural field investigations followed by analysis and report include structural overloads on roofs and floors, inspection of existing buildings and utility tunnels for structural adequacy. Served as structural engineer for value engineering teams which have provided value engineering services on water treatment plants, office buildings, manufacturing facilities, flood control projects, and seismic retrofit of facilities. Major United States and international projects include structural design for various types of projects such as office buildings, multistory university laboratory, warehouses, industrial processing and design facilities, industrial water and wastewater treatment plants, power plant facilities, high voltage electrical transmission lines and substations, and military air base facilities and support systems.

Representative Projects East Campus 13.2 kV Switchgear Replacement; University of Colorado; Boulder, CO, US --Lead Structural Engineer responsible for providing detailed design and preparing construction documents for switchgear vault and masonry screen wall. Stanley Consultants provided engineering services for the construction of the 13.2 kV electrical switchgear replacement on the East Campus. The existing switchgear was 45 years old and had reached the end of its useful life. It was housed in a building not suitable for 15 kV switchgear, and could not accommodate additional breakers for a second main feeder or to serve the new Systems Biotechnology Building.

Steam Tunnels Phase VIIA, Design and Construction Administration; University of Colorado; Boulder, CO, US--Lead Structural Engineer responsible for providing design of a tunnel strengthening system to safely support anticipated vehicular traffic. Project included design of steam and condensate piping support frames. Project involved work on Phase VIIA upgrades to the primary steam supply and condensate return system from Norlin Library to Cristol Chemistry, from the Powerhouse to Engine Alley, Hallet Hall to Willard Hall, and Kittredge West to Arnett Hall.

Steam Tunnel M00038; University of Colorado; Boulder, CO, US--Project Manager responsible for providing budget and schedule control, contract tendering, client liaison, and contract administration; preparing reports; and performing quality assurance/control. Responsible for structural repair and

Years of Experience: 32

Location: Denver, CO

Education: B.A., Iowa State University, Architecture

Registration/License: Structural Engineering:

CO: #32295

IA, MN

Professional Societies Professional Engineers of Colorado and National Society of Professional Engineers

Specialized Training: OSHA 10-Hour Training Course

Page 11: Building/Facilities Facts Colorado Higher Education Experience Colorado State University Chilled Water Plant Expansion/Renew. IDRC Complex Steam Utility Expansion Replace Deteriorated

Stanley Consultants, Inc. 2

condition monitoring of an existing steam tunnel, installation of the tunnel access hatches, and periodic construction inspection.

Tunnel 34 Reed Hall Structural Repair; University of Colorado; Boulder, CO, US--Project Manager responsible for providing budget and schedule control, contract tendering, client liaison, and contract administration; preparing reports; and performing quality assurance/control. Managed all resources necessary to support project requirements. The University of Colorado Boulder has a network of cast-in-place concrete tunnels to distribute steam, hot water, and other utilities to various campus buildings. Stanley Consultants performed a visual structural condition assessment of the tunnel system.

Business Building Tunnel Study; University of Colorado; Boulder, CO, US--Project Manager responsible for developing construction drawings used for a steam tunnel shoring procedure to allow construction traffic to drive over the existing tunnel. Tasks included developing construction loads, analysis of concrete wall and roof strength, and design of shoring system. Stanley Consultants determined the temporary structural shoring design required at the existing underground tunnels adjacent to the Business School construction project and issued construction drawings for installation. Through various site visits and engineering, Stanley Consultants determined the size and extent of the required shoring system according to general locations that UCB and the contractor identified as areas that heavy construction operations will be adjacent or on top of the existing tunnels.

Heating Plant Controls Upgrade; Utah State University; Logan, UT, US--Lead Structural Engineer responsible for providing structural steel and foundation design, drawings, and specifications. Project included conceptual design, project scoping, procurement, and construction of complete controls upgrade of steam heating plant. Facility included five boilers ranging from 20,000 lb/hr to 60,000 lb/hr of varying vintages. Controls system centralized controls into DCS-based system and project included on-line transfer of controls to new system and removal of existing controls. Controls system was designed to interface with University's Metasys information and control system.

Campus Steam Infrastructure Improvements; Colorado School of Mines; Golden, CO, US--Lead Structural Engineer responsible for providing detailed design and preparing construction documents for steam and condensate pipe support systems. Stanley Consultants provided engineering services for the replacement of approximately 200-linear-feet of existing 8-inch steam main from the CSM Heating Plant to the branch connection to Coolbaugh Hall in the utility tunnel.

Utilities Tunnel, Steam, and Condensate Distribution System Design; Loyola University Medical Center; Maywood, IL, US--Lead Structural Engineer responsible for providing the design of a utility tunnel to house steam and condensate distribution piping, electrical distribution system cables, communication system circuits, and chilled water piping. The first phase of this project included the design of 2,000-feet of underground tunnel that is 13-feet wide and 13-feet to 17-feet high, as well as five underground pump rooms adjacent to the tunnel.

Replace Boilers 7 and 8; University of Iowa; Iowa City, IA, US--Structural Engineer responsible for providing structural steel design and modifications for installation and support of the new boilers. Design for replacement of two gas-/oil-fired 150,000 lb/hr, 400 psig, superheat steam boilers and associated systems in existing power plant. Design and construction management services for replacement of two 170,000 lb/hr steam boilers in the University of Iowa Heating Plant. The boilers are powered by natural gas or No. 2 fuel oil. The unique aspects of this project included removal of two existing boilers that had been previously replaced by Stanley Consultants, and revision of supporting structure, utility emission monitoring equipment, and controls to accommodate the new boilers.

Water Treatment Plant Expansion; University of Iowa; Iowa City, IA, US--Structural Engineer responsible for providing foundation and structural steel framing design. Project was for final design and construction to upgrade and expand the existing 4 mgd water treatment and lime softening plant to 6.735 mgd. Final design of the recommended improvements was completed.