CONSTRUCTIONThe Chippewa County Economic Development Corporation and Hoeft Builders, Inc. both work to foster growth and business development in Chippewa County. We have developed the following industrial end users guide to give companies some information on typical industrial floor plans, project timelines and ball park construction cost figures for pre-engineered and precast buildings.
Plans are based on the following:• Typical manufacturing layout
• Ease of warehousing
• Layout versatility
Estimated costs include:• Earthwork & Site Utilities
• Asphalt
• Site concrete
• Structural steel & steel erection
• Carpentry
• Doors & windows
• Electrical
(Non-machinery hookups)
• Fire Protection (Standard use)
• HVAC
• Masonry
• Plumbing
• Roofing, Thermal & moisture protection
• Specialties
• General conditions
20,000 sq. ft.• 1 Truck loading dock & equipment with 9’X10’
overhead door• 1 Ground level 12’X14’ overhead door• 800 amp service
• 2,000 sq. ft. office area finished
40,000 sq. ft.• 2 Truck loading docks & equipment with 9’X10’
overhead doors at each• 1 Ground level 12’X14’ overhead door• 800 amp service
• 4,000 sq. ft. office area finished
65,000 sq. ft.• 4 Truck loading docks & equipment with 9’X10’
overhead doors at each• 2 Ground level 12’X14’ overhead doors• 1,200 amp service• 5,000 sq. ft. office area finished
100,000 sq. ft.• 8 Truck loading docks & equipment with 9’X10’
overhead doors at each• 4 Ground level 12’X14’ overhead doors• 2,400 amp service• 8,000 sq. ft. office area finished
Based on building size, estimated costs also include:
3
FAST-TRACK SCHEDULING
20,000 square feet ................... 5 Months
40,000 square feet ................... 7.5 Months
65,000 square feet ................... 9 Months
100,000 square feet ................. 11 Months
The chart below indicates schedules for pre-engineered and precast buildings at four spec sizes: 20,000 square feet, 40,000 square feet, 65,000 square feet and 100,000 square feet.Examples (time from preliminary drawings through construction completion)
Facility Size
1 2 3 4 5 6 7 8 9 10 11 12
20,000 sq ft
40,000 sq ft
65,000 sq ft
100,000 sq ft
20,000 sq ft
40,000 sq ft
65,000 sq ft
100,000 sq ft
20,000 sq ft
40,000 sq ft
65,000 sq ft
100,000 sq ft
20,000 sq ft
40,000 sq ft
65,000 sq ft
100,000 sq ft
20,000 sq ft
40,000 sq ft
65,000 sq ft
100,000 sq ft
MONTHDrawings
General Construction
Punch List
Closeout
Permits
4
• 2x4 ceiling tiles (In office areas)
Plant to be open structure painted
• 2x4 LED recessed lights (In office areas)
• Recessed truck loading dock systems
with overhead doors
• At grade overhead doors (12’x14”)
• 6” (R-19) exterior wall insulation, R-24
ceiling insulation (Min)
• Electrical and electrical service*
• ADA Code
• Architectural plans and engineering
• IBC (International Building Code)
2010 code
• Building eave height 24’
• Flooring in offices (Plant sealed
concrete)
• Ceiling fans in plant
• Doors, frames and all hardware
• Energy efficient T-12 lighting in plant
to 70 foot candles
• Fire protection
• Footings and foundations
• Excavation and backfill
• High efficiency, gas fired forced air
heating and cooling in offices
• High efficiency, gas fired unit
heaters in plant
• Exterior lighting (LED)
• Interior wall framing
• Local permits for building
• Plumbing
• Rough site grade
• Site utilities
• Supervision and general conditions
for project
• Construction Management
BUILDING SPECIFICATIONS
Scalable building option
*800-amp (20,000 and 40,000 square foot options); 1,200-amp (65,000 square foot option); 2,400-amp (100,000 square foot option)
5
100,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF
IncludedIncludedIncludedIncludedIncluded
$5,710,621.00$57.11
Included
$6,310,621.81$63.11
IncludedIncludedIncludedIncluded
20,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF
IncludedIncludedIncludedIncludedIncluded
$1,448,326.00$72.42
IncludedIncludedIncludedIncludedIncluded
$1,620,000.00$81.00
PRE-ENGINEERED PRECAST
40,000 SQ. FT. FACILITYIncludedIncludedIncludedIncludedIncluded
$2,431,162.00$60.78
Included
$2,731,162.56$68.28
IncludedIncludedIncludedIncluded
General ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF
65,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF
IncludedIncludedIncludedIncludedIncluded
$3,832,004.00$58.95
Included
$4,254,250.00$65.45
IncludedIncludedIncludedIncluded
General construction includes: general conditions, fire protection, site work, concrete, masonry, steel and metal, carpentry, doors and windows, overhead doors and truck docks. Prices were estimated as of 09/2015 and may vary, depending on conditions.
Building CostsThe chart below indicates schedules for pre-engineered and precast buildings at four spec sizes: 20,000 square feet, 40,000 square feet, 65,000 square feet and 100,000 square feet.Examples (time from preliminary drawings through construction completion)
40,000 Sq Ft Precast
20,000 Sq Ft Precast
65,000 Sq Ft Precast
100,000 Sq Ft Precast
6
BUILDING PLANSThe renderings and footprint samples below give you a sense of what the buildings and layout would look like.
20,000 square-foot pre-engineered facility
20,000 square-foot precast facility