building permit application efficiencies workshop permits... · workshop manufactured housing ......
TRANSCRIPT
Building Permit Application Efficiencies Workshop
Manufactured Housing Association of BC - 2018 Conference
Ken Kunka AScT, RBO
Building and Permitting Manager - Penticton
The purpose of this presentation is to familiarize the MHABC members with the roles of Building Officials and challenges
we face.
- Fact finding -
My hope is to develop a greater line of trust & communication to improve the relationships between Building Officials and home manufactures, suppliers and
installers.
Information presented today does not directly represent the opinions of the City
of Penticton or the Building Officials Association of BC.
Why do I do this?Idea *Design*Build Product
25 years – city and regional
Both sides of the counter
How can I(we) help make it better!
Building Official Building Official Building Official Building Official –––– why we do itwhy we do itwhy we do itwhy we do it
Serve Serve Serve Serve –––– Protect Protect Protect Protect –––– EducateEducateEducateEducate(client (client (client (client –––– owner/city owner/city owner/city owner/city –––– all)all)all)all)
Building and Licencing
City of Penticton
Advances the City’s mission as a livable ,
thriving, safe and sustainable City by guiding
how buildings are constructed, occupied and
businesses operate.
This is achieved by creating a quality business
and development climate in order to grow
the tax base.
BOABC MISSION
The BOABC is dedicated to serving the best
interests of the public in building safety by
moving forward with the highest standards in
professionalism, competency and consistent
practice in the Building Community.
The Association’s motto is; “Promoting
Building Safety and Professionalism”
+ Energy efficiency?
Building Officials Association of BC
Association of over 700 members primarily
representing local government Building
Officials and those involved in building
design, construction, testing and research.
• has grown since 1954 from 24 members
situated largely in the Greater Vancouver
Building Officials Association of BC
Governance model
• Building Officials Act
1997
• President and Executive
Committee
• Representing 7 zones
• Executive Director,
Education Coordinator
Office administrator
BC Building Act2015 – Building Act legislation passed.
Dedicated to building and construction
• it's designed to modernize and
streamline the building regulatory
system.
BC Building ActMain changes:
• Consistency – BOABC & L/G
• Competency – BOABC & L/G*
• Innovation – Building Standards
Two-year transition period for section
5 of the Building Act started December
15, 2015 and ends December 15, 2017
Building Bylaw revisions – reduce
unique regulations.
BC Building ActMain changes:
• Consistency – BOABC & L/G
• Competency – BOABC & L/G
• Innovation – Building Standards
Four-year transition period for
building official qualifications started
February 28, 2017 and ends February
28, 2021
Challenge for small communities and
Regional Districts
Evolution of Building OfficialEvolution of Building OfficialEvolution of Building OfficialEvolution of Building Official• Scope of Work – many hats
• Customer Service
• Not Black and White - Code• Prescriptive to Performance
• Background - The Trades person • To Academic background
• Technology
• Third Party• Licensing Consumer Services (HPO)• Worksafe BC – Asbestos
• Certification
Plans exam
BC Building ActMain changes:
• Consistency – BOABC & L/G
• Competency – BOABC & L/G
• Innovation – Building Standards
*The Province will establish a review
process to accept and evaluate
innovative building proposals received
from individuals.
No specific confirmation of start date.
What is a manufactured home?- manufactured unit-
- site built construction-foundation-cribbing-crawl-basement
garageporch/deck
commissioning of plmg/mechsite finishing
Layers of a Permit – Being PreparedZoning
Environmental Restrictions - DPServices
Building Code - changesBuilding Bylaw
Manufactured Home Bylaw
Stages of UseNew Manufactured Unit
- types & install variations -
Relocating Existing- condition of existing – climatic & zoning
Alterations- what voids certification -
Time Available- Quality of Submission –
- Frequency -- Knowledge of Certification* –
- Existing Condition for relocates-- Proprietary Products –
Applications & Site Inspections- Quality of Submission -
- Knowledge of regulations–- changes on site -
- Existing Condition- relocate -- Proprietary Products -
Complaints after Occupancyworst case – structural collapse
plumbing not hooked upuncertified units – no labels
(letter of certification)
Challenge – Liability ExposureJoint & Several - Limitations Act - June 1, 2013,
• Basic Limitations Period (BLP) = 2 Years (from 2, 6 or 10yr)
• Ultimate Limitations Period (ULP) = 15 Years (from 30+yrs)
Challenge – Liability Exposure
Any new project that starts tomorrow will have a 15-year liability exposure for all parties involved. Toward the end of that 15 year period, what are the chances that the contractors or engineers
involved will still have insurance, assuming you can find them at all? But that is still a lot better than the 30-years we used to face.
Home warranty provisions?
Consumer Licensing exemption
Future of Codes• New Technology
• Alternative Solutions
• Energy Performance
• Energy Step Codes
• Climate Change – snow,floods & fires
Perception of Building Dept.Perception of Building Dept.Perception of Building Dept.Perception of Building Dept.
Inconsistency between & in jurisdictions.
(moving the goal posts)- level of knowledge –
- level of trust –- rules change -
- worst case scenario -
Attitude toward each otherAttitude toward each otherAttitude toward each otherAttitude toward each other
Modern Building BylawsModern Building BylawsModern Building BylawsModern Building Bylaws
• Easy to read
• Consistent message• Limit unique requirements
• Outline responsibilities• Application & inspections• Occupancy
• Enforcement
Education and ConsistencyEducation and ConsistencyEducation and ConsistencyEducation and Consistency• Consistent lines of communication• Building Officials• Developers-Builders• Designers• Builders & Trades
• Workshops –webinars - guides• Open forum for design ideas• Standard details
Standardized forms and checklistsStandardized forms and checklistsStandardized forms and checklistsStandardized forms and checklists
Consistent requirements• What is a good application?• What is a good drawing?
Standardized innovation reviews
Standard forms
E-apply – Digital submissions
Complete package
Project Streams Project Streams Project Streams Project Streams ---- TrustTrustTrustTrust• Type A (clients)• Qualified Builder• Qualified Designer• Registered Professionals
• Type B (customers)• Home Owner• Occasional Builder
• Type E• Enforcement Projects