Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Upload: albert-miller

Post on 11-Jan-2016

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Building the Electric Grid of the Future in Texas; aka the CREZ Projects

Barry T. SmithermanChairman, Public Utility Commission of Texas

January 27, 2010

Page 2: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Current Policies• Despite the theater in Copenhagen, and the

misguided efforts in Washington to enact meaningful energy and climate change policies…

• Texas is leading the nation in:– Renewable energy capacity and generation,– New and innovative technologies,– Deployment of “smart grid” elements, and– Reducing emissions of CO2 and other

pollutants.2

Page 3: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

3

Eagle Pass36 MVA

Laredo100 MW

McAllen150 MW

North Tie200 MW

East Tie600 MW

SERC

WSCC ERCOT

Texas Electric MarketA Puzzle with Four Pieces

ERCOT – Electric Reliability Council of Texas

SPP - Southwest Power Pool

SERC - Southeastern Electric Reliability Council

WSCC - Western Systems Coordinating Council

Page 4: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

4

Current SPP Transmission System, With Additional 345-kV Construction Commitments, Approved Balanced Portfolio, Projects, Pending Priority Projects,

and Proposed EHV Overlay (Under Study)

Balanced Portfolio Projects

Pending Priority Projects

EHV Overlay

Page 5: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

ERCOT Competitive Market• In 1999, the Legislature

passed SB 7, which “unbundled” utility services by breaking companies up into three parts:

1. Generation Companies

2. Transmission and Distribution Utilities (TDUs)

3. Retail Electric Providers

5

Page 6: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Transmission & Distribution Utilities in ERCOT

• Own and operate transmission lines—which provide high-capacity transport of electricity—and distribution lines—which bring electricity to individual homes and businesses.

• Build new lines to connect new power generation, relieve congestion, increase reliability, and meet the growing demand for power in Texas.

• Maintain transmission and distribution lines to ensure continued system reliability.

• Read meters and collect usage information.– OVERSIGHT: TDUs are fully regulated by the PUC.

6

Page 7: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

ERCOT – A “Goldilocks” Moment• Smart grid

implementation• CREZ Transmission

approval, and process build-out

• 9000 MW Wind, going to 18,500 MW

• Robust resource margins

• Low electric prices• Reduction of CO2

emissions between 2004 and 2007

7

Page 8: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Elements of the Smart Grid• First, build the grid.

– In 2008 and 2009, ERCOT transmission service providers have completed improvement projects of approximately 1,137 circuit miles of transmission and about 8,511 MVA of autotransformer capacity, with an estimated capital cost of over $1.38 billion.

– Though 2013, planned projects are estimated to cost approximately $3 billion and are expected to improve or add about 3,400 circuit miles of transmission lines.

– Additionally, the Public Utility Commission has approved the construction of more than 2,300 miles of high-capacity transmission lines from West Texas, allowing more than 18,000 MW of renewable generation, at a capital cost of nearly $5 billion.

• Then, make it smart.– The Commission recently approved the deployment of smart meters in

the Oncor, CenterPoint , and AEP service areas, putting more than 6 million smart meters into service over the next several years.

– Implementation of the nodal system will allow for more efficient dispatch of generation in ERCOT.

– Incent the development and incorporation of PHEV into the grid.

Page 9: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

9

Page 10: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

The CREZ Process is a New Process• Typically, transmission is built from generation or

to load when there are no lines or when current lines get congested.

• Designating the zones and building transmission before the generation is in place is the reverse of what normally happens; removes “the chicken or the egg” problem.

• The PUC approved different transmission providers to build the CREZ lines to encourage new market participants rather than the rely exclusively on traditional monopoly utilities.

10

Page 11: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Transmission Line Approval Process• Utilities must apply to the PUC for a certificate of convenience and necessity (CCN)

before it can build a power line.• Under PURA, the PUC must consider factors such as the community, historical, and

aesthetic values, and the environmental integrity associated with the transmission line.

• Additional factors in PUC rules are whether the routes:– utilize existing compatible rights-of-way, including the use of vacant positions

on existing multiple -circuit transmission lines;– parallel existing compatible rights-of-way;– parallel property lines or other natural or cultural features; and– conform with the policy of prudent avoidance.

• As all customers eventually pay for transmission lines, cost is also a factor.• A CREZ transmission line must be approved within 180 days, rather then 1 year for

other transmission lines, or the application is deemed approved.• A CCN gives utilities the power of eminent domain to obtain the use of private

property easements for the power lines.

11

Page 12: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Wind Generation in ERCOT(Does not include 867 MW in SPP in Texas)

12

Page 13: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Area of best wind generation in Texas

The CREZ projects will involve the construction of more than 2,300 miles of 345 kV transmission lines, enable a total of more than 18,000 MW of wind capacity in Texas, and cost nearly $5 billion

Oncor is currently installing more than 3 million smart meters across its service area.

CenterPoint is currently installing more than 2 million smart meters in its service area.

AEP will install 1.1 million smart meters in its service areas

ERCOT System

13

The nodal market design will be implemented for ERCOT, allowing for more efficient pricing, dispatch, and siting of generation

Page 14: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

2007-2009 Energy Generated in ERCOT by Fuel Type

14

Page 15: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

ERCOT in 2009

15

Page 16: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

ERCOT in 2013

16

Assuming 18,000 MW of wind, approximately 5,600 MW of new coal, 4,300 MW of new natural gas

Page 17: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

17

Peak Summer Week Generation by Fuel Type [ACTUAL]

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Nuclear Coal CombCycle GasSteam PrivateGas GasTurbine Wind Other

Sunday 07/12/09

Monday 07/13/09

Tuesday 07/14/09

Wednesday 07/15/09

Thursday 07/16/09

Friday 07/17/09

Saturday 07/18/09

Page 18: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

1818 August 2009 ERCOT Public

2013 Peak Load Week - Generation by Fuel Type

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Nuke Coal Combined Cycle Gas Steam Private Gas Turbine Wind Other

Thursday 08/01/13

Friday 08/02/13

Saturday 08/03/13

Sunday 08/04/13

Monday 08/05/13

Tuesday 08/06/13

Friday 08/07/13

Note – no changes to existing reserves requirements were assumed for this analysis

Page 19: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

19

Typical Spring Week Generation by Fuel Type [ACTUAL]

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

Nuclear Coal CombCycle GasSteam PrivateGas GasTurbine Wind Other

Sunday 04/19/09

Monday 04/20/09

Tuesday 04/21/09

Wednesday 04/22/09

Thursday 04/23/09

Friday 04/24/09

Saturday 04/25/09

Page 20: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

2018 August 2009 ERCOT Public

2013 High Wind Week - Generation by Fuel Type

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

Nuke Coal Combined Cycle Gas Steam Private Gas Turbine Wind Other

Monday 03/11/13

Tuesday 03/12/13

Wednesday 03/13/13

Thursday 03/14/13

Friday 03/15/13

Saturday 03/16/13

Sunday 03/17/13

Note – no changes to existing reserves requirements were assumed for this analysis

Page 21: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

The American Clean Energy and Security Act of 2009, “Waxman-Markey Bill” and the Clean Energy

Jobs and American Power Act, “Boxer-Kerry Bill”

21

Issues House Version Senate Version

CO2 reduction(Greenhouse gas emission reduction by using a cap and trade program)

3% 201217% 202042% 203083% 2050

3% 201220% 202042% 203083% 2050

Renewable Energy Standard

6% in 2012 and increases to 25% by 2025.

Not addressed

Energy Efficiency Utilities must reduce “electricity consumption, relative to business-as-usual projections,” by 1% in 2012, increasing to 15% by 2020.

Requires creation of energy efficiency building codes.

Page 22: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Reduction of CO2 in Texas• A recent report by Environment Texas, “Too Much Pollution,” highlights the

decrease of CO2 emissions in Texas over the past several years.• Between 2004 and 2007, Texas saw the second highest total decline in CO2

emissions in the United States.• “On a per capita basis, emissions from electric generators in Texas fell by 4

percent between 2004 and 2007—the result of reduced reliance on coal and an increase in the share of power produced by natural gas and wind.”

• “Texas-which is now America’s number one producer of wind power-has been able to use its growing wind power portfolio to reduce the need for additional fossil fuel generation, keeping emission growth from the electricity sector at bay.”

• “Texas, meanwhile, has led the nation in wind energy installations, helping to stabilize emissions from its power sector…[showing] that switching from highly polluting fuels such as coal and oil to cleaner sources of power, including renewable energy, can lead to rapid and substantial reductions in emissions.”

22

Page 23: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Change in Total Carbon Dioxide Emissions from Fossil Fuels, 2004 to 2007

23

Page 24: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Preparing for Electric Vehicles• Use of EV/PHEVs can help lower emission of pollutants, utilize less fossil fuels as

the amount of wind generation in Texas grows, and help address energy security issues by reducing the amount of imported oil.

• Powering a car on electricity would result in 93 percent less smog-forming volatile organic compounds and 31 percent less nitrogen oxide emissions than powering a car on gasoline.

• Operating costs of plug-in cars are likely to be significantly lower than those of gasoline-powered cars. Electricity costs three to five cents per mile with average electric rates, or the equivalent of $0.75 to $1.25 per gallon of gasoline.

• Market participants, such as Reliant, Oncor and TXU, have announced support for deployment of EVs in Texas.

• Use of smart meters, with time-of-use products, could help insure that customers charge their vehicles with inexpensive off-peak energy and take advantage of wind energy generated at night.

24

Page 25: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

25

ERCOT Reserve Margin Changes2009 2010 2011 2012 2013 2014 2015

May 2007 10.1% 8.3% 6.7% 5.9% n/a n/a n/aDecember 2007 12.1% 14.0% 11.2% 10.5% 8.2% n/a n/aMay 2008 16.5% 17.3% 15.0% 14.5% 12.3% n/a n/aDecember 2008 15.8% 21.2% 18.7% 17.8% 17.9% 15.8% n/aMay 2009 16.8% 20.1% 18.8% 17.0% 16.3% 13.9% n/aDecember 2009 n/a 21.8% 19.9% 18.1% 14.7% 12.3%

10.2%

• The following units have recently begun commercial operation, are under construction, or have been announced: JK Spruce 2 for 750 MW (expected completion date of June 2010), Oak Grove 1 (completed) and 2 (mid 2010) for 1710 MW, Sandy Creek for 925 MW (2012), Nueces Bay for 112 MW (1Q 2010), Barney Davis for 348 MW (1Q 2010), Sandow 5 for 581 MW (completed), Limestone 3 for 800 MW (2012) and more than 2,200 MW of wind generation with signed interconnection agreements.

• The reduction of the reserve margin in 2013-2015 reflects the exclusion of the Cobisa Greenville Project, a 1,792 MW natural-gas fired plant that was scheduled for completion in 2013, after the company announced a delay in the construction of the facility.

• ERCOT only counts 8.7% of wind generation nameplate capacity when calculating reserve margins.

Page 26: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

26

Load Zone Price Data

Total Load Weighted Average Price ($/MWH)*[MCPE weighted by Total Zonal Load]

*Represents the average price for loads within the zone

Load Zone

Nov 2009

Oct 2009

Sept 2009

Aug 2009

July 2009

June 2009

May 2009

April 2009

March 2009

Feb 2009

Jan 2009

South $27.77 $31.22 $30.82 $32.51 $35.67 $82.81 $32.97 $24.27 $26.35 $27.27 $34.69

North $27.75 $30.25 $26.96 $32.47 $35.81 $35.15 $32.99 $24.82 $32.21 $27.89 $32.32

Houston $27.72 $31.61 $31.25 $32.81 $35.68 $61.82 $32.70 $24.58 $29.11 $27.19 $32.78

West $27.02 $27.84 $24.32 $29.84 $33.75 $32.95 $24.57 $12.93 $25.70 $19.93 $24.04

Load Zone

Nov 2008

Oct 2008

Sept 2008

Aug 2008

July 2008

June 2008

May 2008

April 2008

March 2008

Feb 2008

Jan 2008

South $41.11 $55.19 $46.77 $88.47 $97.86 $147.24 $171.09 $83.65 $64.34 $63.26 $60.24

North $40.69 $48.98 $45.38 $89.19 $97.08 $104.37 $86.41 $74.92 $69.64 $59.05 $62.31

Houston $40.88 $56.01 $48.61 $88.40 $97.30 $129.48 $152.76 $100.00 $68.19 $60.06 $60.16

West $34.62 $41.16 $43.72 $84.92 $90.98 $82.22 $58.01 $58.59 $38.52 $56.84 $52.04

Page 27: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Current Residential Retail Prices in ERCOTLowest Offers Available (Average price based on use of 1000 kWh, January 12, 2010, from www.powertochoose.com)

Service Area Fixed-Price Offers(term of at least 3 months)

Variable Price Offers

Renewable Generation Offers (100% renewable)

Dec. 2001 prices (Not adjusted for inflation)

Dec. 2001 prices (inflation adjusted)

AEP – TCC 9.9¢/kWh 9.1¢/kWh 9.6¢/kWh 9.6¢/kWh 11.7¢/kWh

AEP – TNC 9.0¢/kWh 8.8¢/kWh 9.3¢/kWh 9.6¢/kWh 12.2¢/kWh

CenterPoint 9.6¢/kWh 8.7¢/kWh 9.2¢/kWh 10.4¢/kWh 12.7¢/kWh

Oncor 9.2¢/kWh 8.2¢/kWh 8.7¢/kWh 9.7¢/kWh 11.8¢/kWh

TNMP 9.2¢/kWh 8.3¢/kWh 8.9¢/kWh 10.6¢/kWh 12.9¢/kWh

Austin: 9.0¢/kWh; San Antonio: 8.7¢/kWh (based on 1000 kWh)

27

Page 28: Building the Electric Grid of the Future in Texas; aka the CREZ Projects Barry T. Smitherman Chairman, Public Utility Commission of Texas January 27, 2010

Questions?

For this and other presentations, go to

http://www.puc.state.tx.us/about/commissioners/index.cfm and follow the link for Chairman Smitherman.