Pre-assemble the lower sub profiles (4x)Step 1:
Locking pinShort version
CS-01052x
Securing ringCS-0248
2x
Lower (short) sub profile CS-0055
T-Connector Lower RightMarked with “LR”
CS-0057
T-Connector Lower LeftMarked with “LL”
CS-0052
LL
LR
Curvature has to point downwards!
Building instructions Crossover L
Page 2www.creativestructures.nl
Pre-assemble the upper sub profiles (4x)Step 2:
Upper (long) sub profile CS-0054
T-Connector Upper RightMarked with “UR”
CS-0056
T-Connector Upper LeftMarked with “UL”
CS-0051
UL
UR
Locking pinShort version
CS-01052x
Securing ringCS-0248
2x
Curvature has to point downwards!
Building instructions Crossover L
Page 3www.creativestructures.nl
Pre-assemble the sub frameStep 3:
Sub frame centerCS-0334
Secure all parts with locking pins (short version) and securing rings!
Joint has to point downwards!
Sub frame beamCS-0335
4x
Sub frame connectorCS-0336
4x
Building instructions Crossover L
Page 4www.creativestructures.nl
Assemble frame bodyStep 4:
Secure all parts with locking pins (long version) and securing rings!
Main profileCS-0049
X-connectorCS-0050
X-connectorCS-0050
Hooks have to point inwards!
Main profileCS-0049
Main profileCS-0049
Building instructions Crossover L
Page 5www.creativestructures.nl
Secure all parts with locking pins (long version) and securing rings!
Main profileCS-0049
X-connectorCS-0050
X-connectorCS-0050
Building instructions Crossover L
Page 6www.creativestructures.nl
Mount sub frame at frame bodyStep 5:
Locking stripCS-0337
4x
Securing ringCS-0248
4x
Building instructions Crossover L
Page 7www.creativestructures.nl
While building, the structure has to be lifted multiple times so that the assembly can easily be done on floor level. The structure is designed for two lifting methods:
1. Lifting from below (for example with a traverse lift) by using the subframe. Requirements lifting device: • minimum lifting height: 6 meter • minimum save working load: 300kg
2. Lifting from above (for example with a crane) by using lifting slings (2 meter, 1000 KG) and the hooks of the X-connectors
Lifting:
Note: this lifting methode requires more height for building!
Building instructions Crossover L
Page 8www.creativestructures.nl
Mount the first end of the main cablesStep 6:
Main cable4x per X-connector
CS-0086
Building instructions Crossover L
Page 9www.creativestructures.nl
Step 7:Mount the first level of main profiles
Main profile CS-0049
8x
Secure all parts with locking pins (long version) and securing rings!
Building instructions Crossover L
Page 10www.creativestructures.nl
Step 8:Mount the upper sub profiles (4x)
Secure all parts with locking pins (long version) and securing rings!
UL UR
Curvature sub profiles has to point inwards!
Building instructions Crossover L
Page 11www.creativestructures.nl
Step 9:Mount the second end of the 8 inner main cables
Building instructions Crossover L
Page 12www.creativestructures.nl
Step 10:Mount the first end of the tensioning cables
Tensioning cableCS-0234
8x
Building instructions Crossover L
Page 13www.creativestructures.nl
Step 11:Mount the second level of main profiles
Secure all parts with locking pins (long version) and securing rings!
Main profile CS-0049
8x
Building instructions Crossover L
Page 14www.creativestructures.nl
Step 12:Mount the lower sub profiles (4x)
Secure all parts with locking pins (long version) and securing rings!
LL LR
Curvature sub profiles has to point inwards!
Building instructions Crossover L
Page 15www.creativestructures.nl
Step 13:Mount the second end of the 8 remaining main cables cables
Building instructions Crossover L
Page 16www.creativestructures.nl
Step 14:Mount the last level of main profiles
Secure all parts with locking pins (long version) and securing rings!
Main profile CS-0049
8x
Building instructions Crossover L
Page 17www.creativestructures.nl
Step 15:Mount the feet (4x)
Secure all parts with locking pins (long version) and securing rings!
Foot connector LeftCS-0058
Foot connector RightCS-0108
Anchor slideCS-0099
Anchor supportCS-0148
Hooks have to point to the inside of the structure!
Building instructions Crossover L
Page 18www.creativestructures.nl
Step 16:Mount the positioning cables
Positioning cableCS-0235
4x
The positioning cables are used to secure an acurate distance between the feet. After mounting the positioning cables the structure can be placed on its feet Pull the legs of the structure outwards to put the positioning cables under tension
!
Building instructions Crossover L
Page 19www.creativestructures.nl
Step 17:Anchor the structure
For the different anchoring options and instructions see the anchoring guide !
After anchoring, the positioning cables can be removed. In stormy conditions the positioning cables have to be mounted to provide extra stability to the structure !
Building instructions Crossover L
Page 20www.creativestructures.nl
Step 18:Mount and tension the 8 tension cables By tensioning the tension cables all the cables in the structure get tensioned and the structure gets its rigidity
Use the inner hooks of the feet!
Building instructions Crossover L
Page 21www.creativestructures.nl
Step 19:Place the cover over the structureThe included rope can be used to pull the cover over the structure
Do not place the cover in windy conditions or take decent security measures!
Step 20:Place the pull bars in the loops of the cover corners
Pull barCS-0497
Building instructions Crossover L
Page 22www.creativestructures.nl
Step 21Tension the cover at the cornersUse the the seams of the cover to align the cover with the structure
Ratchet plateCS-0236
Building instructions Crossover L
Page 23www.creativestructures.nl
Step 22:Tension the contours of the cover with the turn buckles
Turn buckle8x
Building instructions Crossover L
Page 24www.creativestructures.nl
Step 23:Mount the side panels (if desired)1. Hang the side panel under the cover openings using the 5 hooks on the upper contour2. Close the zipper from right to left, seen from the inside of the structure. The 5 hooks now can be demounted3. Tension the side panel with the lashings at the bottom. Tension the outer lashings to the structure feet and the inner lashings to the ground
Inside
For the different anchoring options and instructions see the anchoring guide!
Side panelCS-0402
Step 24:Mount the connection gutter (if desired) Close the zippers from right to left, seen from the inside of the structure