Prevailing Wage Rates System Annual Adjusted July 1st Rates Building Rates County Town Hourly Benefit Hourly Rate Classification Fairfield Bethel 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal and encapsulation (except its removal from mechanical systems which are not to be scrapped), toxic waste removers, blasters.**See Laborers Group 7** Fairfield Bethel 30.99 $40.21 1c) Asbestos Worker/Heat and Frost Insulator Fairfield Bethel 26.01 $38.34 2) Boilermaker Fairfield Bethel 33.31 + a $35.71 3a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), Stone Masons Fairfield Bethel 25.87 $34.90 3b) Tile Setter Fairfield Bethel 22.35 $31.69 3c) Terrazzo Mechanics and Marble Setters Fairfield Bethel 21.75 $26.70 3d) Tile, Marble & Terrazzo Finishers Fairfield Bethel 32.06 $33.48 3e) Plasterer Fairfield Bethel ------LABORERS------ Fairfield Bethel 22.15 $31.00 4) Group 1: Laborers (common or general), acetylene burners, concrete specialists, wrecking laborers, fire watchers. Fairfield Bethel 22.15 $31.25 4a) Group 2: Mortar mixers, plaster tender, power buggy operators, powdermen, fireproofer/mixer/nozzleman (Person running mixer and spraying fireproof only). Fairfield Bethel 22.15 $31.50 4b) Group 3: Jackhammer operators/pavement breaker, mason tender (brick), mason tender (cement/concrete), forklift operators and forklift operators (masonry). Fairfield Bethel 22.15 $32.00 4c) **Group 4: Pipelayers (Installation of water, storm drainage or sewage lines outside of the building line with P6, P7 license) (the pipelayer rate shall apply only to one or two employees of the total crew who primary task is to actually perform the mating of pipe sections) P6 and P7 rate is $26.80. As of: July 1, 2020

Upload: others

Post on 04-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Prevailing Wage Rates SystemAnnual Adjusted July 1st Rates

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bethel 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal and

encapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Bethel 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Bethel 26.01$38.342) Boilermaker

Fairfield Bethel 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Bethel 25.87$34.903b) Tile Setter

Fairfield Bethel 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Bethel 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Bethel 32.06$33.483e) Plasterer

Fairfield Bethel ------LABORERS------

Fairfield Bethel 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Bethel 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Bethel 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Bethel 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 2: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bethel 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Bethel 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Bethel 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Bethel 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Bethel 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Bethel 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Bethel 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Bethel 26.19$34.945a) Millwrights

Fairfield Bethel 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Bethel 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Bethel -----LINE CONSTRUCTION----

Fairfield Bethel 6.5% + 9.00$26.50Groundman

Fairfield Bethel 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Bethel 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Bethel 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Bethel ----OPERATORS----

Fairfield Bethel 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Bethel 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 3: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bethel 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Bethel 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Bethel 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Bethel 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Bethel 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Bethel 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Bethel 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Bethel 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Bethel 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Bethel 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Bethel 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Bethel 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Bethel 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Bethel 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Bethel 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 4: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bethel 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Bethel 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Bethel ------PAINTERS (Including Drywall Finishing)------

Fairfield Bethel 22.55$35.6210a) Brush and Roller

Fairfield Bethel 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Bethel 22.55$36.1210c) Paperhanger and Red Label

Fairfield Bethel 22.55$38.6210e) Blast and Spray

Fairfield Bethel 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Bethel 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Bethel 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Bethel 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Bethel 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Bethel 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Bethel ------TRUCK DRIVERS------

Fairfield Bethel 25.79 + a$29.8617a) 2 Axle

Fairfield Bethel 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Bethel 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Bethel 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Bethel 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Bethel 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 5: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bethel 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Bethel 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Bethel 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Bridgeport 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Bridgeport 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Bridgeport 26.01$38.342) Boilermaker

Fairfield Bridgeport 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Bridgeport 25.87$34.903b) Tile Setter

Fairfield Bridgeport 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Bridgeport 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Bridgeport 32.06$33.483e) Plasterer

Fairfield Bridgeport ------LABORERS------

Fairfield Bridgeport 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Bridgeport 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Bridgeport 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Bridgeport 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 6: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bridgeport 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Bridgeport 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Bridgeport 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Bridgeport 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Bridgeport 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Bridgeport 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Bridgeport 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Bridgeport 26.19$34.945a) Millwrights

Fairfield Bridgeport 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Bridgeport 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Bridgeport -----LINE CONSTRUCTION----

Fairfield Bridgeport 6.5% + 9.00$26.50Groundman

Fairfield Bridgeport 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Bridgeport 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Bridgeport 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Bridgeport ----OPERATORS----

Fairfield Bridgeport 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Bridgeport 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 7: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bridgeport 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Bridgeport 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Bridgeport 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Bridgeport 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Bridgeport 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Bridgeport 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Bridgeport 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Bridgeport 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Bridgeport 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Bridgeport 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Bridgeport 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Bridgeport 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Bridgeport 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Bridgeport 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Bridgeport 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 8: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bridgeport 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Bridgeport 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Bridgeport ------PAINTERS (Including Drywall Finishing)------

Fairfield Bridgeport 22.55$35.6210a) Brush and Roller

Fairfield Bridgeport 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Bridgeport 22.55$36.1210c) Paperhanger and Red Label

Fairfield Bridgeport 22.55$38.6210e) Blast and Spray

Fairfield Bridgeport 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Bridgeport 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Bridgeport 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Bridgeport 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Bridgeport 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Bridgeport 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Bridgeport ------TRUCK DRIVERS------

Fairfield Bridgeport 25.79 + a$29.8617a) 2 Axle

Fairfield Bridgeport 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Bridgeport 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Bridgeport 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Bridgeport 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Bridgeport 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 9: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Bridgeport 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Bridgeport 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Bridgeport 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Brookfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Brookfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Brookfield 26.01$38.342) Boilermaker

Fairfield Brookfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Brookfield 25.87$34.903b) Tile Setter

Fairfield Brookfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Brookfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Brookfield 32.06$33.483e) Plasterer

Fairfield Brookfield ------LABORERS------

Fairfield Brookfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Brookfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Brookfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Brookfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 10: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Brookfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Brookfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Brookfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Brookfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Brookfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Brookfield 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Brookfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Brookfield 26.19$34.945a) Millwrights

Fairfield Brookfield 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Brookfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Brookfield -----LINE CONSTRUCTION----

Fairfield Brookfield 6.5% + 9.00$26.50Groundman

Fairfield Brookfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Brookfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Brookfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Brookfield ----OPERATORS----

Fairfield Brookfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Brookfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 11: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Brookfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Brookfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Brookfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Brookfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Brookfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Brookfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Brookfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Brookfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Brookfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Brookfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Brookfield 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Brookfield 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Brookfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Brookfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Brookfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 12: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Brookfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Brookfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Brookfield ------PAINTERS (Including Drywall Finishing)------

Fairfield Brookfield 22.55$35.6210a) Brush and Roller

Fairfield Brookfield 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Brookfield 22.55$36.1210c) Paperhanger and Red Label

Fairfield Brookfield 22.55$38.6210e) Blast and Spray

Fairfield Brookfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Brookfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Brookfield 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Brookfield 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Brookfield 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Brookfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Brookfield ------TRUCK DRIVERS------

Fairfield Brookfield 25.79 + a$29.8617a) 2 Axle

Fairfield Brookfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Brookfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Brookfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Brookfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Brookfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 13: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Brookfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Brookfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Brookfield 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Danbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Danbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Danbury 26.01$38.342) Boilermaker

Fairfield Danbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Danbury 25.87$34.903b) Tile Setter

Fairfield Danbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Danbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Danbury 32.06$33.483e) Plasterer

Fairfield Danbury ------LABORERS------

Fairfield Danbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Danbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Danbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Danbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 14: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Danbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Danbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Danbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Danbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Danbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Danbury 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Danbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Danbury 26.19$34.945a) Millwrights

Fairfield Danbury 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Danbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Danbury -----LINE CONSTRUCTION----

Fairfield Danbury 6.5% + 9.00$26.50Groundman

Fairfield Danbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Danbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Danbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Danbury ----OPERATORS----

Fairfield Danbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Danbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 15: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Danbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Danbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Danbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Danbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Danbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Danbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Danbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Danbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Danbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Danbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Danbury 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Danbury 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Danbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Danbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Danbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 16: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Danbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Danbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Danbury ------PAINTERS (Including Drywall Finishing)------

Fairfield Danbury 22.55$35.6210a) Brush and Roller

Fairfield Danbury 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Danbury 22.55$36.1210c) Paperhanger and Red Label

Fairfield Danbury 22.55$38.6210e) Blast and Spray

Fairfield Danbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Danbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Danbury 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Danbury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Danbury 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Danbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Danbury ------TRUCK DRIVERS------

Fairfield Danbury 25.79 + a$29.8617a) 2 Axle

Fairfield Danbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Danbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Danbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Danbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Danbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 17: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Danbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Danbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Danbury 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Darien 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Darien 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Darien 26.01$38.342) Boilermaker

Fairfield Darien 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Darien 25.87$34.903b) Tile Setter

Fairfield Darien 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Darien 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Darien 32.06$33.483e) Plasterer

Fairfield Darien ------LABORERS------

Fairfield Darien 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Darien 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Darien 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Darien 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 18: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Darien 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Darien 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Darien 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Darien 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Darien 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Darien 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Darien 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Darien 26.19$34.945a) Millwrights

Fairfield Darien 36.15$40.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Darien 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Darien -----LINE CONSTRUCTION----

Fairfield Darien 6.5% + 9.00$26.50Groundman

Fairfield Darien 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Darien 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Darien 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Darien ----OPERATORS----

Fairfield Darien 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Darien 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 19: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Darien 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Darien 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Darien 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Darien 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Darien 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Darien 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Darien 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Darien 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Darien 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Darien 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Darien 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Darien 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Darien 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Darien 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Darien 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 20: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Darien 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Darien 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Darien ------PAINTERS (Including Drywall Finishing)------

Fairfield Darien 22.55$35.6210a) Brush and Roller

Fairfield Darien 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Darien 22.55$36.1210c) Paperhanger and Red Label

Fairfield Darien 22.55$38.6210e) Blast and Spray

Fairfield Darien 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Darien 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Darien 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Darien 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Darien 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Darien 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Darien ------TRUCK DRIVERS------

Fairfield Darien 25.79 + a$29.8617a) 2 Axle

Fairfield Darien 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Darien 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Darien 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Darien 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Darien 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 21: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Darien 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Darien 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Darien 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Easton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Easton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Easton 26.01$38.342) Boilermaker

Fairfield Easton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Easton 25.87$34.903b) Tile Setter

Fairfield Easton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Easton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Easton 32.06$33.483e) Plasterer

Fairfield Easton ------LABORERS------

Fairfield Easton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Easton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Easton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Easton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 22: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Easton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Easton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Easton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Easton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Easton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Easton 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Easton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Easton 26.19$34.945a) Millwrights

Fairfield Easton 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Easton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Easton -----LINE CONSTRUCTION----

Fairfield Easton 6.5% + 9.00$26.50Groundman

Fairfield Easton 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Easton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Easton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Easton ----OPERATORS----

Fairfield Easton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Easton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 23: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Easton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Easton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Easton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Easton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Easton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Easton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Easton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Easton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Easton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Easton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Easton 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Easton 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Easton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Easton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Easton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 24: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Easton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Easton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Easton ------PAINTERS (Including Drywall Finishing)------

Fairfield Easton 22.55$35.6210a) Brush and Roller

Fairfield Easton 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Easton 22.55$36.1210c) Paperhanger and Red Label

Fairfield Easton 22.55$38.6210e) Blast and Spray

Fairfield Easton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Easton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Easton 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Easton 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Easton 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Easton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Easton ------TRUCK DRIVERS------

Fairfield Easton 25.79 + a$29.8617a) 2 Axle

Fairfield Easton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Easton 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Easton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Easton 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Easton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 25: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Easton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Easton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Easton 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Fairfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Fairfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Fairfield 26.01$38.342) Boilermaker

Fairfield Fairfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Fairfield 25.87$34.903b) Tile Setter

Fairfield Fairfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Fairfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Fairfield 32.06$33.483e) Plasterer

Fairfield Fairfield ------LABORERS------

Fairfield Fairfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Fairfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Fairfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Fairfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 26: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Fairfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Fairfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Fairfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Fairfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Fairfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Fairfield 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Fairfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Fairfield 26.19$34.945a) Millwrights

Fairfield Fairfield 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Fairfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Fairfield -----LINE CONSTRUCTION----

Fairfield Fairfield 6.5% + 9.00$26.50Groundman

Fairfield Fairfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Fairfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Fairfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Fairfield ----OPERATORS----

Fairfield Fairfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Fairfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 27: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Fairfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Fairfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Fairfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Fairfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Fairfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Fairfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Fairfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Fairfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Fairfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Fairfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Fairfield 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Fairfield 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Fairfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Fairfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Fairfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 28: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Fairfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Fairfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Fairfield ------PAINTERS (Including Drywall Finishing)------

Fairfield Fairfield 22.55$35.6210a) Brush and Roller

Fairfield Fairfield 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Fairfield 22.55$36.1210c) Paperhanger and Red Label

Fairfield Fairfield 22.55$38.6210e) Blast and Spray

Fairfield Fairfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Fairfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Fairfield 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Fairfield 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Fairfield 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Fairfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Fairfield ------TRUCK DRIVERS------

Fairfield Fairfield 25.79 + a$29.8617a) 2 Axle

Fairfield Fairfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Fairfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Fairfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Fairfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Fairfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 29: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Fairfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Fairfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Fairfield 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Greenwich 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Greenwich 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Greenwich 26.01$38.342) Boilermaker

Fairfield Greenwich 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Greenwich 25.87$34.903b) Tile Setter

Fairfield Greenwich 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Greenwich 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Greenwich 32.06$33.483e) Plasterer

Fairfield Greenwich ------LABORERS------

Fairfield Greenwich 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Greenwich 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Greenwich 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Greenwich 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 30: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Greenwich 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Greenwich 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Greenwich 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Greenwich 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Greenwich 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Greenwich 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Greenwich 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Greenwich 26.19$34.945a) Millwrights

Fairfield Greenwich 36.15$40.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Greenwich 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Greenwich -----LINE CONSTRUCTION----

Fairfield Greenwich 6.5% + 9.00$26.50Groundman

Fairfield Greenwich 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Greenwich 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Greenwich 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Greenwich ----OPERATORS----

Fairfield Greenwich 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Greenwich 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 31: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Greenwich 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Greenwich 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Greenwich 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Greenwich 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Greenwich 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Greenwich 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Greenwich 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Greenwich 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Greenwich 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Greenwich 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Greenwich 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Greenwich 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Greenwich 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Greenwich 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Greenwich 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 32: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Greenwich 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Greenwich 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Greenwich ------PAINTERS (Including Drywall Finishing)------

Fairfield Greenwich 22.55$35.6210a) Brush and Roller

Fairfield Greenwich 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Greenwich 22.55$36.1210c) Paperhanger and Red Label

Fairfield Greenwich 22.55$38.6210e) Blast and Spray

Fairfield Greenwich 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Greenwich 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Greenwich 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Greenwich 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Greenwich 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Greenwich 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Greenwich ------TRUCK DRIVERS------

Fairfield Greenwich 25.79 + a$29.8617a) 2 Axle

Fairfield Greenwich 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Greenwich 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Greenwich 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Greenwich 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Greenwich 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 33: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Greenwich 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Greenwich 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Greenwich 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Monroe 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Monroe 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Monroe 26.01$38.342) Boilermaker

Fairfield Monroe 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Monroe 25.87$34.903b) Tile Setter

Fairfield Monroe 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Monroe 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Monroe 32.06$33.483e) Plasterer

Fairfield Monroe ------LABORERS------

Fairfield Monroe 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Monroe 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Monroe 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Monroe 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 34: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Monroe 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Monroe 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Monroe 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Monroe 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Monroe 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Monroe 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Monroe 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Monroe 26.19$34.945a) Millwrights

Fairfield Monroe 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Monroe 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Monroe -----LINE CONSTRUCTION----

Fairfield Monroe 6.5% + 9.00$26.50Groundman

Fairfield Monroe 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Monroe 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Monroe 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Monroe ----OPERATORS----

Fairfield Monroe 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Monroe 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 35: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Monroe 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Monroe 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Monroe 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Monroe 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Monroe 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Monroe 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Monroe 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Monroe 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Monroe 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Monroe 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Monroe 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Monroe 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Monroe 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Monroe 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Monroe 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 36: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Monroe 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Monroe 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Monroe ------PAINTERS (Including Drywall Finishing)------

Fairfield Monroe 22.55$35.6210a) Brush and Roller

Fairfield Monroe 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Monroe 22.55$36.1210c) Paperhanger and Red Label

Fairfield Monroe 22.55$38.6210e) Blast and Spray

Fairfield Monroe 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Monroe 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Monroe 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Monroe 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Monroe 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Monroe 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Monroe ------TRUCK DRIVERS------

Fairfield Monroe 25.79 + a$29.8617a) 2 Axle

Fairfield Monroe 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Monroe 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Monroe 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Monroe 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Monroe 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 37: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Monroe 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Monroe 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Monroe 7.34$25.7619) Theatrical Stage Journeyman

Fairfield New Canaan 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield New Canaan 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield New Canaan 26.01$38.342) Boilermaker

Fairfield New Canaan 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield New Canaan 25.87$34.903b) Tile Setter

Fairfield New Canaan 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield New Canaan 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield New Canaan 32.06$33.483e) Plasterer

Fairfield New Canaan ------LABORERS------

Fairfield New Canaan 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield New Canaan 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield New Canaan 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield New Canaan 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 38: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Canaan 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield New Canaan 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield New Canaan 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield New Canaan 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield New Canaan 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield New Canaan 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield New Canaan 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield New Canaan 26.19$34.945a) Millwrights

Fairfield New Canaan 36.15$40.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield New Canaan 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield New Canaan -----LINE CONSTRUCTION----

Fairfield New Canaan 6.5% + 9.00$26.50Groundman

Fairfield New Canaan 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield New Canaan 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield New Canaan 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield New Canaan ----OPERATORS----

Fairfield New Canaan 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield New Canaan 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 39: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Canaan 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield New Canaan 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield New Canaan 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield New Canaan 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield New Canaan 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield New Canaan 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield New Canaan 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield New Canaan 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield New Canaan 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield New Canaan 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield New Canaan 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield New Canaan 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield New Canaan 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield New Canaan 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield New Canaan 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 40: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Canaan 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield New Canaan 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield New Canaan ------PAINTERS (Including Drywall Finishing)------

Fairfield New Canaan 22.55$35.6210a) Brush and Roller

Fairfield New Canaan 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield New Canaan 22.55$36.1210c) Paperhanger and Red Label

Fairfield New Canaan 22.55$38.6210e) Blast and Spray

Fairfield New Canaan 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield New Canaan 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield New Canaan 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield New Canaan 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield New Canaan 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield New Canaan 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield New Canaan ------TRUCK DRIVERS------

Fairfield New Canaan 25.79 + a$29.8617a) 2 Axle

Fairfield New Canaan 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield New Canaan 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield New Canaan 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield New Canaan 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield New Canaan 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 41: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Canaan 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield New Canaan 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield New Canaan 7.34$25.7619) Theatrical Stage Journeyman

Fairfield New Fairfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield New Fairfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield New Fairfield 26.01$38.342) Boilermaker

Fairfield New Fairfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield New Fairfield 25.87$34.903b) Tile Setter

Fairfield New Fairfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield New Fairfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield New Fairfield 32.06$33.483e) Plasterer

Fairfield New Fairfield ------LABORERS------

Fairfield New Fairfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield New Fairfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield New Fairfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield New Fairfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 42: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Fairfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield New Fairfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield New Fairfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield New Fairfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield New Fairfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield New Fairfield 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield New Fairfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield New Fairfield 26.19$34.945a) Millwrights

Fairfield New Fairfield 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield New Fairfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield New Fairfield -----LINE CONSTRUCTION----

Fairfield New Fairfield 6.5% + 9.00$26.50Groundman

Fairfield New Fairfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield New Fairfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield New Fairfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield New Fairfield ----OPERATORS----

Fairfield New Fairfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield New Fairfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 43: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Fairfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield New Fairfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield New Fairfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield New Fairfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield New Fairfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield New Fairfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield New Fairfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield New Fairfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield New Fairfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield New Fairfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield New Fairfield 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield New Fairfield 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield New Fairfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield New Fairfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield New Fairfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 44: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Fairfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield New Fairfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield New Fairfield ------PAINTERS (Including Drywall Finishing)------

Fairfield New Fairfield 22.55$35.6210a) Brush and Roller

Fairfield New Fairfield 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield New Fairfield 22.55$36.1210c) Paperhanger and Red Label

Fairfield New Fairfield 22.55$38.6210e) Blast and Spray

Fairfield New Fairfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield New Fairfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield New Fairfield 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield New Fairfield 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield New Fairfield 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield New Fairfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield New Fairfield ------TRUCK DRIVERS------

Fairfield New Fairfield 25.79 + a$29.8617a) 2 Axle

Fairfield New Fairfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield New Fairfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield New Fairfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield New Fairfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield New Fairfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 45: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield New Fairfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield New Fairfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield New Fairfield 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Newtown 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Newtown 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Newtown 26.01$38.342) Boilermaker

Fairfield Newtown 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Newtown 25.87$34.903b) Tile Setter

Fairfield Newtown 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Newtown 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Newtown 32.06$33.483e) Plasterer

Fairfield Newtown ------LABORERS------

Fairfield Newtown 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Newtown 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Newtown 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Newtown 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 46: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Newtown 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Newtown 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Newtown 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Newtown 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Newtown 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Newtown 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Newtown 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Newtown 26.19$34.945a) Millwrights

Fairfield Newtown 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Newtown 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Newtown -----LINE CONSTRUCTION----

Fairfield Newtown 6.5% + 9.00$26.50Groundman

Fairfield Newtown 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Newtown 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Newtown 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Newtown ----OPERATORS----

Fairfield Newtown 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Newtown 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 47: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Newtown 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Newtown 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Newtown 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Newtown 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Newtown 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Newtown 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Newtown 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Newtown 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Newtown 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Newtown 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Newtown 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Newtown 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Newtown 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Newtown 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Newtown 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 48: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Newtown 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Newtown 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Newtown ------PAINTERS (Including Drywall Finishing)------

Fairfield Newtown 22.55$35.6210a) Brush and Roller

Fairfield Newtown 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Newtown 22.55$36.1210c) Paperhanger and Red Label

Fairfield Newtown 22.55$38.6210e) Blast and Spray

Fairfield Newtown 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Newtown 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Newtown 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Newtown 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Newtown 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Newtown 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Newtown ------TRUCK DRIVERS------

Fairfield Newtown 25.79 + a$29.8617a) 2 Axle

Fairfield Newtown 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Newtown 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Newtown 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Newtown 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Newtown 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 49: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Newtown 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Newtown 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Newtown 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Norwalk 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Norwalk 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Norwalk 26.01$38.342) Boilermaker

Fairfield Norwalk 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Norwalk 25.87$34.903b) Tile Setter

Fairfield Norwalk 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Norwalk 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Norwalk 32.06$33.483e) Plasterer

Fairfield Norwalk ------LABORERS------

Fairfield Norwalk 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Norwalk 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Norwalk 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Norwalk 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 50: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Norwalk 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Norwalk 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Norwalk 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Norwalk 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Norwalk 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Norwalk 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Norwalk 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Norwalk 26.19$34.945a) Millwrights

Fairfield Norwalk 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Norwalk 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Norwalk -----LINE CONSTRUCTION----

Fairfield Norwalk 6.5% + 9.00$26.50Groundman

Fairfield Norwalk 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Norwalk 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Norwalk 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Norwalk ----OPERATORS----

Fairfield Norwalk 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Norwalk 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 51: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Norwalk 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Norwalk 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Norwalk 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Norwalk 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Norwalk 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Norwalk 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Norwalk 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Norwalk 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Norwalk 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Norwalk 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Norwalk 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Norwalk 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Norwalk 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Norwalk 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Norwalk 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 52: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Norwalk 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Norwalk 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Norwalk ------PAINTERS (Including Drywall Finishing)------

Fairfield Norwalk 22.55$35.6210a) Brush and Roller

Fairfield Norwalk 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Norwalk 22.55$36.1210c) Paperhanger and Red Label

Fairfield Norwalk 22.55$38.6210e) Blast and Spray

Fairfield Norwalk 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Norwalk 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Norwalk 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Norwalk 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Norwalk 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Norwalk 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Norwalk ------TRUCK DRIVERS------

Fairfield Norwalk 25.79 + a$29.8617a) 2 Axle

Fairfield Norwalk 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Norwalk 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Norwalk 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Norwalk 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Norwalk 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 53: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Norwalk 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Norwalk 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Norwalk 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Redding 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Redding 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Redding 26.01$38.342) Boilermaker

Fairfield Redding 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Redding 25.87$34.903b) Tile Setter

Fairfield Redding 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Redding 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Redding 32.06$33.483e) Plasterer

Fairfield Redding ------LABORERS------

Fairfield Redding 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Redding 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Redding 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Redding 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 54: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Redding 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Redding 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Redding 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Redding 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Redding 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Redding 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Redding 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Redding 26.19$34.945a) Millwrights

Fairfield Redding 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Redding 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Redding -----LINE CONSTRUCTION----

Fairfield Redding 6.5% + 9.00$26.50Groundman

Fairfield Redding 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Redding 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Redding 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Redding ----OPERATORS----

Fairfield Redding 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Redding 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 55: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Redding 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Redding 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Redding 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Redding 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Redding 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Redding 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Redding 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Redding 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Redding 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Redding 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Redding 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Redding 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Redding 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Redding 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Redding 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 56: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Redding 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Redding 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Redding ------PAINTERS (Including Drywall Finishing)------

Fairfield Redding 22.55$35.6210a) Brush and Roller

Fairfield Redding 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Redding 22.55$36.1210c) Paperhanger and Red Label

Fairfield Redding 22.55$38.6210e) Blast and Spray

Fairfield Redding 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Redding 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Redding 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Redding 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Redding 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Redding 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Redding ------TRUCK DRIVERS------

Fairfield Redding 25.79 + a$29.8617a) 2 Axle

Fairfield Redding 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Redding 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Redding 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Redding 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Redding 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 57: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Redding 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Redding 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Redding 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Ridgefield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Ridgefield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Ridgefield 26.01$38.342) Boilermaker

Fairfield Ridgefield 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Ridgefield 25.87$34.903b) Tile Setter

Fairfield Ridgefield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Ridgefield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Ridgefield 32.06$33.483e) Plasterer

Fairfield Ridgefield ------LABORERS------

Fairfield Ridgefield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Ridgefield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Ridgefield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Ridgefield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 58: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Ridgefield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Ridgefield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Ridgefield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Ridgefield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Ridgefield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Ridgefield 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Ridgefield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Ridgefield 26.19$34.945a) Millwrights

Fairfield Ridgefield 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Ridgefield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Ridgefield -----LINE CONSTRUCTION----

Fairfield Ridgefield 6.5% + 9.00$26.50Groundman

Fairfield Ridgefield 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Ridgefield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Ridgefield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Ridgefield ----OPERATORS----

Fairfield Ridgefield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Ridgefield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 59: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Ridgefield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Ridgefield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Ridgefield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Ridgefield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Ridgefield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Ridgefield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Ridgefield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Ridgefield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Ridgefield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Ridgefield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Ridgefield 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Ridgefield 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Ridgefield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Ridgefield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Ridgefield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 60: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Ridgefield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Ridgefield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Ridgefield ------PAINTERS (Including Drywall Finishing)------

Fairfield Ridgefield 22.55$35.6210a) Brush and Roller

Fairfield Ridgefield 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Ridgefield 22.55$36.1210c) Paperhanger and Red Label

Fairfield Ridgefield 22.55$38.6210e) Blast and Spray

Fairfield Ridgefield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Ridgefield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Ridgefield 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Ridgefield 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Ridgefield 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Ridgefield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Ridgefield ------TRUCK DRIVERS------

Fairfield Ridgefield 25.79 + a$29.8617a) 2 Axle

Fairfield Ridgefield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Ridgefield 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Ridgefield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Ridgefield 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Ridgefield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 61: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Ridgefield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Ridgefield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Ridgefield 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Shelton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Shelton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Shelton 26.01$38.342) Boilermaker

Fairfield Shelton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Shelton 25.87$34.903b) Tile Setter

Fairfield Shelton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Shelton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Shelton 32.06$33.483e) Plasterer

Fairfield Shelton ------LABORERS------

Fairfield Shelton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Shelton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Shelton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Shelton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 62: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Shelton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Shelton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Shelton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Shelton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Shelton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Shelton 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Shelton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Shelton 26.19$34.945a) Millwrights

Fairfield Shelton 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Shelton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Shelton -----LINE CONSTRUCTION----

Fairfield Shelton 6.5% + 9.00$26.50Groundman

Fairfield Shelton 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Shelton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Shelton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Shelton ----OPERATORS----

Fairfield Shelton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Shelton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 63: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Shelton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Shelton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Shelton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Shelton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Shelton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Shelton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Shelton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Shelton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Shelton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Shelton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Shelton 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Shelton 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Shelton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Shelton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Shelton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 64: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Shelton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Shelton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Shelton ------PAINTERS (Including Drywall Finishing)------

Fairfield Shelton 22.55$35.6210a) Brush and Roller

Fairfield Shelton 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Shelton 22.55$36.1210c) Paperhanger and Red Label

Fairfield Shelton 22.55$38.6210e) Blast and Spray

Fairfield Shelton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Shelton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Shelton 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Shelton 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Shelton 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Shelton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Shelton ------TRUCK DRIVERS------

Fairfield Shelton 25.79 + a$29.8617a) 2 Axle

Fairfield Shelton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Shelton 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Shelton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Shelton 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Shelton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 65: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Shelton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Shelton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Shelton 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Sherman 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Sherman 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Sherman 26.01$38.342) Boilermaker

Fairfield Sherman 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Sherman 25.87$34.903b) Tile Setter

Fairfield Sherman 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Sherman 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Sherman 32.06$33.483e) Plasterer

Fairfield Sherman ------LABORERS------

Fairfield Sherman 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Sherman 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Sherman 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Sherman 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 66: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Sherman 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Sherman 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Sherman 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Sherman 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Sherman 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Sherman 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Sherman 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Sherman 26.19$34.945a) Millwrights

Fairfield Sherman 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Sherman 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Sherman -----LINE CONSTRUCTION----

Fairfield Sherman 6.5% + 9.00$26.50Groundman

Fairfield Sherman 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Sherman 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Sherman 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Sherman ----OPERATORS----

Fairfield Sherman 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Sherman 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 67: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Sherman 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Sherman 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Sherman 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Sherman 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Sherman 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Sherman 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Sherman 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Sherman 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Sherman 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Sherman 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Sherman 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Sherman 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Sherman 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Sherman 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Sherman 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 68: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Sherman 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Sherman 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Sherman ------PAINTERS (Including Drywall Finishing)------

Fairfield Sherman 22.55$35.6210a) Brush and Roller

Fairfield Sherman 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Sherman 22.55$36.1210c) Paperhanger and Red Label

Fairfield Sherman 22.55$38.6210e) Blast and Spray

Fairfield Sherman 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Sherman 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Sherman 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Sherman 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Sherman 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Sherman 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Sherman ------TRUCK DRIVERS------

Fairfield Sherman 25.79 + a$29.8617a) 2 Axle

Fairfield Sherman 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Sherman 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Sherman 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Sherman 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Sherman 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 69: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Sherman 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Sherman 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Sherman 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Stamford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Stamford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Stamford 26.01$38.342) Boilermaker

Fairfield Stamford 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Stamford 25.87$34.903b) Tile Setter

Fairfield Stamford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Stamford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Stamford 32.06$33.483e) Plasterer

Fairfield Stamford ------LABORERS------

Fairfield Stamford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Stamford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Stamford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Stamford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 70: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stamford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Stamford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Stamford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Stamford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Stamford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Stamford 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Stamford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Stamford 26.19$34.945a) Millwrights

Fairfield Stamford 36.15$40.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Stamford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Stamford -----LINE CONSTRUCTION----

Fairfield Stamford 6.5% + 9.00$26.50Groundman

Fairfield Stamford 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Stamford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Stamford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Stamford ----OPERATORS----

Fairfield Stamford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Stamford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 71: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stamford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Stamford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Stamford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Stamford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Stamford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Stamford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Stamford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Stamford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Stamford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Stamford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Stamford 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Stamford 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Stamford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Stamford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Stamford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 72: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stamford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Stamford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Stamford ------PAINTERS (Including Drywall Finishing)------

Fairfield Stamford 22.55$35.6210a) Brush and Roller

Fairfield Stamford 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Stamford 22.55$36.1210c) Paperhanger and Red Label

Fairfield Stamford 22.55$38.6210e) Blast and Spray

Fairfield Stamford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Stamford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Stamford 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Stamford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Stamford 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Stamford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Stamford ------TRUCK DRIVERS------

Fairfield Stamford 25.79 + a$29.8617a) 2 Axle

Fairfield Stamford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Stamford 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Stamford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Stamford 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Stamford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 73: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stamford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Stamford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Stamford 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Stratford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Stratford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Stratford 26.01$38.342) Boilermaker

Fairfield Stratford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Stratford 25.87$34.903b) Tile Setter

Fairfield Stratford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Stratford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Stratford 32.06$33.483e) Plasterer

Fairfield Stratford ------LABORERS------

Fairfield Stratford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Stratford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Stratford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Stratford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 74: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stratford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Stratford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Stratford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Stratford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Stratford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Stratford 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Stratford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Stratford 26.19$34.945a) Millwrights

Fairfield Stratford 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Stratford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Stratford -----LINE CONSTRUCTION----

Fairfield Stratford 6.5% + 9.00$26.50Groundman

Fairfield Stratford 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Stratford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Stratford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Stratford ----OPERATORS----

Fairfield Stratford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Stratford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 75: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stratford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Stratford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Stratford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Stratford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Stratford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Stratford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Stratford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Stratford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Stratford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Stratford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Stratford 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Stratford 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Stratford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Stratford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Stratford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 76: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stratford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Stratford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Stratford ------PAINTERS (Including Drywall Finishing)------

Fairfield Stratford 22.55$35.6210a) Brush and Roller

Fairfield Stratford 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Stratford 22.55$36.1210c) Paperhanger and Red Label

Fairfield Stratford 22.55$38.6210e) Blast and Spray

Fairfield Stratford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Stratford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Stratford 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Stratford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Stratford 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Stratford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Stratford ------TRUCK DRIVERS------

Fairfield Stratford 25.79 + a$29.8617a) 2 Axle

Fairfield Stratford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Stratford 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Stratford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Stratford 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Stratford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 77: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Stratford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Stratford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Stratford 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Trumbull 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Trumbull 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Trumbull 26.01$38.342) Boilermaker

Fairfield Trumbull 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Trumbull 25.87$34.903b) Tile Setter

Fairfield Trumbull 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Trumbull 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Trumbull 32.06$33.483e) Plasterer

Fairfield Trumbull ------LABORERS------

Fairfield Trumbull 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Trumbull 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Trumbull 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Trumbull 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 78: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Trumbull 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Trumbull 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Trumbull 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Trumbull 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Trumbull 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Trumbull 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Trumbull 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Trumbull 26.19$34.945a) Millwrights

Fairfield Trumbull 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Trumbull 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Trumbull -----LINE CONSTRUCTION----

Fairfield Trumbull 6.5% + 9.00$26.50Groundman

Fairfield Trumbull 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Trumbull 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Trumbull 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Trumbull ----OPERATORS----

Fairfield Trumbull 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Trumbull 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 79: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Trumbull 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Trumbull 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Trumbull 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Trumbull 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Trumbull 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Trumbull 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Trumbull 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Trumbull 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Trumbull 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Trumbull 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Trumbull 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Trumbull 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Trumbull 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Trumbull 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Trumbull 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 80: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Trumbull 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Trumbull 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Trumbull ------PAINTERS (Including Drywall Finishing)------

Fairfield Trumbull 22.55$35.6210a) Brush and Roller

Fairfield Trumbull 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Trumbull 22.55$36.1210c) Paperhanger and Red Label

Fairfield Trumbull 22.55$38.6210e) Blast and Spray

Fairfield Trumbull 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Trumbull 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Trumbull 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Trumbull 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Trumbull 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Trumbull 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Trumbull ------TRUCK DRIVERS------

Fairfield Trumbull 25.79 + a$29.8617a) 2 Axle

Fairfield Trumbull 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Trumbull 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Trumbull 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Trumbull 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Trumbull 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 81: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Trumbull 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Trumbull 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Trumbull 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Weston 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Weston 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Weston 26.01$38.342) Boilermaker

Fairfield Weston 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Weston 25.87$34.903b) Tile Setter

Fairfield Weston 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Weston 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Weston 32.06$33.483e) Plasterer

Fairfield Weston ------LABORERS------

Fairfield Weston 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Weston 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Weston 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Weston 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 82: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Weston 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Weston 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Weston 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Weston 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Weston 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Weston 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Weston 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Weston 26.19$34.945a) Millwrights

Fairfield Weston 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Weston 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Weston -----LINE CONSTRUCTION----

Fairfield Weston 6.5% + 9.00$26.50Groundman

Fairfield Weston 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Weston 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Weston 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Weston ----OPERATORS----

Fairfield Weston 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Weston 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 83: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Weston 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Weston 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Weston 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Weston 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Weston 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Weston 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Weston 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Weston 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Weston 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Weston 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Weston 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Weston 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Weston 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Weston 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Weston 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 84: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Weston 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Weston 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Weston ------PAINTERS (Including Drywall Finishing)------

Fairfield Weston 22.55$35.6210a) Brush and Roller

Fairfield Weston 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Weston 22.55$36.1210c) Paperhanger and Red Label

Fairfield Weston 22.55$38.6210e) Blast and Spray

Fairfield Weston 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Weston 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Weston 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Weston 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Weston 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Weston 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Weston ------TRUCK DRIVERS------

Fairfield Weston 25.79 + a$29.8617a) 2 Axle

Fairfield Weston 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Weston 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Weston 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Weston 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Weston 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 85: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Weston 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Weston 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Weston 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Westport 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Westport 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Westport 26.01$38.342) Boilermaker

Fairfield Westport 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Westport 25.87$34.903b) Tile Setter

Fairfield Westport 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Westport 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Westport 32.06$33.483e) Plasterer

Fairfield Westport ------LABORERS------

Fairfield Westport 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Westport 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Westport 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Westport 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 86: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Westport 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Westport 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Westport 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Westport 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Westport 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Westport 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Westport 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Westport 26.19$34.945a) Millwrights

Fairfield Westport 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Westport 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Westport -----LINE CONSTRUCTION----

Fairfield Westport 6.5% + 9.00$26.50Groundman

Fairfield Westport 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Westport 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Westport 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Westport ----OPERATORS----

Fairfield Westport 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Westport 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 87: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Westport 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Westport 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Westport 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Westport 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Westport 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Westport 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Westport 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Westport 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Westport 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Westport 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Westport 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Westport 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Westport 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Westport 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Westport 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 88: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Westport 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Westport 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Westport ------PAINTERS (Including Drywall Finishing)------

Fairfield Westport 22.55$35.6210a) Brush and Roller

Fairfield Westport 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Westport 22.55$36.1210c) Paperhanger and Red Label

Fairfield Westport 22.55$38.6210e) Blast and Spray

Fairfield Westport 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Westport 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Westport 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Westport 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Westport 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Westport 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Westport ------TRUCK DRIVERS------

Fairfield Westport 25.79 + a$29.8617a) 2 Axle

Fairfield Westport 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Westport 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Westport 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Westport 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Westport 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 89: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Westport 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Westport 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Westport 7.34$25.7619) Theatrical Stage Journeyman

Fairfield Wilton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Fairfield Wilton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Fairfield Wilton 26.01$38.342) Boilermaker

Fairfield Wilton 34.34 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Fairfield Wilton 25.87$34.903b) Tile Setter

Fairfield Wilton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Fairfield Wilton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Fairfield Wilton 32.06$33.483e) Plasterer

Fairfield Wilton ------LABORERS------

Fairfield Wilton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Fairfield Wilton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Fairfield Wilton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Fairfield Wilton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 90: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Wilton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Fairfield Wilton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Fairfield Wilton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Fairfield Wilton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Fairfield Wilton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Fairfield Wilton 22.15$18.004i) Group 10: Traffic Control Signalman

Fairfield Wilton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Fairfield Wilton 26.19$34.945a) Millwrights

Fairfield Wilton 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Fairfield Wilton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Fairfield Wilton -----LINE CONSTRUCTION----

Fairfield Wilton 6.5% + 9.00$26.50Groundman

Fairfield Wilton 6.5% + 22.00$48.19Linemen/Cable Splicer

Fairfield Wilton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Fairfield Wilton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Fairfield Wilton ----OPERATORS----

Fairfield Wilton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Fairfield Wilton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 91: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Wilton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Fairfield Wilton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Fairfield Wilton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Fairfield Wilton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Fairfield Wilton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Fairfield Wilton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Fairfield Wilton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Fairfield Wilton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Fairfield Wilton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Fairfield Wilton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Fairfield Wilton 25.30 + a$36.48Group 12: Wellpoint operator.

Fairfield Wilton 25.30 + a$35.86Group 13: Compressor battery operator.

Fairfield Wilton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Fairfield Wilton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Fairfield Wilton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 92: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Wilton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Fairfield Wilton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Fairfield Wilton ------PAINTERS (Including Drywall Finishing)------

Fairfield Wilton 22.55$35.6210a) Brush and Roller

Fairfield Wilton 22.55$36.3710b) Taping Only/Drywall Finishing

Fairfield Wilton 22.55$36.1210c) Paperhanger and Red Label

Fairfield Wilton 22.55$38.6210e) Blast and Spray

Fairfield Wilton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Fairfield Wilton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Fairfield Wilton 19.55 + a$42.00Roofer: Cole Tar Pitch

Fairfield Wilton 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Fairfield Wilton 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Fairfield Wilton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Fairfield Wilton ------TRUCK DRIVERS------

Fairfield Wilton 25.79 + a$29.8617a) 2 Axle

Fairfield Wilton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Fairfield Wilton 25.79 + a$30.0317c) 3 Axle Ready Mix

Fairfield Wilton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Fairfield Wilton 25.79 + a$30.1317e) 4 Axle Ready Mix

Fairfield Wilton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 93: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationFairfield Wilton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Fairfield Wilton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Fairfield Wilton 7.34$25.7619) Theatrical Stage Journeyman

Hartford Avon 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Avon 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Avon 26.01$38.342) Boilermaker

Hartford Avon 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Avon 25.87$34.903b) Tile Setter

Hartford Avon 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Avon 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Avon 32.06$33.483e) Plasterer

Hartford Avon ------LABORERS------

Hartford Avon 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Avon 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Avon 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Avon 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 94: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Avon 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Avon 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Avon 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Avon 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Avon 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Avon 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Avon 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Avon 26.19$34.945a) Millwrights

Hartford Avon 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Avon 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Avon -----LINE CONSTRUCTION----

Hartford Avon 6.5% + 9.00$26.50Groundman

Hartford Avon 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Avon 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Avon 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Avon ----OPERATORS----

Hartford Avon 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Avon 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 95: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Avon 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Avon 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Avon 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Avon 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Avon 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Avon 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Avon 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Avon 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Avon 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Avon 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Avon 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Avon 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Avon 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Avon 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Avon 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 96: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Avon 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Avon 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Avon ------PAINTERS (Including Drywall Finishing)------

Hartford Avon 22.55$35.6210a) Brush and Roller

Hartford Avon 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Avon 22.55$36.1210c) Paperhanger and Red Label

Hartford Avon 22.55$38.6210e) Blast and Spray

Hartford Avon 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Avon 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Avon 21.35$38.4013) Roofer (composition)

Hartford Avon 21.35$38.9014) Roofer (slate & tile)

Hartford Avon 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Avon 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Avon ------TRUCK DRIVERS------

Hartford Avon 25.79 + a$29.8617a) 2 Axle

Hartford Avon 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Avon 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Avon 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Avon 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Avon 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 97: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Avon 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Avon 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Avon 7.34$25.7619) Theatrical Stage Journeyman

Hartford Berlin 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Berlin 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Berlin 26.01$38.342) Boilermaker

Hartford Berlin 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Berlin 25.87$34.903b) Tile Setter

Hartford Berlin 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Berlin 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Berlin 32.06$33.483e) Plasterer

Hartford Berlin ------LABORERS------

Hartford Berlin 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Berlin 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Berlin 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Berlin 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 98: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Berlin 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Berlin 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Berlin 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Berlin 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Berlin 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Berlin 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Berlin 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Berlin 26.19$34.945a) Millwrights

Hartford Berlin 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Berlin 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Berlin -----LINE CONSTRUCTION----

Hartford Berlin 6.5% + 9.00$26.50Groundman

Hartford Berlin 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Berlin 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Berlin 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Berlin ----OPERATORS----

Hartford Berlin 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Berlin 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 99: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Berlin 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Berlin 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Berlin 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Berlin 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Berlin 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Berlin 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Berlin 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Berlin 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Berlin 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Berlin 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Berlin 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Berlin 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Berlin 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Berlin 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Berlin 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 100: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Berlin 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Berlin 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Berlin ------PAINTERS (Including Drywall Finishing)------

Hartford Berlin 22.55$35.6210a) Brush and Roller

Hartford Berlin 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Berlin 22.55$36.1210c) Paperhanger and Red Label

Hartford Berlin 22.55$38.6210e) Blast and Spray

Hartford Berlin 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Berlin 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Berlin 21.35$38.4013) Roofer (composition)

Hartford Berlin 21.35$38.9014) Roofer (slate & tile)

Hartford Berlin 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Berlin 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Berlin ------TRUCK DRIVERS------

Hartford Berlin 25.79 + a$29.8617a) 2 Axle

Hartford Berlin 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Berlin 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Berlin 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Berlin 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Berlin 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 101: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Berlin 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Berlin 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Berlin 7.34$25.7619) Theatrical Stage Journeyman

Hartford Bloomfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Bloomfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Bloomfield 26.01$38.342) Boilermaker

Hartford Bloomfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Bloomfield 25.87$34.903b) Tile Setter

Hartford Bloomfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Bloomfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Bloomfield 32.06$33.483e) Plasterer

Hartford Bloomfield ------LABORERS------

Hartford Bloomfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Bloomfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Bloomfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Bloomfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 102: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bloomfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Bloomfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Bloomfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Bloomfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Bloomfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Bloomfield 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Bloomfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Bloomfield 26.19$34.945a) Millwrights

Hartford Bloomfield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Bloomfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Bloomfield -----LINE CONSTRUCTION----

Hartford Bloomfield 6.5% + 9.00$26.50Groundman

Hartford Bloomfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Bloomfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Bloomfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Bloomfield ----OPERATORS----

Hartford Bloomfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Bloomfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 103: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bloomfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Bloomfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Bloomfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Bloomfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Bloomfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Bloomfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Bloomfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Bloomfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Bloomfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Bloomfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Bloomfield 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Bloomfield 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Bloomfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Bloomfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Bloomfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 104: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bloomfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Bloomfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Bloomfield ------PAINTERS (Including Drywall Finishing)------

Hartford Bloomfield 22.55$35.6210a) Brush and Roller

Hartford Bloomfield 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Bloomfield 22.55$36.1210c) Paperhanger and Red Label

Hartford Bloomfield 22.55$38.6210e) Blast and Spray

Hartford Bloomfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Bloomfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Bloomfield 21.35$38.4013) Roofer (composition)

Hartford Bloomfield 21.35$38.9014) Roofer (slate & tile)

Hartford Bloomfield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Bloomfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Bloomfield ------TRUCK DRIVERS------

Hartford Bloomfield 25.79 + a$29.8617a) 2 Axle

Hartford Bloomfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Bloomfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Bloomfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Bloomfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Bloomfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 105: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bloomfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Bloomfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Bloomfield 7.34$25.7619) Theatrical Stage Journeyman

Hartford Bristol 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Bristol 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Bristol 26.01$38.342) Boilermaker

Hartford Bristol 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Bristol 25.87$34.903b) Tile Setter

Hartford Bristol 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Bristol 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Bristol 32.06$33.483e) Plasterer

Hartford Bristol ------LABORERS------

Hartford Bristol 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Bristol 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Bristol 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Bristol 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 106: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bristol 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Bristol 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Bristol 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Bristol 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Bristol 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Bristol 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Bristol 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Bristol 26.19$34.945a) Millwrights

Hartford Bristol 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Bristol 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Bristol -----LINE CONSTRUCTION----

Hartford Bristol 6.5% + 9.00$26.50Groundman

Hartford Bristol 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Bristol 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Bristol 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Bristol ----OPERATORS----

Hartford Bristol 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Bristol 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 107: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bristol 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Bristol 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Bristol 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Bristol 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Bristol 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Bristol 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Bristol 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Bristol 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Bristol 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Bristol 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Bristol 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Bristol 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Bristol 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Bristol 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Bristol 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 108: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bristol 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Bristol 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Bristol ------PAINTERS (Including Drywall Finishing)------

Hartford Bristol 22.55$35.6210a) Brush and Roller

Hartford Bristol 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Bristol 22.55$36.1210c) Paperhanger and Red Label

Hartford Bristol 22.55$38.6210e) Blast and Spray

Hartford Bristol 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Bristol 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Bristol 21.35$38.4013) Roofer (composition)

Hartford Bristol 21.35$38.9014) Roofer (slate & tile)

Hartford Bristol 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Bristol 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Bristol ------TRUCK DRIVERS------

Hartford Bristol 25.79 + a$29.8617a) 2 Axle

Hartford Bristol 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Bristol 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Bristol 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Bristol 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Bristol 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 109: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Bristol 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Bristol 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Bristol 7.34$25.7619) Theatrical Stage Journeyman

Hartford Burlington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Burlington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Burlington 26.01$38.342) Boilermaker

Hartford Burlington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Burlington 25.87$34.903b) Tile Setter

Hartford Burlington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Burlington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Burlington 32.06$33.483e) Plasterer

Hartford Burlington ------LABORERS------

Hartford Burlington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Burlington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Burlington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Burlington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 110: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Burlington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Burlington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Burlington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Burlington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Burlington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Burlington 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Burlington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Burlington 26.19$34.945a) Millwrights

Hartford Burlington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Burlington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Burlington -----LINE CONSTRUCTION----

Hartford Burlington 6.5% + 9.00$26.50Groundman

Hartford Burlington 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Burlington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Burlington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Burlington ----OPERATORS----

Hartford Burlington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Burlington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 111: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Burlington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Burlington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Burlington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Burlington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Burlington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Burlington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Burlington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Burlington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Burlington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Burlington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Burlington 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Burlington 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Burlington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Burlington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Burlington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 112: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Burlington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Burlington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Burlington ------PAINTERS (Including Drywall Finishing)------

Hartford Burlington 22.55$35.6210a) Brush and Roller

Hartford Burlington 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Burlington 22.55$36.1210c) Paperhanger and Red Label

Hartford Burlington 22.55$38.6210e) Blast and Spray

Hartford Burlington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Burlington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Burlington 21.35$38.4013) Roofer (composition)

Hartford Burlington 21.35$38.9014) Roofer (slate & tile)

Hartford Burlington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Burlington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Burlington ------TRUCK DRIVERS------

Hartford Burlington 25.79 + a$29.8617a) 2 Axle

Hartford Burlington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Burlington 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Burlington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Burlington 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Burlington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 113: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Burlington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Burlington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Burlington 7.34$25.7619) Theatrical Stage Journeyman

Hartford Canton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Canton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Canton 26.01$38.342) Boilermaker

Hartford Canton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Canton 25.87$34.903b) Tile Setter

Hartford Canton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Canton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Canton 32.06$33.483e) Plasterer

Hartford Canton ------LABORERS------

Hartford Canton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Canton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Canton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Canton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 114: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Canton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Canton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Canton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Canton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Canton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Canton 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Canton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Canton 26.19$34.945a) Millwrights

Hartford Canton 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Canton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Canton -----LINE CONSTRUCTION----

Hartford Canton 6.5% + 9.00$26.50Groundman

Hartford Canton 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Canton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Canton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Canton ----OPERATORS----

Hartford Canton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Canton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 115: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Canton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Canton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Canton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Canton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Canton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Canton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Canton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Canton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Canton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Canton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Canton 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Canton 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Canton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Canton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Canton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 116: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Canton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Canton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Canton ------PAINTERS (Including Drywall Finishing)------

Hartford Canton 22.55$35.6210a) Brush and Roller

Hartford Canton 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Canton 22.55$36.1210c) Paperhanger and Red Label

Hartford Canton 22.55$38.6210e) Blast and Spray

Hartford Canton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Canton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Canton 21.35$38.4013) Roofer (composition)

Hartford Canton 21.35$38.9014) Roofer (slate & tile)

Hartford Canton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Canton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Canton ------TRUCK DRIVERS------

Hartford Canton 25.79 + a$29.8617a) 2 Axle

Hartford Canton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Canton 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Canton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Canton 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Canton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 117: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Canton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Canton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Canton 7.34$25.7619) Theatrical Stage Journeyman

Hartford East Granby 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford East Granby 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford East Granby 26.01$38.342) Boilermaker

Hartford East Granby 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford East Granby 25.87$34.903b) Tile Setter

Hartford East Granby 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford East Granby 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford East Granby 32.06$33.483e) Plasterer

Hartford East Granby ------LABORERS------

Hartford East Granby 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford East Granby 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford East Granby 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford East Granby 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 118: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Granby 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford East Granby 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford East Granby 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford East Granby 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford East Granby 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford East Granby 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford East Granby 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford East Granby 26.19$34.945a) Millwrights

Hartford East Granby 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford East Granby 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford East Granby -----LINE CONSTRUCTION----

Hartford East Granby 6.5% + 9.00$26.50Groundman

Hartford East Granby 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford East Granby 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford East Granby 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford East Granby ----OPERATORS----

Hartford East Granby 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford East Granby 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 119: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Granby 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford East Granby 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford East Granby 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford East Granby 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford East Granby 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford East Granby 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford East Granby 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford East Granby 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford East Granby 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford East Granby 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford East Granby 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford East Granby 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford East Granby 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford East Granby 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford East Granby 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 120: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Granby 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford East Granby 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford East Granby ------PAINTERS (Including Drywall Finishing)------

Hartford East Granby 22.55$35.6210a) Brush and Roller

Hartford East Granby 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford East Granby 22.55$36.1210c) Paperhanger and Red Label

Hartford East Granby 22.55$38.6210e) Blast and Spray

Hartford East Granby 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford East Granby 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford East Granby 21.35$38.4013) Roofer (composition)

Hartford East Granby 21.35$38.9014) Roofer (slate & tile)

Hartford East Granby 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford East Granby 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford East Granby ------TRUCK DRIVERS------

Hartford East Granby 25.79 + a$29.8617a) 2 Axle

Hartford East Granby 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford East Granby 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford East Granby 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford East Granby 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford East Granby 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 121: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Granby 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford East Granby 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford East Granby 7.34$25.7619) Theatrical Stage Journeyman

Hartford East Hartford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford East Hartford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford East Hartford 26.01$38.342) Boilermaker

Hartford East Hartford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford East Hartford 25.87$34.903b) Tile Setter

Hartford East Hartford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford East Hartford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford East Hartford 32.06$33.483e) Plasterer

Hartford East Hartford ------LABORERS------

Hartford East Hartford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford East Hartford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford East Hartford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford East Hartford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 122: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Hartford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford East Hartford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford East Hartford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford East Hartford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford East Hartford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford East Hartford 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford East Hartford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford East Hartford 26.19$34.945a) Millwrights

Hartford East Hartford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford East Hartford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford East Hartford -----LINE CONSTRUCTION----

Hartford East Hartford 6.5% + 9.00$26.50Groundman

Hartford East Hartford 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford East Hartford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford East Hartford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford East Hartford ----OPERATORS----

Hartford East Hartford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford East Hartford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 123: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Hartford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford East Hartford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford East Hartford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford East Hartford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford East Hartford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford East Hartford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford East Hartford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford East Hartford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford East Hartford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford East Hartford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford East Hartford 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford East Hartford 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford East Hartford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford East Hartford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford East Hartford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 124: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Hartford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford East Hartford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford East Hartford ------PAINTERS (Including Drywall Finishing)------

Hartford East Hartford 22.55$35.6210a) Brush and Roller

Hartford East Hartford 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford East Hartford 22.55$36.1210c) Paperhanger and Red Label

Hartford East Hartford 22.55$38.6210e) Blast and Spray

Hartford East Hartford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford East Hartford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford East Hartford 21.35$38.4013) Roofer (composition)

Hartford East Hartford 21.35$38.9014) Roofer (slate & tile)

Hartford East Hartford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford East Hartford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford East Hartford ------TRUCK DRIVERS------

Hartford East Hartford 25.79 + a$29.8617a) 2 Axle

Hartford East Hartford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford East Hartford 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford East Hartford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford East Hartford 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford East Hartford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 125: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Hartford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford East Hartford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford East Hartford 7.34$25.7619) Theatrical Stage Journeyman

Hartford East Windsor 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford East Windsor 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford East Windsor 26.01$38.342) Boilermaker

Hartford East Windsor 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford East Windsor 25.87$34.903b) Tile Setter

Hartford East Windsor 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford East Windsor 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford East Windsor 32.06$33.483e) Plasterer

Hartford East Windsor ------LABORERS------

Hartford East Windsor 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford East Windsor 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford East Windsor 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford East Windsor 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 126: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Windsor 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford East Windsor 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford East Windsor 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford East Windsor 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford East Windsor 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford East Windsor 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford East Windsor 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford East Windsor 26.19$34.945a) Millwrights

Hartford East Windsor 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford East Windsor 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford East Windsor -----LINE CONSTRUCTION----

Hartford East Windsor 6.5% + 9.00$26.50Groundman

Hartford East Windsor 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford East Windsor 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford East Windsor 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford East Windsor ----OPERATORS----

Hartford East Windsor 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford East Windsor 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 127: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Windsor 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford East Windsor 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford East Windsor 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford East Windsor 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford East Windsor 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford East Windsor 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford East Windsor 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford East Windsor 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford East Windsor 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford East Windsor 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford East Windsor 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford East Windsor 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford East Windsor 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford East Windsor 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford East Windsor 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 128: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Windsor 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford East Windsor 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford East Windsor ------PAINTERS (Including Drywall Finishing)------

Hartford East Windsor 22.55$35.6210a) Brush and Roller

Hartford East Windsor 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford East Windsor 22.55$36.1210c) Paperhanger and Red Label

Hartford East Windsor 22.55$38.6210e) Blast and Spray

Hartford East Windsor 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford East Windsor 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford East Windsor 21.35$38.4013) Roofer (composition)

Hartford East Windsor 21.35$38.9014) Roofer (slate & tile)

Hartford East Windsor 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford East Windsor 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford East Windsor ------TRUCK DRIVERS------

Hartford East Windsor 25.79 + a$29.8617a) 2 Axle

Hartford East Windsor 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford East Windsor 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford East Windsor 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford East Windsor 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford East Windsor 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 129: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford East Windsor 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford East Windsor 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford East Windsor 7.34$25.7619) Theatrical Stage Journeyman

Hartford Enfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Enfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Enfield 26.01$38.342) Boilermaker

Hartford Enfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Enfield 25.87$34.903b) Tile Setter

Hartford Enfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Enfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Enfield 32.06$33.483e) Plasterer

Hartford Enfield ------LABORERS------

Hartford Enfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Enfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Enfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Enfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 130: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Enfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Enfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Enfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Enfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Enfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Enfield 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Enfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Enfield 26.19$34.945a) Millwrights

Hartford Enfield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Enfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Enfield -----LINE CONSTRUCTION----

Hartford Enfield 6.5% + 9.00$26.50Groundman

Hartford Enfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Enfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Enfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Enfield ----OPERATORS----

Hartford Enfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Enfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 131: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Enfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Enfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Enfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Enfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Enfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Enfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Enfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Enfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Enfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Enfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Enfield 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Enfield 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Enfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Enfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Enfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 132: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Enfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Enfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Enfield ------PAINTERS (Including Drywall Finishing)------

Hartford Enfield 22.55$35.6210a) Brush and Roller

Hartford Enfield 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Enfield 22.55$36.1210c) Paperhanger and Red Label

Hartford Enfield 22.55$38.6210e) Blast and Spray

Hartford Enfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Enfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Enfield 21.35$38.4013) Roofer (composition)

Hartford Enfield 21.35$38.9014) Roofer (slate & tile)

Hartford Enfield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Enfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Enfield ------TRUCK DRIVERS------

Hartford Enfield 25.79 + a$29.8617a) 2 Axle

Hartford Enfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Enfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Enfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Enfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Enfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 133: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Enfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Enfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Enfield 7.34$25.7619) Theatrical Stage Journeyman

Hartford Farmington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Farmington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Farmington 26.01$38.342) Boilermaker

Hartford Farmington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Farmington 25.87$34.903b) Tile Setter

Hartford Farmington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Farmington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Farmington 32.06$33.483e) Plasterer

Hartford Farmington ------LABORERS------

Hartford Farmington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Farmington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Farmington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Farmington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 134: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Farmington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Farmington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Farmington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Farmington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Farmington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Farmington 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Farmington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Farmington 26.19$34.945a) Millwrights

Hartford Farmington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Farmington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Farmington -----LINE CONSTRUCTION----

Hartford Farmington 6.5% + 9.00$26.50Groundman

Hartford Farmington 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Farmington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Farmington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Farmington ----OPERATORS----

Hartford Farmington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Farmington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 135: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Farmington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Farmington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Farmington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Farmington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Farmington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Farmington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Farmington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Farmington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Farmington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Farmington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Farmington 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Farmington 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Farmington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Farmington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Farmington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 136: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Farmington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Farmington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Farmington ------PAINTERS (Including Drywall Finishing)------

Hartford Farmington 22.55$35.6210a) Brush and Roller

Hartford Farmington 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Farmington 22.55$36.1210c) Paperhanger and Red Label

Hartford Farmington 22.55$38.6210e) Blast and Spray

Hartford Farmington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Farmington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Farmington 21.35$38.4013) Roofer (composition)

Hartford Farmington 21.35$38.9014) Roofer (slate & tile)

Hartford Farmington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Farmington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Farmington ------TRUCK DRIVERS------

Hartford Farmington 25.79 + a$29.8617a) 2 Axle

Hartford Farmington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Farmington 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Farmington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Farmington 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Farmington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 137: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Farmington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Farmington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Farmington 7.34$25.7619) Theatrical Stage Journeyman

Hartford Glastonbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Glastonbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Glastonbury 26.01$38.342) Boilermaker

Hartford Glastonbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Glastonbury 25.87$34.903b) Tile Setter

Hartford Glastonbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Glastonbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Glastonbury 32.06$33.483e) Plasterer

Hartford Glastonbury ------LABORERS------

Hartford Glastonbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Glastonbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Glastonbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Glastonbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 138: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Glastonbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Glastonbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Glastonbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Glastonbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Glastonbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Glastonbury 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Glastonbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Glastonbury 26.19$34.945a) Millwrights

Hartford Glastonbury 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Glastonbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Glastonbury -----LINE CONSTRUCTION----

Hartford Glastonbury 6.5% + 9.00$26.50Groundman

Hartford Glastonbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Glastonbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Glastonbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Glastonbury ----OPERATORS----

Hartford Glastonbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Glastonbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 139: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Glastonbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Glastonbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Glastonbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Glastonbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Glastonbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Glastonbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Glastonbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Glastonbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Glastonbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Glastonbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Glastonbury 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Glastonbury 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Glastonbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Glastonbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Glastonbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 140: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Glastonbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Glastonbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Glastonbury ------PAINTERS (Including Drywall Finishing)------

Hartford Glastonbury 22.55$35.6210a) Brush and Roller

Hartford Glastonbury 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Glastonbury 22.55$36.1210c) Paperhanger and Red Label

Hartford Glastonbury 22.55$38.6210e) Blast and Spray

Hartford Glastonbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Glastonbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Glastonbury 21.35$38.4013) Roofer (composition)

Hartford Glastonbury 21.35$38.9014) Roofer (slate & tile)

Hartford Glastonbury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Glastonbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Glastonbury ------TRUCK DRIVERS------

Hartford Glastonbury 25.79 + a$29.8617a) 2 Axle

Hartford Glastonbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Glastonbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Glastonbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Glastonbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Glastonbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 141: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Glastonbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Glastonbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Glastonbury 7.34$25.7619) Theatrical Stage Journeyman

Hartford Granby 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Granby 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Granby 26.01$38.342) Boilermaker

Hartford Granby 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Granby 25.87$34.903b) Tile Setter

Hartford Granby 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Granby 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Granby 32.06$33.483e) Plasterer

Hartford Granby ------LABORERS------

Hartford Granby 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Granby 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Granby 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Granby 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 142: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Granby 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Granby 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Granby 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Granby 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Granby 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Granby 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Granby 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Granby 26.19$34.945a) Millwrights

Hartford Granby 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Granby 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Granby -----LINE CONSTRUCTION----

Hartford Granby 6.5% + 9.00$26.50Groundman

Hartford Granby 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Granby 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Granby 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Granby ----OPERATORS----

Hartford Granby 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Granby 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 143: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Granby 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Granby 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Granby 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Granby 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Granby 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Granby 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Granby 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Granby 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Granby 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Granby 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Granby 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Granby 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Granby 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Granby 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Granby 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 144: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Granby 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Granby 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Granby ------PAINTERS (Including Drywall Finishing)------

Hartford Granby 22.55$35.6210a) Brush and Roller

Hartford Granby 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Granby 22.55$36.1210c) Paperhanger and Red Label

Hartford Granby 22.55$38.6210e) Blast and Spray

Hartford Granby 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Granby 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Granby 21.35$38.4013) Roofer (composition)

Hartford Granby 21.35$38.9014) Roofer (slate & tile)

Hartford Granby 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Granby 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Granby ------TRUCK DRIVERS------

Hartford Granby 25.79 + a$29.8617a) 2 Axle

Hartford Granby 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Granby 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Granby 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Granby 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Granby 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 145: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Granby 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Granby 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Granby 7.34$25.7619) Theatrical Stage Journeyman

Hartford Hartford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Hartford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Hartford 26.01$38.342) Boilermaker

Hartford Hartford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Hartford 25.87$34.903b) Tile Setter

Hartford Hartford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Hartford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Hartford 32.06$33.483e) Plasterer

Hartford Hartford ------LABORERS------

Hartford Hartford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Hartford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Hartford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Hartford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 146: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Hartford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Hartford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Hartford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Hartford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Hartford 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Hartford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Hartford 26.19$34.945a) Millwrights

Hartford Hartford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Hartford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Hartford -----LINE CONSTRUCTION----

Hartford Hartford 6.5% + 9.00$26.50Groundman

Hartford Hartford 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Hartford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Hartford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Hartford ----OPERATORS----

Hartford Hartford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Hartford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 147: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Hartford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Hartford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Hartford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Hartford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Hartford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Hartford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Hartford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Hartford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Hartford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Hartford 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Hartford 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Hartford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Hartford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Hartford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 148: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Hartford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Hartford ------PAINTERS (Including Drywall Finishing)------

Hartford Hartford 22.55$35.6210a) Brush and Roller

Hartford Hartford 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Hartford 22.55$36.1210c) Paperhanger and Red Label

Hartford Hartford 22.55$38.6210e) Blast and Spray

Hartford Hartford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Hartford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Hartford 21.35$38.4013) Roofer (composition)

Hartford Hartford 21.35$38.9014) Roofer (slate & tile)

Hartford Hartford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Hartford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Hartford ------TRUCK DRIVERS------

Hartford Hartford 25.79 + a$29.8617a) 2 Axle

Hartford Hartford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Hartford 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Hartford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Hartford 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Hartford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 149: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Hartford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Hartford 7.34$25.7619) Theatrical Stage Journeyman

Hartford Hartland 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Hartland 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Hartland 26.01$38.342) Boilermaker

Hartford Hartland 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Hartland 25.87$34.903b) Tile Setter

Hartford Hartland 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Hartland 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Hartland 32.06$33.483e) Plasterer

Hartford Hartland ------LABORERS------

Hartford Hartland 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Hartland 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Hartland 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Hartland 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 150: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartland 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Hartland 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Hartland 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Hartland 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Hartland 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Hartland 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Hartland 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Hartland 26.19$34.945a) Millwrights

Hartford Hartland 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Hartland 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Hartland -----LINE CONSTRUCTION----

Hartford Hartland 6.5% + 9.00$26.50Groundman

Hartford Hartland 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Hartland 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Hartland 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Hartland ----OPERATORS----

Hartford Hartland 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Hartland 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 151: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartland 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Hartland 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Hartland 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Hartland 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Hartland 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Hartland 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Hartland 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Hartland 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Hartland 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Hartland 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Hartland 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Hartland 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Hartland 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Hartland 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Hartland 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 152: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartland 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Hartland 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Hartland ------PAINTERS (Including Drywall Finishing)------

Hartford Hartland 22.55$35.6210a) Brush and Roller

Hartford Hartland 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Hartland 22.55$36.1210c) Paperhanger and Red Label

Hartford Hartland 22.55$38.6210e) Blast and Spray

Hartford Hartland 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Hartland 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Hartland 21.35$38.4013) Roofer (composition)

Hartford Hartland 21.35$38.9014) Roofer (slate & tile)

Hartford Hartland 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Hartland 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Hartland ------TRUCK DRIVERS------

Hartford Hartland 25.79 + a$29.8617a) 2 Axle

Hartford Hartland 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Hartland 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Hartland 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Hartland 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Hartland 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 153: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Hartland 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Hartland 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Hartland 7.34$25.7619) Theatrical Stage Journeyman

Hartford Manchester 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Manchester 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Manchester 26.01$38.342) Boilermaker

Hartford Manchester 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Manchester 25.87$34.903b) Tile Setter

Hartford Manchester 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Manchester 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Manchester 32.06$33.483e) Plasterer

Hartford Manchester ------LABORERS------

Hartford Manchester 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Manchester 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Manchester 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Manchester 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 154: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Manchester 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Manchester 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Manchester 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Manchester 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Manchester 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Manchester 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Manchester 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Manchester 26.19$34.945a) Millwrights

Hartford Manchester 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Manchester 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Manchester -----LINE CONSTRUCTION----

Hartford Manchester 6.5% + 9.00$26.50Groundman

Hartford Manchester 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Manchester 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Manchester 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Manchester ----OPERATORS----

Hartford Manchester 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Manchester 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 155: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Manchester 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Manchester 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Manchester 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Manchester 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Manchester 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Manchester 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Manchester 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Manchester 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Manchester 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Manchester 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Manchester 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Manchester 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Manchester 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Manchester 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Manchester 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 156: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Manchester 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Manchester 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Manchester ------PAINTERS (Including Drywall Finishing)------

Hartford Manchester 22.55$35.6210a) Brush and Roller

Hartford Manchester 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Manchester 22.55$36.1210c) Paperhanger and Red Label

Hartford Manchester 22.55$38.6210e) Blast and Spray

Hartford Manchester 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Manchester 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Manchester 21.35$38.4013) Roofer (composition)

Hartford Manchester 21.35$38.9014) Roofer (slate & tile)

Hartford Manchester 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Manchester 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Manchester ------TRUCK DRIVERS------

Hartford Manchester 25.79 + a$29.8617a) 2 Axle

Hartford Manchester 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Manchester 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Manchester 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Manchester 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Manchester 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 157: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Manchester 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Manchester 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Manchester 7.34$25.7619) Theatrical Stage Journeyman

Hartford Marlborough 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Marlborough 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Marlborough 26.01$38.342) Boilermaker

Hartford Marlborough 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Marlborough 25.87$34.903b) Tile Setter

Hartford Marlborough 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Marlborough 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Marlborough 32.06$33.483e) Plasterer

Hartford Marlborough ------LABORERS------

Hartford Marlborough 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Marlborough 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Marlborough 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Marlborough 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 158: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Marlborough 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Marlborough 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Marlborough 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Marlborough 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Marlborough 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Marlborough 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Marlborough 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Marlborough 26.19$34.945a) Millwrights

Hartford Marlborough 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Marlborough 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Marlborough -----LINE CONSTRUCTION----

Hartford Marlborough 6.5% + 9.00$26.50Groundman

Hartford Marlborough 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Marlborough 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Marlborough 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Marlborough ----OPERATORS----

Hartford Marlborough 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Marlborough 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 159: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Marlborough 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Marlborough 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Marlborough 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Marlborough 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Marlborough 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Marlborough 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Marlborough 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Marlborough 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Marlborough 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Marlborough 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Marlborough 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Marlborough 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Marlborough 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Marlborough 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Marlborough 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 160: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Marlborough 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Marlborough 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Marlborough ------PAINTERS (Including Drywall Finishing)------

Hartford Marlborough 22.55$35.6210a) Brush and Roller

Hartford Marlborough 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Marlborough 22.55$36.1210c) Paperhanger and Red Label

Hartford Marlborough 22.55$38.6210e) Blast and Spray

Hartford Marlborough 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Marlborough 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Marlborough 21.35$38.4013) Roofer (composition)

Hartford Marlborough 21.35$38.9014) Roofer (slate & tile)

Hartford Marlborough 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Marlborough 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Marlborough ------TRUCK DRIVERS------

Hartford Marlborough 25.79 + a$29.8617a) 2 Axle

Hartford Marlborough 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Marlborough 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Marlborough 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Marlborough 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Marlborough 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 161: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Marlborough 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Marlborough 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Marlborough 7.34$25.7619) Theatrical Stage Journeyman

Hartford New Britain 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford New Britain 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford New Britain 26.01$38.342) Boilermaker

Hartford New Britain 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford New Britain 25.87$34.903b) Tile Setter

Hartford New Britain 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford New Britain 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford New Britain 32.06$33.483e) Plasterer

Hartford New Britain ------LABORERS------

Hartford New Britain 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford New Britain 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford New Britain 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford New Britain 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 162: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford New Britain 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford New Britain 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford New Britain 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford New Britain 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford New Britain 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford New Britain 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford New Britain 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford New Britain 26.19$34.945a) Millwrights

Hartford New Britain 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford New Britain 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford New Britain -----LINE CONSTRUCTION----

Hartford New Britain 6.5% + 9.00$26.50Groundman

Hartford New Britain 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford New Britain 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford New Britain 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford New Britain ----OPERATORS----

Hartford New Britain 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford New Britain 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 163: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford New Britain 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford New Britain 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford New Britain 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford New Britain 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford New Britain 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford New Britain 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford New Britain 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford New Britain 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford New Britain 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford New Britain 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford New Britain 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford New Britain 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford New Britain 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford New Britain 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford New Britain 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 164: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford New Britain 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford New Britain 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford New Britain ------PAINTERS (Including Drywall Finishing)------

Hartford New Britain 22.55$35.6210a) Brush and Roller

Hartford New Britain 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford New Britain 22.55$36.1210c) Paperhanger and Red Label

Hartford New Britain 22.55$38.6210e) Blast and Spray

Hartford New Britain 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford New Britain 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford New Britain 21.35$38.4013) Roofer (composition)

Hartford New Britain 21.35$38.9014) Roofer (slate & tile)

Hartford New Britain 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford New Britain 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford New Britain ------TRUCK DRIVERS------

Hartford New Britain 25.79 + a$29.8617a) 2 Axle

Hartford New Britain 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford New Britain 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford New Britain 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford New Britain 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford New Britain 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 165: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford New Britain 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford New Britain 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford New Britain 7.34$25.7619) Theatrical Stage Journeyman

Hartford Newington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Newington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Newington 26.01$38.342) Boilermaker

Hartford Newington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Newington 25.87$34.903b) Tile Setter

Hartford Newington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Newington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Newington 32.06$33.483e) Plasterer

Hartford Newington ------LABORERS------

Hartford Newington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Newington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Newington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Newington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 166: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Newington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Newington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Newington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Newington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Newington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Newington 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Newington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Newington 26.19$34.945a) Millwrights

Hartford Newington 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Newington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Newington -----LINE CONSTRUCTION----

Hartford Newington 6.5% + 9.00$26.50Groundman

Hartford Newington 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Newington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Newington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Newington ----OPERATORS----

Hartford Newington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Newington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 167: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Newington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Newington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Newington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Newington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Newington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Newington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Newington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Newington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Newington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Newington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Newington 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Newington 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Newington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Newington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Newington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 168: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Newington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Newington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Newington ------PAINTERS (Including Drywall Finishing)------

Hartford Newington 22.55$35.6210a) Brush and Roller

Hartford Newington 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Newington 22.55$36.1210c) Paperhanger and Red Label

Hartford Newington 22.55$38.6210e) Blast and Spray

Hartford Newington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Newington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Newington 21.35$38.4013) Roofer (composition)

Hartford Newington 21.35$38.9014) Roofer (slate & tile)

Hartford Newington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Newington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Newington ------TRUCK DRIVERS------

Hartford Newington 25.79 + a$29.8617a) 2 Axle

Hartford Newington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Newington 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Newington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Newington 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Newington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 169: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Newington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Newington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Newington 7.34$25.7619) Theatrical Stage Journeyman

Hartford Plainville 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Plainville 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Plainville 26.01$38.342) Boilermaker

Hartford Plainville 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Plainville 25.87$34.903b) Tile Setter

Hartford Plainville 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Plainville 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Plainville 32.06$33.483e) Plasterer

Hartford Plainville ------LABORERS------

Hartford Plainville 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Plainville 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Plainville 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Plainville 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 170: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Plainville 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Plainville 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Plainville 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Plainville 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Plainville 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Plainville 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Plainville 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Plainville 26.19$34.945a) Millwrights

Hartford Plainville 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Plainville 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Plainville -----LINE CONSTRUCTION----

Hartford Plainville 6.5% + 9.00$26.50Groundman

Hartford Plainville 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Plainville 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Plainville 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Plainville ----OPERATORS----

Hartford Plainville 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Plainville 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 171: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Plainville 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Plainville 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Plainville 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Plainville 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Plainville 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Plainville 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Plainville 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Plainville 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Plainville 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Plainville 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Plainville 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Plainville 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Plainville 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Plainville 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Plainville 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 172: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Plainville 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Plainville 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Plainville ------PAINTERS (Including Drywall Finishing)------

Hartford Plainville 22.55$35.6210a) Brush and Roller

Hartford Plainville 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Plainville 22.55$36.1210c) Paperhanger and Red Label

Hartford Plainville 22.55$38.6210e) Blast and Spray

Hartford Plainville 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Plainville 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Plainville 21.35$38.4013) Roofer (composition)

Hartford Plainville 21.35$38.9014) Roofer (slate & tile)

Hartford Plainville 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Plainville 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Plainville ------TRUCK DRIVERS------

Hartford Plainville 25.79 + a$29.8617a) 2 Axle

Hartford Plainville 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Plainville 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Plainville 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Plainville 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Plainville 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 173: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Plainville 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Plainville 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Plainville 7.34$25.7619) Theatrical Stage Journeyman

Hartford Rocky Hill 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Rocky Hill 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Rocky Hill 26.01$38.342) Boilermaker

Hartford Rocky Hill 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Rocky Hill 25.87$34.903b) Tile Setter

Hartford Rocky Hill 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Rocky Hill 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Rocky Hill 32.06$33.483e) Plasterer

Hartford Rocky Hill ------LABORERS------

Hartford Rocky Hill 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Rocky Hill 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Rocky Hill 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Rocky Hill 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 174: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Rocky Hill 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Rocky Hill 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Rocky Hill 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Rocky Hill 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Rocky Hill 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Rocky Hill 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Rocky Hill 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Rocky Hill 26.19$34.945a) Millwrights

Hartford Rocky Hill 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Rocky Hill 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Rocky Hill -----LINE CONSTRUCTION----

Hartford Rocky Hill 6.5% + 9.00$26.50Groundman

Hartford Rocky Hill 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Rocky Hill 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Rocky Hill 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Rocky Hill ----OPERATORS----

Hartford Rocky Hill 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Rocky Hill 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 175: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Rocky Hill 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Rocky Hill 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Rocky Hill 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Rocky Hill 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Rocky Hill 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Rocky Hill 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Rocky Hill 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Rocky Hill 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Rocky Hill 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Rocky Hill 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Rocky Hill 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Rocky Hill 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Rocky Hill 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Rocky Hill 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Rocky Hill 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 176: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Rocky Hill 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Rocky Hill 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Rocky Hill ------PAINTERS (Including Drywall Finishing)------

Hartford Rocky Hill 22.55$35.6210a) Brush and Roller

Hartford Rocky Hill 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Rocky Hill 22.55$36.1210c) Paperhanger and Red Label

Hartford Rocky Hill 22.55$38.6210e) Blast and Spray

Hartford Rocky Hill 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Rocky Hill 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Rocky Hill 21.35$38.4013) Roofer (composition)

Hartford Rocky Hill 21.35$38.9014) Roofer (slate & tile)

Hartford Rocky Hill 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Rocky Hill 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Rocky Hill ------TRUCK DRIVERS------

Hartford Rocky Hill 25.79 + a$29.8617a) 2 Axle

Hartford Rocky Hill 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Rocky Hill 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Rocky Hill 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Rocky Hill 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Rocky Hill 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 177: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Rocky Hill 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Rocky Hill 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Rocky Hill 7.34$25.7619) Theatrical Stage Journeyman

Hartford Simsbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Simsbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Simsbury 26.01$38.342) Boilermaker

Hartford Simsbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Simsbury 25.87$34.903b) Tile Setter

Hartford Simsbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Simsbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Simsbury 32.06$33.483e) Plasterer

Hartford Simsbury ------LABORERS------

Hartford Simsbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Simsbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Simsbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Simsbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 178: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Simsbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Simsbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Simsbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Simsbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Simsbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Simsbury 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Simsbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Simsbury 26.19$34.945a) Millwrights

Hartford Simsbury 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Simsbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Simsbury -----LINE CONSTRUCTION----

Hartford Simsbury 6.5% + 9.00$26.50Groundman

Hartford Simsbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Simsbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Simsbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Simsbury ----OPERATORS----

Hartford Simsbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Simsbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 179: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Simsbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Simsbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Simsbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Simsbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Simsbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Simsbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Simsbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Simsbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Simsbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Simsbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Simsbury 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Simsbury 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Simsbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Simsbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Simsbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 180: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Simsbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Simsbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Simsbury ------PAINTERS (Including Drywall Finishing)------

Hartford Simsbury 22.55$35.6210a) Brush and Roller

Hartford Simsbury 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Simsbury 22.55$36.1210c) Paperhanger and Red Label

Hartford Simsbury 22.55$38.6210e) Blast and Spray

Hartford Simsbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Simsbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Simsbury 21.35$38.4013) Roofer (composition)

Hartford Simsbury 21.35$38.9014) Roofer (slate & tile)

Hartford Simsbury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Simsbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Simsbury ------TRUCK DRIVERS------

Hartford Simsbury 25.79 + a$29.8617a) 2 Axle

Hartford Simsbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Simsbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Simsbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Simsbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Simsbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 181: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Simsbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Simsbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Simsbury 7.34$25.7619) Theatrical Stage Journeyman

Hartford South Windsor 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford South Windsor 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford South Windsor 26.01$38.342) Boilermaker

Hartford South Windsor 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford South Windsor 25.87$34.903b) Tile Setter

Hartford South Windsor 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford South Windsor 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford South Windsor 32.06$33.483e) Plasterer

Hartford South Windsor ------LABORERS------

Hartford South Windsor 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford South Windsor 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford South Windsor 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford South Windsor 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 182: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford South Windsor 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford South Windsor 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford South Windsor 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford South Windsor 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford South Windsor 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford South Windsor 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford South Windsor 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford South Windsor 26.19$34.945a) Millwrights

Hartford South Windsor 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford South Windsor 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford South Windsor -----LINE CONSTRUCTION----

Hartford South Windsor 6.5% + 9.00$26.50Groundman

Hartford South Windsor 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford South Windsor 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford South Windsor 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford South Windsor ----OPERATORS----

Hartford South Windsor 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford South Windsor 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 183: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford South Windsor 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford South Windsor 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford South Windsor 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford South Windsor 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford South Windsor 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford South Windsor 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford South Windsor 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford South Windsor 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford South Windsor 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford South Windsor 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford South Windsor 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford South Windsor 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford South Windsor 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford South Windsor 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford South Windsor 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 184: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford South Windsor 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford South Windsor 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford South Windsor ------PAINTERS (Including Drywall Finishing)------

Hartford South Windsor 22.55$35.6210a) Brush and Roller

Hartford South Windsor 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford South Windsor 22.55$36.1210c) Paperhanger and Red Label

Hartford South Windsor 22.55$38.6210e) Blast and Spray

Hartford South Windsor 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford South Windsor 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford South Windsor 21.35$38.4013) Roofer (composition)

Hartford South Windsor 21.35$38.9014) Roofer (slate & tile)

Hartford South Windsor 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford South Windsor 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford South Windsor ------TRUCK DRIVERS------

Hartford South Windsor 25.79 + a$29.8617a) 2 Axle

Hartford South Windsor 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford South Windsor 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford South Windsor 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford South Windsor 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford South Windsor 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 185: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford South Windsor 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford South Windsor 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford South Windsor 7.34$25.7619) Theatrical Stage Journeyman

Hartford Southington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Southington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Southington 26.01$38.342) Boilermaker

Hartford Southington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Southington 25.87$34.903b) Tile Setter

Hartford Southington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Southington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Southington 32.06$33.483e) Plasterer

Hartford Southington ------LABORERS------

Hartford Southington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Southington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Southington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Southington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 186: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Southington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Hartford Southington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Southington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Southington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Southington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Southington 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Southington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Southington 26.19$34.945a) Millwrights

Hartford Southington 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Southington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Southington -----LINE CONSTRUCTION----

Hartford Southington 6.5% + 9.00$26.50Groundman

Hartford Southington 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Southington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Southington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Southington ----OPERATORS----

Hartford Southington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Southington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 187: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Southington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Hartford Southington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Southington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Southington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Southington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Southington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Southington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Southington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Southington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Southington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Southington 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Southington 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Southington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Southington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Southington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 188: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Southington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Hartford Southington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Southington ------PAINTERS (Including Drywall Finishing)------

Hartford Southington 22.55$35.6210a) Brush and Roller

Hartford Southington 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Southington 22.55$36.1210c) Paperhanger and Red Label

Hartford Southington 22.55$38.6210e) Blast and Spray

Hartford Southington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Southington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Southington 21.35$38.4013) Roofer (composition)

Hartford Southington 21.35$38.9014) Roofer (slate & tile)

Hartford Southington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Southington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Southington ------TRUCK DRIVERS------

Hartford Southington 25.79 + a$29.8617a) 2 Axle

Hartford Southington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Southington 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Southington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Southington 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Southington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 189: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Southington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Hartford Southington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Southington 7.34$25.7619) Theatrical Stage Journeyman

Hartford Statewide 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Statewide 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Statewide 26.01$38.342) Boilermaker

Hartford Statewide 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Statewide 25.87$34.903b) Tile Setter

Hartford Statewide 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Statewide 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Statewide 32.06$33.483e) Plasterer

Hartford Statewide ------LABORERS------

Hartford Statewide 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Statewide 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Statewide 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford Statewide 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 190: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Statewide 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Statewide 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Statewide 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Statewide 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Statewide 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Statewide 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Statewide 26.19$34.945a) Millwrights

Hartford Statewide 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Statewide 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Statewide -----LINE CONSTRUCTION----

Hartford Statewide 6.5% + 9.00$26.50Groundman

Hartford Statewide 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Statewide 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Statewide 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Statewide ----OPERATORS----

Hartford Statewide 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Statewide 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford Statewide 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 191: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford Statewide 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Statewide 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Statewide 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Statewide 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Statewide 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Statewide 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Statewide 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Statewide 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Statewide 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Statewide 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Statewide 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Statewide 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Statewide 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Statewide 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford Statewide 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 192: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Statewide 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Statewide ------PAINTERS (Including Drywall Finishing)------

Hartford Statewide 22.55$35.6210a) Brush and Roller

Hartford Statewide 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Statewide 22.55$36.1210c) Paperhanger and Red Label

Hartford Statewide 22.55$38.6210e) Blast and Spray

Hartford Statewide 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Statewide 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Statewide 21.35$38.4013) Roofer (composition)

Hartford Statewide 21.35$38.9014) Roofer (slate & tile)

Hartford Statewide 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Statewide 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Statewide ------TRUCK DRIVERS------

Hartford Statewide 25.79 + a$29.8617a) 2 Axle

Hartford Statewide 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Statewide 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Statewide 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Statewide 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Statewide 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford Statewide 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 193: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford Statewide 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Statewide 7.34$25.7619) Theatrical Stage Journeyman

Hartford Suffield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Suffield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Suffield 26.01$38.342) Boilermaker

Hartford Suffield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Suffield 25.87$34.903b) Tile Setter

Hartford Suffield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Suffield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Suffield 32.06$33.483e) Plasterer

Hartford Suffield ------LABORERS------

Hartford Suffield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Suffield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Suffield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Suffield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford Suffield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 194: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Suffield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Suffield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Suffield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Suffield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Suffield 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Suffield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Suffield 26.19$34.945a) Millwrights

Hartford Suffield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Suffield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Suffield -----LINE CONSTRUCTION----

Hartford Suffield 6.5% + 9.00$26.50Groundman

Hartford Suffield 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Suffield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Suffield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Suffield ----OPERATORS----

Hartford Suffield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Suffield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford Suffield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 195: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford Suffield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Suffield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Suffield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Suffield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Suffield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Suffield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Suffield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Suffield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Suffield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Suffield 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Suffield 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Suffield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Suffield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Suffield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford Suffield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 196: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Suffield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Suffield ------PAINTERS (Including Drywall Finishing)------

Hartford Suffield 22.55$35.6210a) Brush and Roller

Hartford Suffield 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Suffield 22.55$36.1210c) Paperhanger and Red Label

Hartford Suffield 22.55$38.6210e) Blast and Spray

Hartford Suffield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Suffield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Suffield 21.35$38.4013) Roofer (composition)

Hartford Suffield 21.35$38.9014) Roofer (slate & tile)

Hartford Suffield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Suffield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Suffield ------TRUCK DRIVERS------

Hartford Suffield 25.79 + a$29.8617a) 2 Axle

Hartford Suffield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Suffield 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Suffield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Suffield 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Suffield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford Suffield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 197: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford Suffield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Suffield 7.34$25.7619) Theatrical Stage Journeyman

Hartford West Hartford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford West Hartford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford West Hartford 26.01$38.342) Boilermaker

Hartford West Hartford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford West Hartford 25.87$34.903b) Tile Setter

Hartford West Hartford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford West Hartford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford West Hartford 32.06$33.483e) Plasterer

Hartford West Hartford ------LABORERS------

Hartford West Hartford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford West Hartford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford West Hartford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford West Hartford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford West Hartford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 198: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford West Hartford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford West Hartford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford West Hartford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford West Hartford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford West Hartford 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford West Hartford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford West Hartford 26.19$34.945a) Millwrights

Hartford West Hartford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford West Hartford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford West Hartford -----LINE CONSTRUCTION----

Hartford West Hartford 6.5% + 9.00$26.50Groundman

Hartford West Hartford 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford West Hartford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford West Hartford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford West Hartford ----OPERATORS----

Hartford West Hartford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford West Hartford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford West Hartford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 199: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford West Hartford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford West Hartford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford West Hartford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford West Hartford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford West Hartford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford West Hartford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford West Hartford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford West Hartford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford West Hartford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford West Hartford 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford West Hartford 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford West Hartford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford West Hartford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford West Hartford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford West Hartford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 200: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford West Hartford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford West Hartford ------PAINTERS (Including Drywall Finishing)------

Hartford West Hartford 22.55$35.6210a) Brush and Roller

Hartford West Hartford 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford West Hartford 22.55$36.1210c) Paperhanger and Red Label

Hartford West Hartford 22.55$38.6210e) Blast and Spray

Hartford West Hartford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford West Hartford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford West Hartford 21.35$38.4013) Roofer (composition)

Hartford West Hartford 21.35$38.9014) Roofer (slate & tile)

Hartford West Hartford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford West Hartford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford West Hartford ------TRUCK DRIVERS------

Hartford West Hartford 25.79 + a$29.8617a) 2 Axle

Hartford West Hartford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford West Hartford 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford West Hartford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford West Hartford 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford West Hartford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford West Hartford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 201: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford West Hartford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford West Hartford 7.34$25.7619) Theatrical Stage Journeyman

Hartford Wethersfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Wethersfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Wethersfield 26.01$38.342) Boilermaker

Hartford Wethersfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Wethersfield 25.87$34.903b) Tile Setter

Hartford Wethersfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Wethersfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Wethersfield 32.06$33.483e) Plasterer

Hartford Wethersfield ------LABORERS------

Hartford Wethersfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Wethersfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Wethersfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Wethersfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford Wethersfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 202: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Wethersfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Wethersfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Wethersfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Wethersfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Wethersfield 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Wethersfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Wethersfield 26.19$34.945a) Millwrights

Hartford Wethersfield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Wethersfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Wethersfield -----LINE CONSTRUCTION----

Hartford Wethersfield 6.5% + 9.00$26.50Groundman

Hartford Wethersfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Wethersfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Wethersfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Wethersfield ----OPERATORS----

Hartford Wethersfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Wethersfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford Wethersfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 203: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford Wethersfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Wethersfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Wethersfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Wethersfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Wethersfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Wethersfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Wethersfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Wethersfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Wethersfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Wethersfield 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Wethersfield 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Wethersfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Wethersfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Wethersfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford Wethersfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 204: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Wethersfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Wethersfield ------PAINTERS (Including Drywall Finishing)------

Hartford Wethersfield 22.55$35.6210a) Brush and Roller

Hartford Wethersfield 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Wethersfield 22.55$36.1210c) Paperhanger and Red Label

Hartford Wethersfield 22.55$38.6210e) Blast and Spray

Hartford Wethersfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Wethersfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Wethersfield 21.35$38.4013) Roofer (composition)

Hartford Wethersfield 21.35$38.9014) Roofer (slate & tile)

Hartford Wethersfield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Wethersfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Wethersfield ------TRUCK DRIVERS------

Hartford Wethersfield 25.79 + a$29.8617a) 2 Axle

Hartford Wethersfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Wethersfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Wethersfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Wethersfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Wethersfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford Wethersfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 205: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford Wethersfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Wethersfield 7.34$25.7619) Theatrical Stage Journeyman

Hartford Windsor 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Windsor 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Windsor 26.01$38.342) Boilermaker

Hartford Windsor 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Windsor 25.87$34.903b) Tile Setter

Hartford Windsor 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Windsor 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Windsor 32.06$33.483e) Plasterer

Hartford Windsor ------LABORERS------

Hartford Windsor 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Windsor 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Windsor 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Windsor 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford Windsor 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 206: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Windsor 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Windsor 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Windsor 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Windsor 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Windsor 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Windsor 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Windsor 26.19$34.945a) Millwrights

Hartford Windsor 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Windsor 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Windsor -----LINE CONSTRUCTION----

Hartford Windsor 6.5% + 9.00$26.50Groundman

Hartford Windsor 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Windsor 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Windsor 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Windsor ----OPERATORS----

Hartford Windsor 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Windsor 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford Windsor 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 207: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford Windsor 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Windsor 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Windsor 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Windsor 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Windsor 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Windsor 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Windsor 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Windsor 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Windsor 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Windsor 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Windsor 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Windsor 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Windsor 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Windsor 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford Windsor 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 208: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Windsor 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Windsor ------PAINTERS (Including Drywall Finishing)------

Hartford Windsor 22.55$35.6210a) Brush and Roller

Hartford Windsor 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Windsor 22.55$36.1210c) Paperhanger and Red Label

Hartford Windsor 22.55$38.6210e) Blast and Spray

Hartford Windsor 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Windsor 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Windsor 21.35$38.4013) Roofer (composition)

Hartford Windsor 21.35$38.9014) Roofer (slate & tile)

Hartford Windsor 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Windsor 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Windsor ------TRUCK DRIVERS------

Hartford Windsor 25.79 + a$29.8617a) 2 Axle

Hartford Windsor 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Windsor 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Windsor 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Windsor 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Windsor 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford Windsor 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 209: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford Windsor 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Windsor 7.34$25.7619) Theatrical Stage Journeyman

Hartford Windsor Locks 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Hartford Windsor Locks 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Hartford Windsor Locks 26.01$38.342) Boilermaker

Hartford Windsor Locks 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Hartford Windsor Locks 25.87$34.903b) Tile Setter

Hartford Windsor Locks 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Hartford Windsor Locks 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Hartford Windsor Locks 32.06$33.483e) Plasterer

Hartford Windsor Locks ------LABORERS------

Hartford Windsor Locks 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Hartford Windsor Locks 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Hartford Windsor Locks 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Hartford Windsor Locks 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Hartford Windsor Locks 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 210: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Windsor Locks 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Hartford Windsor Locks 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Hartford Windsor Locks 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Hartford Windsor Locks 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Hartford Windsor Locks 22.15$18.004i) Group 10: Traffic Control Signalman

Hartford Windsor Locks 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Hartford Windsor Locks 26.19$34.945a) Millwrights

Hartford Windsor Locks 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Hartford Windsor Locks 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Hartford Windsor Locks -----LINE CONSTRUCTION----

Hartford Windsor Locks 6.5% + 9.00$26.50Groundman

Hartford Windsor Locks 6.5% + 22.00$48.19Linemen/Cable Splicer

Hartford Windsor Locks 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Hartford Windsor Locks 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Hartford Windsor Locks ----OPERATORS----

Hartford Windsor Locks 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Hartford Windsor Locks 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Hartford Windsor Locks 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 211: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Hartford Windsor Locks 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Hartford Windsor Locks 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Hartford Windsor Locks 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Hartford Windsor Locks 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Hartford Windsor Locks 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Hartford Windsor Locks 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Hartford Windsor Locks 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Hartford Windsor Locks 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Hartford Windsor Locks 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Hartford Windsor Locks 25.30 + a$36.48Group 12: Wellpoint operator.

Hartford Windsor Locks 25.30 + a$35.86Group 13: Compressor battery operator.

Hartford Windsor Locks 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Hartford Windsor Locks 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Hartford Windsor Locks 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Hartford Windsor Locks 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 212: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationHartford Windsor Locks 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Hartford Windsor Locks ------PAINTERS (Including Drywall Finishing)------

Hartford Windsor Locks 22.55$35.6210a) Brush and Roller

Hartford Windsor Locks 22.55$36.3710b) Taping Only/Drywall Finishing

Hartford Windsor Locks 22.55$36.1210c) Paperhanger and Red Label

Hartford Windsor Locks 22.55$38.6210e) Blast and Spray

Hartford Windsor Locks 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Hartford Windsor Locks 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Hartford Windsor Locks 21.35$38.4013) Roofer (composition)

Hartford Windsor Locks 21.35$38.9014) Roofer (slate & tile)

Hartford Windsor Locks 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Hartford Windsor Locks 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Hartford Windsor Locks ------TRUCK DRIVERS------

Hartford Windsor Locks 25.79 + a$29.8617a) 2 Axle

Hartford Windsor Locks 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Hartford Windsor Locks 25.79 + a$30.0317c) 3 Axle Ready Mix

Hartford Windsor Locks 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Hartford Windsor Locks 25.79 + a$30.1317e) 4 Axle Ready Mix

Hartford Windsor Locks 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Hartford Windsor Locks 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 213: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Hartford Windsor Locks 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Hartford Windsor Locks 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Barkhamsted 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Barkhamsted 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Barkhamsted 26.01$38.342) Boilermaker

Litchfield Barkhamsted 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Barkhamsted 25.87$34.903b) Tile Setter

Litchfield Barkhamsted 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Barkhamsted 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Barkhamsted 32.06$33.483e) Plasterer

Litchfield Barkhamsted ------LABORERS------

Litchfield Barkhamsted 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Barkhamsted 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Barkhamsted 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Barkhamsted 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Barkhamsted 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 214: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Barkhamsted 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Barkhamsted 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Barkhamsted 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Barkhamsted 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Barkhamsted 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Barkhamsted 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Barkhamsted 26.19$34.945a) Millwrights

Litchfield Barkhamsted 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Barkhamsted 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Barkhamsted -----LINE CONSTRUCTION----

Litchfield Barkhamsted 6.5% + 9.00$26.50Groundman

Litchfield Barkhamsted 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Barkhamsted 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Barkhamsted 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Barkhamsted ----OPERATORS----

Litchfield Barkhamsted 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Barkhamsted 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Barkhamsted 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 215: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Litchfield Barkhamsted 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Barkhamsted 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Barkhamsted 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Barkhamsted 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Barkhamsted 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Barkhamsted 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Barkhamsted 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Barkhamsted 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Barkhamsted 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Barkhamsted 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Barkhamsted 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Barkhamsted 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Barkhamsted 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Barkhamsted 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Barkhamsted 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 216: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Barkhamsted 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Litchfield Barkhamsted ------PAINTERS (Including Drywall Finishing)------

Litchfield Barkhamsted 22.55$35.6210a) Brush and Roller

Litchfield Barkhamsted 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Barkhamsted 22.55$36.1210c) Paperhanger and Red Label

Litchfield Barkhamsted 22.55$38.6210e) Blast and Spray

Litchfield Barkhamsted 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Barkhamsted 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Barkhamsted 21.35$38.4013) Roofer (composition)

Litchfield Barkhamsted 21.35$38.9014) Roofer (slate & tile)

Litchfield Barkhamsted 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Barkhamsted 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Barkhamsted ------TRUCK DRIVERS------

Litchfield Barkhamsted 25.79 + a$29.8617a) 2 Axle

Litchfield Barkhamsted 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Barkhamsted 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Barkhamsted 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Barkhamsted 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Barkhamsted 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Barkhamsted 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including

As of: July 1, 2020

Page 217: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationEuclids)

Litchfield Barkhamsted 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Barkhamsted 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Bethlehem 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Bethlehem 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Bethlehem 26.01$38.342) Boilermaker

Litchfield Bethlehem 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Bethlehem 25.87$34.903b) Tile Setter

Litchfield Bethlehem 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Bethlehem 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Bethlehem 32.06$33.483e) Plasterer

Litchfield Bethlehem 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Bethlehem 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Bethlehem 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Bethlehem 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Bethlehem 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Bethlehem 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

As of: July 1, 2020

Page 218: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bethlehem 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removal

from mechanical systems which are not to be scrapped).Litchfield Bethlehem 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boring

crew.Litchfield Bethlehem 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boring

crew.Litchfield Bethlehem 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Bethlehem 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Bethlehem 26.19$34.945a) Millwrights

Litchfield Bethlehem 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Bethlehem 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Bethlehem -----LINE CONSTRUCTION----

Litchfield Bethlehem 6.5% + 9.00$26.50Groundman

Litchfield Bethlehem 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Bethlehem 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Bethlehem 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Bethlehem ----OPERATORS----

Litchfield Bethlehem 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Bethlehem 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Bethlehem 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive

As of: July 1, 2020

Page 219: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationpower of operation), Rubber Tire Excavator (Drott-1085 or similar);GraderOperator; Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.).(Trade License Required)

Litchfield Bethlehem 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Bethlehem 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Bethlehem 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Bethlehem 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Bethlehem 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Bethlehem 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Bethlehem 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Bethlehem 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Bethlehem 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Bethlehem 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Bethlehem 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Bethlehem 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Bethlehem 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Bethlehem 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Bethlehem 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Bethlehem 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

As of: July 1, 2020

Page 220: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bethlehem 22.55$35.6210a) Brush and Roller

Litchfield Bethlehem 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Bethlehem 22.55$36.1210c) Paperhanger and Red Label

Litchfield Bethlehem 22.55$38.6210e) Blast and Spray

Litchfield Bethlehem 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Bethlehem 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Bethlehem 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Bethlehem 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Bethlehem 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Bethlehem 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Bethlehem 25.79 + a$29.8617a) 2 Axle

Litchfield Bethlehem 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Bethlehem 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Bethlehem 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Bethlehem 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Bethlehem 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Bethlehem 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Bethlehem 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Bethlehem 7.34$25.7619) Theatrical Stage Journeyman

As of: July 1, 2020

Page 221: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bridgewater 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal and

encapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Bridgewater 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Bridgewater 26.01$38.342) Boilermaker

Litchfield Bridgewater 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Bridgewater 25.87$34.903b) Tile Setter

Litchfield Bridgewater 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Bridgewater 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Bridgewater 32.06$33.483e) Plasterer

Litchfield Bridgewater 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Bridgewater 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Bridgewater 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Bridgewater 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Bridgewater 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Bridgewater 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Bridgewater 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Bridgewater 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Bridgewater 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

As of: July 1, 2020

Page 222: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bridgewater 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Bridgewater 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Bridgewater 26.19$34.945a) Millwrights

Litchfield Bridgewater 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Bridgewater 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Bridgewater -----LINE CONSTRUCTION----

Litchfield Bridgewater 6.5% + 9.00$26.50Groundman

Litchfield Bridgewater 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Bridgewater 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Bridgewater 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Bridgewater ----OPERATORS----

Litchfield Bridgewater 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Bridgewater 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Bridgewater 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Bridgewater 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

As of: July 1, 2020

Page 223: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bridgewater 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt Reclaiming

Machine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Bridgewater 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Bridgewater 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Bridgewater 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Bridgewater 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Bridgewater 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Bridgewater 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Bridgewater 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Bridgewater 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Bridgewater 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Bridgewater 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Bridgewater 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Bridgewater 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Bridgewater 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Bridgewater 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Bridgewater 22.55$35.6210a) Brush and Roller

Litchfield Bridgewater 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Bridgewater 22.55$36.1210c) Paperhanger and Red Label

As of: July 1, 2020

Page 224: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Bridgewater 22.55$38.6210e) Blast and Spray

Litchfield Bridgewater 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Bridgewater 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Bridgewater 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Bridgewater 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Bridgewater 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Bridgewater 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Bridgewater 25.79 + a$29.8617a) 2 Axle

Litchfield Bridgewater 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Bridgewater 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Bridgewater 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Bridgewater 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Bridgewater 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Bridgewater 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Bridgewater 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Bridgewater 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Canaan 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Canaan 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

As of: July 1, 2020

Page 225: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Canaan 26.01$38.342) Boilermaker

Litchfield Canaan 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Canaan 25.87$34.903b) Tile Setter

Litchfield Canaan 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Canaan 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Canaan 32.06$33.483e) Plasterer

Litchfield Canaan 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Canaan 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Canaan 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Canaan 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Canaan 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Canaan 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Canaan 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Canaan 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Canaan 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Canaan 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Canaan 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

As of: July 1, 2020

Page 226: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Canaan 26.19$34.945a) Millwrights

Litchfield Canaan 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Canaan 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Canaan -----LINE CONSTRUCTION----

Litchfield Canaan 6.5% + 9.00$26.50Groundman

Litchfield Canaan 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Canaan 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Canaan 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Canaan ----OPERATORS----

Litchfield Canaan 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Canaan 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Canaan 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Canaan 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Canaan 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Canaan 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

As of: July 1, 2020

Page 227: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Canaan 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade

dozer).Litchfield Canaan 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Canaan 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Canaan 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Canaan 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Canaan 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Canaan 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Canaan 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Canaan 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Canaan 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Canaan 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Canaan 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Canaan 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Canaan 22.55$35.6210a) Brush and Roller

Litchfield Canaan 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Canaan 22.55$36.1210c) Paperhanger and Red Label

Litchfield Canaan 22.55$38.6210e) Blast and Spray

Litchfield Canaan 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Canaan 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 228: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Canaan 21.35$38.4013) Roofer (composition)

Litchfield Canaan 21.35$38.9014) Roofer (slate & tile)

Litchfield Canaan 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Canaan 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Canaan 25.79 + a$29.8617a) 2 Axle

Litchfield Canaan 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Canaan 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Canaan 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Canaan 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Canaan 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Canaan 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Canaan 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Canaan 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Colebrook 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Colebrook 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Colebrook 26.01$38.342) Boilermaker

Litchfield Colebrook 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Colebrook 25.87$34.903b) Tile Setter

As of: July 1, 2020

Page 229: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Colebrook 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Colebrook 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Colebrook 32.06$33.483e) Plasterer

Litchfield Colebrook 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Colebrook 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Colebrook 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Colebrook 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Colebrook 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Colebrook 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Colebrook 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Colebrook 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Colebrook 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Colebrook 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Colebrook 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Colebrook 26.19$34.945a) Millwrights

Litchfield Colebrook 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Colebrook 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 230: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Colebrook -----LINE CONSTRUCTION----

Litchfield Colebrook 6.5% + 9.00$26.50Groundman

Litchfield Colebrook 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Colebrook 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Colebrook 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Colebrook ----OPERATORS----

Litchfield Colebrook 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Colebrook 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Colebrook 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Colebrook 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Colebrook 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Colebrook 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Colebrook 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Colebrook 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Colebrook 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 231: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Litchfield Colebrook 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Colebrook 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Colebrook 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Colebrook 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Colebrook 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Colebrook 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Colebrook 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Colebrook 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Colebrook 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Colebrook 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Colebrook 22.55$35.6210a) Brush and Roller

Litchfield Colebrook 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Colebrook 22.55$36.1210c) Paperhanger and Red Label

Litchfield Colebrook 22.55$38.6210e) Blast and Spray

Litchfield Colebrook 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Colebrook 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Colebrook 21.35$38.4013) Roofer (composition)

Litchfield Colebrook 21.35$38.9014) Roofer (slate & tile)

Litchfield Colebrook 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

As of: July 1, 2020

Page 232: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Colebrook 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Colebrook 25.79 + a$29.8617a) 2 Axle

Litchfield Colebrook 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Colebrook 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Colebrook 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Colebrook 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Colebrook 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Colebrook 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Colebrook 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Colebrook 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Cornwall 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Cornwall 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Cornwall 26.01$38.342) Boilermaker

Litchfield Cornwall 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Cornwall 25.87$34.903b) Tile Setter

Litchfield Cornwall 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Cornwall 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Cornwall 32.06$33.483e) Plasterer

As of: July 1, 2020

Page 233: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Cornwall 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concrete

specialists, wrecking laborers, fire watchers.Litchfield Cornwall 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,

powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Cornwall 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Cornwall 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Cornwall 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Cornwall 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Cornwall 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Cornwall 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Cornwall 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Cornwall 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Cornwall 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Cornwall 26.19$34.945a) Millwrights

Litchfield Cornwall 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Cornwall 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Cornwall -----LINE CONSTRUCTION----

Litchfield Cornwall 6.5% + 9.00$26.50Groundman

Litchfield Cornwall 6.5% + 22.00$48.19Linemen/Cable Splicer

As of: July 1, 2020

Page 234: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Cornwall 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Cornwall 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Cornwall ----OPERATORS----

Litchfield Cornwall 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Cornwall 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Cornwall 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Cornwall 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Cornwall 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Cornwall 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Cornwall 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Cornwall 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Cornwall 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Cornwall 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Cornwall 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

As of: July 1, 2020

Page 235: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Cornwall 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),

robot demolition equipment.Litchfield Cornwall 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Cornwall 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Cornwall 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Cornwall 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Cornwall 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Cornwall 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Cornwall 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Cornwall 22.55$35.6210a) Brush and Roller

Litchfield Cornwall 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Cornwall 22.55$36.1210c) Paperhanger and Red Label

Litchfield Cornwall 22.55$38.6210e) Blast and Spray

Litchfield Cornwall 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Cornwall 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Cornwall 21.35$38.4013) Roofer (composition)

Litchfield Cornwall 21.35$38.9014) Roofer (slate & tile)

Litchfield Cornwall 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Cornwall 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Cornwall 25.79 + a$29.8617a) 2 Axle

Litchfield Cornwall 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

As of: July 1, 2020

Page 236: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Cornwall 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Cornwall 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Cornwall 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Cornwall 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Cornwall 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Cornwall 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Cornwall 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Goshen 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Goshen 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Goshen 26.01$38.342) Boilermaker

Litchfield Goshen 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Goshen 25.87$34.903b) Tile Setter

Litchfield Goshen 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Goshen 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Goshen 32.06$33.483e) Plasterer

Litchfield Goshen 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Goshen 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Goshen 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

As of: July 1, 2020

Page 237: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Goshen 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewage

lines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Goshen 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Goshen 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Goshen 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Goshen 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Goshen 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Goshen 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Goshen 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Goshen 26.19$34.945a) Millwrights

Litchfield Goshen 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Goshen 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Goshen -----LINE CONSTRUCTION----

Litchfield Goshen 6.5% + 9.00$26.50Groundman

Litchfield Goshen 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Goshen 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Goshen 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Goshen ----OPERATORS----

Litchfield Goshen 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards

As of: July 1, 2020

Page 238: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationor over), work boat 26 ft. and over and Tunnel Boring Machines. (TradeLicense Required)

Litchfield Goshen 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Goshen 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Goshen 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Goshen 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Goshen 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Goshen 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Goshen 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Goshen 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Goshen 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Goshen 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Goshen 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Goshen 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Goshen 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Goshen 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

As of: July 1, 2020

Page 239: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Goshen 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;

Welding Machine Operator; Heater Operator.Litchfield Goshen 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Goshen 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Goshen 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Goshen 22.55$35.6210a) Brush and Roller

Litchfield Goshen 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Goshen 22.55$36.1210c) Paperhanger and Red Label

Litchfield Goshen 22.55$38.6210e) Blast and Spray

Litchfield Goshen 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Goshen 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Goshen 21.35$38.4013) Roofer (composition)

Litchfield Goshen 21.35$38.9014) Roofer (slate & tile)

Litchfield Goshen 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Goshen 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Goshen 25.79 + a$29.8617a) 2 Axle

Litchfield Goshen 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Goshen 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Goshen 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Goshen 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Goshen 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 240: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Goshen 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Goshen 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Goshen 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Harwinton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Harwinton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Harwinton 26.01$38.342) Boilermaker

Litchfield Harwinton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Harwinton 25.87$34.903b) Tile Setter

Litchfield Harwinton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Harwinton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Harwinton 32.06$33.483e) Plasterer

Litchfield Harwinton ------LABORERS------

Litchfield Harwinton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Harwinton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Harwinton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Harwinton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

As of: July 1, 2020

Page 241: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Harwinton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Harwinton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Harwinton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Harwinton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Harwinton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Harwinton 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Harwinton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Harwinton 26.19$34.945a) Millwrights

Litchfield Harwinton 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Harwinton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Harwinton -----LINE CONSTRUCTION----

Litchfield Harwinton 6.5% + 9.00$26.50Groundman

Litchfield Harwinton 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Harwinton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Harwinton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Harwinton ----OPERATORS----

Litchfield Harwinton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Harwinton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

As of: July 1, 2020

Page 242: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Harwinton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes

(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Harwinton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Harwinton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Harwinton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Harwinton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Harwinton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Harwinton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Harwinton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Harwinton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Harwinton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Harwinton 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Harwinton 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Harwinton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Harwinton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Harwinton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

As of: July 1, 2020

Page 243: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Harwinton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;

portable concrete plant operator.Litchfield Harwinton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Litchfield Harwinton ------PAINTERS (Including Drywall Finishing)------

Litchfield Harwinton 22.55$35.6210a) Brush and Roller

Litchfield Harwinton 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Harwinton 22.55$36.1210c) Paperhanger and Red Label

Litchfield Harwinton 22.55$38.6210e) Blast and Spray

Litchfield Harwinton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Harwinton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Harwinton 21.35$38.4013) Roofer (composition)

Litchfield Harwinton 21.35$38.9014) Roofer (slate & tile)

Litchfield Harwinton 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Harwinton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Harwinton ------TRUCK DRIVERS------

Litchfield Harwinton 25.79 + a$29.8617a) 2 Axle

Litchfield Harwinton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Harwinton 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Harwinton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Harwinton 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Harwinton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

As of: July 1, 2020

Page 244: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Harwinton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Type

on-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Harwinton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Harwinton 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Kent 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Kent 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Kent 26.01$38.342) Boilermaker

Litchfield Kent 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Kent 25.87$34.903b) Tile Setter

Litchfield Kent 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Kent 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Kent 32.06$33.483e) Plasterer

Litchfield Kent 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Kent 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Kent 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Kent 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Kent 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

As of: July 1, 2020

Page 245: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Kent 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Kent 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Kent 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Kent 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Kent 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Kent 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Kent 26.19$34.945a) Millwrights

Litchfield Kent 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Kent 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Kent -----LINE CONSTRUCTION----

Litchfield Kent 6.5% + 9.00$26.50Groundman

Litchfield Kent 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Kent 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Kent 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Kent ----OPERATORS----

Litchfield Kent 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Kent 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Kent 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master

As of: July 1, 2020

Page 246: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMechanic; Hoisting Engineer (all types of equipment where a drum andcable are used to hoist or drag material regardless of motive power ofoperation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator;Bulldozer Fine Grade. (slopes, shaping, laser or GPS, etc.). (Trade LicenseRequired)

Litchfield Kent 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Kent 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Kent 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Kent 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Kent 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Kent 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Kent 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Kent 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Kent 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Kent 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Kent 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Kent 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Kent 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Kent 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Kent 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

As of: July 1, 2020

Page 247: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Kent 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimum

for any job requiring a CDL license).Litchfield Kent 22.55$35.6210a) Brush and Roller

Litchfield Kent 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Kent 22.55$36.1210c) Paperhanger and Red Label

Litchfield Kent 22.55$38.6210e) Blast and Spray

Litchfield Kent 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Kent 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Kent 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Kent 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Kent 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Kent 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Kent 25.79 + a$29.8617a) 2 Axle

Litchfield Kent 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Kent 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Kent 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Kent 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Kent 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Kent 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Kent 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

As of: July 1, 2020

Page 248: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Kent 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Litchfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Litchfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Litchfield 26.01$38.342) Boilermaker

Litchfield Litchfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Litchfield 25.87$34.903b) Tile Setter

Litchfield Litchfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Litchfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Litchfield 32.06$33.483e) Plasterer

Litchfield Litchfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Litchfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Litchfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Litchfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Litchfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Litchfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Litchfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Litchfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

As of: July 1, 2020

Page 249: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Litchfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boring

crew.Litchfield Litchfield 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Litchfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Litchfield 26.19$34.945a) Millwrights

Litchfield Litchfield 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Litchfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Litchfield -----LINE CONSTRUCTION----

Litchfield Litchfield 6.5% + 9.00$26.50Groundman

Litchfield Litchfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Litchfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Litchfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Litchfield ----OPERATORS----

Litchfield Litchfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Litchfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Litchfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

As of: July 1, 2020

Page 250: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Litchfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;

CMI Machine or Similar; Koehring Loader (Skooper).Litchfield Litchfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt Reclaiming

Machine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Litchfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Litchfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Litchfield Litchfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Litchfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Litchfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Litchfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Litchfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Litchfield 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Litchfield 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Litchfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Litchfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Litchfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Litchfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Litchfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Litchfield 22.55$35.6210a) Brush and Roller

Litchfield Litchfield 22.55$36.3710b) Taping Only/Drywall Finishing

As of: July 1, 2020

Page 251: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Litchfield 22.55$36.1210c) Paperhanger and Red Label

Litchfield Litchfield 22.55$38.6210e) Blast and Spray

Litchfield Litchfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Litchfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Litchfield 21.35$38.4013) Roofer (composition)

Litchfield Litchfield 21.35$38.9014) Roofer (slate & tile)

Litchfield Litchfield 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Litchfield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Litchfield 25.79 + a$29.8617a) 2 Axle

Litchfield Litchfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Litchfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Litchfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Litchfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Litchfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Litchfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Litchfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Litchfield 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Morris 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

As of: July 1, 2020

Page 252: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Morris 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Morris 26.01$38.342) Boilermaker

Litchfield Morris 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Litchfield Morris 25.87$34.903b) Tile Setter

Litchfield Morris 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Morris 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Morris 32.06$33.483e) Plasterer

Litchfield Morris 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Morris 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Morris 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Morris 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Morris 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Morris 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Morris 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Morris 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Morris 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Morris 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Morris 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building,

As of: July 1, 2020

Page 253: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationDrywall Hanging, Modular-Furniture Systems Installers, Lathers, Piledrivers,Resilient Floor Layers.

Litchfield Morris 26.19$34.945a) Millwrights

Litchfield Morris 28.75+3% of grosswage

$39.926) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Litchfield Morris 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Morris -----LINE CONSTRUCTION----

Litchfield Morris 6.5% + 9.00$26.50Groundman

Litchfield Morris 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Morris 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Morris 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Morris ----OPERATORS----

Litchfield Morris 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Morris 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Morris 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Morris 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Morris 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

As of: July 1, 2020

Page 254: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Morris 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; Directional

Driller; Pile Testing Machine.Litchfield Morris 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade

dozer).Litchfield Morris 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Morris 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Morris 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Morris 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Morris 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Morris 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Morris 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Morris 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Morris 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Morris 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Morris 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Morris 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Morris 22.55$35.6210a) Brush and Roller

Litchfield Morris 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Morris 22.55$36.1210c) Paperhanger and Red Label

Litchfield Morris 22.55$38.6210e) Blast and Spray

Litchfield Morris 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

As of: July 1, 2020

Page 255: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Morris 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Litchfield Morris 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Morris 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Morris 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Morris 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Morris 25.79 + a$29.8617a) 2 Axle

Litchfield Morris 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Morris 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Morris 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Morris 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Morris 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Morris 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Morris 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Morris 7.34$25.7619) Theatrical Stage Journeyman

Litchfield New Hartford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield New Hartford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield New Hartford 26.01$38.342) Boilermaker

Litchfield New Hartford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 256: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Hartford 25.87$34.903b) Tile Setter

Litchfield New Hartford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield New Hartford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield New Hartford 32.06$33.483e) Plasterer

Litchfield New Hartford ------LABORERS------

Litchfield New Hartford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield New Hartford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield New Hartford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield New Hartford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield New Hartford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield New Hartford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield New Hartford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield New Hartford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield New Hartford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield New Hartford 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield New Hartford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield New Hartford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 257: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Hartford 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield New Hartford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield New Hartford -----LINE CONSTRUCTION----

Litchfield New Hartford 6.5% + 9.00$26.50Groundman

Litchfield New Hartford 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield New Hartford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield New Hartford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield New Hartford ----OPERATORS----

Litchfield New Hartford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield New Hartford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield New Hartford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield New Hartford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield New Hartford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield New Hartford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield New Hartford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 258: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Hartford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield New Hartford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield New Hartford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield New Hartford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield New Hartford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield New Hartford 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield New Hartford 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield New Hartford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield New Hartford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield New Hartford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield New Hartford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield New Hartford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield New Hartford ------PAINTERS (Including Drywall Finishing)------

Litchfield New Hartford 22.55$35.6210a) Brush and Roller

Litchfield New Hartford 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield New Hartford 22.55$36.1210c) Paperhanger and Red Label

Litchfield New Hartford 22.55$38.6210e) Blast and Spray

Litchfield New Hartford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield New Hartford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 259: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Hartford 21.35$38.4013) Roofer (composition)

Litchfield New Hartford 21.35$38.9014) Roofer (slate & tile)

Litchfield New Hartford 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield New Hartford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield New Hartford ------TRUCK DRIVERS------

Litchfield New Hartford 25.79 + a$29.8617a) 2 Axle

Litchfield New Hartford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield New Hartford 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield New Hartford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield New Hartford 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield New Hartford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield New Hartford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield New Hartford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield New Hartford 7.34$25.7619) Theatrical Stage Journeyman

Litchfield New Milford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield New Milford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield New Milford 26.01$38.342) Boilermaker

Litchfield New Milford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 260: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Milford 25.87$34.903b) Tile Setter

Litchfield New Milford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield New Milford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield New Milford 32.06$33.483e) Plasterer

Litchfield New Milford ------LABORERS------

Litchfield New Milford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield New Milford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield New Milford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield New Milford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield New Milford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield New Milford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield New Milford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield New Milford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield New Milford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield New Milford 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield New Milford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield New Milford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 261: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Milford 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield New Milford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield New Milford -----LINE CONSTRUCTION----

Litchfield New Milford 6.5% + 9.00$26.50Groundman

Litchfield New Milford 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield New Milford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield New Milford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield New Milford ----OPERATORS----

Litchfield New Milford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield New Milford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield New Milford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield New Milford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield New Milford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield New Milford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield New Milford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 262: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Milford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield New Milford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield New Milford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield New Milford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield New Milford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield New Milford 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield New Milford 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield New Milford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield New Milford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield New Milford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield New Milford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield New Milford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield New Milford ------PAINTERS (Including Drywall Finishing)------

Litchfield New Milford 22.55$35.6210a) Brush and Roller

Litchfield New Milford 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield New Milford 22.55$36.1210c) Paperhanger and Red Label

Litchfield New Milford 22.55$38.6210e) Blast and Spray

Litchfield New Milford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield New Milford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 263: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield New Milford 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield New Milford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield New Milford 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield New Milford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield New Milford ------TRUCK DRIVERS------

Litchfield New Milford 25.79 + a$29.8617a) 2 Axle

Litchfield New Milford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield New Milford 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield New Milford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield New Milford 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield New Milford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield New Milford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield New Milford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield New Milford 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Norfolk 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Norfolk 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Norfolk 26.01$38.342) Boilermaker

Litchfield Norfolk 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 264: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Norfolk 25.87$34.903b) Tile Setter

Litchfield Norfolk 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Norfolk 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Norfolk 32.06$33.483e) Plasterer

Litchfield Norfolk ------LABORERS------

Litchfield Norfolk 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Norfolk 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Norfolk 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Norfolk 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Norfolk 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Norfolk 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Norfolk 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Norfolk 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Norfolk 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Norfolk 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Norfolk 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Norfolk 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 265: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Norfolk 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Norfolk 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Norfolk -----LINE CONSTRUCTION----

Litchfield Norfolk 6.5% + 9.00$26.50Groundman

Litchfield Norfolk 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Norfolk 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Norfolk 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Norfolk ----OPERATORS----

Litchfield Norfolk 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Norfolk 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Norfolk 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Norfolk 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Norfolk 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Norfolk 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Norfolk 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 266: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Norfolk 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Norfolk 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Norfolk 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Norfolk 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Norfolk 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Norfolk 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Norfolk 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Norfolk 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Norfolk 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Norfolk 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Norfolk 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Norfolk 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Norfolk ------PAINTERS (Including Drywall Finishing)------

Litchfield Norfolk 22.55$35.6210a) Brush and Roller

Litchfield Norfolk 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Norfolk 22.55$36.1210c) Paperhanger and Red Label

Litchfield Norfolk 22.55$38.6210e) Blast and Spray

Litchfield Norfolk 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Norfolk 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 267: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Norfolk 21.35$38.4013) Roofer (composition)

Litchfield Norfolk 21.35$38.9014) Roofer (slate & tile)

Litchfield Norfolk 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Norfolk 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Norfolk ------TRUCK DRIVERS------

Litchfield Norfolk 25.79 + a$29.8617a) 2 Axle

Litchfield Norfolk 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Norfolk 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Norfolk 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Norfolk 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Norfolk 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Norfolk 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Norfolk 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Norfolk 7.34$25.7619) Theatrical Stage Journeyman

Litchfield North Canaan 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield North Canaan 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield North Canaan 26.01$38.342) Boilermaker

Litchfield North Canaan 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 268: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield North Canaan 25.87$34.903b) Tile Setter

Litchfield North Canaan 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield North Canaan 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield North Canaan 32.06$33.483e) Plasterer

Litchfield North Canaan ------LABORERS------

Litchfield North Canaan 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield North Canaan 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield North Canaan 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield North Canaan 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield North Canaan 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield North Canaan 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield North Canaan 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield North Canaan 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield North Canaan 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield North Canaan 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield North Canaan 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield North Canaan 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 269: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield North Canaan 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield North Canaan 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield North Canaan -----LINE CONSTRUCTION----

Litchfield North Canaan 6.5% + 9.00$26.50Groundman

Litchfield North Canaan 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield North Canaan 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield North Canaan 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield North Canaan ----OPERATORS----

Litchfield North Canaan 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield North Canaan 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield North Canaan 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield North Canaan 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield North Canaan 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield North Canaan 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield North Canaan 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 270: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield North Canaan 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield North Canaan 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield North Canaan 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield North Canaan 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield North Canaan 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield North Canaan 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield North Canaan 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield North Canaan 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield North Canaan 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield North Canaan 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield North Canaan 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield North Canaan 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield North Canaan ------PAINTERS (Including Drywall Finishing)------

Litchfield North Canaan 22.55$35.6210a) Brush and Roller

Litchfield North Canaan 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield North Canaan 22.55$36.1210c) Paperhanger and Red Label

Litchfield North Canaan 22.55$38.6210e) Blast and Spray

Litchfield North Canaan 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield North Canaan 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 271: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield North Canaan 21.35$38.4013) Roofer (composition)

Litchfield North Canaan 21.35$38.9014) Roofer (slate & tile)

Litchfield North Canaan 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield North Canaan 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield North Canaan ------TRUCK DRIVERS------

Litchfield North Canaan 25.79 + a$29.8617a) 2 Axle

Litchfield North Canaan 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield North Canaan 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield North Canaan 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield North Canaan 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield North Canaan 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield North Canaan 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield North Canaan 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield North Canaan 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Plymouth 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Plymouth 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Plymouth 26.01$38.342) Boilermaker

Litchfield Plymouth 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 272: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Plymouth 25.87$34.903b) Tile Setter

Litchfield Plymouth 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Plymouth 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Plymouth 32.06$33.483e) Plasterer

Litchfield Plymouth ------LABORERS------

Litchfield Plymouth 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Plymouth 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Plymouth 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Plymouth 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Plymouth 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Plymouth 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Plymouth 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Plymouth 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Plymouth 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Plymouth 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Plymouth 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Plymouth 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 273: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Plymouth 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Plymouth 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Plymouth -----LINE CONSTRUCTION----

Litchfield Plymouth 6.5% + 9.00$26.50Groundman

Litchfield Plymouth 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Plymouth 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Plymouth 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Plymouth ----OPERATORS----

Litchfield Plymouth 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Plymouth 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Plymouth 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Plymouth 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Plymouth 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Plymouth 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Plymouth 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 274: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Plymouth 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Plymouth 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Plymouth 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Plymouth 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Plymouth 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Plymouth 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Plymouth 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Plymouth 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Plymouth 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Plymouth 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Plymouth 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Plymouth 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Plymouth ------PAINTERS (Including Drywall Finishing)------

Litchfield Plymouth 22.55$35.6210a) Brush and Roller

Litchfield Plymouth 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Plymouth 22.55$36.1210c) Paperhanger and Red Label

Litchfield Plymouth 22.55$38.6210e) Blast and Spray

Litchfield Plymouth 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Plymouth 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 275: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Plymouth 21.35$38.4013) Roofer (composition)

Litchfield Plymouth 21.35$38.9014) Roofer (slate & tile)

Litchfield Plymouth 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Plymouth 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Plymouth ------TRUCK DRIVERS------

Litchfield Plymouth 25.79 + a$29.8617a) 2 Axle

Litchfield Plymouth 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Plymouth 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Plymouth 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Plymouth 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Plymouth 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Plymouth 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Plymouth 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Plymouth 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Roxbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Roxbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Roxbury 26.01$38.342) Boilermaker

Litchfield Roxbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 276: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Roxbury 25.87$34.903b) Tile Setter

Litchfield Roxbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Roxbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Roxbury 32.06$33.483e) Plasterer

Litchfield Roxbury ------LABORERS------

Litchfield Roxbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Roxbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Roxbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Roxbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Roxbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Roxbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Roxbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Roxbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Roxbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Roxbury 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Roxbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Roxbury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 277: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Roxbury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Roxbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Roxbury -----LINE CONSTRUCTION----

Litchfield Roxbury 6.5% + 9.00$26.50Groundman

Litchfield Roxbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Roxbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Roxbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Roxbury ----OPERATORS----

Litchfield Roxbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Roxbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Roxbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Roxbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Roxbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Roxbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Roxbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 278: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Roxbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Roxbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Roxbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Roxbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Roxbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Roxbury 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Roxbury 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Roxbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Roxbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Roxbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Roxbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Roxbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Roxbury ------PAINTERS (Including Drywall Finishing)------

Litchfield Roxbury 22.55$35.6210a) Brush and Roller

Litchfield Roxbury 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Roxbury 22.55$36.1210c) Paperhanger and Red Label

Litchfield Roxbury 22.55$38.6210e) Blast and Spray

Litchfield Roxbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Roxbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 279: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Roxbury 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Roxbury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Roxbury 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Roxbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Roxbury ------TRUCK DRIVERS------

Litchfield Roxbury 25.79 + a$29.8617a) 2 Axle

Litchfield Roxbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Roxbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Roxbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Roxbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Roxbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Roxbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Roxbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Roxbury 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Salisbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Salisbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Salisbury 26.01$38.342) Boilermaker

Litchfield Salisbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 280: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Salisbury 25.87$34.903b) Tile Setter

Litchfield Salisbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Salisbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Salisbury 32.06$33.483e) Plasterer

Litchfield Salisbury ------LABORERS------

Litchfield Salisbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Salisbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Salisbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Salisbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Salisbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Salisbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Salisbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Salisbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Salisbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Salisbury 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Salisbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Salisbury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 281: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Salisbury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Salisbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Salisbury -----LINE CONSTRUCTION----

Litchfield Salisbury 6.5% + 9.00$26.50Groundman

Litchfield Salisbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Salisbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Salisbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Salisbury ----OPERATORS----

Litchfield Salisbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Salisbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Salisbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Salisbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Salisbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Salisbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Salisbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 282: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Salisbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Salisbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Salisbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Salisbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Salisbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Salisbury 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Salisbury 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Salisbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Salisbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Salisbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Salisbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Salisbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Salisbury ------PAINTERS (Including Drywall Finishing)------

Litchfield Salisbury 22.55$35.6210a) Brush and Roller

Litchfield Salisbury 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Salisbury 22.55$36.1210c) Paperhanger and Red Label

Litchfield Salisbury 22.55$38.6210e) Blast and Spray

Litchfield Salisbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Salisbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 283: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Salisbury 21.35$38.4013) Roofer (composition)

Litchfield Salisbury 21.35$38.9014) Roofer (slate & tile)

Litchfield Salisbury 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Salisbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Salisbury ------TRUCK DRIVERS------

Litchfield Salisbury 25.79 + a$29.8617a) 2 Axle

Litchfield Salisbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Salisbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Salisbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Salisbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Salisbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Salisbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Salisbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Salisbury 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Sharon 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Sharon 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Sharon 26.01$38.342) Boilermaker

Litchfield Sharon 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 284: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Sharon 25.87$34.903b) Tile Setter

Litchfield Sharon 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Sharon 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Sharon 32.06$33.483e) Plasterer

Litchfield Sharon ------LABORERS------

Litchfield Sharon 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Sharon 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Sharon 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Sharon 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Sharon 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Sharon 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Sharon 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Sharon 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Sharon 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Sharon 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Sharon 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Sharon 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 285: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Sharon 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Sharon 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Sharon -----LINE CONSTRUCTION----

Litchfield Sharon 6.5% + 9.00$26.50Groundman

Litchfield Sharon 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Sharon 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Sharon 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Sharon ----OPERATORS----

Litchfield Sharon 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Sharon 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Sharon 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Sharon 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Sharon 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Sharon 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Sharon 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 286: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Sharon 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Sharon 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Sharon 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Sharon 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Sharon 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Sharon 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Sharon 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Sharon 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Sharon 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Sharon 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Sharon 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Sharon 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Sharon ------PAINTERS (Including Drywall Finishing)------

Litchfield Sharon 22.55$35.6210a) Brush and Roller

Litchfield Sharon 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Sharon 22.55$36.1210c) Paperhanger and Red Label

Litchfield Sharon 22.55$38.6210e) Blast and Spray

Litchfield Sharon 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Sharon 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 287: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Sharon 21.35$38.4013) Roofer (composition)

Litchfield Sharon 21.35$38.9014) Roofer (slate & tile)

Litchfield Sharon 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Sharon 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Sharon ------TRUCK DRIVERS------

Litchfield Sharon 25.79 + a$29.8617a) 2 Axle

Litchfield Sharon 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Sharon 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Sharon 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Sharon 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Sharon 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Sharon 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Sharon 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Sharon 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Thomaston 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Thomaston 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Thomaston 26.01$38.342) Boilermaker

Litchfield Thomaston 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 288: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Thomaston 25.87$34.903b) Tile Setter

Litchfield Thomaston 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Thomaston 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Thomaston 32.06$33.483e) Plasterer

Litchfield Thomaston ------LABORERS------

Litchfield Thomaston 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Thomaston 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Thomaston 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Thomaston 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Thomaston 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Thomaston 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Thomaston 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Thomaston 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Thomaston 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Thomaston 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Thomaston 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Thomaston 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 289: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Thomaston 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Thomaston 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Thomaston -----LINE CONSTRUCTION----

Litchfield Thomaston 6.5% + 9.00$26.50Groundman

Litchfield Thomaston 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Thomaston 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Thomaston 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Thomaston ----OPERATORS----

Litchfield Thomaston 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Thomaston 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Thomaston 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Thomaston 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Thomaston 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Thomaston 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Thomaston 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 290: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Thomaston 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Thomaston 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Thomaston 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Thomaston 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Thomaston 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Thomaston 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Thomaston 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Thomaston 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Thomaston 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Thomaston 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Thomaston 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Thomaston 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Thomaston ------PAINTERS (Including Drywall Finishing)------

Litchfield Thomaston 22.55$35.6210a) Brush and Roller

Litchfield Thomaston 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Thomaston 22.55$36.1210c) Paperhanger and Red Label

Litchfield Thomaston 22.55$38.6210e) Blast and Spray

Litchfield Thomaston 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Thomaston 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 291: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Thomaston 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Thomaston 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Thomaston 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Thomaston 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Thomaston ------TRUCK DRIVERS------

Litchfield Thomaston 25.79 + a$29.8617a) 2 Axle

Litchfield Thomaston 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Thomaston 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Thomaston 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Thomaston 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Thomaston 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Thomaston 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Thomaston 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Thomaston 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Torrington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Torrington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Torrington 26.01$38.342) Boilermaker

Litchfield Torrington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 292: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Torrington 25.87$34.903b) Tile Setter

Litchfield Torrington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Torrington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Torrington 32.06$33.483e) Plasterer

Litchfield Torrington ------LABORERS------

Litchfield Torrington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Torrington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Torrington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Torrington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Torrington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Torrington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Torrington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Torrington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Torrington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Torrington 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Torrington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Torrington 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 293: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Torrington 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Torrington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Torrington -----LINE CONSTRUCTION----

Litchfield Torrington 6.5% + 9.00$26.50Groundman

Litchfield Torrington 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Torrington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Torrington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Torrington ----OPERATORS----

Litchfield Torrington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Torrington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Torrington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Torrington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Torrington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Torrington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Torrington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 294: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Torrington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Torrington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Torrington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Torrington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Torrington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Torrington 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Torrington 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Torrington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Torrington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Torrington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Torrington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Torrington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Torrington ------PAINTERS (Including Drywall Finishing)------

Litchfield Torrington 22.55$35.6210a) Brush and Roller

Litchfield Torrington 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Torrington 22.55$36.1210c) Paperhanger and Red Label

Litchfield Torrington 22.55$38.6210e) Blast and Spray

Litchfield Torrington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Torrington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 295: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Torrington 21.35$38.4013) Roofer (composition)

Litchfield Torrington 21.35$38.9014) Roofer (slate & tile)

Litchfield Torrington 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Torrington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Torrington ------TRUCK DRIVERS------

Litchfield Torrington 25.79 + a$29.8617a) 2 Axle

Litchfield Torrington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Torrington 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Torrington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Torrington 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Torrington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Torrington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Torrington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Torrington 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Warren 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Warren 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Warren 26.01$38.342) Boilermaker

Litchfield Warren 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 296: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Warren 25.87$34.903b) Tile Setter

Litchfield Warren 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Warren 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Warren 32.06$33.483e) Plasterer

Litchfield Warren ------LABORERS------

Litchfield Warren 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Warren 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Warren 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Warren 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Warren 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Warren 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Warren 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Warren 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Warren 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Warren 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Warren 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Warren 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 297: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Warren 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Warren 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Warren -----LINE CONSTRUCTION----

Litchfield Warren 6.5% + 9.00$26.50Groundman

Litchfield Warren 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Warren 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Warren 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Warren ----OPERATORS----

Litchfield Warren 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Warren 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Warren 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Warren 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Warren 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Warren 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Warren 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 298: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Warren 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Warren 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Warren 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Warren 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Warren 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Warren 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Warren 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Warren 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Warren 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Warren 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Warren 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Warren 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Warren ------PAINTERS (Including Drywall Finishing)------

Litchfield Warren 22.55$35.6210a) Brush and Roller

Litchfield Warren 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Warren 22.55$36.1210c) Paperhanger and Red Label

Litchfield Warren 22.55$38.6210e) Blast and Spray

Litchfield Warren 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Warren 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 299: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Warren 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Warren 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Warren 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Warren 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Warren ------TRUCK DRIVERS------

Litchfield Warren 25.79 + a$29.8617a) 2 Axle

Litchfield Warren 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Warren 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Warren 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Warren 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Warren 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Warren 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Warren 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Warren 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Washington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Washington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Washington 26.01$38.342) Boilermaker

Litchfield Washington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 300: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Washington 25.87$34.903b) Tile Setter

Litchfield Washington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Washington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Washington 32.06$33.483e) Plasterer

Litchfield Washington ------LABORERS------

Litchfield Washington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Washington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Washington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Washington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Washington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Washington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Washington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Washington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Washington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Washington 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Washington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Washington 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 301: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Washington 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Washington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Washington -----LINE CONSTRUCTION----

Litchfield Washington 6.5% + 9.00$26.50Groundman

Litchfield Washington 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Washington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Washington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Washington ----OPERATORS----

Litchfield Washington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Washington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Washington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Washington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Washington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Washington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Washington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 302: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Washington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Washington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Washington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Washington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Washington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Washington 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Washington 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Washington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Washington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Washington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Washington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Washington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Washington ------PAINTERS (Including Drywall Finishing)------

Litchfield Washington 22.55$35.6210a) Brush and Roller

Litchfield Washington 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Washington 22.55$36.1210c) Paperhanger and Red Label

Litchfield Washington 22.55$38.6210e) Blast and Spray

Litchfield Washington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Washington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 303: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Washington 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Washington 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Washington 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Washington 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Washington ------TRUCK DRIVERS------

Litchfield Washington 25.79 + a$29.8617a) 2 Axle

Litchfield Washington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Washington 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Washington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Washington 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Washington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Washington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Washington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Washington 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Watertown 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Watertown 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Watertown 26.01$38.342) Boilermaker

Litchfield Watertown 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 304: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Watertown 25.87$34.903b) Tile Setter

Litchfield Watertown 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Watertown 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Watertown 32.06$33.483e) Plasterer

Litchfield Watertown ------LABORERS------

Litchfield Watertown 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Watertown 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Watertown 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Watertown 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Watertown 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Watertown 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Watertown 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Watertown 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Watertown 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Watertown 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Watertown 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Watertown 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 305: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Watertown 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Watertown 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Watertown -----LINE CONSTRUCTION----

Litchfield Watertown 6.5% + 9.00$26.50Groundman

Litchfield Watertown 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Watertown 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Watertown 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Watertown ----OPERATORS----

Litchfield Watertown 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Watertown 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Watertown 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Watertown 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Watertown 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Watertown 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Watertown 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 306: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Watertown 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Watertown 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Watertown 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Watertown 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Watertown 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Watertown 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Watertown 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Watertown 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Watertown 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Watertown 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Watertown 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Watertown 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Watertown ------PAINTERS (Including Drywall Finishing)------

Litchfield Watertown 22.55$35.6210a) Brush and Roller

Litchfield Watertown 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Watertown 22.55$36.1210c) Paperhanger and Red Label

Litchfield Watertown 22.55$38.6210e) Blast and Spray

Litchfield Watertown 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Watertown 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 307: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Watertown 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Watertown 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Watertown 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Watertown 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Watertown ------TRUCK DRIVERS------

Litchfield Watertown 25.79 + a$29.8617a) 2 Axle

Litchfield Watertown 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Watertown 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Watertown 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Watertown 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Watertown 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Watertown 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Watertown 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Watertown 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Winchester 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Winchester 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Winchester 26.01$38.342) Boilermaker

Litchfield Winchester 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 308: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Winchester 25.87$34.903b) Tile Setter

Litchfield Winchester 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Winchester 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Winchester 32.06$33.483e) Plasterer

Litchfield Winchester ------LABORERS------

Litchfield Winchester 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Winchester 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Winchester 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Winchester 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Winchester 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Winchester 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Winchester 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Winchester 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Winchester 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Winchester 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Winchester 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Winchester 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 309: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Winchester 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Winchester 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Winchester -----LINE CONSTRUCTION----

Litchfield Winchester 6.5% + 9.00$26.50Groundman

Litchfield Winchester 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Winchester 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Winchester 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Winchester ----OPERATORS----

Litchfield Winchester 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Winchester 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Winchester 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Winchester 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Winchester 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Winchester 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Winchester 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 310: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Winchester 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Winchester 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Winchester 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Winchester 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Winchester 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Winchester 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Winchester 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Winchester 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Winchester 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Winchester 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Winchester 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Winchester 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Winchester ------PAINTERS (Including Drywall Finishing)------

Litchfield Winchester 22.55$35.6210a) Brush and Roller

Litchfield Winchester 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Winchester 22.55$36.1210c) Paperhanger and Red Label

Litchfield Winchester 22.55$38.6210e) Blast and Spray

Litchfield Winchester 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Winchester 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 311: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Winchester 21.35$38.4013) Roofer (composition)

Litchfield Winchester 21.35$38.9014) Roofer (slate & tile)

Litchfield Winchester 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Winchester 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Winchester ------TRUCK DRIVERS------

Litchfield Winchester 25.79 + a$29.8617a) 2 Axle

Litchfield Winchester 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Winchester 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Winchester 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Winchester 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Winchester 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Winchester 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Winchester 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Winchester 7.34$25.7619) Theatrical Stage Journeyman

Litchfield Woodbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Litchfield Woodbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Litchfield Woodbury 26.01$38.342) Boilermaker

Litchfield Woodbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 312: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Woodbury 25.87$34.903b) Tile Setter

Litchfield Woodbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Litchfield Woodbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Litchfield Woodbury 32.06$33.483e) Plasterer

Litchfield Woodbury ------LABORERS------

Litchfield Woodbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Litchfield Woodbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Litchfield Woodbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Litchfield Woodbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Litchfield Woodbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Litchfield Woodbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Litchfield Woodbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Litchfield Woodbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Litchfield Woodbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Litchfield Woodbury 22.15$18.004i) Group 10: Traffic Control Signalman

Litchfield Woodbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Litchfield Woodbury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 313: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Woodbury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Litchfield Woodbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Litchfield Woodbury -----LINE CONSTRUCTION----

Litchfield Woodbury 6.5% + 9.00$26.50Groundman

Litchfield Woodbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Litchfield Woodbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Litchfield Woodbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Litchfield Woodbury ----OPERATORS----

Litchfield Woodbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Litchfield Woodbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Litchfield Woodbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Litchfield Woodbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Litchfield Woodbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Litchfield Woodbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Litchfield Woodbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 314: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Woodbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Litchfield Woodbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Litchfield Woodbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Litchfield Woodbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Litchfield Woodbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Litchfield Woodbury 25.30 + a$36.48Group 12: Wellpoint operator.

Litchfield Woodbury 25.30 + a$35.86Group 13: Compressor battery operator.

Litchfield Woodbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Litchfield Woodbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Litchfield Woodbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Litchfield Woodbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Litchfield Woodbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Litchfield Woodbury ------PAINTERS (Including Drywall Finishing)------

Litchfield Woodbury 22.55$35.6210a) Brush and Roller

Litchfield Woodbury 22.55$36.3710b) Taping Only/Drywall Finishing

Litchfield Woodbury 22.55$36.1210c) Paperhanger and Red Label

Litchfield Woodbury 22.55$38.6210e) Blast and Spray

Litchfield Woodbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Litchfield Woodbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 315: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationLitchfield Woodbury 19.55 + a$42.00Roofer: Cole Tar Pitch

Litchfield Woodbury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

Litchfield Woodbury 42.80$46.9215) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Litchfield Woodbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Litchfield Woodbury ------TRUCK DRIVERS------

Litchfield Woodbury 25.79 + a$29.8617a) 2 Axle

Litchfield Woodbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Litchfield Woodbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Litchfield Woodbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Litchfield Woodbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Litchfield Woodbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Litchfield Woodbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Litchfield Woodbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Litchfield Woodbury 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Chester 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Chester 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Chester 26.01$38.342) Boilermaker

Middlesex Chester 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 316: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Chester 25.87$34.903b) Tile Setter

Middlesex Chester 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Chester 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Chester 32.06$33.483e) Plasterer

Middlesex Chester ------LABORERS------

Middlesex Chester 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Chester 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Chester 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Chester 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Chester 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Chester 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Chester 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Chester 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Chester 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Chester 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Chester 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Chester 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 317: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Chester 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Chester 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Chester -----LINE CONSTRUCTION----

Middlesex Chester 6.5% + 9.00$26.50Groundman

Middlesex Chester 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Chester 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Chester 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Chester ----OPERATORS----

Middlesex Chester 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Chester 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Chester 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Chester 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Chester 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Chester 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Chester 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 318: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Chester 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Chester 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Chester 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Chester 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Chester 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Chester 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Chester 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Chester 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Chester 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Chester 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Chester 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Chester 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Chester ------PAINTERS (Including Drywall Finishing)------

Middlesex Chester 22.55$35.6210a) Brush and Roller

Middlesex Chester 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Chester 22.55$36.1210c) Paperhanger and Red Label

Middlesex Chester 22.55$38.6210e) Blast and Spray

Middlesex Chester 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Chester 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 319: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Chester 21.35$38.4013) Roofer (composition)

Middlesex Chester 21.35$38.9014) Roofer (slate & tile)

Middlesex Chester 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Chester 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Chester ------TRUCK DRIVERS------

Middlesex Chester 25.79 + a$29.8617a) 2 Axle

Middlesex Chester 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Chester 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Chester 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Chester 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Chester 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Chester 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Chester 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Chester 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Clinton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Clinton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Clinton 26.01$38.342) Boilermaker

Middlesex Clinton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 320: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Clinton 25.87$34.903b) Tile Setter

Middlesex Clinton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Clinton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Clinton 32.06$33.483e) Plasterer

Middlesex Clinton ------LABORERS------

Middlesex Clinton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Clinton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Clinton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Clinton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Clinton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Clinton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Clinton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Clinton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Clinton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Clinton 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Clinton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Clinton 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 321: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Clinton 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Clinton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Clinton -----LINE CONSTRUCTION----

Middlesex Clinton 6.5% + 9.00$26.50Groundman

Middlesex Clinton 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Clinton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Clinton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Clinton ----OPERATORS----

Middlesex Clinton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Clinton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Clinton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Clinton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Clinton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Clinton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Clinton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 322: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Clinton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Clinton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Clinton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Clinton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Clinton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Clinton 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Clinton 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Clinton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Clinton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Clinton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Clinton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Clinton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Clinton ------PAINTERS (Including Drywall Finishing)------

Middlesex Clinton 22.55$35.6210a) Brush and Roller

Middlesex Clinton 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Clinton 22.55$36.1210c) Paperhanger and Red Label

Middlesex Clinton 22.55$38.6210e) Blast and Spray

Middlesex Clinton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Clinton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 323: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Clinton 21.35$38.4013) Roofer (composition)

Middlesex Clinton 21.35$38.9014) Roofer (slate & tile)

Middlesex Clinton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Clinton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Clinton ------TRUCK DRIVERS------

Middlesex Clinton 25.79 + a$29.8617a) 2 Axle

Middlesex Clinton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Clinton 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Clinton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Clinton 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Clinton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Clinton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Clinton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Clinton 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Cromwell 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Cromwell 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Cromwell 26.01$38.342) Boilermaker

Middlesex Cromwell 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 324: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Cromwell 25.87$34.903b) Tile Setter

Middlesex Cromwell 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Cromwell 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Cromwell 32.06$33.483e) Plasterer

Middlesex Cromwell ------LABORERS------

Middlesex Cromwell 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Cromwell 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Cromwell 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Cromwell 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Cromwell 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Cromwell 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Cromwell 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Cromwell 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Cromwell 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Cromwell 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Cromwell 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Cromwell 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 325: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Cromwell 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Cromwell 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Cromwell -----LINE CONSTRUCTION----

Middlesex Cromwell 6.5% + 9.00$26.50Groundman

Middlesex Cromwell 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Cromwell 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Cromwell 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Cromwell ----OPERATORS----

Middlesex Cromwell 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Cromwell 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Cromwell 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Cromwell 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Cromwell 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Cromwell 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Cromwell 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 326: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Cromwell 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Cromwell 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Cromwell 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Cromwell 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Cromwell 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Cromwell 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Cromwell 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Cromwell 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Cromwell 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Cromwell 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Cromwell 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Cromwell 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Cromwell ------PAINTERS (Including Drywall Finishing)------

Middlesex Cromwell 22.55$35.6210a) Brush and Roller

Middlesex Cromwell 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Cromwell 22.55$36.1210c) Paperhanger and Red Label

Middlesex Cromwell 22.55$38.6210e) Blast and Spray

Middlesex Cromwell 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Cromwell 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 327: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Cromwell 21.35$38.4013) Roofer (composition)

Middlesex Cromwell 21.35$38.9014) Roofer (slate & tile)

Middlesex Cromwell 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Cromwell 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Cromwell ------TRUCK DRIVERS------

Middlesex Cromwell 25.79 + a$29.8617a) 2 Axle

Middlesex Cromwell 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Cromwell 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Cromwell 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Cromwell 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Cromwell 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Cromwell 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Cromwell 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Cromwell 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Deep River 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Deep River 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Deep River 26.01$38.342) Boilermaker

Middlesex Deep River 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 328: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Deep River 25.87$34.903b) Tile Setter

Middlesex Deep River 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Deep River 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Deep River 32.06$33.483e) Plasterer

Middlesex Deep River ------LABORERS------

Middlesex Deep River 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Deep River 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Deep River 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Deep River 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Deep River 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Deep River 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Deep River 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Deep River 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Deep River 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Deep River 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Deep River 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Deep River 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 329: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Deep River 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Deep River 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Deep River -----LINE CONSTRUCTION----

Middlesex Deep River 6.5% + 9.00$26.50Groundman

Middlesex Deep River 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Deep River 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Deep River 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Deep River ----OPERATORS----

Middlesex Deep River 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Deep River 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Deep River 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Deep River 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Deep River 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Deep River 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Deep River 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 330: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Deep River 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Deep River 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Deep River 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Deep River 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Deep River 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Deep River 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Deep River 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Deep River 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Deep River 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Deep River 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Deep River 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Deep River 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Deep River ------PAINTERS (Including Drywall Finishing)------

Middlesex Deep River 22.55$35.6210a) Brush and Roller

Middlesex Deep River 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Deep River 22.55$36.1210c) Paperhanger and Red Label

Middlesex Deep River 22.55$38.6210e) Blast and Spray

Middlesex Deep River 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Deep River 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 331: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Deep River 21.35$38.4013) Roofer (composition)

Middlesex Deep River 21.35$38.9014) Roofer (slate & tile)

Middlesex Deep River 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Deep River 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Deep River ------TRUCK DRIVERS------

Middlesex Deep River 25.79 + a$29.8617a) 2 Axle

Middlesex Deep River 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Deep River 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Deep River 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Deep River 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Deep River 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Deep River 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Deep River 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Deep River 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Durham 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Durham 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Durham 26.01$38.342) Boilermaker

Middlesex Durham 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 332: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Durham 25.87$34.903b) Tile Setter

Middlesex Durham 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Durham 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Durham 32.06$33.483e) Plasterer

Middlesex Durham ------LABORERS------

Middlesex Durham 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Durham 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Durham 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Durham 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Durham 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Durham 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Durham 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Durham 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Durham 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Durham 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Durham 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Durham 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 333: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Durham 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Durham 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Durham -----LINE CONSTRUCTION----

Middlesex Durham 6.5% + 9.00$26.50Groundman

Middlesex Durham 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Durham 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Durham 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Durham ----OPERATORS----

Middlesex Durham 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Durham 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Durham 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Durham 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Durham 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Durham 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Durham 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 334: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Durham 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Durham 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Durham 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Durham 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Durham 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Durham 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Durham 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Durham 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Durham 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Durham 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Durham 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Durham 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Durham ------PAINTERS (Including Drywall Finishing)------

Middlesex Durham 22.55$35.6210a) Brush and Roller

Middlesex Durham 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Durham 22.55$36.1210c) Paperhanger and Red Label

Middlesex Durham 22.55$38.6210e) Blast and Spray

Middlesex Durham 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Durham 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 335: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Durham 21.35$38.4013) Roofer (composition)

Middlesex Durham 21.35$38.9014) Roofer (slate & tile)

Middlesex Durham 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Durham 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Durham ------TRUCK DRIVERS------

Middlesex Durham 25.79 + a$29.8617a) 2 Axle

Middlesex Durham 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Durham 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Durham 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Durham 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Durham 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Durham 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Durham 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Durham 7.34$25.7619) Theatrical Stage Journeyman

Middlesex East Haddam 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex East Haddam 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex East Haddam 26.01$38.342) Boilermaker

Middlesex East Haddam 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 336: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Haddam 25.87$34.903b) Tile Setter

Middlesex East Haddam 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex East Haddam 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex East Haddam 32.06$33.483e) Plasterer

Middlesex East Haddam ------LABORERS------

Middlesex East Haddam 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex East Haddam 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex East Haddam 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex East Haddam 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex East Haddam 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex East Haddam 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex East Haddam 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex East Haddam 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex East Haddam 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex East Haddam 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex East Haddam 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex East Haddam 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 337: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Haddam 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex East Haddam 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex East Haddam -----LINE CONSTRUCTION----

Middlesex East Haddam 6.5% + 9.00$26.50Groundman

Middlesex East Haddam 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex East Haddam 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex East Haddam 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex East Haddam ----OPERATORS----

Middlesex East Haddam 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex East Haddam 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex East Haddam 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex East Haddam 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex East Haddam 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex East Haddam 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex East Haddam 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 338: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Haddam 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex East Haddam 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex East Haddam 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex East Haddam 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex East Haddam 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex East Haddam 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex East Haddam 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex East Haddam 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex East Haddam 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex East Haddam 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex East Haddam 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex East Haddam 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex East Haddam ------PAINTERS (Including Drywall Finishing)------

Middlesex East Haddam 22.55$35.6210a) Brush and Roller

Middlesex East Haddam 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex East Haddam 22.55$36.1210c) Paperhanger and Red Label

Middlesex East Haddam 22.55$38.6210e) Blast and Spray

Middlesex East Haddam 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex East Haddam 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 339: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Haddam 21.35$38.4013) Roofer (composition)

Middlesex East Haddam 21.35$38.9014) Roofer (slate & tile)

Middlesex East Haddam 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex East Haddam 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex East Haddam ------TRUCK DRIVERS------

Middlesex East Haddam 25.79 + a$29.8617a) 2 Axle

Middlesex East Haddam 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex East Haddam 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex East Haddam 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex East Haddam 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex East Haddam 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex East Haddam 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex East Haddam 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex East Haddam 7.34$25.7619) Theatrical Stage Journeyman

Middlesex East Hampton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex East Hampton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex East Hampton 26.01$38.342) Boilermaker

Middlesex East Hampton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 340: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Hampton 25.87$34.903b) Tile Setter

Middlesex East Hampton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex East Hampton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex East Hampton 32.06$33.483e) Plasterer

Middlesex East Hampton ------LABORERS------

Middlesex East Hampton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex East Hampton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex East Hampton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex East Hampton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex East Hampton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex East Hampton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex East Hampton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex East Hampton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex East Hampton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex East Hampton 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex East Hampton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex East Hampton 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 341: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Hampton 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex East Hampton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex East Hampton -----LINE CONSTRUCTION----

Middlesex East Hampton 6.5% + 9.00$26.50Groundman

Middlesex East Hampton 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex East Hampton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex East Hampton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex East Hampton ----OPERATORS----

Middlesex East Hampton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex East Hampton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex East Hampton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex East Hampton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex East Hampton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex East Hampton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex East Hampton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 342: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Hampton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex East Hampton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex East Hampton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex East Hampton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex East Hampton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex East Hampton 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex East Hampton 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex East Hampton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex East Hampton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex East Hampton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex East Hampton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex East Hampton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex East Hampton ------PAINTERS (Including Drywall Finishing)------

Middlesex East Hampton 22.55$35.6210a) Brush and Roller

Middlesex East Hampton 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex East Hampton 22.55$36.1210c) Paperhanger and Red Label

Middlesex East Hampton 22.55$38.6210e) Blast and Spray

Middlesex East Hampton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex East Hampton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 343: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex East Hampton 21.35$38.4013) Roofer (composition)

Middlesex East Hampton 21.35$38.9014) Roofer (slate & tile)

Middlesex East Hampton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex East Hampton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex East Hampton ------TRUCK DRIVERS------

Middlesex East Hampton 25.79 + a$29.8617a) 2 Axle

Middlesex East Hampton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex East Hampton 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex East Hampton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex East Hampton 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex East Hampton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex East Hampton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex East Hampton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex East Hampton 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Essex 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Essex 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Essex 26.01$38.342) Boilermaker

Middlesex Essex 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 344: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Essex 25.87$34.903b) Tile Setter

Middlesex Essex 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Essex 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Essex 32.06$33.483e) Plasterer

Middlesex Essex ------LABORERS------

Middlesex Essex 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Essex 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Essex 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Essex 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Essex 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Essex 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Essex 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Essex 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Essex 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Essex 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Essex 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Essex 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 345: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Essex 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Essex 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Essex -----LINE CONSTRUCTION----

Middlesex Essex 6.5% + 9.00$26.50Groundman

Middlesex Essex 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Essex 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Essex 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Essex ----OPERATORS----

Middlesex Essex 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Essex 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Essex 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Essex 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Essex 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Essex 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Essex 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 346: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Essex 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Essex 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Essex 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Essex 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Essex 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Essex 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Essex 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Essex 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Essex 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Essex 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Essex 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Essex 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Essex ------PAINTERS (Including Drywall Finishing)------

Middlesex Essex 22.55$35.6210a) Brush and Roller

Middlesex Essex 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Essex 22.55$36.1210c) Paperhanger and Red Label

Middlesex Essex 22.55$38.6210e) Blast and Spray

Middlesex Essex 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Essex 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 347: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Essex 21.35$38.4013) Roofer (composition)

Middlesex Essex 21.35$38.9014) Roofer (slate & tile)

Middlesex Essex 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Essex 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Essex ------TRUCK DRIVERS------

Middlesex Essex 25.79 + a$29.8617a) 2 Axle

Middlesex Essex 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Essex 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Essex 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Essex 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Essex 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Essex 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Essex 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Essex 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Haddam 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Haddam 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Haddam 26.01$38.342) Boilermaker

Middlesex Haddam 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 348: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Haddam 25.87$34.903b) Tile Setter

Middlesex Haddam 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Haddam 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Haddam 32.06$33.483e) Plasterer

Middlesex Haddam ------LABORERS------

Middlesex Haddam 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Haddam 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Haddam 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Haddam 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Haddam 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Haddam 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Haddam 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Haddam 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Haddam 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Haddam 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Haddam 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Haddam 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 349: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Haddam 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Haddam 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Haddam -----LINE CONSTRUCTION----

Middlesex Haddam 6.5% + 9.00$26.50Groundman

Middlesex Haddam 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Haddam 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Haddam 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Haddam ----OPERATORS----

Middlesex Haddam 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Haddam 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Haddam 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Haddam 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Haddam 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Haddam 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Haddam 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 350: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Haddam 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Haddam 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Haddam 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Haddam 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Haddam 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Haddam 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Haddam 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Haddam 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Haddam 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Haddam 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Haddam 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Haddam 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Haddam ------PAINTERS (Including Drywall Finishing)------

Middlesex Haddam 22.55$35.6210a) Brush and Roller

Middlesex Haddam 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Haddam 22.55$36.1210c) Paperhanger and Red Label

Middlesex Haddam 22.55$38.6210e) Blast and Spray

Middlesex Haddam 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Haddam 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 351: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Haddam 21.35$38.4013) Roofer (composition)

Middlesex Haddam 21.35$38.9014) Roofer (slate & tile)

Middlesex Haddam 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Haddam 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Haddam ------TRUCK DRIVERS------

Middlesex Haddam 25.79 + a$29.8617a) 2 Axle

Middlesex Haddam 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Haddam 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Haddam 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Haddam 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Haddam 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Haddam 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Haddam 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Haddam 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Killingworth 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Killingworth 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Killingworth 26.01$38.342) Boilermaker

Middlesex Killingworth 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 352: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Killingworth 25.87$34.903b) Tile Setter

Middlesex Killingworth 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Killingworth 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Killingworth 32.06$33.483e) Plasterer

Middlesex Killingworth ------LABORERS------

Middlesex Killingworth 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Killingworth 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Killingworth 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Killingworth 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Killingworth 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Killingworth 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Killingworth 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Killingworth 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Killingworth 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Killingworth 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Killingworth 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Killingworth 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 353: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Killingworth 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Killingworth 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Killingworth -----LINE CONSTRUCTION----

Middlesex Killingworth 6.5% + 9.00$26.50Groundman

Middlesex Killingworth 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Killingworth 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Killingworth 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Killingworth ----OPERATORS----

Middlesex Killingworth 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Killingworth 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Killingworth 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Killingworth 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Killingworth 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Killingworth 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Killingworth 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 354: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Killingworth 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Killingworth 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Killingworth 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Killingworth 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Killingworth 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Killingworth 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Killingworth 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Killingworth 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Killingworth 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Killingworth 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Killingworth 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Killingworth 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Killingworth ------PAINTERS (Including Drywall Finishing)------

Middlesex Killingworth 22.55$35.6210a) Brush and Roller

Middlesex Killingworth 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Killingworth 22.55$36.1210c) Paperhanger and Red Label

Middlesex Killingworth 22.55$38.6210e) Blast and Spray

Middlesex Killingworth 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Killingworth 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 355: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Killingworth 21.35$38.4013) Roofer (composition)

Middlesex Killingworth 21.35$38.9014) Roofer (slate & tile)

Middlesex Killingworth 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Killingworth 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Killingworth ------TRUCK DRIVERS------

Middlesex Killingworth 25.79 + a$29.8617a) 2 Axle

Middlesex Killingworth 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Killingworth 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Killingworth 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Killingworth 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Killingworth 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Killingworth 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Killingworth 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Killingworth 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Middlefield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Middlefield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Middlefield 26.01$38.342) Boilermaker

Middlesex Middlefield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 356: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middlefield 25.87$34.903b) Tile Setter

Middlesex Middlefield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Middlefield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Middlefield 32.06$33.483e) Plasterer

Middlesex Middlefield ------LABORERS------

Middlesex Middlefield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Middlefield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Middlefield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Middlefield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Middlefield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Middlefield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Middlefield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Middlefield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Middlefield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Middlefield 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Middlefield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Middlefield 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 357: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middlefield 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Middlefield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Middlefield -----LINE CONSTRUCTION----

Middlesex Middlefield 6.5% + 9.00$26.50Groundman

Middlesex Middlefield 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Middlefield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Middlefield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Middlefield ----OPERATORS----

Middlesex Middlefield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Middlefield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Middlefield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Middlefield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Middlefield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Middlefield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Middlefield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 358: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middlefield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Middlefield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Middlefield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Middlefield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Middlefield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Middlefield 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Middlefield 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Middlefield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Middlefield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Middlefield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Middlefield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Middlefield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Middlefield ------PAINTERS (Including Drywall Finishing)------

Middlesex Middlefield 22.55$35.6210a) Brush and Roller

Middlesex Middlefield 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Middlefield 22.55$36.1210c) Paperhanger and Red Label

Middlesex Middlefield 22.55$38.6210e) Blast and Spray

Middlesex Middlefield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Middlefield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 359: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middlefield 21.35$38.4013) Roofer (composition)

Middlesex Middlefield 21.35$38.9014) Roofer (slate & tile)

Middlesex Middlefield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Middlefield 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Middlefield ------TRUCK DRIVERS------

Middlesex Middlefield 25.79 + a$29.8617a) 2 Axle

Middlesex Middlefield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Middlefield 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Middlefield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Middlefield 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Middlefield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Middlefield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Middlefield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Middlefield 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Middletown 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Middletown 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Middletown 26.01$38.342) Boilermaker

Middlesex Middletown 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 360: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middletown 25.87$34.903b) Tile Setter

Middlesex Middletown 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Middletown 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Middletown 32.06$33.483e) Plasterer

Middlesex Middletown ------LABORERS------

Middlesex Middletown 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Middletown 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Middletown 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Middletown 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Middletown 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Middletown 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Middletown 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Middletown 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Middletown 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Middletown 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Middletown 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Middletown 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 361: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middletown 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Middletown 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Middletown -----LINE CONSTRUCTION----

Middlesex Middletown 6.5% + 9.00$26.50Groundman

Middlesex Middletown 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Middletown 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Middletown 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Middletown ----OPERATORS----

Middlesex Middletown 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Middletown 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Middletown 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Middletown 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Middletown 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Middletown 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Middletown 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 362: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middletown 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Middletown 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Middletown 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Middletown 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Middletown 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Middletown 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Middletown 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Middletown 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Middletown 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Middletown 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Middletown 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Middletown 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Middletown ------PAINTERS (Including Drywall Finishing)------

Middlesex Middletown 22.55$35.6210a) Brush and Roller

Middlesex Middletown 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Middletown 22.55$36.1210c) Paperhanger and Red Label

Middlesex Middletown 22.55$38.6210e) Blast and Spray

Middlesex Middletown 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Middletown 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 363: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Middletown 21.35$38.4013) Roofer (composition)

Middlesex Middletown 21.35$38.9014) Roofer (slate & tile)

Middlesex Middletown 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Middletown 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Middletown ------TRUCK DRIVERS------

Middlesex Middletown 25.79 + a$29.8617a) 2 Axle

Middlesex Middletown 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Middletown 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Middletown 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Middletown 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Middletown 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Middletown 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Middletown 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Middletown 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Old Saybrook 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Old Saybrook 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Old Saybrook 26.01$38.342) Boilermaker

Middlesex Old Saybrook 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 364: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Old Saybrook 25.87$34.903b) Tile Setter

Middlesex Old Saybrook 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Old Saybrook 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Old Saybrook 32.06$33.483e) Plasterer

Middlesex Old Saybrook ------LABORERS------

Middlesex Old Saybrook 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Old Saybrook 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Old Saybrook 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Old Saybrook 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Old Saybrook 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Old Saybrook 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Old Saybrook 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Old Saybrook 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Old Saybrook 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Old Saybrook 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Old Saybrook 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Old Saybrook 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 365: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Old Saybrook 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Old Saybrook 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Old Saybrook -----LINE CONSTRUCTION----

Middlesex Old Saybrook 6.5% + 9.00$26.50Groundman

Middlesex Old Saybrook 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Old Saybrook 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Old Saybrook 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Old Saybrook ----OPERATORS----

Middlesex Old Saybrook 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Old Saybrook 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Old Saybrook 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Old Saybrook 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Old Saybrook 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Old Saybrook 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Old Saybrook 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 366: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Old Saybrook 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Old Saybrook 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Old Saybrook 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Old Saybrook 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Old Saybrook 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Old Saybrook 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Old Saybrook 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Old Saybrook 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Old Saybrook 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Old Saybrook 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Old Saybrook 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Old Saybrook 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Old Saybrook ------PAINTERS (Including Drywall Finishing)------

Middlesex Old Saybrook 22.55$35.6210a) Brush and Roller

Middlesex Old Saybrook 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Old Saybrook 22.55$36.1210c) Paperhanger and Red Label

Middlesex Old Saybrook 22.55$38.6210e) Blast and Spray

Middlesex Old Saybrook 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Old Saybrook 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 367: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Old Saybrook 21.35$38.4013) Roofer (composition)

Middlesex Old Saybrook 21.35$38.9014) Roofer (slate & tile)

Middlesex Old Saybrook 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Old Saybrook 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Old Saybrook ------TRUCK DRIVERS------

Middlesex Old Saybrook 25.79 + a$29.8617a) 2 Axle

Middlesex Old Saybrook 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Old Saybrook 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Old Saybrook 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Old Saybrook 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Old Saybrook 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Old Saybrook 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Old Saybrook 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Old Saybrook 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Portland 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Portland 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Portland 26.01$38.342) Boilermaker

Middlesex Portland 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 368: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Portland 25.87$34.903b) Tile Setter

Middlesex Portland 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Portland 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Portland 32.06$33.483e) Plasterer

Middlesex Portland ------LABORERS------

Middlesex Portland 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Portland 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Portland 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Portland 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Portland 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Portland 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Portland 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Portland 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Portland 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Portland 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Portland 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Portland 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 369: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Portland 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Portland 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Portland -----LINE CONSTRUCTION----

Middlesex Portland 6.5% + 9.00$26.50Groundman

Middlesex Portland 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Portland 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Portland 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Portland ----OPERATORS----

Middlesex Portland 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Portland 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Portland 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Portland 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Portland 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Portland 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Portland 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 370: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Portland 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Portland 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Portland 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Portland 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Portland 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Portland 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Portland 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Portland 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Portland 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Portland 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Portland 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Portland 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Portland ------PAINTERS (Including Drywall Finishing)------

Middlesex Portland 22.55$35.6210a) Brush and Roller

Middlesex Portland 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Portland 22.55$36.1210c) Paperhanger and Red Label

Middlesex Portland 22.55$38.6210e) Blast and Spray

Middlesex Portland 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Portland 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 371: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Portland 21.35$38.4013) Roofer (composition)

Middlesex Portland 21.35$38.9014) Roofer (slate & tile)

Middlesex Portland 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Portland 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Portland ------TRUCK DRIVERS------

Middlesex Portland 25.79 + a$29.8617a) 2 Axle

Middlesex Portland 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Portland 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Portland 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Portland 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Portland 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Portland 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Portland 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Portland 7.34$25.7619) Theatrical Stage Journeyman

Middlesex Westbrook 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Middlesex Westbrook 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Middlesex Westbrook 26.01$38.342) Boilermaker

Middlesex Westbrook 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 372: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Westbrook 25.87$34.903b) Tile Setter

Middlesex Westbrook 22.35$31.693c) Terrazzo Mechanics and Marble Setters

Middlesex Westbrook 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Middlesex Westbrook 32.06$33.483e) Plasterer

Middlesex Westbrook ------LABORERS------

Middlesex Westbrook 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Middlesex Westbrook 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Middlesex Westbrook 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Middlesex Westbrook 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Middlesex Westbrook 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Middlesex Westbrook 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Middlesex Westbrook 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Middlesex Westbrook 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Middlesex Westbrook 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Middlesex Westbrook 22.15$18.004i) Group 10: Traffic Control Signalman

Middlesex Westbrook 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Middlesex Westbrook 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 373: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Westbrook 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)Middlesex Westbrook 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

Middlesex Westbrook -----LINE CONSTRUCTION----

Middlesex Westbrook 6.5% + 9.00$26.50Groundman

Middlesex Westbrook 6.5% + 22.00$48.19Linemen/Cable Splicer

Middlesex Westbrook 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Middlesex Westbrook 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Middlesex Westbrook ----OPERATORS----

Middlesex Westbrook 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Middlesex Westbrook 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Middlesex Westbrook 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Middlesex Westbrook 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Middlesex Westbrook 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Middlesex Westbrook 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Middlesex Westbrook 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 374: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Westbrook 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Middlesex Westbrook 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

Middlesex Westbrook 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Middlesex Westbrook 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Middlesex Westbrook 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Middlesex Westbrook 25.30 + a$36.48Group 12: Wellpoint operator.

Middlesex Westbrook 25.30 + a$35.86Group 13: Compressor battery operator.

Middlesex Westbrook 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Middlesex Westbrook 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Middlesex Westbrook 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Middlesex Westbrook 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Middlesex Westbrook 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Middlesex Westbrook ------PAINTERS (Including Drywall Finishing)------

Middlesex Westbrook 22.55$35.6210a) Brush and Roller

Middlesex Westbrook 22.55$36.3710b) Taping Only/Drywall Finishing

Middlesex Westbrook 22.55$36.1210c) Paperhanger and Red Label

Middlesex Westbrook 22.55$38.6210e) Blast and Spray

Middlesex Westbrook 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Middlesex Westbrook 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 375: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationMiddlesex Westbrook 21.35$38.4013) Roofer (composition)

Middlesex Westbrook 21.35$38.9014) Roofer (slate & tile)

Middlesex Westbrook 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

Middlesex Westbrook 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Middlesex Westbrook ------TRUCK DRIVERS------

Middlesex Westbrook 25.79 + a$29.8617a) 2 Axle

Middlesex Westbrook 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Middlesex Westbrook 25.79 + a$30.0317c) 3 Axle Ready Mix

Middlesex Westbrook 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Middlesex Westbrook 25.79 + a$30.1317e) 4 Axle Ready Mix

Middlesex Westbrook 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Middlesex Westbrook 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Middlesex Westbrook 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Middlesex Westbrook 7.34$25.7619) Theatrical Stage Journeyman

New Haven Ansonia 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Ansonia 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Ansonia 26.01$38.342) Boilermaker

New Haven Ansonia 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 376: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Ansonia 25.87$34.903b) Tile Setter

New Haven Ansonia 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Ansonia 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Ansonia 32.06$33.483e) Plasterer

New Haven Ansonia ------LABORERS------

New Haven Ansonia 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Ansonia 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Ansonia 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Ansonia 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Ansonia 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Ansonia 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Ansonia 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Ansonia 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Ansonia 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Ansonia 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Ansonia 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Ansonia 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 377: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Ansonia 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Ansonia 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Ansonia -----LINE CONSTRUCTION----

New Haven Ansonia 6.5% + 9.00$26.50Groundman

New Haven Ansonia 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Ansonia 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Ansonia 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Ansonia ----OPERATORS----

New Haven Ansonia 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Ansonia 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Ansonia 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Ansonia 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Ansonia 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Ansonia 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Ansonia 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 378: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Ansonia 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Ansonia 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Ansonia 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Ansonia 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Ansonia 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Ansonia 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Ansonia 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Ansonia 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Ansonia 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Ansonia 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Ansonia 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Ansonia 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Ansonia ------PAINTERS (Including Drywall Finishing)------

New Haven Ansonia 22.55$35.6210a) Brush and Roller

New Haven Ansonia 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Ansonia 22.55$36.1210c) Paperhanger and Red Label

New Haven Ansonia 22.55$38.6210e) Blast and Spray

New Haven Ansonia 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Ansonia 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 379: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Ansonia 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Ansonia 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Ansonia 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Ansonia 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Ansonia ------TRUCK DRIVERS------

New Haven Ansonia 25.79 + a$29.8617a) 2 Axle

New Haven Ansonia 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Ansonia 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Ansonia 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Ansonia 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Ansonia 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Ansonia 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Ansonia 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Ansonia 7.34$25.7619) Theatrical Stage Journeyman

New Haven Beacon Falls 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Beacon Falls 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Beacon Falls 26.01$38.342) Boilermaker

New Haven Beacon Falls 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 380: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Beacon Falls 25.87$34.903b) Tile Setter

New Haven Beacon Falls 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Beacon Falls 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Beacon Falls 32.06$33.483e) Plasterer

New Haven Beacon Falls ------LABORERS------

New Haven Beacon Falls 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Beacon Falls 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Beacon Falls 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Beacon Falls 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Beacon Falls 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Beacon Falls 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Beacon Falls 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Beacon Falls 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Beacon Falls 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Beacon Falls 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Beacon Falls 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Beacon Falls 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 381: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Beacon Falls 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Beacon Falls 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Beacon Falls -----LINE CONSTRUCTION----

New Haven Beacon Falls 6.5% + 9.00$26.50Groundman

New Haven Beacon Falls 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Beacon Falls 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Beacon Falls 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Beacon Falls ----OPERATORS----

New Haven Beacon Falls 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Beacon Falls 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Beacon Falls 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Beacon Falls 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Beacon Falls 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Beacon Falls 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Beacon Falls 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 382: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Beacon Falls 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Beacon Falls 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Beacon Falls 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Beacon Falls 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Beacon Falls 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Beacon Falls 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Beacon Falls 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Beacon Falls 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Beacon Falls 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Beacon Falls 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Beacon Falls 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Beacon Falls 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Beacon Falls ------PAINTERS (Including Drywall Finishing)------

New Haven Beacon Falls 22.55$35.6210a) Brush and Roller

New Haven Beacon Falls 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Beacon Falls 22.55$36.1210c) Paperhanger and Red Label

New Haven Beacon Falls 22.55$38.6210e) Blast and Spray

New Haven Beacon Falls 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Beacon Falls 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 383: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Beacon Falls 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Beacon Falls 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Beacon Falls 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Beacon Falls 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Beacon Falls ------TRUCK DRIVERS------

New Haven Beacon Falls 25.79 + a$29.8617a) 2 Axle

New Haven Beacon Falls 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Beacon Falls 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Beacon Falls 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Beacon Falls 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Beacon Falls 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Beacon Falls 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Beacon Falls 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Beacon Falls 7.34$25.7619) Theatrical Stage Journeyman

New Haven Bethany 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Bethany 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Bethany 26.01$38.342) Boilermaker

New Haven Bethany 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 384: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Bethany 25.87$34.903b) Tile Setter

New Haven Bethany 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Bethany 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Bethany 32.06$33.483e) Plasterer

New Haven Bethany ------LABORERS------

New Haven Bethany 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Bethany 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Bethany 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Bethany 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Bethany 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Bethany 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Bethany 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Bethany 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Bethany 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Bethany 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Bethany 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Bethany 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 385: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Bethany 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Bethany 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Bethany -----LINE CONSTRUCTION----

New Haven Bethany 6.5% + 9.00$26.50Groundman

New Haven Bethany 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Bethany 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Bethany 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Bethany ----OPERATORS----

New Haven Bethany 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Bethany 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Bethany 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Bethany 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Bethany 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Bethany 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Bethany 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 386: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Bethany 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Bethany 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Bethany 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Bethany 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Bethany 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Bethany 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Bethany 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Bethany 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Bethany 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Bethany 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Bethany 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Bethany 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Bethany ------PAINTERS (Including Drywall Finishing)------

New Haven Bethany 22.55$35.6210a) Brush and Roller

New Haven Bethany 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Bethany 22.55$36.1210c) Paperhanger and Red Label

New Haven Bethany 22.55$38.6210e) Blast and Spray

New Haven Bethany 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Bethany 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 387: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Bethany 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Bethany 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Bethany 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Bethany 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Bethany ------TRUCK DRIVERS------

New Haven Bethany 25.79 + a$29.8617a) 2 Axle

New Haven Bethany 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Bethany 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Bethany 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Bethany 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Bethany 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Bethany 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Bethany 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Bethany 7.34$25.7619) Theatrical Stage Journeyman

New Haven Branford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Branford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Branford 26.01$38.342) Boilermaker

New Haven Branford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 388: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Branford 25.87$34.903b) Tile Setter

New Haven Branford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Branford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Branford 32.06$33.483e) Plasterer

New Haven Branford ------LABORERS------

New Haven Branford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Branford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Branford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Branford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Branford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Branford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Branford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Branford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Branford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Branford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Branford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Branford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 389: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Branford 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Branford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Branford -----LINE CONSTRUCTION----

New Haven Branford 6.5% + 9.00$26.50Groundman

New Haven Branford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Branford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Branford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Branford ----OPERATORS----

New Haven Branford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Branford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Branford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Branford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Branford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Branford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Branford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 390: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Branford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Branford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Branford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Branford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Branford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Branford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Branford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Branford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Branford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Branford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Branford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Branford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Branford ------PAINTERS (Including Drywall Finishing)------

New Haven Branford 22.55$35.6210a) Brush and Roller

New Haven Branford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Branford 22.55$36.1210c) Paperhanger and Red Label

New Haven Branford 22.55$38.6210e) Blast and Spray

New Haven Branford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Branford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 391: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Branford 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Branford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Branford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Branford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Branford ------TRUCK DRIVERS------

New Haven Branford 25.79 + a$29.8617a) 2 Axle

New Haven Branford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Branford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Branford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Branford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Branford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Branford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Branford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Branford 7.34$25.7619) Theatrical Stage Journeyman

New Haven Cheshire 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Cheshire 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Cheshire 26.01$38.342) Boilermaker

New Haven Cheshire 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 392: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Cheshire 25.87$34.903b) Tile Setter

New Haven Cheshire 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Cheshire 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Cheshire 32.06$33.483e) Plasterer

New Haven Cheshire ------LABORERS------

New Haven Cheshire 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Cheshire 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Cheshire 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Cheshire 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Cheshire 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Cheshire 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Cheshire 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Cheshire 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Cheshire 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Cheshire 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Cheshire 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Cheshire 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 393: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Cheshire 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Cheshire 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Cheshire -----LINE CONSTRUCTION----

New Haven Cheshire 6.5% + 9.00$26.50Groundman

New Haven Cheshire 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Cheshire 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Cheshire 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Cheshire ----OPERATORS----

New Haven Cheshire 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Cheshire 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Cheshire 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Cheshire 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Cheshire 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Cheshire 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Cheshire 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 394: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Cheshire 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Cheshire 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Cheshire 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Cheshire 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Cheshire 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Cheshire 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Cheshire 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Cheshire 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Cheshire 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Cheshire 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Cheshire 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Cheshire 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Cheshire ------PAINTERS (Including Drywall Finishing)------

New Haven Cheshire 22.55$35.6210a) Brush and Roller

New Haven Cheshire 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Cheshire 22.55$36.1210c) Paperhanger and Red Label

New Haven Cheshire 22.55$38.6210e) Blast and Spray

New Haven Cheshire 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Cheshire 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 395: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Cheshire 21.35$38.4013) Roofer (composition)

New Haven Cheshire 21.35$38.9014) Roofer (slate & tile)

New Haven Cheshire 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Cheshire 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Cheshire ------TRUCK DRIVERS------

New Haven Cheshire 25.79 + a$29.8617a) 2 Axle

New Haven Cheshire 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Cheshire 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Cheshire 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Cheshire 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Cheshire 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Cheshire 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Cheshire 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Cheshire 7.34$25.7619) Theatrical Stage Journeyman

New Haven Derby 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Derby 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Derby 26.01$38.342) Boilermaker

New Haven Derby 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 396: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Derby 25.87$34.903b) Tile Setter

New Haven Derby 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Derby 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Derby 32.06$33.483e) Plasterer

New Haven Derby ------LABORERS------

New Haven Derby 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Derby 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Derby 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Derby 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Derby 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Derby 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Derby 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Derby 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Derby 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Derby 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Derby 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Derby 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 397: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Derby 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Derby 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Derby -----LINE CONSTRUCTION----

New Haven Derby 6.5% + 9.00$26.50Groundman

New Haven Derby 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Derby 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Derby 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Derby ----OPERATORS----

New Haven Derby 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Derby 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Derby 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Derby 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Derby 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Derby 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Derby 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 398: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Derby 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Derby 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Derby 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Derby 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Derby 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Derby 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Derby 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Derby 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Derby 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Derby 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Derby 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Derby 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Derby ------PAINTERS (Including Drywall Finishing)------

New Haven Derby 22.55$35.6210a) Brush and Roller

New Haven Derby 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Derby 22.55$36.1210c) Paperhanger and Red Label

New Haven Derby 22.55$38.6210e) Blast and Spray

New Haven Derby 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Derby 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 399: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Derby 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Derby 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Derby 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Derby 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Derby ------TRUCK DRIVERS------

New Haven Derby 25.79 + a$29.8617a) 2 Axle

New Haven Derby 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Derby 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Derby 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Derby 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Derby 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Derby 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Derby 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Derby 7.34$25.7619) Theatrical Stage Journeyman

New Haven East Haven 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven East Haven 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven East Haven 26.01$38.342) Boilermaker

New Haven East Haven 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 400: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven East Haven 25.87$34.903b) Tile Setter

New Haven East Haven 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven East Haven 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven East Haven 32.06$33.483e) Plasterer

New Haven East Haven ------LABORERS------

New Haven East Haven 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven East Haven 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven East Haven 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven East Haven 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven East Haven 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven East Haven 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven East Haven 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven East Haven 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven East Haven 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven East Haven 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven East Haven 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven East Haven 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 401: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven East Haven 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven East Haven 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven East Haven -----LINE CONSTRUCTION----

New Haven East Haven 6.5% + 9.00$26.50Groundman

New Haven East Haven 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven East Haven 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven East Haven 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven East Haven ----OPERATORS----

New Haven East Haven 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven East Haven 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven East Haven 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven East Haven 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven East Haven 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven East Haven 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven East Haven 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 402: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven East Haven 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven East Haven 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven East Haven 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven East Haven 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven East Haven 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven East Haven 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven East Haven 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven East Haven 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven East Haven 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven East Haven 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven East Haven 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven East Haven 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven East Haven ------PAINTERS (Including Drywall Finishing)------

New Haven East Haven 22.55$35.6210a) Brush and Roller

New Haven East Haven 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven East Haven 22.55$36.1210c) Paperhanger and Red Label

New Haven East Haven 22.55$38.6210e) Blast and Spray

New Haven East Haven 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven East Haven 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 403: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven East Haven 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven East Haven 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven East Haven 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven East Haven 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven East Haven ------TRUCK DRIVERS------

New Haven East Haven 25.79 + a$29.8617a) 2 Axle

New Haven East Haven 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven East Haven 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven East Haven 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven East Haven 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven East Haven 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven East Haven 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven East Haven 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven East Haven 7.34$25.7619) Theatrical Stage Journeyman

New Haven Guilford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Guilford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Guilford 26.01$38.342) Boilermaker

New Haven Guilford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 404: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Guilford 25.87$34.903b) Tile Setter

New Haven Guilford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Guilford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Guilford 32.06$33.483e) Plasterer

New Haven Guilford ------LABORERS------

New Haven Guilford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Guilford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Guilford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Guilford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Guilford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Guilford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Guilford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Guilford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Guilford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Guilford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Guilford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Guilford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 405: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Guilford 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Guilford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Guilford -----LINE CONSTRUCTION----

New Haven Guilford 6.5% + 9.00$26.50Groundman

New Haven Guilford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Guilford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Guilford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Guilford ----OPERATORS----

New Haven Guilford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Guilford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Guilford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Guilford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Guilford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Guilford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Guilford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 406: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Guilford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Guilford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Guilford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Guilford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Guilford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Guilford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Guilford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Guilford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Guilford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Guilford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Guilford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Guilford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Guilford ------PAINTERS (Including Drywall Finishing)------

New Haven Guilford 22.55$35.6210a) Brush and Roller

New Haven Guilford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Guilford 22.55$36.1210c) Paperhanger and Red Label

New Haven Guilford 22.55$38.6210e) Blast and Spray

New Haven Guilford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Guilford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 407: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Guilford 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Guilford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Guilford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Guilford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Guilford ------TRUCK DRIVERS------

New Haven Guilford 25.79 + a$29.8617a) 2 Axle

New Haven Guilford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Guilford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Guilford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Guilford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Guilford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Guilford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Guilford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Guilford 7.34$25.7619) Theatrical Stage Journeyman

New Haven Hamden 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Hamden 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Hamden 26.01$38.342) Boilermaker

New Haven Hamden 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 408: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Hamden 25.87$34.903b) Tile Setter

New Haven Hamden 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Hamden 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Hamden 32.06$33.483e) Plasterer

New Haven Hamden ------LABORERS------

New Haven Hamden 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Hamden 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Hamden 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Hamden 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Hamden 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Hamden 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Hamden 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Hamden 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Hamden 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Hamden 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Hamden 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Hamden 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 409: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Hamden 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Hamden 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Hamden -----LINE CONSTRUCTION----

New Haven Hamden 6.5% + 9.00$26.50Groundman

New Haven Hamden 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Hamden 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Hamden 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Hamden ----OPERATORS----

New Haven Hamden 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Hamden 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Hamden 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Hamden 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Hamden 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Hamden 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Hamden 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 410: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Hamden 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Hamden 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Hamden 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Hamden 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Hamden 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Hamden 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Hamden 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Hamden 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Hamden 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Hamden 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Hamden 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Hamden 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Hamden ------PAINTERS (Including Drywall Finishing)------

New Haven Hamden 22.55$35.6210a) Brush and Roller

New Haven Hamden 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Hamden 22.55$36.1210c) Paperhanger and Red Label

New Haven Hamden 22.55$38.6210e) Blast and Spray

New Haven Hamden 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Hamden 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 411: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Hamden 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Hamden 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Hamden 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Hamden 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Hamden ------TRUCK DRIVERS------

New Haven Hamden 25.79 + a$29.8617a) 2 Axle

New Haven Hamden 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Hamden 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Hamden 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Hamden 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Hamden 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Hamden 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Hamden 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Hamden 7.34$25.7619) Theatrical Stage Journeyman

New Haven Madison 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Madison 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Madison 26.01$38.342) Boilermaker

New Haven Madison 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 412: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Madison 25.87$34.903b) Tile Setter

New Haven Madison 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Madison 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Madison 32.06$33.483e) Plasterer

New Haven Madison ------LABORERS------

New Haven Madison 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Madison 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Madison 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Madison 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Madison 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Madison 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Madison 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Madison 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Madison 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Madison 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Madison 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Madison 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 413: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Madison 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Madison 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Madison -----LINE CONSTRUCTION----

New Haven Madison 6.5% + 9.00$26.50Groundman

New Haven Madison 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Madison 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Madison 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Madison ----OPERATORS----

New Haven Madison 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Madison 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Madison 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Madison 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Madison 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Madison 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Madison 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 414: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Madison 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Madison 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Madison 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Madison 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Madison 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Madison 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Madison 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Madison 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Madison 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Madison 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Madison 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Madison 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Madison ------PAINTERS (Including Drywall Finishing)------

New Haven Madison 22.55$35.6210a) Brush and Roller

New Haven Madison 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Madison 22.55$36.1210c) Paperhanger and Red Label

New Haven Madison 22.55$38.6210e) Blast and Spray

New Haven Madison 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Madison 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 415: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Madison 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Madison 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Madison 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Madison 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Madison ------TRUCK DRIVERS------

New Haven Madison 25.79 + a$29.8617a) 2 Axle

New Haven Madison 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Madison 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Madison 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Madison 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Madison 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Madison 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Madison 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Madison 7.34$25.7619) Theatrical Stage Journeyman

New Haven Meriden 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Meriden 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Meriden 26.01$38.342) Boilermaker

New Haven Meriden 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 416: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Meriden 25.87$34.903b) Tile Setter

New Haven Meriden 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Meriden 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Meriden 32.06$33.483e) Plasterer

New Haven Meriden ------LABORERS------

New Haven Meriden 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Meriden 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Meriden 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Meriden 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Meriden 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Meriden 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Meriden 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Meriden 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Meriden 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Meriden 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Meriden 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Meriden 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 417: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Meriden 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Meriden 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Meriden -----LINE CONSTRUCTION----

New Haven Meriden 6.5% + 9.00$26.50Groundman

New Haven Meriden 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Meriden 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Meriden 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Meriden ----OPERATORS----

New Haven Meriden 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Meriden 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Meriden 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Meriden 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Meriden 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Meriden 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Meriden 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 418: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Meriden 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Meriden 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Meriden 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Meriden 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Meriden 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Meriden 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Meriden 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Meriden 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Meriden 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Meriden 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Meriden 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Meriden 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Meriden ------PAINTERS (Including Drywall Finishing)------

New Haven Meriden 22.55$35.6210a) Brush and Roller

New Haven Meriden 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Meriden 22.55$36.1210c) Paperhanger and Red Label

New Haven Meriden 22.55$38.6210e) Blast and Spray

New Haven Meriden 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Meriden 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 419: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Meriden 21.35$38.4013) Roofer (composition)

New Haven Meriden 21.35$38.9014) Roofer (slate & tile)

New Haven Meriden 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Meriden 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Meriden ------TRUCK DRIVERS------

New Haven Meriden 25.79 + a$29.8617a) 2 Axle

New Haven Meriden 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Meriden 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Meriden 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Meriden 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Meriden 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Meriden 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Meriden 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Meriden 7.34$25.7619) Theatrical Stage Journeyman

New Haven Middlebury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Middlebury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Middlebury 26.01$38.342) Boilermaker

New Haven Middlebury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 420: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Middlebury 25.87$34.903b) Tile Setter

New Haven Middlebury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Middlebury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Middlebury 32.06$33.483e) Plasterer

New Haven Middlebury ------LABORERS------

New Haven Middlebury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Middlebury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Middlebury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Middlebury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Middlebury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Middlebury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Middlebury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Middlebury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Middlebury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Middlebury 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Middlebury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Middlebury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 421: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Middlebury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Middlebury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Middlebury -----LINE CONSTRUCTION----

New Haven Middlebury 6.5% + 9.00$26.50Groundman

New Haven Middlebury 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Middlebury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Middlebury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Middlebury ----OPERATORS----

New Haven Middlebury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Middlebury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Middlebury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Middlebury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Middlebury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Middlebury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Middlebury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 422: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Middlebury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Middlebury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Middlebury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Middlebury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Middlebury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Middlebury 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Middlebury 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Middlebury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Middlebury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Middlebury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Middlebury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Middlebury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Middlebury ------PAINTERS (Including Drywall Finishing)------

New Haven Middlebury 22.55$35.6210a) Brush and Roller

New Haven Middlebury 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Middlebury 22.55$36.1210c) Paperhanger and Red Label

New Haven Middlebury 22.55$38.6210e) Blast and Spray

New Haven Middlebury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Middlebury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 423: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Middlebury 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Middlebury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Middlebury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Middlebury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Middlebury ------TRUCK DRIVERS------

New Haven Middlebury 25.79 + a$29.8617a) 2 Axle

New Haven Middlebury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Middlebury 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Middlebury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Middlebury 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Middlebury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Middlebury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Middlebury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Middlebury 7.34$25.7619) Theatrical Stage Journeyman

New Haven Milford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Milford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Milford 26.01$38.342) Boilermaker

New Haven Milford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 424: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Milford 25.87$34.903b) Tile Setter

New Haven Milford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Milford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Milford 32.06$33.483e) Plasterer

New Haven Milford ------LABORERS------

New Haven Milford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Milford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Milford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Milford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Milford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Milford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Milford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Milford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Milford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Milford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Milford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Milford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 425: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Milford 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Milford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Milford -----LINE CONSTRUCTION----

New Haven Milford 6.5% + 9.00$26.50Groundman

New Haven Milford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Milford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Milford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Milford ----OPERATORS----

New Haven Milford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Milford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Milford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Milford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Milford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Milford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Milford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 426: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Milford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Milford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Milford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Milford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Milford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Milford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Milford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Milford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Milford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Milford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Milford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Milford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Milford ------PAINTERS (Including Drywall Finishing)------

New Haven Milford 22.55$35.6210a) Brush and Roller

New Haven Milford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Milford 22.55$36.1210c) Paperhanger and Red Label

New Haven Milford 22.55$38.6210e) Blast and Spray

New Haven Milford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Milford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 427: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Milford 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Milford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Milford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Milford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Milford ------TRUCK DRIVERS------

New Haven Milford 25.79 + a$29.8617a) 2 Axle

New Haven Milford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Milford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Milford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Milford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Milford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Milford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Milford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Milford 7.34$25.7619) Theatrical Stage Journeyman

New Haven Naugatuck 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Naugatuck 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Naugatuck 26.01$38.342) Boilermaker

New Haven Naugatuck 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 428: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Naugatuck 25.87$34.903b) Tile Setter

New Haven Naugatuck 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Naugatuck 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Naugatuck 32.06$33.483e) Plasterer

New Haven Naugatuck ------LABORERS------

New Haven Naugatuck 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Naugatuck 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Naugatuck 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Naugatuck 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Naugatuck 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Naugatuck 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Naugatuck 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Naugatuck 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Naugatuck 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Naugatuck 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Naugatuck 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Naugatuck 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 429: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Naugatuck 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Naugatuck 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Naugatuck -----LINE CONSTRUCTION----

New Haven Naugatuck 6.5% + 9.00$26.50Groundman

New Haven Naugatuck 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Naugatuck 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Naugatuck 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Naugatuck ----OPERATORS----

New Haven Naugatuck 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Naugatuck 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Naugatuck 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Naugatuck 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Naugatuck 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Naugatuck 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Naugatuck 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 430: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Naugatuck 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Naugatuck 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Naugatuck 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Naugatuck 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Naugatuck 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Naugatuck 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Naugatuck 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Naugatuck 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Naugatuck 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Naugatuck 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Naugatuck 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Naugatuck 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Naugatuck ------PAINTERS (Including Drywall Finishing)------

New Haven Naugatuck 22.55$35.6210a) Brush and Roller

New Haven Naugatuck 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Naugatuck 22.55$36.1210c) Paperhanger and Red Label

New Haven Naugatuck 22.55$38.6210e) Blast and Spray

New Haven Naugatuck 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Naugatuck 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 431: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Naugatuck 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Naugatuck 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Naugatuck 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Naugatuck 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Naugatuck ------TRUCK DRIVERS------

New Haven Naugatuck 25.79 + a$29.8617a) 2 Axle

New Haven Naugatuck 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Naugatuck 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Naugatuck 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Naugatuck 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Naugatuck 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Naugatuck 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Naugatuck 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Naugatuck 7.34$25.7619) Theatrical Stage Journeyman

New Haven New Haven 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven New Haven 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven New Haven 26.01$38.342) Boilermaker

New Haven New Haven 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 432: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven New Haven 25.87$34.903b) Tile Setter

New Haven New Haven 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven New Haven 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven New Haven 32.06$33.483e) Plasterer

New Haven New Haven ------LABORERS------

New Haven New Haven 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven New Haven 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven New Haven 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven New Haven 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven New Haven 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven New Haven 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven New Haven 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven New Haven 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven New Haven 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven New Haven 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven New Haven 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven New Haven 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 433: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven New Haven 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven New Haven 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven New Haven -----LINE CONSTRUCTION----

New Haven New Haven 6.5% + 9.00$26.50Groundman

New Haven New Haven 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven New Haven 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven New Haven 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven New Haven ----OPERATORS----

New Haven New Haven 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven New Haven 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven New Haven 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven New Haven 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven New Haven 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven New Haven 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven New Haven 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 434: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven New Haven 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven New Haven 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven New Haven 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven New Haven 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven New Haven 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven New Haven 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven New Haven 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven New Haven 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven New Haven 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven New Haven 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven New Haven 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven New Haven 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven New Haven ------PAINTERS (Including Drywall Finishing)------

New Haven New Haven 22.55$35.6210a) Brush and Roller

New Haven New Haven 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven New Haven 22.55$36.1210c) Paperhanger and Red Label

New Haven New Haven 22.55$38.6210e) Blast and Spray

New Haven New Haven 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven New Haven 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 435: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven New Haven 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven New Haven 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven New Haven 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven New Haven 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven New Haven ------TRUCK DRIVERS------

New Haven New Haven 25.79 + a$29.8617a) 2 Axle

New Haven New Haven 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven New Haven 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven New Haven 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven New Haven 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven New Haven 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven New Haven 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven New Haven 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven New Haven 7.34$25.7619) Theatrical Stage Journeyman

New Haven North Branford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven North Branford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven North Branford 26.01$38.342) Boilermaker

New Haven North Branford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 436: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Branford 25.87$34.903b) Tile Setter

New Haven North Branford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven North Branford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven North Branford 32.06$33.483e) Plasterer

New Haven North Branford ------LABORERS------

New Haven North Branford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven North Branford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven North Branford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven North Branford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven North Branford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven North Branford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven North Branford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven North Branford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven North Branford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven North Branford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven North Branford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven North Branford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 437: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Branford 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven North Branford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven North Branford -----LINE CONSTRUCTION----

New Haven North Branford 6.5% + 9.00$26.50Groundman

New Haven North Branford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven North Branford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven North Branford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven North Branford ----OPERATORS----

New Haven North Branford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven North Branford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven North Branford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven North Branford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven North Branford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven North Branford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven North Branford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 438: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Branford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven North Branford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven North Branford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven North Branford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven North Branford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven North Branford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven North Branford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven North Branford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven North Branford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven North Branford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven North Branford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven North Branford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven North Branford ------PAINTERS (Including Drywall Finishing)------

New Haven North Branford 22.55$35.6210a) Brush and Roller

New Haven North Branford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven North Branford 22.55$36.1210c) Paperhanger and Red Label

New Haven North Branford 22.55$38.6210e) Blast and Spray

New Haven North Branford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven North Branford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 439: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Branford 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven North Branford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven North Branford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven North Branford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven North Branford ------TRUCK DRIVERS------

New Haven North Branford 25.79 + a$29.8617a) 2 Axle

New Haven North Branford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven North Branford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven North Branford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven North Branford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven North Branford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven North Branford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven North Branford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven North Branford 7.34$25.7619) Theatrical Stage Journeyman

New Haven North Haven 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven North Haven 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven North Haven 26.01$38.342) Boilermaker

New Haven North Haven 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 440: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Haven 25.87$34.903b) Tile Setter

New Haven North Haven 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven North Haven 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven North Haven 32.06$33.483e) Plasterer

New Haven North Haven ------LABORERS------

New Haven North Haven 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven North Haven 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven North Haven 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven North Haven 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven North Haven 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven North Haven 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven North Haven 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven North Haven 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven North Haven 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven North Haven 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven North Haven 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven North Haven 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 441: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Haven 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven North Haven 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven North Haven -----LINE CONSTRUCTION----

New Haven North Haven 6.5% + 9.00$26.50Groundman

New Haven North Haven 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven North Haven 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven North Haven 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven North Haven ----OPERATORS----

New Haven North Haven 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven North Haven 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven North Haven 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven North Haven 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven North Haven 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven North Haven 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven North Haven 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 442: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Haven 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven North Haven 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven North Haven 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven North Haven 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven North Haven 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven North Haven 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven North Haven 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven North Haven 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven North Haven 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven North Haven 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven North Haven 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven North Haven 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven North Haven ------PAINTERS (Including Drywall Finishing)------

New Haven North Haven 22.55$35.6210a) Brush and Roller

New Haven North Haven 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven North Haven 22.55$36.1210c) Paperhanger and Red Label

New Haven North Haven 22.55$38.6210e) Blast and Spray

New Haven North Haven 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven North Haven 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 443: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven North Haven 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven North Haven 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven North Haven 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven North Haven 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven North Haven ------TRUCK DRIVERS------

New Haven North Haven 25.79 + a$29.8617a) 2 Axle

New Haven North Haven 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven North Haven 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven North Haven 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven North Haven 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven North Haven 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven North Haven 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven North Haven 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven North Haven 7.34$25.7619) Theatrical Stage Journeyman

New Haven Orange 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Orange 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Orange 26.01$38.342) Boilermaker

New Haven Orange 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 444: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Orange 25.87$34.903b) Tile Setter

New Haven Orange 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Orange 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Orange 32.06$33.483e) Plasterer

New Haven Orange ------LABORERS------

New Haven Orange 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Orange 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Orange 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Orange 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Orange 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Orange 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Orange 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Orange 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Orange 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Orange 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Orange 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Orange 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 445: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Orange 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Orange 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Orange -----LINE CONSTRUCTION----

New Haven Orange 6.5% + 9.00$26.50Groundman

New Haven Orange 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Orange 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Orange 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Orange ----OPERATORS----

New Haven Orange 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Orange 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Orange 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Orange 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Orange 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Orange 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Orange 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 446: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Orange 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Orange 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Orange 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Orange 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Orange 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Orange 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Orange 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Orange 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Orange 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Orange 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Orange 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Orange 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Orange ------PAINTERS (Including Drywall Finishing)------

New Haven Orange 22.55$35.6210a) Brush and Roller

New Haven Orange 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Orange 22.55$36.1210c) Paperhanger and Red Label

New Haven Orange 22.55$38.6210e) Blast and Spray

New Haven Orange 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Orange 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 447: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Orange 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Orange 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Orange 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Orange 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Orange ------TRUCK DRIVERS------

New Haven Orange 25.79 + a$29.8617a) 2 Axle

New Haven Orange 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Orange 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Orange 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Orange 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Orange 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Orange 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Orange 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Orange 7.34$25.7619) Theatrical Stage Journeyman

New Haven Oxford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Oxford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Oxford 26.01$38.342) Boilermaker

New Haven Oxford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 448: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Oxford 25.87$34.903b) Tile Setter

New Haven Oxford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Oxford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Oxford 32.06$33.483e) Plasterer

New Haven Oxford ------LABORERS------

New Haven Oxford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Oxford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Oxford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Oxford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Oxford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Oxford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Oxford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Oxford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Oxford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Oxford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Oxford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Oxford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 449: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Oxford 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Oxford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Oxford -----LINE CONSTRUCTION----

New Haven Oxford 6.5% + 9.00$26.50Groundman

New Haven Oxford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Oxford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Oxford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Oxford ----OPERATORS----

New Haven Oxford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Oxford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Oxford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Oxford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Oxford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Oxford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Oxford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 450: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Oxford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Oxford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Oxford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Oxford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Oxford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Oxford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Oxford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Oxford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Oxford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Oxford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Oxford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Oxford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Oxford ------PAINTERS (Including Drywall Finishing)------

New Haven Oxford 22.55$35.6210a) Brush and Roller

New Haven Oxford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Oxford 22.55$36.1210c) Paperhanger and Red Label

New Haven Oxford 22.55$38.6210e) Blast and Spray

New Haven Oxford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Oxford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 451: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Oxford 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Oxford 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Oxford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Oxford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Oxford ------TRUCK DRIVERS------

New Haven Oxford 25.79 + a$29.8617a) 2 Axle

New Haven Oxford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Oxford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Oxford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Oxford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Oxford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Oxford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Oxford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Oxford 7.34$25.7619) Theatrical Stage Journeyman

New Haven Prospect 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Prospect 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Prospect 26.01$38.342) Boilermaker

New Haven Prospect 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 452: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Prospect 25.87$34.903b) Tile Setter

New Haven Prospect 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Prospect 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Prospect 32.06$33.483e) Plasterer

New Haven Prospect ------LABORERS------

New Haven Prospect 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Prospect 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Prospect 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Prospect 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Prospect 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Prospect 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Prospect 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Prospect 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Prospect 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Prospect 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Prospect 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Prospect 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 453: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Prospect 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Prospect 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Prospect -----LINE CONSTRUCTION----

New Haven Prospect 6.5% + 9.00$26.50Groundman

New Haven Prospect 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Prospect 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Prospect 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Prospect ----OPERATORS----

New Haven Prospect 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Prospect 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Prospect 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Prospect 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Prospect 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Prospect 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Prospect 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 454: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Prospect 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Prospect 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Prospect 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Prospect 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Prospect 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Prospect 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Prospect 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Prospect 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Prospect 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Prospect 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Prospect 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Prospect 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Prospect ------PAINTERS (Including Drywall Finishing)------

New Haven Prospect 22.55$35.6210a) Brush and Roller

New Haven Prospect 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Prospect 22.55$36.1210c) Paperhanger and Red Label

New Haven Prospect 22.55$38.6210e) Blast and Spray

New Haven Prospect 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Prospect 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 455: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Prospect 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Prospect 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Prospect 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Prospect 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Prospect ------TRUCK DRIVERS------

New Haven Prospect 25.79 + a$29.8617a) 2 Axle

New Haven Prospect 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Prospect 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Prospect 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Prospect 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Prospect 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Prospect 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Prospect 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Prospect 7.34$25.7619) Theatrical Stage Journeyman

New Haven Seymour 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Seymour 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Seymour 26.01$38.342) Boilermaker

New Haven Seymour 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 456: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Seymour 25.87$34.903b) Tile Setter

New Haven Seymour 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Seymour 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Seymour 32.06$33.483e) Plasterer

New Haven Seymour ------LABORERS------

New Haven Seymour 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Seymour 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Seymour 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Seymour 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Seymour 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Seymour 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Seymour 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Seymour 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Seymour 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Seymour 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Seymour 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Seymour 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 457: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Seymour 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Seymour 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Seymour -----LINE CONSTRUCTION----

New Haven Seymour 6.5% + 9.00$26.50Groundman

New Haven Seymour 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Seymour 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Seymour 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Seymour ----OPERATORS----

New Haven Seymour 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Seymour 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Seymour 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Seymour 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Seymour 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Seymour 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Seymour 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 458: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Seymour 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Seymour 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Seymour 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Seymour 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Seymour 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Seymour 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Seymour 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Seymour 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Seymour 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Seymour 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Seymour 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Seymour 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Seymour ------PAINTERS (Including Drywall Finishing)------

New Haven Seymour 22.55$35.6210a) Brush and Roller

New Haven Seymour 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Seymour 22.55$36.1210c) Paperhanger and Red Label

New Haven Seymour 22.55$38.6210e) Blast and Spray

New Haven Seymour 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Seymour 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 459: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Seymour 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Seymour 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Seymour 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Seymour 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Seymour ------TRUCK DRIVERS------

New Haven Seymour 25.79 + a$29.8617a) 2 Axle

New Haven Seymour 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Seymour 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Seymour 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Seymour 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Seymour 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Seymour 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Seymour 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Seymour 7.34$25.7619) Theatrical Stage Journeyman

New Haven Southbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Southbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Southbury 26.01$38.342) Boilermaker

New Haven Southbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 460: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Southbury 25.87$34.903b) Tile Setter

New Haven Southbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Southbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Southbury 32.06$33.483e) Plasterer

New Haven Southbury ------LABORERS------

New Haven Southbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Southbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Southbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Southbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Southbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Southbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Southbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Southbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Southbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Southbury 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Southbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Southbury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 461: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Southbury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Southbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Southbury -----LINE CONSTRUCTION----

New Haven Southbury 6.5% + 9.00$26.50Groundman

New Haven Southbury 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Southbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Southbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Southbury ----OPERATORS----

New Haven Southbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Southbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Southbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Southbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Southbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Southbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Southbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 462: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Southbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Southbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Southbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Southbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Southbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Southbury 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Southbury 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Southbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Southbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Southbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Southbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Southbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Southbury ------PAINTERS (Including Drywall Finishing)------

New Haven Southbury 22.55$35.6210a) Brush and Roller

New Haven Southbury 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Southbury 22.55$36.1210c) Paperhanger and Red Label

New Haven Southbury 22.55$38.6210e) Blast and Spray

New Haven Southbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Southbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 463: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Southbury 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Southbury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Southbury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Southbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Southbury ------TRUCK DRIVERS------

New Haven Southbury 25.79 + a$29.8617a) 2 Axle

New Haven Southbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Southbury 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Southbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Southbury 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Southbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Southbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Southbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Southbury 7.34$25.7619) Theatrical Stage Journeyman

New Haven Wallingford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Wallingford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Wallingford 26.01$38.342) Boilermaker

New Haven Wallingford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 464: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wallingford 25.87$34.903b) Tile Setter

New Haven Wallingford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Wallingford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Wallingford 32.06$33.483e) Plasterer

New Haven Wallingford ------LABORERS------

New Haven Wallingford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Wallingford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Wallingford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Wallingford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Wallingford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Wallingford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Wallingford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Wallingford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Wallingford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Wallingford 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Wallingford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Wallingford 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 465: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wallingford 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Wallingford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Wallingford -----LINE CONSTRUCTION----

New Haven Wallingford 6.5% + 9.00$26.50Groundman

New Haven Wallingford 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Wallingford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Wallingford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Wallingford ----OPERATORS----

New Haven Wallingford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Wallingford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Wallingford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Wallingford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Wallingford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Wallingford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Wallingford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 466: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wallingford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Wallingford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Wallingford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Wallingford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Wallingford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Wallingford 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Wallingford 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Wallingford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Wallingford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Wallingford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Wallingford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Wallingford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Wallingford ------PAINTERS (Including Drywall Finishing)------

New Haven Wallingford 22.55$35.6210a) Brush and Roller

New Haven Wallingford 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Wallingford 22.55$36.1210c) Paperhanger and Red Label

New Haven Wallingford 22.55$38.6210e) Blast and Spray

New Haven Wallingford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Wallingford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 467: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wallingford 21.35$38.4013) Roofer (composition)

New Haven Wallingford 21.35$38.9014) Roofer (slate & tile)

New Haven Wallingford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Wallingford 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Wallingford ------TRUCK DRIVERS------

New Haven Wallingford 25.79 + a$29.8617a) 2 Axle

New Haven Wallingford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Wallingford 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Wallingford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Wallingford 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Wallingford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Wallingford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Wallingford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Wallingford 7.34$25.7619) Theatrical Stage Journeyman

New Haven Waterbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Waterbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Waterbury 26.01$38.342) Boilermaker

New Haven Waterbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 468: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Waterbury 25.87$34.903b) Tile Setter

New Haven Waterbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Waterbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Waterbury 32.06$33.483e) Plasterer

New Haven Waterbury ------LABORERS------

New Haven Waterbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Waterbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Waterbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Waterbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Waterbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Waterbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Waterbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Waterbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Waterbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Waterbury 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Waterbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Waterbury 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 469: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Waterbury 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Waterbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Waterbury -----LINE CONSTRUCTION----

New Haven Waterbury 6.5% + 9.00$26.50Groundman

New Haven Waterbury 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Waterbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Waterbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Waterbury ----OPERATORS----

New Haven Waterbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Waterbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Waterbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Waterbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Waterbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Waterbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Waterbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 470: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Waterbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Waterbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Waterbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Waterbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Waterbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Waterbury 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Waterbury 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Waterbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Waterbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Waterbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Waterbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Waterbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Waterbury ------PAINTERS (Including Drywall Finishing)------

New Haven Waterbury 22.55$35.6210a) Brush and Roller

New Haven Waterbury 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Waterbury 22.55$36.1210c) Paperhanger and Red Label

New Haven Waterbury 22.55$38.6210e) Blast and Spray

New Haven Waterbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Waterbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 471: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Waterbury 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Waterbury 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Waterbury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Waterbury 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Waterbury ------TRUCK DRIVERS------

New Haven Waterbury 25.79 + a$29.8617a) 2 Axle

New Haven Waterbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Waterbury 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Waterbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Waterbury 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Waterbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Waterbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Waterbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Waterbury 7.34$25.7619) Theatrical Stage Journeyman

New Haven West Haven 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven West Haven 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven West Haven 26.01$38.342) Boilermaker

New Haven West Haven 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 472: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven West Haven 25.87$34.903b) Tile Setter

New Haven West Haven 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven West Haven 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven West Haven 32.06$33.483e) Plasterer

New Haven West Haven ------LABORERS------

New Haven West Haven 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven West Haven 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven West Haven 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven West Haven 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven West Haven 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven West Haven 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven West Haven 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven West Haven 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven West Haven 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven West Haven 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven West Haven 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven West Haven 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 473: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven West Haven 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven West Haven 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven West Haven -----LINE CONSTRUCTION----

New Haven West Haven 6.5% + 9.00$26.50Groundman

New Haven West Haven 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven West Haven 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven West Haven 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven West Haven ----OPERATORS----

New Haven West Haven 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven West Haven 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven West Haven 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven West Haven 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven West Haven 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven West Haven 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven West Haven 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 474: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven West Haven 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven West Haven 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven West Haven 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven West Haven 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven West Haven 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven West Haven 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven West Haven 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven West Haven 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven West Haven 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven West Haven 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven West Haven 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven West Haven 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven West Haven ------PAINTERS (Including Drywall Finishing)------

New Haven West Haven 22.55$35.6210a) Brush and Roller

New Haven West Haven 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven West Haven 22.55$36.1210c) Paperhanger and Red Label

New Haven West Haven 22.55$38.6210e) Blast and Spray

New Haven West Haven 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven West Haven 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 475: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven West Haven 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven West Haven 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven West Haven 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven West Haven 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven West Haven ------TRUCK DRIVERS------

New Haven West Haven 25.79 + a$29.8617a) 2 Axle

New Haven West Haven 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven West Haven 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven West Haven 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven West Haven 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven West Haven 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven West Haven 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven West Haven 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven West Haven 7.34$25.7619) Theatrical Stage Journeyman

New Haven Wolcott 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Wolcott 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Wolcott 26.01$38.342) Boilermaker

New Haven Wolcott 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 476: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wolcott 25.87$34.903b) Tile Setter

New Haven Wolcott 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Wolcott 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Wolcott 32.06$33.483e) Plasterer

New Haven Wolcott ------LABORERS------

New Haven Wolcott 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Wolcott 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Wolcott 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Wolcott 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Wolcott 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Wolcott 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Wolcott 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Wolcott 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Wolcott 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Wolcott 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Wolcott 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Wolcott 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 477: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wolcott 28.75+3% of gross

wage$39.926) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Wolcott 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Wolcott -----LINE CONSTRUCTION----

New Haven Wolcott 6.5% + 9.00$26.50Groundman

New Haven Wolcott 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Wolcott 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Wolcott 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Wolcott ----OPERATORS----

New Haven Wolcott 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Wolcott 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Wolcott 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Wolcott 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Wolcott 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Wolcott 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Wolcott 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 478: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wolcott 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Wolcott 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Wolcott 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Wolcott 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Wolcott 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Wolcott 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Wolcott 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Wolcott 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Wolcott 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Wolcott 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Wolcott 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Wolcott 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Wolcott ------PAINTERS (Including Drywall Finishing)------

New Haven Wolcott 22.55$35.6210a) Brush and Roller

New Haven Wolcott 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Wolcott 22.55$36.1210c) Paperhanger and Red Label

New Haven Wolcott 22.55$38.6210e) Blast and Spray

New Haven Wolcott 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Wolcott 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 479: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Wolcott 21.35$38.4013) Roofer (composition)

New Haven Wolcott 21.35$38.9014) Roofer (slate & tile)

New Haven Wolcott 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Wolcott 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Wolcott ------TRUCK DRIVERS------

New Haven Wolcott 25.79 + a$29.8617a) 2 Axle

New Haven Wolcott 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Wolcott 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Wolcott 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Wolcott 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Wolcott 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Wolcott 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Wolcott 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Wolcott 7.34$25.7619) Theatrical Stage Journeyman

New Haven Woodbridge 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New Haven Woodbridge 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New Haven Woodbridge 26.01$38.342) Boilermaker

New Haven Woodbridge 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 480: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Woodbridge 25.87$34.903b) Tile Setter

New Haven Woodbridge 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New Haven Woodbridge 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New Haven Woodbridge 32.06$33.483e) Plasterer

New Haven Woodbridge ------LABORERS------

New Haven Woodbridge 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New Haven Woodbridge 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New Haven Woodbridge 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New Haven Woodbridge 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New Haven Woodbridge 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New Haven Woodbridge 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New Haven Woodbridge 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New Haven Woodbridge 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New Haven Woodbridge 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New Haven Woodbridge 22.15$18.004i) Group 10: Traffic Control Signalman

New Haven Woodbridge 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New Haven Woodbridge 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 481: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Woodbridge 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New Haven Woodbridge 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New Haven Woodbridge -----LINE CONSTRUCTION----

New Haven Woodbridge 6.5% + 9.00$26.50Groundman

New Haven Woodbridge 6.5% + 22.00$48.19Linemen/Cable Splicer

New Haven Woodbridge 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New Haven Woodbridge 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New Haven Woodbridge ----OPERATORS----

New Haven Woodbridge 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New Haven Woodbridge 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New Haven Woodbridge 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New Haven Woodbridge 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New Haven Woodbridge 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New Haven Woodbridge 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New Haven Woodbridge 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 482: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Woodbridge 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New Haven Woodbridge 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New Haven Woodbridge 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New Haven Woodbridge 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New Haven Woodbridge 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New Haven Woodbridge 25.30 + a$36.48Group 12: Wellpoint operator.

New Haven Woodbridge 25.30 + a$35.86Group 13: Compressor battery operator.

New Haven Woodbridge 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New Haven Woodbridge 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New Haven Woodbridge 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New Haven Woodbridge 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New Haven Woodbridge 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New Haven Woodbridge ------PAINTERS (Including Drywall Finishing)------

New Haven Woodbridge 22.55$35.6210a) Brush and Roller

New Haven Woodbridge 22.55$36.3710b) Taping Only/Drywall Finishing

New Haven Woodbridge 22.55$36.1210c) Paperhanger and Red Label

New Haven Woodbridge 22.55$38.6210e) Blast and Spray

New Haven Woodbridge 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New Haven Woodbridge 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 483: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew Haven Woodbridge 19.55 + a$42.00Roofer: Cole Tar Pitch

New Haven Woodbridge 19.55 + a$40.50Roofer: Slate, Tile, Composition, Shingles, Singly Ply andDamp/Waterproofing

New Haven Woodbridge 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New Haven Woodbridge 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New Haven Woodbridge ------TRUCK DRIVERS------

New Haven Woodbridge 25.79 + a$29.8617a) 2 Axle

New Haven Woodbridge 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New Haven Woodbridge 25.79 + a$30.0317c) 3 Axle Ready Mix

New Haven Woodbridge 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New Haven Woodbridge 25.79 + a$30.1317e) 4 Axle Ready Mix

New Haven Woodbridge 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New Haven Woodbridge 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New Haven Woodbridge 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New Haven Woodbridge 7.34$25.7619) Theatrical Stage Journeyman

New London Bozrah 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Bozrah 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Bozrah 26.01$38.342) Boilermaker

New London Bozrah 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 484: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Bozrah 25.87$34.903b) Tile Setter

New London Bozrah 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Bozrah 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Bozrah 32.06$33.483e) Plasterer

New London Bozrah ------LABORERS------

New London Bozrah 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Bozrah 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Bozrah 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Bozrah 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Bozrah 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Bozrah 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Bozrah 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Bozrah 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Bozrah 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Bozrah 22.15$18.004i) Group 10: Traffic Control Signalman

New London Bozrah 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Bozrah 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 485: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Bozrah 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Bozrah 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Bozrah -----LINE CONSTRUCTION----

New London Bozrah 6.5% + 9.00$26.50Groundman

New London Bozrah 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Bozrah 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Bozrah 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Bozrah ----OPERATORS----

New London Bozrah 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Bozrah 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Bozrah 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Bozrah 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Bozrah 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Bozrah 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Bozrah 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 486: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Bozrah 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Bozrah 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Bozrah 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Bozrah 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Bozrah 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Bozrah 25.30 + a$36.48Group 12: Wellpoint operator.

New London Bozrah 25.30 + a$35.86Group 13: Compressor battery operator.

New London Bozrah 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Bozrah 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Bozrah 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Bozrah 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Bozrah 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Bozrah ------PAINTERS (Including Drywall Finishing)------

New London Bozrah 22.55$35.6210a) Brush and Roller

New London Bozrah 22.55$36.3710b) Taping Only/Drywall Finishing

New London Bozrah 22.55$36.1210c) Paperhanger and Red Label

New London Bozrah 22.55$38.6210e) Blast and Spray

New London Bozrah 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Bozrah 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 487: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Bozrah 21.35$38.4013) Roofer (composition)

New London Bozrah 21.35$38.9014) Roofer (slate & tile)

New London Bozrah 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Bozrah 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Bozrah ------TRUCK DRIVERS------

New London Bozrah 25.79 + a$29.8617a) 2 Axle

New London Bozrah 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Bozrah 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Bozrah 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Bozrah 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Bozrah 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Bozrah 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Bozrah 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Bozrah 7.34$25.7619) Theatrical Stage Journeyman

New London Colchester 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Colchester 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Colchester 26.01$38.342) Boilermaker

New London Colchester 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 488: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Colchester 25.87$34.903b) Tile Setter

New London Colchester 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Colchester 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Colchester 32.06$33.483e) Plasterer

New London Colchester ------LABORERS------

New London Colchester 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Colchester 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Colchester 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Colchester 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Colchester 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Colchester 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Colchester 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Colchester 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Colchester 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Colchester 22.15$18.004i) Group 10: Traffic Control Signalman

New London Colchester 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Colchester 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 489: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Colchester 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Colchester 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Colchester -----LINE CONSTRUCTION----

New London Colchester 6.5% + 9.00$26.50Groundman

New London Colchester 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Colchester 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Colchester 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Colchester ----OPERATORS----

New London Colchester 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Colchester 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Colchester 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Colchester 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Colchester 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Colchester 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Colchester 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 490: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Colchester 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Colchester 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Colchester 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Colchester 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Colchester 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Colchester 25.30 + a$36.48Group 12: Wellpoint operator.

New London Colchester 25.30 + a$35.86Group 13: Compressor battery operator.

New London Colchester 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Colchester 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Colchester 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Colchester 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Colchester 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Colchester ------PAINTERS (Including Drywall Finishing)------

New London Colchester 22.55$35.6210a) Brush and Roller

New London Colchester 22.55$36.3710b) Taping Only/Drywall Finishing

New London Colchester 22.55$36.1210c) Paperhanger and Red Label

New London Colchester 22.55$38.6210e) Blast and Spray

New London Colchester 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Colchester 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 491: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Colchester 21.35$38.4013) Roofer (composition)

New London Colchester 21.35$38.9014) Roofer (slate & tile)

New London Colchester 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Colchester 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Colchester ------TRUCK DRIVERS------

New London Colchester 25.79 + a$29.8617a) 2 Axle

New London Colchester 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Colchester 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Colchester 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Colchester 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Colchester 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Colchester 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Colchester 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Colchester 7.34$25.7619) Theatrical Stage Journeyman

New London East Lyme 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London East Lyme 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London East Lyme 26.01$38.342) Boilermaker

New London East Lyme 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 492: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London East Lyme 25.87$34.903b) Tile Setter

New London East Lyme 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London East Lyme 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London East Lyme 32.06$33.483e) Plasterer

New London East Lyme ------LABORERS------

New London East Lyme 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London East Lyme 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London East Lyme 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London East Lyme 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London East Lyme 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London East Lyme 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London East Lyme 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London East Lyme 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London East Lyme 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London East Lyme 22.15$18.004i) Group 10: Traffic Control Signalman

New London East Lyme 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London East Lyme 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 493: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London East Lyme 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London East Lyme 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London East Lyme -----LINE CONSTRUCTION----

New London East Lyme 6.5% + 9.00$26.50Groundman

New London East Lyme 6.5% + 22.00$48.19Linemen/Cable Splicer

New London East Lyme 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London East Lyme 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London East Lyme ----OPERATORS----

New London East Lyme 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London East Lyme 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London East Lyme 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London East Lyme 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London East Lyme 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London East Lyme 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London East Lyme 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 494: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London East Lyme 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London East Lyme 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London East Lyme 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London East Lyme 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London East Lyme 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London East Lyme 25.30 + a$36.48Group 12: Wellpoint operator.

New London East Lyme 25.30 + a$35.86Group 13: Compressor battery operator.

New London East Lyme 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London East Lyme 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London East Lyme 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London East Lyme 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London East Lyme 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London East Lyme ------PAINTERS (Including Drywall Finishing)------

New London East Lyme 22.55$35.6210a) Brush and Roller

New London East Lyme 22.55$36.3710b) Taping Only/Drywall Finishing

New London East Lyme 22.55$36.1210c) Paperhanger and Red Label

New London East Lyme 22.55$38.6210e) Blast and Spray

New London East Lyme 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London East Lyme 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 495: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London East Lyme 21.35$38.4013) Roofer (composition)

New London East Lyme 21.35$38.9014) Roofer (slate & tile)

New London East Lyme 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London East Lyme 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London East Lyme ------TRUCK DRIVERS------

New London East Lyme 25.79 + a$29.8617a) 2 Axle

New London East Lyme 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London East Lyme 25.79 + a$30.0317c) 3 Axle Ready Mix

New London East Lyme 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London East Lyme 25.79 + a$30.1317e) 4 Axle Ready Mix

New London East Lyme 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London East Lyme 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London East Lyme 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London East Lyme 7.34$25.7619) Theatrical Stage Journeyman

New London Franklin 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Franklin 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Franklin 26.01$38.342) Boilermaker

New London Franklin 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 496: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Franklin 25.87$34.903b) Tile Setter

New London Franklin 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Franklin 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Franklin 32.06$33.483e) Plasterer

New London Franklin ------LABORERS------

New London Franklin 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Franklin 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Franklin 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Franklin 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Franklin 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Franklin 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Franklin 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Franklin 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Franklin 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Franklin 22.15$18.004i) Group 10: Traffic Control Signalman

New London Franklin 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Franklin 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 497: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Franklin 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Franklin 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Franklin -----LINE CONSTRUCTION----

New London Franklin 6.5% + 9.00$26.50Groundman

New London Franklin 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Franklin 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Franklin 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Franklin ----OPERATORS----

New London Franklin 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Franklin 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Franklin 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Franklin 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Franklin 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Franklin 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Franklin 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 498: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Franklin 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Franklin 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Franklin 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Franklin 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Franklin 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Franklin 25.30 + a$36.48Group 12: Wellpoint operator.

New London Franklin 25.30 + a$35.86Group 13: Compressor battery operator.

New London Franklin 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Franklin 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Franklin 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Franklin 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Franklin 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Franklin ------PAINTERS (Including Drywall Finishing)------

New London Franklin 22.55$35.6210a) Brush and Roller

New London Franklin 22.55$36.3710b) Taping Only/Drywall Finishing

New London Franklin 22.55$36.1210c) Paperhanger and Red Label

New London Franklin 22.55$38.6210e) Blast and Spray

New London Franklin 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Franklin 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 499: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Franklin 21.35$38.4013) Roofer (composition)

New London Franklin 21.35$38.9014) Roofer (slate & tile)

New London Franklin 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Franklin 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Franklin ------TRUCK DRIVERS------

New London Franklin 25.79 + a$29.8617a) 2 Axle

New London Franklin 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Franklin 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Franklin 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Franklin 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Franklin 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Franklin 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Franklin 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Franklin 7.34$25.7619) Theatrical Stage Journeyman

New London Griswold 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Griswold 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Griswold 26.01$38.342) Boilermaker

New London Griswold 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 500: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Griswold 25.87$34.903b) Tile Setter

New London Griswold 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Griswold 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Griswold 32.06$33.483e) Plasterer

New London Griswold ------LABORERS------

New London Griswold 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Griswold 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Griswold 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Griswold 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Griswold 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Griswold 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Griswold 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Griswold 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Griswold 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Griswold 22.15$18.004i) Group 10: Traffic Control Signalman

New London Griswold 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Griswold 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 501: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Griswold 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Griswold 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Griswold -----LINE CONSTRUCTION----

New London Griswold 6.5% + 9.00$26.50Groundman

New London Griswold 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Griswold 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Griswold 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Griswold ----OPERATORS----

New London Griswold 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Griswold 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Griswold 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Griswold 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Griswold 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Griswold 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Griswold 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 502: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Griswold 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Griswold 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Griswold 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Griswold 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Griswold 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Griswold 25.30 + a$36.48Group 12: Wellpoint operator.

New London Griswold 25.30 + a$35.86Group 13: Compressor battery operator.

New London Griswold 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Griswold 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Griswold 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Griswold 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Griswold 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Griswold ------PAINTERS (Including Drywall Finishing)------

New London Griswold 22.55$35.6210a) Brush and Roller

New London Griswold 22.55$36.3710b) Taping Only/Drywall Finishing

New London Griswold 22.55$36.1210c) Paperhanger and Red Label

New London Griswold 22.55$38.6210e) Blast and Spray

New London Griswold 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Griswold 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 503: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Griswold 21.35$38.4013) Roofer (composition)

New London Griswold 21.35$38.9014) Roofer (slate & tile)

New London Griswold 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Griswold 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Griswold ------TRUCK DRIVERS------

New London Griswold 25.79 + a$29.8617a) 2 Axle

New London Griswold 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Griswold 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Griswold 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Griswold 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Griswold 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Griswold 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Griswold 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Griswold 7.34$25.7619) Theatrical Stage Journeyman

New London Groton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Groton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Groton 26.01$38.342) Boilermaker

New London Groton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 504: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Groton 25.87$34.903b) Tile Setter

New London Groton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Groton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Groton 32.06$33.483e) Plasterer

New London Groton ------LABORERS------

New London Groton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Groton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Groton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Groton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Groton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Groton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Groton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Groton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Groton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Groton 22.15$18.004i) Group 10: Traffic Control Signalman

New London Groton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Groton 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 505: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Groton 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Groton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Groton -----LINE CONSTRUCTION----

New London Groton 6.5% + 9.00$26.50Groundman

New London Groton 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Groton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Groton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Groton ----OPERATORS----

New London Groton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Groton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Groton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Groton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Groton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Groton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Groton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 506: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Groton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Groton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Groton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Groton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Groton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Groton 25.30 + a$36.48Group 12: Wellpoint operator.

New London Groton 25.30 + a$35.86Group 13: Compressor battery operator.

New London Groton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Groton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Groton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Groton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Groton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Groton ------PAINTERS (Including Drywall Finishing)------

New London Groton 22.55$35.6210a) Brush and Roller

New London Groton 22.55$36.3710b) Taping Only/Drywall Finishing

New London Groton 22.55$36.1210c) Paperhanger and Red Label

New London Groton 22.55$38.6210e) Blast and Spray

New London Groton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Groton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 507: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Groton 21.35$38.4013) Roofer (composition)

New London Groton 21.35$38.9014) Roofer (slate & tile)

New London Groton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Groton 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Groton ------TRUCK DRIVERS------

New London Groton 25.79 + a$29.8617a) 2 Axle

New London Groton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Groton 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Groton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Groton 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Groton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Groton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Groton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Groton 7.34$25.7619) Theatrical Stage Journeyman

New London Lebanon 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Lebanon 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Lebanon 26.01$38.342) Boilermaker

New London Lebanon 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 508: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lebanon 25.87$34.903b) Tile Setter

New London Lebanon 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Lebanon 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Lebanon 32.06$33.483e) Plasterer

New London Lebanon ------LABORERS------

New London Lebanon 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Lebanon 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Lebanon 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Lebanon 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Lebanon 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Lebanon 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Lebanon 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Lebanon 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Lebanon 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Lebanon 22.15$18.004i) Group 10: Traffic Control Signalman

New London Lebanon 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Lebanon 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 509: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lebanon 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Lebanon 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Lebanon -----LINE CONSTRUCTION----

New London Lebanon 6.5% + 9.00$26.50Groundman

New London Lebanon 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Lebanon 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Lebanon 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Lebanon ----OPERATORS----

New London Lebanon 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Lebanon 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Lebanon 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Lebanon 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Lebanon 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Lebanon 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Lebanon 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 510: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lebanon 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Lebanon 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Lebanon 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Lebanon 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Lebanon 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Lebanon 25.30 + a$36.48Group 12: Wellpoint operator.

New London Lebanon 25.30 + a$35.86Group 13: Compressor battery operator.

New London Lebanon 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Lebanon 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Lebanon 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Lebanon 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Lebanon 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Lebanon ------PAINTERS (Including Drywall Finishing)------

New London Lebanon 22.55$35.6210a) Brush and Roller

New London Lebanon 22.55$36.3710b) Taping Only/Drywall Finishing

New London Lebanon 22.55$36.1210c) Paperhanger and Red Label

New London Lebanon 22.55$38.6210e) Blast and Spray

New London Lebanon 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Lebanon 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 511: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lebanon 21.35$38.4013) Roofer (composition)

New London Lebanon 21.35$38.9014) Roofer (slate & tile)

New London Lebanon 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Lebanon 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Lebanon ------TRUCK DRIVERS------

New London Lebanon 25.79 + a$29.8617a) 2 Axle

New London Lebanon 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Lebanon 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Lebanon 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Lebanon 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Lebanon 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Lebanon 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Lebanon 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Lebanon 7.34$25.7619) Theatrical Stage Journeyman

New London Ledyard 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Ledyard 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Ledyard 26.01$38.342) Boilermaker

New London Ledyard 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 512: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Ledyard 25.87$34.903b) Tile Setter

New London Ledyard 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Ledyard 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Ledyard 32.06$33.483e) Plasterer

New London Ledyard ------LABORERS------

New London Ledyard 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Ledyard 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Ledyard 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Ledyard 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Ledyard 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Ledyard 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Ledyard 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Ledyard 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Ledyard 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Ledyard 22.15$18.004i) Group 10: Traffic Control Signalman

New London Ledyard 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Ledyard 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 513: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Ledyard 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Ledyard 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Ledyard -----LINE CONSTRUCTION----

New London Ledyard 6.5% + 9.00$26.50Groundman

New London Ledyard 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Ledyard 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Ledyard 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Ledyard ----OPERATORS----

New London Ledyard 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Ledyard 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Ledyard 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Ledyard 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Ledyard 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Ledyard 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Ledyard 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 514: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Ledyard 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Ledyard 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Ledyard 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Ledyard 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Ledyard 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Ledyard 25.30 + a$36.48Group 12: Wellpoint operator.

New London Ledyard 25.30 + a$35.86Group 13: Compressor battery operator.

New London Ledyard 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Ledyard 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Ledyard 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Ledyard 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Ledyard 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Ledyard ------PAINTERS (Including Drywall Finishing)------

New London Ledyard 22.55$35.6210a) Brush and Roller

New London Ledyard 22.55$36.3710b) Taping Only/Drywall Finishing

New London Ledyard 22.55$36.1210c) Paperhanger and Red Label

New London Ledyard 22.55$38.6210e) Blast and Spray

New London Ledyard 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Ledyard 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 515: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Ledyard 21.35$38.4013) Roofer (composition)

New London Ledyard 21.35$38.9014) Roofer (slate & tile)

New London Ledyard 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Ledyard 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Ledyard ------TRUCK DRIVERS------

New London Ledyard 25.79 + a$29.8617a) 2 Axle

New London Ledyard 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Ledyard 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Ledyard 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Ledyard 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Ledyard 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Ledyard 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Ledyard 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Ledyard 7.34$25.7619) Theatrical Stage Journeyman

New London Lisbon 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Lisbon 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Lisbon 26.01$38.342) Boilermaker

New London Lisbon 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 516: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lisbon 25.87$34.903b) Tile Setter

New London Lisbon 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Lisbon 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Lisbon 32.06$33.483e) Plasterer

New London Lisbon ------LABORERS------

New London Lisbon 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Lisbon 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Lisbon 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Lisbon 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Lisbon 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Lisbon 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Lisbon 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Lisbon 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Lisbon 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Lisbon 22.15$18.004i) Group 10: Traffic Control Signalman

New London Lisbon 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Lisbon 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 517: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lisbon 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Lisbon 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Lisbon -----LINE CONSTRUCTION----

New London Lisbon 6.5% + 9.00$26.50Groundman

New London Lisbon 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Lisbon 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Lisbon 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Lisbon ----OPERATORS----

New London Lisbon 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Lisbon 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Lisbon 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Lisbon 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Lisbon 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Lisbon 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Lisbon 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 518: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lisbon 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Lisbon 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Lisbon 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Lisbon 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Lisbon 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Lisbon 25.30 + a$36.48Group 12: Wellpoint operator.

New London Lisbon 25.30 + a$35.86Group 13: Compressor battery operator.

New London Lisbon 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Lisbon 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Lisbon 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Lisbon 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Lisbon 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Lisbon ------PAINTERS (Including Drywall Finishing)------

New London Lisbon 22.55$35.6210a) Brush and Roller

New London Lisbon 22.55$36.3710b) Taping Only/Drywall Finishing

New London Lisbon 22.55$36.1210c) Paperhanger and Red Label

New London Lisbon 22.55$38.6210e) Blast and Spray

New London Lisbon 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Lisbon 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 519: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lisbon 21.35$38.4013) Roofer (composition)

New London Lisbon 21.35$38.9014) Roofer (slate & tile)

New London Lisbon 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Lisbon 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Lisbon ------TRUCK DRIVERS------

New London Lisbon 25.79 + a$29.8617a) 2 Axle

New London Lisbon 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Lisbon 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Lisbon 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Lisbon 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Lisbon 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Lisbon 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Lisbon 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Lisbon 7.34$25.7619) Theatrical Stage Journeyman

New London Lyme 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Lyme 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Lyme 26.01$38.342) Boilermaker

New London Lyme 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 520: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lyme 25.87$34.903b) Tile Setter

New London Lyme 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Lyme 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Lyme 32.06$33.483e) Plasterer

New London Lyme ------LABORERS------

New London Lyme 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Lyme 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Lyme 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Lyme 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Lyme 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Lyme 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Lyme 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Lyme 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Lyme 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Lyme 22.15$18.004i) Group 10: Traffic Control Signalman

New London Lyme 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Lyme 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 521: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lyme 29.91+3% of gross

wage$39.006) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Lyme 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Lyme -----LINE CONSTRUCTION----

New London Lyme 6.5% + 9.00$26.50Groundman

New London Lyme 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Lyme 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Lyme 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Lyme ----OPERATORS----

New London Lyme 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Lyme 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Lyme 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Lyme 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Lyme 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Lyme 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Lyme 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 522: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lyme 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Lyme 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Lyme 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Lyme 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Lyme 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Lyme 25.30 + a$36.48Group 12: Wellpoint operator.

New London Lyme 25.30 + a$35.86Group 13: Compressor battery operator.

New London Lyme 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Lyme 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Lyme 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Lyme 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Lyme 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Lyme ------PAINTERS (Including Drywall Finishing)------

New London Lyme 22.55$35.6210a) Brush and Roller

New London Lyme 22.55$36.3710b) Taping Only/Drywall Finishing

New London Lyme 22.55$36.1210c) Paperhanger and Red Label

New London Lyme 22.55$38.6210e) Blast and Spray

New London Lyme 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Lyme 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 523: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Lyme 21.35$38.4013) Roofer (composition)

New London Lyme 21.35$38.9014) Roofer (slate & tile)

New London Lyme 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Lyme 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Lyme ------TRUCK DRIVERS------

New London Lyme 25.79 + a$29.8617a) 2 Axle

New London Lyme 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Lyme 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Lyme 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Lyme 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Lyme 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Lyme 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Lyme 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Lyme 7.34$25.7619) Theatrical Stage Journeyman

New London Montville 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Montville 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Montville 26.01$38.342) Boilermaker

New London Montville 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 524: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Montville 25.87$34.903b) Tile Setter

New London Montville 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London Montville 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Montville 32.06$33.483e) Plasterer

New London Montville ------LABORERS------

New London Montville 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Montville 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Montville 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Montville 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Montville 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Montville 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Montville 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Montville 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Montville 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Montville 22.15$18.004i) Group 10: Traffic Control Signalman

New London Montville 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Montville 26.19$34.945a) Millwrights

As of: July 1, 2020

Page 525: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Montville 29.17+3% of gross

wage$40.256) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)New London Montville 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London Montville -----LINE CONSTRUCTION----

New London Montville 6.5% + 9.00$26.50Groundman

New London Montville 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Montville 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Montville 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Montville ----OPERATORS----

New London Montville 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Montville 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Montville 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Montville 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Montville 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Montville 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Montville 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

As of: July 1, 2020

Page 526: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Montville 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeer

concrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Montville 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London Montville 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Montville 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Montville 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Montville 25.30 + a$36.48Group 12: Wellpoint operator.

New London Montville 25.30 + a$35.86Group 13: Compressor battery operator.

New London Montville 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Montville 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Montville 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Montville 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Montville 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Montville ------PAINTERS (Including Drywall Finishing)------

New London Montville 22.55$35.6210a) Brush and Roller

New London Montville 22.55$36.3710b) Taping Only/Drywall Finishing

New London Montville 22.55$36.1210c) Paperhanger and Red Label

New London Montville 22.55$38.6210e) Blast and Spray

New London Montville 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Montville 24.05 + a$37.2612) Well Digger, Pile Testing Machine

As of: July 1, 2020

Page 527: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Montville 21.35$38.4013) Roofer (composition)

New London Montville 21.35$38.9014) Roofer (slate & tile)

New London Montville 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

New London Montville 32.95$44.6316) Pipefitter (Including HVAC work) (TradeLicense required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Montville ------TRUCK DRIVERS------

New London Montville 25.79 + a$29.8617a) 2 Axle

New London Montville 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Montville 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Montville 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Montville 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Montville 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Montville 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Montville 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Montville 7.34$25.7619) Theatrical Stage Journeyman

New London New London 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London New London 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London New London 26.01$38.342) Boilermaker

New London New London 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

As of: July 1, 2020

Page 528: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London New London 25.87$34.903b) Tile Setter

New London New London 22.35$31.693c) Terrazzo Mechanics and Marble Setters

New London New London 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London New London 32.06$33.483e) Plasterer

New London New London 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London New London 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London New London 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London New London 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London New London 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London New London 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London New London 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London New London 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London New London 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London New London 22.15$18.004i) Group 10: Traffic Control Signalman

New London New London 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London New London 26.19$34.945a) Millwrights

New London New London 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

As of: July 1, 2020

Page 529: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London New London 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

New London New London -----LINE CONSTRUCTION----

New London New London 6.5% + 9.00$26.50Groundman

New London New London 6.5% + 22.00$48.19Linemen/Cable Splicer

New London New London 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London New London 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London New London ----OPERATORS----

New London New London 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London New London 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London New London 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London New London 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London New London 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London New London 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London New London 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London New London 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

As of: July 1, 2020

Page 530: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London New London 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;

power stone spreader; welding; work boat under 26 ft.; transfer machine.

New London New London 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London New London 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London New London 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London New London 25.30 + a$36.48Group 12: Wellpoint operator.

New London New London 25.30 + a$35.86Group 13: Compressor battery operator.

New London New London 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London New London 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London New London 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London New London 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London New London 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London New London 22.55$35.6210a) Brush and Roller

New London New London 22.55$36.3710b) Taping Only/Drywall Finishing

New London New London 22.55$36.1210c) Paperhanger and Red Label

New London New London 22.55$38.6210e) Blast and Spray

New London New London 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London New London 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London New London 21.35$38.4013) Roofer (composition)

New London New London 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 531: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London New London 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London New London 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London New London ------TRUCK DRIVERS------

New London New London 25.79 + a$29.8617a) 2 Axle

New London New London 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London New London 25.79 + a$30.0317c) 3 Axle Ready Mix

New London New London 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London New London 25.79 + a$30.1317e) 4 Axle Ready Mix

New London New London 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London New London 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London New London 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London New London 7.34$25.7619) Theatrical Stage Journeyman

New London North Stonington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London North Stonington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London North Stonington 26.01$38.342) Boilermaker

New London North Stonington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London North Stonington 25.87$34.903b) Tile Setter

New London North Stonington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 532: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London North Stonington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London North Stonington 32.06$33.483e) Plasterer

New London North Stonington ------LABORERS------

New London North Stonington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London North Stonington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London North Stonington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London North Stonington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London North Stonington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London North Stonington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London North Stonington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London North Stonington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London North Stonington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London North Stonington 22.15$18.004i) Group 10: Traffic Control Signalman

New London North Stonington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London North Stonington 26.19$34.945a) Millwrights

New London North Stonington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London North Stonington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 533: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London North Stonington -----LINE CONSTRUCTION----

New London North Stonington 6.5% + 9.00$26.50Groundman

New London North Stonington 6.5% + 22.00$48.19Linemen/Cable Splicer

New London North Stonington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London North Stonington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London North Stonington ----OPERATORS----

New London North Stonington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London North Stonington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London North Stonington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London North Stonington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London North Stonington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London North Stonington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London North Stonington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London North Stonington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London North Stonington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 534: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London North Stonington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London North Stonington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London North Stonington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London North Stonington 25.30 + a$36.48Group 12: Wellpoint operator.

New London North Stonington 25.30 + a$35.86Group 13: Compressor battery operator.

New London North Stonington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London North Stonington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London North Stonington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London North Stonington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London North Stonington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London North Stonington ------PAINTERS (Including Drywall Finishing)------

New London North Stonington 22.55$35.6210a) Brush and Roller

New London North Stonington 22.55$36.3710b) Taping Only/Drywall Finishing

New London North Stonington 22.55$36.1210c) Paperhanger and Red Label

New London North Stonington 22.55$38.6210e) Blast and Spray

New London North Stonington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London North Stonington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London North Stonington 21.35$38.4013) Roofer (composition)

New London North Stonington 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 535: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London North Stonington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London North Stonington 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London North Stonington ------TRUCK DRIVERS------

New London North Stonington 25.79 + a$29.8617a) 2 Axle

New London North Stonington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London North Stonington 25.79 + a$30.0317c) 3 Axle Ready Mix

New London North Stonington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London North Stonington 25.79 + a$30.1317e) 4 Axle Ready Mix

New London North Stonington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London North Stonington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London North Stonington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London North Stonington 7.34$25.7619) Theatrical Stage Journeyman

New London Norwich 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Norwich 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Norwich 26.01$38.342) Boilermaker

New London Norwich 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Norwich 25.87$34.903b) Tile Setter

New London Norwich 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 536: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Norwich 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Norwich 32.06$33.483e) Plasterer

New London Norwich ------LABORERS------

New London Norwich 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Norwich 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Norwich 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Norwich 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Norwich 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Norwich 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Norwich 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Norwich 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Norwich 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Norwich 22.15$18.004i) Group 10: Traffic Control Signalman

New London Norwich 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Norwich 26.19$34.945a) Millwrights

New London Norwich 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Norwich 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 537: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Norwich -----LINE CONSTRUCTION----

New London Norwich 6.5% + 9.00$26.50Groundman

New London Norwich 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Norwich 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Norwich 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Norwich ----OPERATORS----

New London Norwich 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Norwich 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Norwich 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Norwich 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Norwich 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Norwich 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Norwich 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Norwich 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Norwich 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 538: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Norwich 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Norwich 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Norwich 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Norwich 25.30 + a$36.48Group 12: Wellpoint operator.

New London Norwich 25.30 + a$35.86Group 13: Compressor battery operator.

New London Norwich 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Norwich 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Norwich 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Norwich 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Norwich 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Norwich ------PAINTERS (Including Drywall Finishing)------

New London Norwich 22.55$35.6210a) Brush and Roller

New London Norwich 22.55$36.3710b) Taping Only/Drywall Finishing

New London Norwich 22.55$36.1210c) Paperhanger and Red Label

New London Norwich 22.55$38.6210e) Blast and Spray

New London Norwich 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Norwich 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Norwich 21.35$38.4013) Roofer (composition)

New London Norwich 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 539: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Norwich 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Norwich 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Norwich ------TRUCK DRIVERS------

New London Norwich 25.79 + a$29.8617a) 2 Axle

New London Norwich 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Norwich 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Norwich 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Norwich 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Norwich 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Norwich 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Norwich 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Norwich 7.34$25.7619) Theatrical Stage Journeyman

New London Old Lyme 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Old Lyme 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Old Lyme 26.01$38.342) Boilermaker

New London Old Lyme 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Old Lyme 25.87$34.903b) Tile Setter

New London Old Lyme 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 540: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Old Lyme 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Old Lyme 32.06$33.483e) Plasterer

New London Old Lyme ------LABORERS------

New London Old Lyme 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Old Lyme 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Old Lyme 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Old Lyme 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Old Lyme 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Old Lyme 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Old Lyme 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Old Lyme 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Old Lyme 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Old Lyme 22.15$18.004i) Group 10: Traffic Control Signalman

New London Old Lyme 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Old Lyme 26.19$34.945a) Millwrights

New London Old Lyme 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Old Lyme 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 541: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Old Lyme -----LINE CONSTRUCTION----

New London Old Lyme 6.5% + 9.00$26.50Groundman

New London Old Lyme 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Old Lyme 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Old Lyme 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Old Lyme ----OPERATORS----

New London Old Lyme 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Old Lyme 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Old Lyme 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Old Lyme 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Old Lyme 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Old Lyme 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Old Lyme 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Old Lyme 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Old Lyme 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 542: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Old Lyme 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Old Lyme 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Old Lyme 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Old Lyme 25.30 + a$36.48Group 12: Wellpoint operator.

New London Old Lyme 25.30 + a$35.86Group 13: Compressor battery operator.

New London Old Lyme 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Old Lyme 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Old Lyme 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Old Lyme 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Old Lyme 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Old Lyme ------PAINTERS (Including Drywall Finishing)------

New London Old Lyme 22.55$35.6210a) Brush and Roller

New London Old Lyme 22.55$36.3710b) Taping Only/Drywall Finishing

New London Old Lyme 22.55$36.1210c) Paperhanger and Red Label

New London Old Lyme 22.55$38.6210e) Blast and Spray

New London Old Lyme 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Old Lyme 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Old Lyme 21.35$38.4013) Roofer (composition)

New London Old Lyme 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 543: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Old Lyme 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Old Lyme 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Old Lyme ------TRUCK DRIVERS------

New London Old Lyme 25.79 + a$29.8617a) 2 Axle

New London Old Lyme 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Old Lyme 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Old Lyme 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Old Lyme 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Old Lyme 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Old Lyme 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Old Lyme 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Old Lyme 7.34$25.7619) Theatrical Stage Journeyman

New London Preston 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Preston 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Preston 26.01$38.342) Boilermaker

New London Preston 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Preston 25.87$34.903b) Tile Setter

New London Preston 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 544: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Preston 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Preston 32.06$33.483e) Plasterer

New London Preston ------LABORERS------

New London Preston 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Preston 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Preston 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Preston 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Preston 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Preston 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Preston 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Preston 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Preston 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Preston 22.15$18.004i) Group 10: Traffic Control Signalman

New London Preston 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Preston 26.19$34.945a) Millwrights

New London Preston 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Preston 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 545: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Preston -----LINE CONSTRUCTION----

New London Preston 6.5% + 9.00$26.50Groundman

New London Preston 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Preston 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Preston 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Preston ----OPERATORS----

New London Preston 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Preston 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Preston 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Preston 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Preston 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Preston 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Preston 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Preston 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Preston 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 546: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Preston 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Preston 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Preston 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Preston 25.30 + a$36.48Group 12: Wellpoint operator.

New London Preston 25.30 + a$35.86Group 13: Compressor battery operator.

New London Preston 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Preston 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Preston 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Preston 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Preston 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Preston ------PAINTERS (Including Drywall Finishing)------

New London Preston 22.55$35.6210a) Brush and Roller

New London Preston 22.55$36.3710b) Taping Only/Drywall Finishing

New London Preston 22.55$36.1210c) Paperhanger and Red Label

New London Preston 22.55$38.6210e) Blast and Spray

New London Preston 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Preston 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Preston 21.35$38.4013) Roofer (composition)

New London Preston 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 547: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Preston 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Preston 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Preston ------TRUCK DRIVERS------

New London Preston 25.79 + a$29.8617a) 2 Axle

New London Preston 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Preston 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Preston 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Preston 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Preston 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Preston 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Preston 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Preston 7.34$25.7619) Theatrical Stage Journeyman

New London Salem 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Salem 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Salem 26.01$38.342) Boilermaker

New London Salem 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Salem 25.87$34.903b) Tile Setter

New London Salem 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 548: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Salem 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Salem 32.06$33.483e) Plasterer

New London Salem ------LABORERS------

New London Salem 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Salem 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Salem 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Salem 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Salem 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Salem 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Salem 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Salem 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Salem 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Salem 22.15$18.004i) Group 10: Traffic Control Signalman

New London Salem 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Salem 26.19$34.945a) Millwrights

New London Salem 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Salem 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 549: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Salem -----LINE CONSTRUCTION----

New London Salem 6.5% + 9.00$26.50Groundman

New London Salem 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Salem 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Salem 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Salem ----OPERATORS----

New London Salem 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Salem 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Salem 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Salem 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Salem 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Salem 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Salem 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Salem 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Salem 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 550: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Salem 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Salem 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Salem 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Salem 25.30 + a$36.48Group 12: Wellpoint operator.

New London Salem 25.30 + a$35.86Group 13: Compressor battery operator.

New London Salem 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Salem 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Salem 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Salem 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Salem 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Salem ------PAINTERS (Including Drywall Finishing)------

New London Salem 22.55$35.6210a) Brush and Roller

New London Salem 22.55$36.3710b) Taping Only/Drywall Finishing

New London Salem 22.55$36.1210c) Paperhanger and Red Label

New London Salem 22.55$38.6210e) Blast and Spray

New London Salem 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Salem 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Salem 21.35$38.4013) Roofer (composition)

New London Salem 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 551: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Salem 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Salem 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Salem ------TRUCK DRIVERS------

New London Salem 25.79 + a$29.8617a) 2 Axle

New London Salem 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Salem 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Salem 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Salem 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Salem 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Salem 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Salem 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Salem 7.34$25.7619) Theatrical Stage Journeyman

New London Sprague 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Sprague 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Sprague 26.01$38.342) Boilermaker

New London Sprague 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Sprague 25.87$34.903b) Tile Setter

New London Sprague 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 552: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Sprague 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Sprague 32.06$33.483e) Plasterer

New London Sprague ------LABORERS------

New London Sprague 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Sprague 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Sprague 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Sprague 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Sprague 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Sprague 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Sprague 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Sprague 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Sprague 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Sprague 22.15$18.004i) Group 10: Traffic Control Signalman

New London Sprague 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Sprague 26.19$34.945a) Millwrights

New London Sprague 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Sprague 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 553: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Sprague -----LINE CONSTRUCTION----

New London Sprague 6.5% + 9.00$26.50Groundman

New London Sprague 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Sprague 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Sprague 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Sprague ----OPERATORS----

New London Sprague 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Sprague 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Sprague 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Sprague 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Sprague 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Sprague 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Sprague 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Sprague 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Sprague 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 554: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Sprague 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Sprague 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Sprague 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Sprague 25.30 + a$36.48Group 12: Wellpoint operator.

New London Sprague 25.30 + a$35.86Group 13: Compressor battery operator.

New London Sprague 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Sprague 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Sprague 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Sprague 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Sprague 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Sprague ------PAINTERS (Including Drywall Finishing)------

New London Sprague 22.55$35.6210a) Brush and Roller

New London Sprague 22.55$36.3710b) Taping Only/Drywall Finishing

New London Sprague 22.55$36.1210c) Paperhanger and Red Label

New London Sprague 22.55$38.6210e) Blast and Spray

New London Sprague 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Sprague 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Sprague 21.35$38.4013) Roofer (composition)

New London Sprague 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 555: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Sprague 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Sprague 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Sprague ------TRUCK DRIVERS------

New London Sprague 25.79 + a$29.8617a) 2 Axle

New London Sprague 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Sprague 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Sprague 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Sprague 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Sprague 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Sprague 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Sprague 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Sprague 7.34$25.7619) Theatrical Stage Journeyman

New London Stonington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Stonington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Stonington 26.01$38.342) Boilermaker

New London Stonington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Stonington 25.87$34.903b) Tile Setter

New London Stonington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 556: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Stonington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Stonington 32.06$33.483e) Plasterer

New London Stonington ------LABORERS------

New London Stonington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Stonington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Stonington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Stonington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Stonington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Stonington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Stonington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Stonington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Stonington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Stonington 22.15$18.004i) Group 10: Traffic Control Signalman

New London Stonington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Stonington 26.19$34.945a) Millwrights

New London Stonington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Stonington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 557: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Stonington -----LINE CONSTRUCTION----

New London Stonington 6.5% + 9.00$26.50Groundman

New London Stonington 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Stonington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Stonington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Stonington ----OPERATORS----

New London Stonington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Stonington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Stonington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Stonington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Stonington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Stonington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Stonington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Stonington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Stonington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 558: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Stonington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Stonington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Stonington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Stonington 25.30 + a$36.48Group 12: Wellpoint operator.

New London Stonington 25.30 + a$35.86Group 13: Compressor battery operator.

New London Stonington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Stonington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Stonington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Stonington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Stonington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Stonington ------PAINTERS (Including Drywall Finishing)------

New London Stonington 22.55$35.6210a) Brush and Roller

New London Stonington 22.55$36.3710b) Taping Only/Drywall Finishing

New London Stonington 22.55$36.1210c) Paperhanger and Red Label

New London Stonington 22.55$38.6210e) Blast and Spray

New London Stonington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Stonington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Stonington 21.35$38.4013) Roofer (composition)

New London Stonington 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 559: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Stonington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Stonington 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Stonington ------TRUCK DRIVERS------

New London Stonington 25.79 + a$29.8617a) 2 Axle

New London Stonington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Stonington 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Stonington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Stonington 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Stonington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Stonington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Stonington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Stonington 7.34$25.7619) Theatrical Stage Journeyman

New London Voluntown 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Voluntown 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Voluntown 26.01$38.342) Boilermaker

New London Voluntown 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Voluntown 25.87$34.903b) Tile Setter

New London Voluntown 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 560: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Voluntown 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Voluntown 32.06$33.483e) Plasterer

New London Voluntown ------LABORERS------

New London Voluntown 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Voluntown 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Voluntown 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Voluntown 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Voluntown 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Voluntown 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Voluntown 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Voluntown 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Voluntown 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Voluntown 22.15$18.004i) Group 10: Traffic Control Signalman

New London Voluntown 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Voluntown 26.19$34.945a) Millwrights

New London Voluntown 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Voluntown 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 561: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Voluntown -----LINE CONSTRUCTION----

New London Voluntown 6.5% + 9.00$26.50Groundman

New London Voluntown 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Voluntown 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Voluntown 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Voluntown ----OPERATORS----

New London Voluntown 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Voluntown 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Voluntown 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Voluntown 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Voluntown 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Voluntown 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Voluntown 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Voluntown 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Voluntown 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 562: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Voluntown 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Voluntown 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Voluntown 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Voluntown 25.30 + a$36.48Group 12: Wellpoint operator.

New London Voluntown 25.30 + a$35.86Group 13: Compressor battery operator.

New London Voluntown 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Voluntown 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Voluntown 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Voluntown 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Voluntown 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Voluntown ------PAINTERS (Including Drywall Finishing)------

New London Voluntown 22.55$35.6210a) Brush and Roller

New London Voluntown 22.55$36.3710b) Taping Only/Drywall Finishing

New London Voluntown 22.55$36.1210c) Paperhanger and Red Label

New London Voluntown 22.55$38.6210e) Blast and Spray

New London Voluntown 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Voluntown 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Voluntown 21.35$38.4013) Roofer (composition)

New London Voluntown 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 563: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Voluntown 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Voluntown 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Voluntown ------TRUCK DRIVERS------

New London Voluntown 25.79 + a$29.8617a) 2 Axle

New London Voluntown 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Voluntown 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Voluntown 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Voluntown 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Voluntown 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Voluntown 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Voluntown 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Voluntown 7.34$25.7619) Theatrical Stage Journeyman

New London Waterford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

New London Waterford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

New London Waterford 26.01$38.342) Boilermaker

New London Waterford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

New London Waterford 25.87$34.903b) Tile Setter

New London Waterford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 564: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Waterford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

New London Waterford 32.06$33.483e) Plasterer

New London Waterford ------LABORERS------

New London Waterford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

New London Waterford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

New London Waterford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

New London Waterford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

New London Waterford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

New London Waterford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

New London Waterford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

New London Waterford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

New London Waterford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

New London Waterford 22.15$18.004i) Group 10: Traffic Control Signalman

New London Waterford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

New London Waterford 26.19$34.945a) Millwrights

New London Waterford 29.91+3% of grosswage

$39.006) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

New London Waterford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 565: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Waterford -----LINE CONSTRUCTION----

New London Waterford 6.5% + 9.00$26.50Groundman

New London Waterford 6.5% + 22.00$48.19Linemen/Cable Splicer

New London Waterford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

New London Waterford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

New London Waterford ----OPERATORS----

New London Waterford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

New London Waterford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

New London Waterford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

New London Waterford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

New London Waterford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

New London Waterford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

New London Waterford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

New London Waterford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

New London Waterford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 566: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

New London Waterford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

New London Waterford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

New London Waterford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

New London Waterford 25.30 + a$36.48Group 12: Wellpoint operator.

New London Waterford 25.30 + a$35.86Group 13: Compressor battery operator.

New London Waterford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

New London Waterford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

New London Waterford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

New London Waterford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

New London Waterford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

New London Waterford ------PAINTERS (Including Drywall Finishing)------

New London Waterford 22.55$35.6210a) Brush and Roller

New London Waterford 22.55$36.3710b) Taping Only/Drywall Finishing

New London Waterford 22.55$36.1210c) Paperhanger and Red Label

New London Waterford 22.55$38.6210e) Blast and Spray

New London Waterford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

New London Waterford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

New London Waterford 21.35$38.4013) Roofer (composition)

New London Waterford 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 567: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationNew London Waterford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)New London Waterford 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

New London Waterford ------TRUCK DRIVERS------

New London Waterford 25.79 + a$29.8617a) 2 Axle

New London Waterford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

New London Waterford 25.79 + a$30.0317c) 3 Axle Ready Mix

New London Waterford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

New London Waterford 25.79 + a$30.1317e) 4 Axle Ready Mix

New London Waterford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

New London Waterford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

New London Waterford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

New London Waterford 7.34$25.7619) Theatrical Stage Journeyman

Tolland Andover 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Andover 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Andover 26.01$38.342) Boilermaker

Tolland Andover 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Andover 25.87$34.903b) Tile Setter

Tolland Andover 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 568: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Andover 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Andover 32.06$33.483e) Plasterer

Tolland Andover ------LABORERS------

Tolland Andover 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Andover 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Andover 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Andover 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Andover 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Andover 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Andover 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Andover 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Andover 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Andover 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Andover 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Andover 26.19$34.945a) Millwrights

Tolland Andover 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Andover 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 569: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Andover -----LINE CONSTRUCTION----

Tolland Andover 6.5% + 9.00$26.50Groundman

Tolland Andover 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Andover 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Andover 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Andover ----OPERATORS----

Tolland Andover 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Andover 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Andover 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Andover 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Andover 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Andover 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Andover 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Andover 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Andover 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 570: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Andover 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Andover 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Andover 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Andover 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Andover 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Andover 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Andover 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Andover 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Andover 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Andover 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Andover ------PAINTERS (Including Drywall Finishing)------

Tolland Andover 22.55$35.6210a) Brush and Roller

Tolland Andover 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Andover 22.55$36.1210c) Paperhanger and Red Label

Tolland Andover 22.55$38.6210e) Blast and Spray

Tolland Andover 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Andover 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Andover 21.35$38.4013) Roofer (composition)

Tolland Andover 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 571: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Andover 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Andover 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Andover ------TRUCK DRIVERS------

Tolland Andover 25.79 + a$29.8617a) 2 Axle

Tolland Andover 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Andover 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Andover 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Andover 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Andover 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Andover 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Andover 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Andover 7.34$25.7619) Theatrical Stage Journeyman

Tolland Bolton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Bolton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Bolton 26.01$38.342) Boilermaker

Tolland Bolton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Bolton 25.87$34.903b) Tile Setter

Tolland Bolton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 572: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Bolton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Bolton 32.06$33.483e) Plasterer

Tolland Bolton ------LABORERS------

Tolland Bolton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Bolton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Bolton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Bolton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Bolton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Bolton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Bolton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Bolton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Bolton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Bolton 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Bolton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Bolton 26.19$34.945a) Millwrights

Tolland Bolton 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Bolton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 573: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Bolton -----LINE CONSTRUCTION----

Tolland Bolton 6.5% + 9.00$26.50Groundman

Tolland Bolton 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Bolton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Bolton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Bolton ----OPERATORS----

Tolland Bolton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Bolton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Bolton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Bolton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Bolton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Bolton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Bolton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Bolton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Bolton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 574: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Bolton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Bolton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Bolton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Bolton 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Bolton 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Bolton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Bolton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Bolton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Bolton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Bolton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Bolton ------PAINTERS (Including Drywall Finishing)------

Tolland Bolton 22.55$35.6210a) Brush and Roller

Tolland Bolton 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Bolton 22.55$36.1210c) Paperhanger and Red Label

Tolland Bolton 22.55$38.6210e) Blast and Spray

Tolland Bolton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Bolton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Bolton 21.35$38.4013) Roofer (composition)

Tolland Bolton 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 575: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Bolton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Bolton 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Bolton ------TRUCK DRIVERS------

Tolland Bolton 25.79 + a$29.8617a) 2 Axle

Tolland Bolton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Bolton 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Bolton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Bolton 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Bolton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Bolton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Bolton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Bolton 7.34$25.7619) Theatrical Stage Journeyman

Tolland Columbia 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Columbia 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Columbia 26.01$38.342) Boilermaker

Tolland Columbia 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Columbia 25.87$34.903b) Tile Setter

Tolland Columbia 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 576: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Columbia 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Columbia 32.06$33.483e) Plasterer

Tolland Columbia ------LABORERS------

Tolland Columbia 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Columbia 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Columbia 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Columbia 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Columbia 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Columbia 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Columbia 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Columbia 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Columbia 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Columbia 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Columbia 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Columbia 26.19$34.945a) Millwrights

Tolland Columbia 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Columbia 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 577: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Columbia -----LINE CONSTRUCTION----

Tolland Columbia 6.5% + 9.00$26.50Groundman

Tolland Columbia 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Columbia 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Columbia 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Columbia ----OPERATORS----

Tolland Columbia 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Columbia 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Columbia 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Columbia 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Columbia 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Columbia 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Columbia 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Columbia 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Columbia 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 578: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Columbia 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Columbia 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Columbia 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Columbia 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Columbia 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Columbia 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Columbia 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Columbia 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Columbia 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Columbia 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Columbia ------PAINTERS (Including Drywall Finishing)------

Tolland Columbia 22.55$35.6210a) Brush and Roller

Tolland Columbia 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Columbia 22.55$36.1210c) Paperhanger and Red Label

Tolland Columbia 22.55$38.6210e) Blast and Spray

Tolland Columbia 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Columbia 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Columbia 21.35$38.4013) Roofer (composition)

Tolland Columbia 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 579: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Columbia 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Columbia 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Columbia ------TRUCK DRIVERS------

Tolland Columbia 25.79 + a$29.8617a) 2 Axle

Tolland Columbia 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Columbia 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Columbia 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Columbia 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Columbia 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Columbia 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Columbia 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Columbia 7.34$25.7619) Theatrical Stage Journeyman

Tolland Coventry 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Coventry 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Coventry 26.01$38.342) Boilermaker

Tolland Coventry 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Coventry 25.87$34.903b) Tile Setter

Tolland Coventry 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 580: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Coventry 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Coventry 32.06$33.483e) Plasterer

Tolland Coventry ------LABORERS------

Tolland Coventry 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Coventry 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Coventry 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Coventry 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Coventry 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Coventry 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Coventry 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Coventry 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Coventry 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Coventry 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Coventry 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Coventry 26.19$34.945a) Millwrights

Tolland Coventry 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Coventry 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 581: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Coventry -----LINE CONSTRUCTION----

Tolland Coventry 6.5% + 9.00$26.50Groundman

Tolland Coventry 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Coventry 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Coventry 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Coventry ----OPERATORS----

Tolland Coventry 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Coventry 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Coventry 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Coventry 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Coventry 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Coventry 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Coventry 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Coventry 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Coventry 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 582: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Coventry 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Coventry 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Coventry 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Coventry 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Coventry 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Coventry 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Coventry 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Coventry 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Coventry 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Coventry 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Coventry ------PAINTERS (Including Drywall Finishing)------

Tolland Coventry 22.55$35.6210a) Brush and Roller

Tolland Coventry 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Coventry 22.55$36.1210c) Paperhanger and Red Label

Tolland Coventry 22.55$38.6210e) Blast and Spray

Tolland Coventry 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Coventry 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Coventry 21.35$38.4013) Roofer (composition)

Tolland Coventry 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 583: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Coventry 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Coventry 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Coventry ------TRUCK DRIVERS------

Tolland Coventry 25.79 + a$29.8617a) 2 Axle

Tolland Coventry 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Coventry 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Coventry 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Coventry 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Coventry 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Coventry 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Coventry 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Coventry 7.34$25.7619) Theatrical Stage Journeyman

Tolland Ellington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Ellington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Ellington 26.01$38.342) Boilermaker

Tolland Ellington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Ellington 25.87$34.903b) Tile Setter

Tolland Ellington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 584: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Ellington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Ellington 32.06$33.483e) Plasterer

Tolland Ellington ------LABORERS------

Tolland Ellington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Ellington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Ellington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Ellington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Ellington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Ellington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Ellington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Ellington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Ellington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Ellington 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Ellington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Ellington 26.19$34.945a) Millwrights

Tolland Ellington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Ellington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 585: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Ellington -----LINE CONSTRUCTION----

Tolland Ellington 6.5% + 9.00$26.50Groundman

Tolland Ellington 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Ellington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Ellington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Ellington ----OPERATORS----

Tolland Ellington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Ellington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Ellington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Ellington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Ellington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Ellington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Ellington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Ellington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Ellington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 586: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Ellington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Ellington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Ellington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Ellington 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Ellington 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Ellington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Ellington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Ellington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Ellington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Ellington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Ellington ------PAINTERS (Including Drywall Finishing)------

Tolland Ellington 22.55$35.6210a) Brush and Roller

Tolland Ellington 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Ellington 22.55$36.1210c) Paperhanger and Red Label

Tolland Ellington 22.55$38.6210e) Blast and Spray

Tolland Ellington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Ellington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Ellington 21.35$38.4013) Roofer (composition)

Tolland Ellington 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 587: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Ellington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Ellington 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Ellington ------TRUCK DRIVERS------

Tolland Ellington 25.79 + a$29.8617a) 2 Axle

Tolland Ellington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Ellington 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Ellington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Ellington 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Ellington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Ellington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Ellington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Ellington 7.34$25.7619) Theatrical Stage Journeyman

Tolland Hebron 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Hebron 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Hebron 26.01$38.342) Boilermaker

Tolland Hebron 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Hebron 25.87$34.903b) Tile Setter

Tolland Hebron 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 588: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Hebron 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Hebron 32.06$33.483e) Plasterer

Tolland Hebron ------LABORERS------

Tolland Hebron 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Hebron 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Hebron 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Hebron 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Hebron 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Hebron 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Hebron 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Hebron 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Hebron 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Hebron 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Hebron 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Hebron 26.19$34.945a) Millwrights

Tolland Hebron 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Hebron 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 589: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Hebron -----LINE CONSTRUCTION----

Tolland Hebron 6.5% + 9.00$26.50Groundman

Tolland Hebron 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Hebron 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Hebron 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Hebron ----OPERATORS----

Tolland Hebron 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Hebron 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Hebron 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Hebron 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Hebron 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Hebron 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Hebron 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Hebron 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Hebron 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 590: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Hebron 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Hebron 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Hebron 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Hebron 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Hebron 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Hebron 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Hebron 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Hebron 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Hebron 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Hebron 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Hebron ------PAINTERS (Including Drywall Finishing)------

Tolland Hebron 22.55$35.6210a) Brush and Roller

Tolland Hebron 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Hebron 22.55$36.1210c) Paperhanger and Red Label

Tolland Hebron 22.55$38.6210e) Blast and Spray

Tolland Hebron 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Hebron 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Hebron 21.35$38.4013) Roofer (composition)

Tolland Hebron 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 591: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Hebron 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Hebron 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Hebron ------TRUCK DRIVERS------

Tolland Hebron 25.79 + a$29.8617a) 2 Axle

Tolland Hebron 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Hebron 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Hebron 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Hebron 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Hebron 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Hebron 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Hebron 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Hebron 7.34$25.7619) Theatrical Stage Journeyman

Tolland Mansfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Mansfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Mansfield 26.01$38.342) Boilermaker

Tolland Mansfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Mansfield 25.87$34.903b) Tile Setter

Tolland Mansfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 592: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Mansfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Mansfield 32.06$33.483e) Plasterer

Tolland Mansfield ------LABORERS------

Tolland Mansfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Mansfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Mansfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Mansfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Mansfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Mansfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Mansfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Mansfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Mansfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Mansfield 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Mansfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Mansfield 26.19$34.945a) Millwrights

Tolland Mansfield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Mansfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 593: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Mansfield -----LINE CONSTRUCTION----

Tolland Mansfield 6.5% + 9.00$26.50Groundman

Tolland Mansfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Mansfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Mansfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Mansfield ----OPERATORS----

Tolland Mansfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Mansfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Mansfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Mansfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Mansfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Mansfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Mansfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Mansfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Mansfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 594: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Mansfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Mansfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Mansfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Mansfield 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Mansfield 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Mansfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Mansfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Mansfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Mansfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Mansfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Mansfield ------PAINTERS (Including Drywall Finishing)------

Tolland Mansfield 22.55$35.6210a) Brush and Roller

Tolland Mansfield 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Mansfield 22.55$36.1210c) Paperhanger and Red Label

Tolland Mansfield 22.55$38.6210e) Blast and Spray

Tolland Mansfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Mansfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Mansfield 21.35$38.4013) Roofer (composition)

Tolland Mansfield 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 595: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Mansfield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Mansfield 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Mansfield ------TRUCK DRIVERS------

Tolland Mansfield 25.79 + a$29.8617a) 2 Axle

Tolland Mansfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Mansfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Mansfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Mansfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Mansfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Mansfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Mansfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Mansfield 7.34$25.7619) Theatrical Stage Journeyman

Tolland Somers 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Somers 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Somers 26.01$38.342) Boilermaker

Tolland Somers 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Somers 25.87$34.903b) Tile Setter

Tolland Somers 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 596: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Somers 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Somers 32.06$33.483e) Plasterer

Tolland Somers ------LABORERS------

Tolland Somers 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Somers 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Somers 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Somers 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Somers 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Somers 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Somers 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Somers 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Somers 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Somers 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Somers 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Somers 26.19$34.945a) Millwrights

Tolland Somers 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Somers 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 597: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Somers -----LINE CONSTRUCTION----

Tolland Somers 6.5% + 9.00$26.50Groundman

Tolland Somers 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Somers 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Somers 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Somers ----OPERATORS----

Tolland Somers 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Somers 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Somers 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Somers 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Somers 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Somers 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Somers 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Somers 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Somers 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 598: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Somers 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Somers 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Somers 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Somers 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Somers 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Somers 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Somers 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Somers 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Somers 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Somers 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Somers ------PAINTERS (Including Drywall Finishing)------

Tolland Somers 22.55$35.6210a) Brush and Roller

Tolland Somers 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Somers 22.55$36.1210c) Paperhanger and Red Label

Tolland Somers 22.55$38.6210e) Blast and Spray

Tolland Somers 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Somers 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Somers 21.35$38.4013) Roofer (composition)

Tolland Somers 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 599: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Somers 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Somers 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Somers ------TRUCK DRIVERS------

Tolland Somers 25.79 + a$29.8617a) 2 Axle

Tolland Somers 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Somers 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Somers 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Somers 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Somers 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Somers 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Somers 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Somers 7.34$25.7619) Theatrical Stage Journeyman

Tolland Stafford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Stafford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Stafford 26.01$38.342) Boilermaker

Tolland Stafford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Stafford 25.87$34.903b) Tile Setter

Tolland Stafford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 600: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Stafford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Stafford 32.06$33.483e) Plasterer

Tolland Stafford ------LABORERS------

Tolland Stafford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Stafford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Stafford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Stafford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Stafford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Stafford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Stafford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Stafford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Stafford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Stafford 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Stafford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Stafford 26.19$34.945a) Millwrights

Tolland Stafford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Stafford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 601: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Stafford -----LINE CONSTRUCTION----

Tolland Stafford 6.5% + 9.00$26.50Groundman

Tolland Stafford 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Stafford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Stafford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Stafford ----OPERATORS----

Tolland Stafford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Stafford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Stafford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Stafford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Stafford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Stafford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Stafford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Stafford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Stafford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 602: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Stafford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Stafford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Stafford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Stafford 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Stafford 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Stafford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Stafford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Stafford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Stafford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Stafford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Stafford ------PAINTERS (Including Drywall Finishing)------

Tolland Stafford 22.55$35.6210a) Brush and Roller

Tolland Stafford 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Stafford 22.55$36.1210c) Paperhanger and Red Label

Tolland Stafford 22.55$38.6210e) Blast and Spray

Tolland Stafford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Stafford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Stafford 21.35$38.4013) Roofer (composition)

Tolland Stafford 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 603: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Stafford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Stafford 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Stafford ------TRUCK DRIVERS------

Tolland Stafford 25.79 + a$29.8617a) 2 Axle

Tolland Stafford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Stafford 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Stafford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Stafford 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Stafford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Stafford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Stafford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Stafford 7.34$25.7619) Theatrical Stage Journeyman

Tolland Tolland 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Tolland 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Tolland 26.01$38.342) Boilermaker

Tolland Tolland 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Tolland 25.87$34.903b) Tile Setter

Tolland Tolland 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 604: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Tolland 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Tolland 32.06$33.483e) Plasterer

Tolland Tolland ------LABORERS------

Tolland Tolland 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Tolland 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Tolland 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Tolland 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Tolland 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Tolland 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Tolland 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Tolland 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Tolland 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Tolland 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Tolland 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Tolland 26.19$34.945a) Millwrights

Tolland Tolland 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Tolland 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 605: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Tolland -----LINE CONSTRUCTION----

Tolland Tolland 6.5% + 9.00$26.50Groundman

Tolland Tolland 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Tolland 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Tolland 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Tolland ----OPERATORS----

Tolland Tolland 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Tolland 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Tolland 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Tolland 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Tolland 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Tolland 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Tolland 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Tolland 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Tolland 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 606: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Tolland 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Tolland 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Tolland 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Tolland 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Tolland 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Tolland 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Tolland 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Tolland 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Tolland 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Tolland 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Tolland ------PAINTERS (Including Drywall Finishing)------

Tolland Tolland 22.55$35.6210a) Brush and Roller

Tolland Tolland 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Tolland 22.55$36.1210c) Paperhanger and Red Label

Tolland Tolland 22.55$38.6210e) Blast and Spray

Tolland Tolland 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Tolland 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Tolland 21.35$38.4013) Roofer (composition)

Tolland Tolland 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 607: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Tolland 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Tolland 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Tolland ------TRUCK DRIVERS------

Tolland Tolland 25.79 + a$29.8617a) 2 Axle

Tolland Tolland 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Tolland 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Tolland 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Tolland 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Tolland 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Tolland 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Tolland 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Tolland 7.34$25.7619) Theatrical Stage Journeyman

Tolland Union 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Union 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Union 26.01$38.342) Boilermaker

Tolland Union 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Union 25.87$34.903b) Tile Setter

Tolland Union 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 608: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Union 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Union 32.06$33.483e) Plasterer

Tolland Union ------LABORERS------

Tolland Union 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Union 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Union 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Union 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Union 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Union 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Union 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Union 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Union 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Union 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Union 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Union 26.19$34.945a) Millwrights

Tolland Union 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Union 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 609: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Union -----LINE CONSTRUCTION----

Tolland Union 6.5% + 9.00$26.50Groundman

Tolland Union 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Union 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Union 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Union ----OPERATORS----

Tolland Union 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Union 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Union 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Union 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Union 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Union 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Union 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Union 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Union 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 610: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Union 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Union 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Union 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Union 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Union 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Union 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Union 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Union 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Union 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Union 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Union ------PAINTERS (Including Drywall Finishing)------

Tolland Union 22.55$35.6210a) Brush and Roller

Tolland Union 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Union 22.55$36.1210c) Paperhanger and Red Label

Tolland Union 22.55$38.6210e) Blast and Spray

Tolland Union 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Union 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Union 21.35$38.4013) Roofer (composition)

Tolland Union 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 611: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Union 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Union 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Union ------TRUCK DRIVERS------

Tolland Union 25.79 + a$29.8617a) 2 Axle

Tolland Union 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Union 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Union 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Union 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Union 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Union 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Union 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Union 7.34$25.7619) Theatrical Stage Journeyman

Tolland Vernon 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Vernon 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Vernon 26.01$38.342) Boilermaker

Tolland Vernon 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Vernon 25.87$34.903b) Tile Setter

Tolland Vernon 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 612: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Vernon 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Vernon 32.06$33.483e) Plasterer

Tolland Vernon ------LABORERS------

Tolland Vernon 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Vernon 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Vernon 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Vernon 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Vernon 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Vernon 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Vernon 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Vernon 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Vernon 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Vernon 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Vernon 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Vernon 26.19$34.945a) Millwrights

Tolland Vernon 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Vernon 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 613: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Vernon -----LINE CONSTRUCTION----

Tolland Vernon 6.5% + 9.00$26.50Groundman

Tolland Vernon 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Vernon 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Vernon 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Vernon ----OPERATORS----

Tolland Vernon 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Vernon 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Vernon 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Vernon 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Vernon 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Vernon 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Vernon 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Vernon 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Vernon 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 614: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Vernon 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Vernon 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Vernon 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Vernon 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Vernon 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Vernon 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Vernon 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Vernon 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Vernon 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Vernon 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Vernon ------PAINTERS (Including Drywall Finishing)------

Tolland Vernon 22.55$35.6210a) Brush and Roller

Tolland Vernon 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Vernon 22.55$36.1210c) Paperhanger and Red Label

Tolland Vernon 22.55$38.6210e) Blast and Spray

Tolland Vernon 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Vernon 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Vernon 21.35$38.4013) Roofer (composition)

Tolland Vernon 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 615: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Vernon 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Vernon 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Vernon ------TRUCK DRIVERS------

Tolland Vernon 25.79 + a$29.8617a) 2 Axle

Tolland Vernon 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Vernon 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Vernon 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Vernon 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Vernon 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Vernon 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Vernon 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Vernon 7.34$25.7619) Theatrical Stage Journeyman

Tolland Willington 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Tolland Willington 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Tolland Willington 26.01$38.342) Boilermaker

Tolland Willington 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Tolland Willington 25.87$34.903b) Tile Setter

Tolland Willington 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 616: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Willington 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Tolland Willington 32.06$33.483e) Plasterer

Tolland Willington ------LABORERS------

Tolland Willington 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Tolland Willington 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Tolland Willington 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Tolland Willington 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Tolland Willington 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Tolland Willington 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Tolland Willington 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Tolland Willington 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Tolland Willington 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Tolland Willington 22.15$18.004i) Group 10: Traffic Control Signalman

Tolland Willington 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Tolland Willington 26.19$34.945a) Millwrights

Tolland Willington 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Tolland Willington 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 617: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Willington -----LINE CONSTRUCTION----

Tolland Willington 6.5% + 9.00$26.50Groundman

Tolland Willington 6.5% + 22.00$48.19Linemen/Cable Splicer

Tolland Willington 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Tolland Willington 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Tolland Willington ----OPERATORS----

Tolland Willington 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Tolland Willington 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Tolland Willington 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Tolland Willington 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Tolland Willington 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Tolland Willington 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Tolland Willington 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Tolland Willington 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Tolland Willington 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 618: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Tolland Willington 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Tolland Willington 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Tolland Willington 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Tolland Willington 25.30 + a$36.48Group 12: Wellpoint operator.

Tolland Willington 25.30 + a$35.86Group 13: Compressor battery operator.

Tolland Willington 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Tolland Willington 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Tolland Willington 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Tolland Willington 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Tolland Willington 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Tolland Willington ------PAINTERS (Including Drywall Finishing)------

Tolland Willington 22.55$35.6210a) Brush and Roller

Tolland Willington 22.55$36.3710b) Taping Only/Drywall Finishing

Tolland Willington 22.55$36.1210c) Paperhanger and Red Label

Tolland Willington 22.55$38.6210e) Blast and Spray

Tolland Willington 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Tolland Willington 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Tolland Willington 21.35$38.4013) Roofer (composition)

Tolland Willington 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 619: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationTolland Willington 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Tolland Willington 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Tolland Willington ------TRUCK DRIVERS------

Tolland Willington 25.79 + a$29.8617a) 2 Axle

Tolland Willington 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Tolland Willington 25.79 + a$30.0317c) 3 Axle Ready Mix

Tolland Willington 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Tolland Willington 25.79 + a$30.1317e) 4 Axle Ready Mix

Tolland Willington 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Tolland Willington 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Tolland Willington 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Tolland Willington 7.34$25.7619) Theatrical Stage Journeyman

Windham Ashford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Ashford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Ashford 26.01$38.342) Boilermaker

Windham Ashford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Ashford 25.87$34.903b) Tile Setter

Windham Ashford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 620: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Ashford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Ashford 32.06$33.483e) Plasterer

Windham Ashford ------LABORERS------

Windham Ashford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Ashford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Ashford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Ashford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Ashford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Ashford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Ashford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Ashford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Ashford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Ashford 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Ashford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Ashford 26.19$34.945a) Millwrights

Windham Ashford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Ashford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 621: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Ashford -----LINE CONSTRUCTION----

Windham Ashford 6.5% + 9.00$26.50Groundman

Windham Ashford 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Ashford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Ashford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Ashford ----OPERATORS----

Windham Ashford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Ashford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Ashford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Ashford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Ashford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Ashford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Ashford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Ashford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Ashford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 622: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Ashford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Ashford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Ashford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Ashford 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Ashford 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Ashford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Ashford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Ashford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Ashford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Ashford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Ashford ------PAINTERS (Including Drywall Finishing)------

Windham Ashford 22.55$35.6210a) Brush and Roller

Windham Ashford 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Ashford 22.55$36.1210c) Paperhanger and Red Label

Windham Ashford 22.55$38.6210e) Blast and Spray

Windham Ashford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Ashford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Ashford 21.35$38.4013) Roofer (composition)

Windham Ashford 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 623: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Ashford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Ashford 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Ashford ------TRUCK DRIVERS------

Windham Ashford 25.79 + a$29.8617a) 2 Axle

Windham Ashford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Ashford 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Ashford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Ashford 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Ashford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Ashford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Ashford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Ashford 7.34$25.7619) Theatrical Stage Journeyman

Windham Brooklyn 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Brooklyn 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Brooklyn 26.01$38.342) Boilermaker

Windham Brooklyn 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Brooklyn 25.87$34.903b) Tile Setter

Windham Brooklyn 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 624: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Brooklyn 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Brooklyn 32.06$33.483e) Plasterer

Windham Brooklyn ------LABORERS------

Windham Brooklyn 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Brooklyn 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Brooklyn 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Brooklyn 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Brooklyn 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Brooklyn 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Brooklyn 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Brooklyn 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Brooklyn 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Brooklyn 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Brooklyn 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Brooklyn 26.19$34.945a) Millwrights

Windham Brooklyn 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Brooklyn 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 625: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Brooklyn -----LINE CONSTRUCTION----

Windham Brooklyn 6.5% + 9.00$26.50Groundman

Windham Brooklyn 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Brooklyn 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Brooklyn 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Brooklyn ----OPERATORS----

Windham Brooklyn 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Brooklyn 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Brooklyn 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Brooklyn 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Brooklyn 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Brooklyn 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Brooklyn 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Brooklyn 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Brooklyn 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 626: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Brooklyn 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Brooklyn 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Brooklyn 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Brooklyn 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Brooklyn 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Brooklyn 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Brooklyn 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Brooklyn 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Brooklyn 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Brooklyn 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Brooklyn ------PAINTERS (Including Drywall Finishing)------

Windham Brooklyn 22.55$35.6210a) Brush and Roller

Windham Brooklyn 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Brooklyn 22.55$36.1210c) Paperhanger and Red Label

Windham Brooklyn 22.55$38.6210e) Blast and Spray

Windham Brooklyn 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Brooklyn 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Brooklyn 21.35$38.4013) Roofer (composition)

Windham Brooklyn 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 627: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Brooklyn 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Brooklyn 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Brooklyn ------TRUCK DRIVERS------

Windham Brooklyn 25.79 + a$29.8617a) 2 Axle

Windham Brooklyn 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Brooklyn 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Brooklyn 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Brooklyn 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Brooklyn 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Brooklyn 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Brooklyn 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Brooklyn 7.34$25.7619) Theatrical Stage Journeyman

Windham Canterbury 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Canterbury 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Canterbury 26.01$38.342) Boilermaker

Windham Canterbury 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Canterbury 25.87$34.903b) Tile Setter

Windham Canterbury 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 628: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Canterbury 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Canterbury 32.06$33.483e) Plasterer

Windham Canterbury ------LABORERS------

Windham Canterbury 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Canterbury 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Canterbury 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Canterbury 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Canterbury 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Canterbury 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Canterbury 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Canterbury 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Canterbury 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Canterbury 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Canterbury 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Canterbury 26.19$34.945a) Millwrights

Windham Canterbury 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Canterbury 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 629: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Canterbury -----LINE CONSTRUCTION----

Windham Canterbury 6.5% + 9.00$26.50Groundman

Windham Canterbury 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Canterbury 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Canterbury 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Canterbury ----OPERATORS----

Windham Canterbury 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Canterbury 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Canterbury 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Canterbury 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Canterbury 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Canterbury 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Canterbury 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Canterbury 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Canterbury 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 630: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Canterbury 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Canterbury 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Canterbury 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Canterbury 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Canterbury 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Canterbury 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Canterbury 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Canterbury 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Canterbury 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Canterbury 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Canterbury ------PAINTERS (Including Drywall Finishing)------

Windham Canterbury 22.55$35.6210a) Brush and Roller

Windham Canterbury 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Canterbury 22.55$36.1210c) Paperhanger and Red Label

Windham Canterbury 22.55$38.6210e) Blast and Spray

Windham Canterbury 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Canterbury 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Canterbury 21.35$38.4013) Roofer (composition)

Windham Canterbury 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 631: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Canterbury 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Canterbury 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Canterbury ------TRUCK DRIVERS------

Windham Canterbury 25.79 + a$29.8617a) 2 Axle

Windham Canterbury 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Canterbury 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Canterbury 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Canterbury 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Canterbury 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Canterbury 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Canterbury 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Canterbury 7.34$25.7619) Theatrical Stage Journeyman

Windham Chaplin 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Chaplin 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Chaplin 26.01$38.342) Boilermaker

Windham Chaplin 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Chaplin 25.87$34.903b) Tile Setter

Windham Chaplin 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 632: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Chaplin 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Chaplin 32.06$33.483e) Plasterer

Windham Chaplin ------LABORERS------

Windham Chaplin 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Chaplin 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Chaplin 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Chaplin 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Chaplin 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Chaplin 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Chaplin 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Chaplin 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Chaplin 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Chaplin 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Chaplin 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Chaplin 26.19$34.945a) Millwrights

Windham Chaplin 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Chaplin 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 633: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Chaplin -----LINE CONSTRUCTION----

Windham Chaplin 6.5% + 9.00$26.50Groundman

Windham Chaplin 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Chaplin 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Chaplin 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Chaplin ----OPERATORS----

Windham Chaplin 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Chaplin 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Chaplin 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Chaplin 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Chaplin 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Chaplin 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Chaplin 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Chaplin 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Chaplin 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 634: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Chaplin 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Chaplin 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Chaplin 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Chaplin 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Chaplin 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Chaplin 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Chaplin 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Chaplin 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Chaplin 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Chaplin 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Chaplin ------PAINTERS (Including Drywall Finishing)------

Windham Chaplin 22.55$35.6210a) Brush and Roller

Windham Chaplin 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Chaplin 22.55$36.1210c) Paperhanger and Red Label

Windham Chaplin 22.55$38.6210e) Blast and Spray

Windham Chaplin 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Chaplin 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Chaplin 21.35$38.4013) Roofer (composition)

Windham Chaplin 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 635: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Chaplin 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Chaplin 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Chaplin ------TRUCK DRIVERS------

Windham Chaplin 25.79 + a$29.8617a) 2 Axle

Windham Chaplin 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Chaplin 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Chaplin 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Chaplin 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Chaplin 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Chaplin 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Chaplin 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Chaplin 7.34$25.7619) Theatrical Stage Journeyman

Windham Eastford 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Eastford 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Eastford 26.01$38.342) Boilermaker

Windham Eastford 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Eastford 25.87$34.903b) Tile Setter

Windham Eastford 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 636: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Eastford 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Eastford 32.06$33.483e) Plasterer

Windham Eastford ------LABORERS------

Windham Eastford 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Eastford 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Eastford 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Eastford 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Eastford 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Eastford 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Eastford 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Eastford 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Eastford 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Eastford 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Eastford 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Eastford 26.19$34.945a) Millwrights

Windham Eastford 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Eastford 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 637: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Eastford -----LINE CONSTRUCTION----

Windham Eastford 6.5% + 9.00$26.50Groundman

Windham Eastford 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Eastford 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Eastford 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Eastford ----OPERATORS----

Windham Eastford 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Eastford 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Eastford 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Eastford 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Eastford 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Eastford 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Eastford 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Eastford 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Eastford 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 638: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Eastford 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Eastford 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Eastford 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Eastford 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Eastford 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Eastford 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Eastford 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Eastford 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Eastford 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Eastford 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Eastford ------PAINTERS (Including Drywall Finishing)------

Windham Eastford 22.55$35.6210a) Brush and Roller

Windham Eastford 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Eastford 22.55$36.1210c) Paperhanger and Red Label

Windham Eastford 22.55$38.6210e) Blast and Spray

Windham Eastford 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Eastford 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Eastford 21.35$38.4013) Roofer (composition)

Windham Eastford 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 639: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Eastford 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Eastford 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Eastford ------TRUCK DRIVERS------

Windham Eastford 25.79 + a$29.8617a) 2 Axle

Windham Eastford 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Eastford 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Eastford 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Eastford 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Eastford 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Eastford 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Eastford 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Eastford 7.34$25.7619) Theatrical Stage Journeyman

Windham Hampton 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Hampton 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Hampton 26.01$38.342) Boilermaker

Windham Hampton 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Hampton 25.87$34.903b) Tile Setter

Windham Hampton 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 640: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Hampton 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Hampton 32.06$33.483e) Plasterer

Windham Hampton ------LABORERS------

Windham Hampton 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Hampton 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Hampton 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Hampton 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Hampton 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Hampton 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Hampton 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Hampton 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Hampton 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Hampton 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Hampton 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Hampton 26.19$34.945a) Millwrights

Windham Hampton 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Hampton 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 641: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Hampton -----LINE CONSTRUCTION----

Windham Hampton 6.5% + 9.00$26.50Groundman

Windham Hampton 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Hampton 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Hampton 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Hampton ----OPERATORS----

Windham Hampton 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Hampton 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Hampton 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Hampton 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Hampton 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Hampton 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Hampton 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Hampton 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Hampton 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 642: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Hampton 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Hampton 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Hampton 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Hampton 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Hampton 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Hampton 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Hampton 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Hampton 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Hampton 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Hampton 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Hampton ------PAINTERS (Including Drywall Finishing)------

Windham Hampton 22.55$35.6210a) Brush and Roller

Windham Hampton 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Hampton 22.55$36.1210c) Paperhanger and Red Label

Windham Hampton 22.55$38.6210e) Blast and Spray

Windham Hampton 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Hampton 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Hampton 21.35$38.4013) Roofer (composition)

Windham Hampton 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 643: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Hampton 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Hampton 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Hampton ------TRUCK DRIVERS------

Windham Hampton 25.79 + a$29.8617a) 2 Axle

Windham Hampton 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Hampton 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Hampton 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Hampton 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Hampton 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Hampton 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Hampton 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Hampton 7.34$25.7619) Theatrical Stage Journeyman

Windham Killingly 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Killingly 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Killingly 26.01$38.342) Boilermaker

Windham Killingly 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Killingly 25.87$34.903b) Tile Setter

Windham Killingly 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 644: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Killingly 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Killingly 32.06$33.483e) Plasterer

Windham Killingly ------LABORERS------

Windham Killingly 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Killingly 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Killingly 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Killingly 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Killingly 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Killingly 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Killingly 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Killingly 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Killingly 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Killingly 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Killingly 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Killingly 26.19$34.945a) Millwrights

Windham Killingly 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Killingly 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 645: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Killingly -----LINE CONSTRUCTION----

Windham Killingly 6.5% + 9.00$26.50Groundman

Windham Killingly 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Killingly 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Killingly 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Killingly ----OPERATORS----

Windham Killingly 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Killingly 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Killingly 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Killingly 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Killingly 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Killingly 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Killingly 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Killingly 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Killingly 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 646: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Killingly 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Killingly 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Killingly 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Killingly 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Killingly 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Killingly 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Killingly 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Killingly 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Killingly 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Killingly 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Killingly ------PAINTERS (Including Drywall Finishing)------

Windham Killingly 22.55$35.6210a) Brush and Roller

Windham Killingly 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Killingly 22.55$36.1210c) Paperhanger and Red Label

Windham Killingly 22.55$38.6210e) Blast and Spray

Windham Killingly 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Killingly 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Killingly 21.35$38.4013) Roofer (composition)

Windham Killingly 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 647: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Killingly 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Killingly 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Killingly ------TRUCK DRIVERS------

Windham Killingly 25.79 + a$29.8617a) 2 Axle

Windham Killingly 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Killingly 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Killingly 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Killingly 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Killingly 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Killingly 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Killingly 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Killingly 7.34$25.7619) Theatrical Stage Journeyman

Windham Plainfield 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Plainfield 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Plainfield 26.01$38.342) Boilermaker

Windham Plainfield 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Plainfield 25.87$34.903b) Tile Setter

Windham Plainfield 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 648: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Plainfield 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Plainfield 32.06$33.483e) Plasterer

Windham Plainfield ------LABORERS------

Windham Plainfield 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Plainfield 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Plainfield 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Plainfield 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Plainfield 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Plainfield 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Plainfield 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Plainfield 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Plainfield 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Plainfield 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Plainfield 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Plainfield 26.19$34.945a) Millwrights

Windham Plainfield 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Plainfield 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 649: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Plainfield -----LINE CONSTRUCTION----

Windham Plainfield 6.5% + 9.00$26.50Groundman

Windham Plainfield 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Plainfield 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Plainfield 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Plainfield ----OPERATORS----

Windham Plainfield 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Plainfield 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Plainfield 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Plainfield 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Plainfield 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Plainfield 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Plainfield 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Plainfield 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Plainfield 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 650: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Plainfield 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Plainfield 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Plainfield 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Plainfield 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Plainfield 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Plainfield 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Plainfield 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Plainfield 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Plainfield 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Plainfield 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Plainfield ------PAINTERS (Including Drywall Finishing)------

Windham Plainfield 22.55$35.6210a) Brush and Roller

Windham Plainfield 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Plainfield 22.55$36.1210c) Paperhanger and Red Label

Windham Plainfield 22.55$38.6210e) Blast and Spray

Windham Plainfield 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Plainfield 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Plainfield 21.35$38.4013) Roofer (composition)

Windham Plainfield 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 651: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Plainfield 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Plainfield 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Plainfield ------TRUCK DRIVERS------

Windham Plainfield 25.79 + a$29.8617a) 2 Axle

Windham Plainfield 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Plainfield 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Plainfield 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Plainfield 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Plainfield 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Plainfield 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Plainfield 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Plainfield 7.34$25.7619) Theatrical Stage Journeyman

Windham Pomfret 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Pomfret 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Pomfret 26.01$38.342) Boilermaker

Windham Pomfret 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Pomfret 25.87$34.903b) Tile Setter

Windham Pomfret 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 652: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Pomfret 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Pomfret 32.06$33.483e) Plasterer

Windham Pomfret ------LABORERS------

Windham Pomfret 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Pomfret 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Pomfret 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Pomfret 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Pomfret 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Pomfret 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Pomfret 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Pomfret 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Pomfret 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Pomfret 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Pomfret 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Pomfret 26.19$34.945a) Millwrights

Windham Pomfret 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Pomfret 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 653: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Pomfret -----LINE CONSTRUCTION----

Windham Pomfret 6.5% + 9.00$26.50Groundman

Windham Pomfret 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Pomfret 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Pomfret 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Pomfret ----OPERATORS----

Windham Pomfret 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Pomfret 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Pomfret 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Pomfret 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Pomfret 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Pomfret 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Pomfret 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Pomfret 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Pomfret 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 654: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Pomfret 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Pomfret 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Pomfret 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Pomfret 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Pomfret 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Pomfret 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Pomfret 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Pomfret 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Pomfret 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Pomfret 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Pomfret ------PAINTERS (Including Drywall Finishing)------

Windham Pomfret 22.55$35.6210a) Brush and Roller

Windham Pomfret 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Pomfret 22.55$36.1210c) Paperhanger and Red Label

Windham Pomfret 22.55$38.6210e) Blast and Spray

Windham Pomfret 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Pomfret 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Pomfret 21.35$38.4013) Roofer (composition)

Windham Pomfret 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 655: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Pomfret 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Pomfret 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Pomfret ------TRUCK DRIVERS------

Windham Pomfret 25.79 + a$29.8617a) 2 Axle

Windham Pomfret 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Pomfret 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Pomfret 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Pomfret 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Pomfret 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Pomfret 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Pomfret 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Pomfret 7.34$25.7619) Theatrical Stage Journeyman

Windham Putnam 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Putnam 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Putnam 26.01$38.342) Boilermaker

Windham Putnam 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Putnam 25.87$34.903b) Tile Setter

Windham Putnam 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 656: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Putnam 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Putnam 32.06$33.483e) Plasterer

Windham Putnam ------LABORERS------

Windham Putnam 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Putnam 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Putnam 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Putnam 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Putnam 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Putnam 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Putnam 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Putnam 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Putnam 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Putnam 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Putnam 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Putnam 26.19$34.945a) Millwrights

Windham Putnam 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Putnam 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 657: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Putnam -----LINE CONSTRUCTION----

Windham Putnam 6.5% + 9.00$26.50Groundman

Windham Putnam 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Putnam 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Putnam 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Putnam ----OPERATORS----

Windham Putnam 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Putnam 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Putnam 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Putnam 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Putnam 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Putnam 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Putnam 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Putnam 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Putnam 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 658: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Putnam 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Putnam 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Putnam 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Putnam 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Putnam 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Putnam 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Putnam 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Putnam 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Putnam 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Putnam 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Putnam ------PAINTERS (Including Drywall Finishing)------

Windham Putnam 22.55$35.6210a) Brush and Roller

Windham Putnam 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Putnam 22.55$36.1210c) Paperhanger and Red Label

Windham Putnam 22.55$38.6210e) Blast and Spray

Windham Putnam 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Putnam 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Putnam 21.35$38.4013) Roofer (composition)

Windham Putnam 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 659: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Putnam 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Putnam 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Putnam ------TRUCK DRIVERS------

Windham Putnam 25.79 + a$29.8617a) 2 Axle

Windham Putnam 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Putnam 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Putnam 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Putnam 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Putnam 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Putnam 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Putnam 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Putnam 7.34$25.7619) Theatrical Stage Journeyman

Windham Scotland 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Scotland 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Scotland 26.01$38.342) Boilermaker

Windham Scotland 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Scotland 25.87$34.903b) Tile Setter

Windham Scotland 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 660: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Scotland 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Scotland 32.06$33.483e) Plasterer

Windham Scotland ------LABORERS------

Windham Scotland 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Scotland 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Scotland 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Scotland 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Scotland 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Scotland 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Scotland 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Scotland 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Scotland 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Scotland 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Scotland 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Scotland 26.19$34.945a) Millwrights

Windham Scotland 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Scotland 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 661: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Scotland -----LINE CONSTRUCTION----

Windham Scotland 6.5% + 9.00$26.50Groundman

Windham Scotland 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Scotland 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Scotland 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Scotland ----OPERATORS----

Windham Scotland 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Scotland 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Scotland 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Scotland 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Scotland 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Scotland 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Scotland 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Scotland 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Scotland 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 662: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Scotland 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Scotland 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Scotland 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Scotland 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Scotland 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Scotland 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Scotland 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Scotland 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Scotland 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Scotland 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Scotland ------PAINTERS (Including Drywall Finishing)------

Windham Scotland 22.55$35.6210a) Brush and Roller

Windham Scotland 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Scotland 22.55$36.1210c) Paperhanger and Red Label

Windham Scotland 22.55$38.6210e) Blast and Spray

Windham Scotland 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Scotland 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Scotland 21.35$38.4013) Roofer (composition)

Windham Scotland 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 663: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Scotland 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Scotland 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Scotland ------TRUCK DRIVERS------

Windham Scotland 25.79 + a$29.8617a) 2 Axle

Windham Scotland 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Scotland 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Scotland 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Scotland 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Scotland 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Scotland 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Scotland 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Scotland 7.34$25.7619) Theatrical Stage Journeyman

Windham Sterling 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Sterling 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Sterling 26.01$38.342) Boilermaker

Windham Sterling 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Sterling 25.87$34.903b) Tile Setter

Windham Sterling 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 664: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Sterling 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Sterling 32.06$33.483e) Plasterer

Windham Sterling ------LABORERS------

Windham Sterling 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Sterling 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Sterling 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Sterling 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Sterling 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Sterling 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Sterling 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Sterling 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Sterling 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Sterling 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Sterling 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Sterling 26.19$34.945a) Millwrights

Windham Sterling 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Sterling 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 665: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Sterling -----LINE CONSTRUCTION----

Windham Sterling 6.5% + 9.00$26.50Groundman

Windham Sterling 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Sterling 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Sterling 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Sterling ----OPERATORS----

Windham Sterling 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Sterling 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Sterling 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Sterling 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Sterling 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Sterling 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Sterling 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Sterling 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Sterling 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 666: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Sterling 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Sterling 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Sterling 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Sterling 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Sterling 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Sterling 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Sterling 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Sterling 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Sterling 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Sterling 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Sterling ------PAINTERS (Including Drywall Finishing)------

Windham Sterling 22.55$35.6210a) Brush and Roller

Windham Sterling 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Sterling 22.55$36.1210c) Paperhanger and Red Label

Windham Sterling 22.55$38.6210e) Blast and Spray

Windham Sterling 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Sterling 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Sterling 21.35$38.4013) Roofer (composition)

Windham Sterling 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 667: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Sterling 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Sterling 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Sterling ------TRUCK DRIVERS------

Windham Sterling 25.79 + a$29.8617a) 2 Axle

Windham Sterling 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Sterling 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Sterling 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Sterling 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Sterling 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Sterling 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Sterling 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Sterling 7.34$25.7619) Theatrical Stage Journeyman

Windham Thompson 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Thompson 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Thompson 26.01$38.342) Boilermaker

Windham Thompson 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Thompson 25.87$34.903b) Tile Setter

Windham Thompson 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 668: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Thompson 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Thompson 32.06$33.483e) Plasterer

Windham Thompson ------LABORERS------

Windham Thompson 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Thompson 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Thompson 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Thompson 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Thompson 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Thompson 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Thompson 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Thompson 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Thompson 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Thompson 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Thompson 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Thompson 26.19$34.945a) Millwrights

Windham Thompson 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Thompson 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 669: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Thompson -----LINE CONSTRUCTION----

Windham Thompson 6.5% + 9.00$26.50Groundman

Windham Thompson 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Thompson 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Thompson 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Thompson ----OPERATORS----

Windham Thompson 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Thompson 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Thompson 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Thompson 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Thompson 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Thompson 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Thompson 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Thompson 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Thompson 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 670: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Thompson 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Thompson 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Thompson 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Thompson 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Thompson 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Thompson 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Thompson 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Thompson 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Thompson 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Thompson 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Thompson ------PAINTERS (Including Drywall Finishing)------

Windham Thompson 22.55$35.6210a) Brush and Roller

Windham Thompson 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Thompson 22.55$36.1210c) Paperhanger and Red Label

Windham Thompson 22.55$38.6210e) Blast and Spray

Windham Thompson 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Thompson 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Thompson 21.35$38.4013) Roofer (composition)

Windham Thompson 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 671: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Thompson 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Thompson 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Thompson ------TRUCK DRIVERS------

Windham Thompson 25.79 + a$29.8617a) 2 Axle

Windham Thompson 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Thompson 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Thompson 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Thompson 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Thompson 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Thompson 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Thompson 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Thompson 7.34$25.7619) Theatrical Stage Journeyman

Windham Willimantic 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Willimantic 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Willimantic 26.01$38.342) Boilermaker

Windham Willimantic 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Willimantic 25.87$34.903b) Tile Setter

Windham Willimantic 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 672: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Willimantic 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Willimantic 32.06$33.483e) Plasterer

Windham Willimantic ------LABORERS------

Windham Willimantic 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Willimantic 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Willimantic 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Willimantic 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Willimantic 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Willimantic 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Willimantic 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Willimantic 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Willimantic 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Willimantic 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Willimantic 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Willimantic 26.19$34.945a) Millwrights

Windham Willimantic 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Willimantic 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 673: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Willimantic -----LINE CONSTRUCTION----

Windham Willimantic 6.5% + 9.00$26.50Groundman

Windham Willimantic 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Willimantic 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Willimantic 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Willimantic ----OPERATORS----

Windham Willimantic 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Willimantic 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Willimantic 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Willimantic 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Willimantic 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Willimantic 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Willimantic 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Willimantic 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Willimantic 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 674: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Willimantic 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Willimantic 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Willimantic 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Willimantic 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Willimantic 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Willimantic 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Willimantic 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Willimantic 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Willimantic 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Willimantic 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Willimantic ------PAINTERS (Including Drywall Finishing)------

Windham Willimantic 22.55$35.6210a) Brush and Roller

Windham Willimantic 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Willimantic 22.55$36.1210c) Paperhanger and Red Label

Windham Willimantic 22.55$38.6210e) Blast and Spray

Windham Willimantic 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Willimantic 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Willimantic 21.35$38.4013) Roofer (composition)

Windham Willimantic 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 675: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Willimantic 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Willimantic 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Willimantic ------TRUCK DRIVERS------

Windham Willimantic 25.79 + a$29.8617a) 2 Axle

Windham Willimantic 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Willimantic 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Willimantic 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Willimantic 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Willimantic 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Willimantic 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Willimantic 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Willimantic 7.34$25.7619) Theatrical Stage Journeyman

Windham Windham 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Windham 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Windham 26.01$38.342) Boilermaker

Windham Windham 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Windham 25.87$34.903b) Tile Setter

Windham Windham 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 676: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Windham 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Windham 32.06$33.483e) Plasterer

Windham Windham ------LABORERS------

Windham Windham 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Windham 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Windham 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Windham 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Windham 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Windham 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Windham 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Windham 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Windham 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Windham 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Windham 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Windham 26.19$34.945a) Millwrights

Windham Windham 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Windham 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 677: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Windham -----LINE CONSTRUCTION----

Windham Windham 6.5% + 9.00$26.50Groundman

Windham Windham 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Windham 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Windham 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Windham ----OPERATORS----

Windham Windham 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Windham 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Windham 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Windham 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Windham 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Windham 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Windham 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Windham 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Windham 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 678: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Windham 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Windham 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Windham 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Windham 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Windham 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Windham 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Windham 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Windham 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Windham 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Windham 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Windham ------PAINTERS (Including Drywall Finishing)------

Windham Windham 22.55$35.6210a) Brush and Roller

Windham Windham 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Windham 22.55$36.1210c) Paperhanger and Red Label

Windham Windham 22.55$38.6210e) Blast and Spray

Windham Windham 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Windham 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Windham 21.35$38.4013) Roofer (composition)

Windham Windham 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 679: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Windham 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Windham 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Windham ------TRUCK DRIVERS------

Windham Windham 25.79 + a$29.8617a) 2 Axle

Windham Windham 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Windham 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Windham 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Windham 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Windham 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Windham 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Windham 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Windham 7.34$25.7619) Theatrical Stage Journeyman

Windham Woodstock 1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal andencapsulation (except its removal from mechanical systems which are not tobe scrapped), toxic waste removers, blasters.**See Laborers Group 7**

Windham Woodstock 30.99$40.211c) Asbestos Worker/Heat and Frost Insulator

Windham Woodstock 26.01$38.342) Boilermaker

Windham Woodstock 33.31 + a$35.713a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), StoneMasons

Windham Woodstock 25.87$34.903b) Tile Setter

Windham Woodstock 22.35$31.693c) Terrazzo Mechanics and Marble Setters

As of: July 1, 2020

Page 680: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Woodstock 21.75$26.703d) Tile, Marble & Terrazzo Finishers

Windham Woodstock 32.06$33.483e) Plasterer

Windham Woodstock ------LABORERS------

Windham Woodstock 22.15$31.004) Group 1: Laborers (common or general), acetylene burners, concretespecialists, wrecking laborers, fire watchers.

Windham Woodstock 22.15$31.254a) Group 2: Mortar mixers, plaster tender, power buggy operators,powdermen, fireproofer/mixer/nozzleman (Person running mixer andspraying fireproof only).

Windham Woodstock 22.15$31.504b) Group 3: Jackhammer operators/pavement breaker, mason tender(brick), mason tender (cement/concrete), forklift operators and forkliftoperators (masonry).

Windham Woodstock 22.15$32.004c) **Group 4: Pipelayers (Installation of water, storm drainage or sewagelines outside of the building line with P6, P7 license) (the pipelayer rate shallapply only to one or two employees of the total crew who primary task is toactually perform the mating of pipe sections) P6 and P7 rate is $26.80.

Windham Woodstock 22.15$31.754d) Group 5: Air track operator, sand blaster and hydraulic drills.

Windham Woodstock 22.15$34.004e) Group 6: Blasters, nuclear and toxic waste removal.

Windham Woodstock 22.15$32.004f) Group 7: Asbestos/lead removal and encapsulation (except it's removalfrom mechanical systems which are not to be scrapped).

Windham Woodstock 22.15$29.284g) Group 8: Bottom men on open air caisson, cylindrical work and boringcrew.

Windham Woodstock 22.15$28.744h) Group 9: Top men on open air caisson, cylindrical work and boringcrew.

Windham Woodstock 22.15$18.004i) Group 10: Traffic Control Signalman

Windham Woodstock 25.64$34.535) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, MetalStud Installation, Form Work and Scaffold Building, Drywall Hanging,Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient FloorLayers.

Windham Woodstock 26.19$34.945a) Millwrights

Windham Woodstock 29.17+3% of grosswage

$40.256) Electrical Worker (including low voltage wiring) (Trade License required:E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

Windham Woodstock 34.765+a+b$55.127a) Elevator Mechanic (Trade License required: R-1,2,5,6)

As of: July 1, 2020

Page 681: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Woodstock -----LINE CONSTRUCTION----

Windham Woodstock 6.5% + 9.00$26.50Groundman

Windham Woodstock 6.5% + 22.00$48.19Linemen/Cable Splicer

Windham Woodstock 22.55 + a$39.188) Glazier (Trade License required: FG-1,2)

Windham Woodstock 37.62 + a$36.679) Ironworker, Ornamental, Reinforcing, Structural, and Precast ConcreteErection

Windham Woodstock ----OPERATORS----

Windham Woodstock 25.30 + a$42.45Group 1: Crane handling or erecting structural steel or stone, hoistingengineer 2 drums or over, front end loader (7 cubic yards or over), workboat 26 ft. and over and Tunnel Boring Machines. (Trade License Required)

Windham Woodstock 25.30 + a$42.11Group 2: Cranes (100 ton rate capacity and over); Excavator over 2 cubicyards; Piledriver ($3.00 premium when operator controls hammer); BauerDrill/Caisson. (Trade License Required)

Windham Woodstock 25.30 + a$41.32Group 3: Excavator; Backhoe/Excavator under 2 cubic yards; Cranes(under 100 ton rated capacity), Grader/Blade; Master Mechanic; HoistingEngineer (all types of equipment where a drum and cable are used to hoistor drag material regardless of motive power of operation), Rubber TireExcavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade.(slopes, shaping, laser or GPS, etc.). (Trade License Required)

Windham Woodstock 25.30 + a$40.91Group 4: Trenching Machines; Lighter Derrick; Concrete Finishing Machine;CMI Machine or Similar; Koehring Loader (Skooper).

Windham Woodstock 25.30 + a$40.28Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt ReclaimingMachine; Line Grinder; Concrete Pumps; Drills with Self Contained PowerUnits; Boring Machine; Post Hole Digger; Auger; Pounder; Well Digger;Milling Machine (over 24

Windham Woodstock 25.30 + a$40.28Group 5 continued: Side Boom; Combination Hoe and Loader; DirectionalDriller; Pile Testing Machine.

Windham Woodstock 25.30 + a$39.95Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough gradedozer).

Windham Woodstock 25.30 + a$39.59Group 7: Asphalt roller, concrete saws and cutters (ride on types), vermeerconcrete cutter, Stump Grinder; Scraper; Snooper; Skidder; Milling Machine(24

Windham Woodstock 25.30 + a$39.17Group 8: Mechanic, grease truck operator, hydroblaster; barrier mover;power stone spreader; welding; work boat under 26 ft.;

As of: July 1, 2020

Page 682: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationtransfer machine.

Windham Woodstock 25.30 + a$38.71Group 9: Front end loader (under 3 cubic yards), skid steer loaderregardless of attachments, (Bobcat or Similar): forklift, power chipper;landscape equipment (including Hydroseeder).

Windham Woodstock 25.30 + a$36.54Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc.

Windham Woodstock 25.30 + a$36.54Group 11: Conveyor, earth roller, power pavement breaker (whiphammer),robot demolition equipment.

Windham Woodstock 25.30 + a$36.48Group 12: Wellpoint operator.

Windham Woodstock 25.30 + a$35.86Group 13: Compressor battery operator.

Windham Woodstock 25.30 + a$34.66Group 14: Elevator operator; tow motor operator (solid tire no rough terrain).

Windham Woodstock 25.30 + a$34.23Group 15: Generator Operator; Compressor Operator; Pump Operator;Welding Machine Operator; Heater Operator.

Windham Woodstock 25.30 + a$33.54Group 16: Maintenance Engineer/Oiler.

Windham Woodstock 25.30 + a$38.11Group 17: Portable asphalt plant operator; portable crusher plant operator;portable concrete plant operator.

Windham Woodstock 25.30 + a$35.53Group 18: Power safety boat; vacuum truck; zim mixer; sweeper; (Minimumfor any job requiring a CDL license).

Windham Woodstock ------PAINTERS (Including Drywall Finishing)------

Windham Woodstock 22.55$35.6210a) Brush and Roller

Windham Woodstock 22.55$36.3710b) Taping Only/Drywall Finishing

Windham Woodstock 22.55$36.1210c) Paperhanger and Red Label

Windham Woodstock 22.55$38.6210e) Blast and Spray

Windham Woodstock 32.95$44.6311) Plumber (excluding HVAC pipe installation) (Trade License required: P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

Windham Woodstock 24.05 + a$37.2612) Well Digger, Pile Testing Machine

Windham Woodstock 21.35$38.4013) Roofer (composition)

Windham Woodstock 21.35$38.9014) Roofer (slate & tile)

As of: July 1, 2020

Page 683: Building Rates · 1/7/2020  · Fairfield Bethel 4b) Group 3: Jackhammer operators/pavement breaker, mason tender $31.50 22.15 (brick), mason tender (cement/concrete), forklift operators

Building Rates

County Town Hourly BenefitHourly RateClassificationWindham Woodstock 39.46$38.9015) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)Windham Woodstock 32.95$44.6316) Pipefitter (Including HVAC work) (Trade

License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G-9)

Windham Woodstock ------TRUCK DRIVERS------

Windham Woodstock 25.79 + a$29.8617a) 2 Axle

Windham Woodstock 25.79 + a$29.9717b) 3 Axle, 2 Axle Ready Mix

Windham Woodstock 25.79 + a$30.0317c) 3 Axle Ready Mix

Windham Woodstock 25.79 + a$30.0817d) 4 Axle, Heavy Duty Trailer up to 40 tons

Windham Woodstock 25.79 + a$30.1317e) 4 Axle Ready Mix

Windham Woodstock 25.79 + a$30.3517f) Heavy Duty Trailer (40 Tons and Over)

Windham Woodstock 25.79 + a$30.1317g) Specialized Earth Moving Equipment (Other Than Conventional Typeon-the-Road Trucks and Semi-Trailers, Including Euclids)

Windham Woodstock 26.08 + a$45.9218) Sprinkler Fitter (Trade License required: F-1,2,3,4)

Windham Woodstock 7.34$25.7619) Theatrical Stage Journeyman