Phases of the Building Process
• Pre Construction Phase– Development of plans, Specification, Financing, Budgets and Permits
• Initial Construction Phase– Building the foundation, framing floors, walls and roof
– Installing windows, doors, exterior walls, and roof coverings
• Finishes Phase– Interior Components are installed in this phase
• Mechanical systems installed: plumbing, electrical, and HVAC
• Interior finishes applied: walls, flooring, ceilings, fixtures, appliances, and cabinets
• Exterior Landscaping plantings, drives, walks
• Post Construction Phase– Final finishing touches, completion inspections, and establish a move-in date
![Page 3: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/3.jpg)
Pre-Construction Phase
• Selection of building site
• Develop final working plans
• Develop specifications
• Develop cost analysis
• Develop detailedconstruction budget
• Develop homeownerallowances
• Develop site and landscapeplans
• Building contract executed
• Determine exterior & trimsurfaces, color, & roofingmaterials
• Secure local governmentapproval & permits
• Financing Secured• Construction
• Permanent
![Page 4: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/4.jpg)
Building Plans Development
![Page 5: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/5.jpg)
Sample Budget Allowance
• Windows $3,520.00
• Plumbing (Includes Fixtures and Installation) $10,000.00
• Heating (Includes Fireplace $1,400) $7,500.00
• Electrical (Includes Installation of Fixtures) $8,000.00
• Light Fixtures $2,000.00
• Cabinets $4,000.00
• Countertops $5,000.00
• Interior Doors $2,000.00
• Exterior Doors $835.00
• Door Hardware $920.00
• Flooring $12,000.00
• Mirrors $750.00
• Garage Door $1,750.00
• Appliances $3,500.00
• Shower Door $800.00
• Window Covering $2,000.00
• Landscaping $6,500.00
![Page 6: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/6.jpg)
Development of Specifications
• Date
• Project Name
• Location
• House Dimensions in Square Footage (sf)
• First Floor
• Second Floor
• Basement
• Bonus Room
• Garage
• Porch
• Patio
• Deck
The following specification are based on plans and initial interviews with the homeowner.
Site work: Generally the contractor is responsible for the removal of all unwanted trees on the construction site and protection of the remaining treesto excavate any soil as needed for placement of the foundation and to install any erosion control systems, as needed. (Note: If at any time duringconstruction , should unsuitable soils, underground water, or any other unknown structures or substances be found, the builder will notify the ownerand a resolution will be determined with the owner’s consent and at the owner’s expense.)
Footings: 3000 psi concrete
Foundation:
Waterproofing and Drainage:
Framing:
![Page 7: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/7.jpg)
Preliminary Shopping for BudgetAllowance Components
• Shop for kitchen cabinets, counter tops andappliances
• Shop for bathroom fixtures, faucets, andaccessories
• Shop for floor coverings (carpet, hardwoodfloors and/or ceramic tile)
• Shop for interior and exterior door styles
• Shop for interior finishes
• Shop for window styles
• Shop for other allowance components
![Page 8: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/8.jpg)
Initial Construction Phase
• Pour footings & buildfoundation
• Construct floor system(s)
• Construct wall system(s)
• Construct roofing system
• Apply exterior wall & roofsheeting
• Install vapor barrier
• Install roof covering
• Install windows & exteriordoors
• Initial walk-thru inspection
• Rough-in plumbing
• Rough-in electrical
• Rough-in HVAC
• Rough-in fireplace(s)
• Install exterior surfaces, &exterior trim
![Page 9: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/9.jpg)
Initial Construction Phase
![Page 10: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/10.jpg)
Footings and Foundation Walls
![Page 11: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/11.jpg)
Building the Flooring System
![Page 12: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/12.jpg)
Building Stud Walls
![Page 13: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/13.jpg)
Installing the Roof System
![Page 14: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/14.jpg)
Owner Walk-Through, Layout, and Inspection
Occurs at the end of the initial construction or rough-inphase. Confirmation of the work in progress andlayout, as to meeting the expectations of the owner,and consideration of any adjustments to theapplicability of the allowances and their associatedcosts prior to their purchase and installation.
![Page 15: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/15.jpg)
Rough-In for Plumbing, Electrical, and HVAC
![Page 16: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/16.jpg)
Finishes Phase
• Install insulation
• Install & finish interiorsheetrock wall coverings
• Install & finish ceilingsheetrock
• Install trim and moldings
• Install fireplace & mantle
• Paint walls, ceilings, & trim
• Install closet systems
• Install electrical fixtures
• Install kitchen and bath“finished” floor surfaces
• Install bath and otherplumbing fixtures
• Install kitchen cabinets andappliances
• Install other built-ins, asspecified
• Install floor coverings
• Complete landscaping, drives,walks
![Page 17: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/17.jpg)
Insulation is Installed
![Page 18: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/18.jpg)
The Finishes Phase
![Page 19: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/19.jpg)
Interior Sheet Rock Installation and Finishes
![Page 20: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/20.jpg)
Interior Finishes
![Page 21: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/21.jpg)
Kitchen
![Page 22: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/22.jpg)
Baths
![Page 23: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/23.jpg)
Landscape
![Page 24: Building Process - E G Construction LLCeg-construction.com/.../buildingProcess.pdfPhases of the Building Process • Pre Construction Phase – Development of plans, Specification,](https://reader030.vdocuments.site/reader030/viewer/2022040922/5e9b5ac5c84d4c23491afb74/html5/thumbnails/24.jpg)
Post-Construction Phase
• Conduct Final Inspections– Homeowner
– Building Inspector
– Appearance Committee
• Secure Certificate of Occupancy
• Secure Permanent Financing
• Establish Move-In Date