building strong sm los angeles district american council of engineering companies briefing by col...

27
BUILDING STRONG SM Los Angeles District Los Angeles District American Council of Engineering Companies Briefing by COL Thomas H. Magness District Commander Los Angeles District US Army Corps of Engineers 22 JULY 2009 Title Page

Upload: marilynn-mccarthy

Post on 18-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

BUILDING STRONGSM

Los Angeles District

Los Angeles District

American Council of Engineering Companies Briefing

by

COL Thomas H. MagnessDistrict CommanderLos Angeles District

US Army Corps of Engineers

22 JULY 2009

Title Page

BUILDING STRONGSM

Los Angeles District

226,000 square miles

Provides support to 8 million acres of military installations

80,000 acres of USACE project properties

420 miles of shore line / 14 harbors

ENVIRONMENTAL “EXTREMES” ( in contiguous 48 states ) :

Hottest and Driest Locations ( Death Valley )Highest Elevation - Mount Whitney ( 14,494 feet above sea level )

Lowest Elevation - Bad Water, Death Valley ( 282 feet below sea level )Critical Habitat / Biodiversity ( 385 Threatened / Endangered Species )

30 Million people ( 1 in 10 Americans )

Population growing by 500,000 annually

3 of 7 Most Populated US cities ( Los Angeles / San Diego / Phoenix )

8 U.S. SEN / 44 U.S. REP / 4 GOV

World’s 8th largest economy ( > Canada / Spain )

CA ports = 40% US trade by volume

Ports of LA / Long Beach = US No. 1 and 3

LA Customs = US No. 1 ( $300 BIL annually )

LA Metro = US No. 1 manufacturer ( employment )

Navigation

Flood Control

Engineering Design

Military Construction

Emergency Operations ( PL 84 – 99 )

Environmental Restoration

Regulatory Permitting ( § 404, Clean Water Act )

International and Interagency Support

Overseas Contingency Operations / Homeland Security

Civil Works

Military

Army Installation

Air Force Installation

Area Office

Resident Office

OREGON

IDAHO

WYOMING

COLORADO

NEVADA

NEW MEXICO

TEXAS

UTAH

ARIZONA

CALIFORNIA

BUILDING STRONGSM

Los Angeles District

Davis-Monthan AFB

Fort Huachuca

Military ProgramFY08 = $ 362.7MFY09 = $ 380.1M

Army ‘08 = $ 178.7MArmy ’09 = $ 82.6M

Operations & Maint = $99.6M Environmental = $ 27.4M

Air Force ‘08 = $ 112.5M Air Force ’09 = $ 170.5M

BUILDING STRONGSM

Los Angeles District

• Construct Barracks w/Co Ops Facility– $12M - $22M– MATOC/Unrestricted (Barracks)– 8(a) Competitive (COF)– 4th QTR/FY09

• Repair Barracks Bldg 264– $2.5M - $3.5M– POCA– 4th QTR/FY09

• Repair Barracks Bldg 261– $1.5M - $2M– POCA– 4th QTR/FY09

Return

Fort IrwinFort Irwin• Repair Chilled/Hot Loop Feed

System– $1.5M - $2M– POCA– 4th QTR/FY09

• Repair Athletic Center– $500K - $1M– POCA– 4th QTR/FY09

• Repair Road Shoulders– $500K - $1.5M– POCA– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

• Repair Fence & Install Cable Barrier at Coast Gate– $50K - $100K– POCA– 4th QTR/FY09

• Replace Water Line– $1.5M - $2M– POCA– 4th QTR/FY09

• Replace HVAC – $500K - $1M– POCA– 4th QTR/FY09

Vandenberg AFBVandenberg AFB• Replace Water System

– $2M - $3M– DB– 4th QTR/FY09

• Replace Water Line– $1M - $2M– POCA– 4th QTR/FY09

• Maintain Backflow Prevention Devices Basewide– $100K - $200K

BUILDING STRONGSM

Los Angeles District

• Lighting System – Sensors (ECIP)– $1.5M– SB-Set-Aside– 4th QTR/FY09

• High Speed Gravel Test– $5M– SB-Set Aside

– 3rd QTR/FY09

• Security & Safety Improvements– $1M - $3M– SB-Set Aside– 3rd QTR/FY09

Yuma Proving GroundsYuma Proving Grounds

BUILDING STRONGSM

Los Angeles District

• Fire/Crash Rescue Station– $10M - $20M– SB-Set-Aside– 4th QTR/FY09

Davis-Monthan AFBDavis-Monthan AFB

BUILDING STRONGSM

Los Angeles District

• UAS– $8M - $12M– 8a Competitive– 4th QTR/FY09

• Repair Admin Building – $1M - $2M– POCA– 4th QTR/FY09

• Replace Evap Cooling– $2M - $3M– POCA– 4th QTR/FY09

Fort HuachucaFort Huachuca• Construct Mezzanine-Barnes

Field House– $50K - $150K– POCA– 4th QTR/FY09

• Repair Base Wide EMCS– $500K - $1M– POCA– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

• Main Gate/Sewer Transfer Station– $4M - $8M– SB-Set-Aside– 4th QTR/FY09

Creech AFBCreech AFB

BUILDING STRONGSM

Los Angeles District

• Airfield Fire Rescue Station– $5M - $15M– SB-Set-Aside– 4th QTR/FY09

• Child Development Center (ARRA project)– $10M - $15M– Unrestricted– 4th QTR/FY09

• Child Development Center (NAF funded)– $3M - $7M– SB-Set-Aside– 4th QTR/FY09

• Hangar/Maint Unit– $25M - $35M– Unrestricted– 4th QTR/FY09

Nellis AFBNellis AFB

BUILDING STRONGSM

Los Angeles District

California Air National GuardCalifornia Air National Guard HVAC/Electrical Upgrade/Window Replacement & Latrines

– $500K - $1M– POCA– 4th QTR/FY09

Camp PendletonCamp Pendleton22190 Dental Renovation

– $1M - $2M– POCA– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles DistrictCivil Works Program

Flood Risk Management:

Prado Dam

Ecosystem Restoration:

Tres Rios

Navigation, Ports & Harbors:Port of L.A.

BUILDING STRONGSM

Los Angeles District

CIVIL WORKS PROJECTSCIVIL WORKS PROJECTSTYPES of WORKTYPES of WORK

• The Civil Works program contracts for Architect Engineer services primarily though Indefinite Delivery Type contracts. All AE contracts are advertised in FEDBIZOPS and about 2 new AE’s are hired each year, on average. Delivery orders are issued from these contracts for Plans and Specifications, Surveys, Geotechnical Investigations, etc.

• The Civil Works program awards Construction Contracts for channel and levee improvements, environmental restoration, shore protection, harbor dredging, water and wastewater facilities, and other civil works projects. Contracts are typically awarded based on competitive bidding.

• Service Contracts are awarded for professional services for development of Environmental Assessments and Environmental Impact Statements and the associated studies and field surveys.

BUILDING STRONGSM

Los Angeles District

Construction Contracts Construction Contracts • Harbor/South Bay, CA

– $1.5M – $3M– 4th QTR/FY09

• LA County Drainage Area, CA– $2.8M - $4M– 4th QTR/FY09

• Nogales Wash, AZ– $500K - $2M– 4th QTR/FY09

• Rural Nevada Searchlight, NV– $2M - $3M– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

Construction Contracts Construction Contracts • Santa Ana River Mainstem, CA (2)

– $3M - $25M– 4th QTR/FY09

• Santa Paula, CA– $3M - $4M– 4th QTR/FY09

• Santa Maria River, CA (2)– $5M - $20M– 4th QTR/FY09

• Tres Rios, AZ– $9M - $15M– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

Construction Contracts Construction Contracts • Tropicana & Flamingo Washes, NV

– $1M - $2M– 3rd QTR/FY09

• Upper Newport Bay Eco, CA– $5M – 13M– 4th QTR/FY09

• O&M Dana Point, CA– $100K - 200K– 4th QTR/FY09

• O&M San Diego – Mission Bay– $4M - $5M– 4th QTR/FY09

• O&M Santa Barbara Harbor, CA– $500K - $8.5K– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

Construction Contracts Construction Contracts • Upper Newport Bay Eco, CA

– $5M – 13M– 4th QTR/FY09

• O&M Dana Point, CA– $100K - 200K– 4th QTR/FY09

• O&M San Diego – Mission Bay– $4M - $5M– 4th QTR/FY09

• O&M Santa Barbara Harbor, CA– $500K - $8.5K– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

A/E Services A/E Services

• QA Services (SB Set - aside), SPD Wide– $1M - $5M– 4th QTR/FY09

• Coastal Planning Services (SB Set - aside), CA– $1M - $5M– 4th QTR/FY09

• Coastal Planning Services (Unrestricted), CA– $1M - $5M– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

A/E Services A/E Services • Water Resources, H&H Eng (SB Set - aside), CA

– $1M - $5M– 4th QTR/FY09

• Water Resources, H&H Eng (Unrestricted), CA– $5M - $10M– 4th QTR/FY09

• Civil Engineering, Design (SB Set - aside), CA (2)– $1M - $5M– 4th QTR/FY09

• Civil Engineering, Design (Unrestricted), CA (2)– $5M - $10M– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

A/E Services A/E Services • Civil Engineering, Design (Unrestricted), CA (2)

– $5M - $10M– 4th QTR/FY09

• Geotechnical, (SB Set - aside), CA (2)– $1M - $5M– 4th QTR/FY09

• Geotechnical, (Unrestricted), CA (2)– $5M - $10M– 4th QTR/FY09

BUILDING STRONGSM

Los Angeles District

New Acquisitions

THREE MATOC’s - $49.5M each

VA Specific (SDVOB) Source Selection – 2 Jun 09Phase II RFP – 02 Jul 09Scheduled award for - Aug 09

VerticalRFP Phase I – Re-issue 4th Qtr FY09Award - 1st Qtr FY10

Horizontal RFP Phase I Issued – 4th Qtr 09Scheduled for Award 1st Qtr 10

Regional DB MATOC <$500M

Civil, Military, IIS, forhorizontal and verticalconstruction within SPD

Issue RFP (Phase I) 4th Qtr FY09Award – FY 10

Regional DB MATOC(s)Regional DB MATOC(s)::

BUILDING STRONGSM

Los Angeles District

NEVADA

Interagency & InternationalSupport

ARIZONA

UTAH

CALIFORNIA

CBP Tactical InfrastructureVertical Infrastructure ( 225 miles )

Border Patrol / Customs and Border PatrolBureau of Indian AffairsBureau of Land ManagementBureau of PrisonsDepartment of AgricultureDrug Enforcement AgencyEnvironmental Protection AgencyFederal Emergency Management AgencyDepartment of Homeland SecurityFood and Drug AdministrationInternational Boundaries and Water CommissionVeteran’s Administration

VA Support CA -

92 Projects(2008-2009 ~ $101M)

LOS ANGELES

LAS VEGAS

PHOENIX Yuma Wellton

AjoTucson

Casa GrandeFlorence

Wilcox

DouglasNacoNogales

Brown FieldCampo

Chula Vista

El Cajon

Imperial Beach

San Clemente

Murrieta

CalexicoEl Centro

Indio

Riverside

Blythe

CBP Support162 projects Vertical Construction (2005-2008 ~ $399M)

SBI-NET SupportBorder Fence46 Projects (2007-2009 ~ $775M)

BUILDING STRONGSM

Los Angeles District

Other Contracting OpportunitiesOther Contracting Opportunities

*Expecting ~$10M-$20M in additional VA projects - information will not be available until VA prioritizes among 65+ desired projects

Veterans Administration,* VISN #22, CA – SB Set-Aside

• San Diego -- $1.7M - $2.2M/FY09• Long Beach -- $7M - $8.1M/FY09• Greater Los Angeles -- $25M - $33M/FY09• Loma Linda -- $6M - $7.5M/FY09

CBP Stations, AZ

• Naco -- $34M 3rd QTR/FY10• Ajo -- $39M, 1st QTR/FY10

BUILDING STRONGSM

Los Angeles District

Sustainable “Green” EngineeringSustainable “Green” Engineering

Cambria Desalinization PlantCambria, CA

850kW Wind Power GeneratorFort Huachuca, AZ

MOUT SiteFort Irwin, CA (NTC)

• Walls made of studcast• Cut the budget by 30%• Accelerated constr by50%

• Will provide potable watersupply; contamination currentlylimiting available sources

Sustainable Needand Potential!

Opportunity for new partnerships in:

MILCONCivil Works

I&IS

Wind

Solar

Land area

Lack of water

Growing population

BUILDING STRONGSM

Los Angeles District

Doing Business With the CorpsDoing Business With the Corps• Proven record of performance

• Relationships, relationships, relationships

• Understand the Army Corps of Engineers Project Delivery Process

• Know you strengths and weaknesses

• Use the Corps and the Federal Business Opportunities website

• Be a part of the solution - help us meet our goals

• Deliver!

BUILDING STRONGSM

Los Angeles District

Los Angeles District:www.spl.usace.army.mil

Los Angeles District Commander:[email protected]

Los Angeles District Small Business Administrator:[email protected]

Doing Business With the Corps

http://ebs.spl.usace.army.mil/

www.fedbizopps.gov

BUILDING STRONGSM

Los Angeles District

Questions?Questions?