BUILDING SERVICES WATER SYSTEM SERVICES FOR 12- STOREY APARTMENT BUILDING

Upload: nur-azreen

Post on 16-May-2015

456 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Building services

BUILDING SERVICES

WATER SYSTEM SERVICES FOR 12-

STOREY APARTMENT BUILDING

Page 2: Building services

COMPANY PROFILECompany name : BSW Berhad

Address :

BSW Bhd Building,

Jalan Tronoh Utama, 037500 Tronoh,Perak Darul Ridzuan

Contact :

E-mail : [email protected]

Call : (+603-9813913)

Fax : (+603-9813912)

 

Nature of business:

1. BSW Berhad have become the most reliable and amazing virtual center for designing and engineering.

2. Providing services in all aspect of engineering including civil, structural and building services.

Page 3: Building services

COMPANY OVERVIEW• BSW Berhad incorporated on 17th August 1995. • Was started in east coast especially in Terengganu and Kelantan.• Has branches in Singapore after two years.• Was set up primilarily to supply foreign workers to qualified businesses in

Malaysia. • The second branch located at Gangnam, Korea and the new places at

Seoul.• involved in many kind of constructions such in building, mechanical and

environmental engineering.• have extensive experience with public and private sector projects.• had construct are Kuala Lumpur Management University (KLMU) Kuala

Lumpur , Malaysia (2007) and Swiss Garden Hotel, Resort and Country Golf Club, Lumut Perak, Malaysia (2008) as Mechanical Engineering contractor.

Page 4: Building services

ORGANIZATION COMPANY

MANAGERNorsaladila binti

Makhtar

ASS. MANAGERNur Izzati binti Ab.

Rahman

PROF.ARCHITECTEzza Hafriza binti

Hussin

CONST. ENGINEERNur Azreen binti Ab.

Aziz

CONSULTANT QSAlyaa Anisah binti

Azmi

Page 5: Building services

MISSION

VISIONTO FULFILL AND ENHANCE CUSTOMER’S

SATISFACTION WITH CRITICAL AND DEEP THINKING, COMING UP WITH BEST RESULTS WHICH LEADS TO

LOYALTY AND RETENTION, AND MAKE THE WORLD A GREENER PLACE BY PRESERVING OUR ENVIRONMENT

PROVIDE SOLUTIONS FOR CLIENTS IN ORDER TO ACHIEVE COMFORT AND LUXURY, WITHOUT

FORGETTING AND COMPROMISING THE DEFINITION OF QUALITY AND PRICE.

Page 6: Building services

OBJECTIVE

• To supply adequate water supply to occupants inside the building of CTZ Properties bhd.

• To prevent shortage of water supply.• For future maintenance or repairing.• To provide building occupants with cold and hot

water.• To provide the occupants with treated, purified,

clear water for daily uses, necessities and activities.

Page 7: Building services

SECTION DRAWING

Page 8: Building services

PLAN ELEVATION

Page 9: Building services

FLOOR PLAN

Page 10: Building services

FRONT ELEVATION

Page 11: Building services

SIDE ELEVATION

Page 12: Building services

SITE LOCATION

Page 13: Building services

SITE LOCATION

Page 14: Building services

WHY BSW BHD. CHOSE THE LOCATION?

The natural and clean sources of water from the top of hill and directly at Sungai Belaga.

Direct water supply from sources of water.

The facilities for the residents.

Suitable soil.

Page 15: Building services

RAW WATER IS TAKEN FROM SURFACE WATER INTAKE WHICH IS AT SUNGAI BELAGA

Page 16: Building services

INLET GATE Structure constructed at the river bank or reservoir for

water intake Strong and stable• When the water flow which large floating debris it

does not damage the structure. Coarse and fine screens are placed at the inlet gate

to trap debris in river. Entrance of the inlet gate is big enaugh.• Quantity of water pump meets the water treatment

plant requirement can be operated during low flow season

Page 17: Building services

INLET GATE STRUCTURE

Page 18: Building services

WATER TREATMENT PROCESS

ScreeningAeration

filtering

Chemical diffusion

SedimentationCoagulation

and Flocculation

Adjustment of pHChlorinationFluoridation

Page 19: Building services
Page 20: Building services

SCREENING PROCESS

• A screen is placed at the water entrance of inlet gate, to prevent floating impurities from entering pumping chamber.

• Coarse screen : to exclude large sized impurities.

• Fine screen: placed after the coarse screen to remove final impurities.

Page 21: Building services

AERATION

• Function of water aeration process;i. Increase the dissolve oxygen in the water.ii. Enhance the freshness of wateriii. Reduce hydrogen sulphude odour in wateriv. Oxidize soluble iron andmanganese into

insoluble iron and manganese oxide

Page 22: Building services

CHEMICAL DIFFUSION

• Chemical is add into raw water.• The chemical is added in the channel that

transport water from aeration process basin to flucculation process tank.

• Purpose: To generate thickening agent to trap micro impurities in water.

Page 23: Building services

FLOCCULATION AND COAGULATION

• Alum acts as a thickening agent that allo small particles combine and form flucculations.

• Coagulations is a process where fine flocculants are combined togather to form larger and heavier flocculants.

Page 24: Building services

SEDIMENTATION

purposedTo remove suspended solid from water

Sedimentation tank

One level rectangular with horizontal flow

Two level rectangular with horizontal flow

Page 25: Building services

FILTRATION

• Carried out by passing the water through the porous medium that can trap suspended elements.

• Pressure filter --> Placed in airtight tank, so the pressure can be applied on water.

Filtration

Rapid sand filter

Pressure filter

Page 26: Building services

FLUORIDATION

• Fluoride is add on the water.• Function: To reduce the dental problems

among consumer especially children.• Chemical compound normally used in

flouridation process sodium silicofluoride• Concentration of fluoride permitted isbetween

0.6-0.8mg

Page 27: Building services

CHLORINATION

• Function : to Eliminated bacteria.• Chlorine agent in the form of solid, liquid or

gas is added into specific dostage.• Normally method that used in water

treatment is by chlorination• Chlorine agent or chlorine compound in the

form solid , liquid or gas is added into water specific dosage

Page 28: Building services

ADJUSTMENT OF PH

• Low acidic value cause corrosion in the distribution pipe.

• Function : To prevent corrosion in pipe.• Hydrated lime Ca(OH)

Page 29: Building services

METHOD DISTRIBUTION OF

PURIFIED WATER TO

DEVELOPMENT

Page 30: Building services

GRAVITY AND PUMP SYSTEM

Page 31: Building services

GRAVITY AND PUMP SYSTEM

Page 32: Building services

EXPLANATION• Combination of both gravity and pumping system.

The gravity system usually must locate at high land that called reservoir.

Water in reservoir will be an adequate supply, in case the pump broke down.

Water in service tank is distribute during high demand at peak hours.

At night, water is store in service tanks to be distributed during hour the following day.

Therefore, both pump and gravity system are works together.

Page 33: Building services

ADVANTAGES : Economical and practical because pumping

process are operates at fixed rate.

Pump operates with high efficient and required less maintenance.

Easy to design the pipe layout

Damage is easy to be reduces : Any system can be used when there are a few

damages in this system.

Page 34: Building services

DISADVANTAGES

If supplied is located lower than water treatment plant, pressure in the pipe becomes too high ndeasily damages pipe and distribution system

High pressure during low emand period especially at night

High operational cost to maintain pump and distribution system.

Page 35: Building services

COOL WATER SUPPLY

Page 36: Building services

MATERIAL• Pipes – Mild Steel and Polythene• Tank – SteelSIZE• Main Tank – 2500mm L x 2600mm W x

3486mm H• Storage Tank – 1834mm L x 1951mm W x

2980mm H

Page 37: Building services

HOT WATER SUPPLY

Page 38: Building services

MATERIAL• Pipes – Lead and Copper• Water Heater – Copper

Page 39: Building services

WATER TANK

Page 40: Building services

CONCLUSION• Various kinds of sanitary appliances are needed in

order to fulfill a variety functions which are supplied with water.

• Propose built at the best location which is Jalan Gopeng near Sungai Belaga because of the nearest water sources.

• Propose to use the Gravity & Pump system and Radial system for the distribution system.

• Propose to use indirect system which used less pressure to transfer the water into the building and can supply emergency water supply.

Page 41: Building services

COST ESTIMATION FOR 1 UNIT OF APARTMENTNO MATERIAL RATE QUANTITY AMOUNT

ESTIMATION FOR WATER TREATMENT

1. Water Tank RM900.00 52 RM46800.00

2. Machine Equipment RM45000.00 3 RM135000.00

3 Pump RM1000.00 6 RM6000.00

4 Chemical subtanes RM1000.00 Assumption (5)

RM5000.00

5 Manholes RM2000.00 8 RM16000.00

Sub-total RM208800.00

ESTIMATION FOR WATER SUPPLY

1. Septic Tank RM1200.00 4 RM4800.00

2. Pipe Valve RM30.00 700 RM21000.00

3. Pump RM1000.00 6 RM6000.00

4. Water Meter RM300.00 6 RM1800.00

5. Garden Tap RM20.00 8 RM160.00

Sub-total RM33760.00

Main total RM242560.00

Page 42: Building services

OVERALL COST ESTIMATION

RM 242560.00X 24 apartment

RM 5821440.00