Page 1: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

Ruhnau Clarke ArchitectsDesign Presentation

September 2018

RUSD STEM HIGH SCHOOLBuilding for the Future

A  state of the art public STEM high school on the premises of a world class public research university, University of California, Riverside

Page 2: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

2

WHYSTEM

QualityProvide high level of STEM teaching and learning.

EquityEnsure equitable Access and Success for ALL students at the Riverside STEM High School.

ExperienceOffer a variety of interdisciplinary STEM areas of study with capstone projects and industry certification.

PartnershipsCreate a STEM Partnership Forum to facilitate robust partnerships with higher education, business and industry.

STEM AmbassadorsEnsure all students graduate with strong STEM knowledge, develop into socially responsible citizens and cultivate a joy of learning.

BENEFITS OF A STEM HIGH SCHOOL

FOUNDATIONAL TENETS

1

2

3

4

5

Page 3: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

3

STEMPATHWAYS

Bio-Medical/Allied HealthEnvironmental/Agricultural Science Engineering & Advanced ManufacturingComputer Science

Page 4: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

4

CONCEPTUAL FLOOR PLAN: 1ST FLOOR

GROUND FLOOR 1

1

2

1

2

Page 5: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

5

CONCEPTUAL FLOOR PLAN: 2ND FLOOR

SECOND FLOOR 2

1

2

1

2

Page 6: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

6

CONCEPTUAL FLOOR PLAN: 3RD FLOOR

THIRD FLOOR 3

1

2

1

2

Page 7: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

7

CONTEXTDIAGRAM

A R R O Y O

S T E M H I G H S C H O O L S I T E

W . L I N D E N S T.

N . C A M P U S D R .

B I G S P R I N G S R D .

B L A I N E S T.

VA

LE

NC

IA H

ILL

DR

.

CA

NY

ON

CR

ES

T D

R.

AB

ER

DE

EN

DR

.

WAT K I N S D R .

F U T U R E N O R T H D I S T R I C T D E V E L O P M E N T

10-Minute walk (1/2 mile)

5-Minute walk (1/4 mile)

LEGEND

SCIENCE LAB CONNECTION 1

SCIENCE LAB CONNECTION 2

SCIENCE LAB CONNECTION 3

FUTURE PEDESTRIAN & BICYCLE ONLY STREET

VEHICULAR STREET

LIMITED ACCESS STREET

MAJOR PEDESTRIAN/BICYCLE WAY

PEDESTRIAN/BICYCLE BRIDGE

PARKING STRUCTURE

CAMPUS BOUNDARY

PROJECT BOUNDARY

Page 8: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

8

CONTEXT:SITE IMAGES

WATKINS DR. LOOKING EAST WATKINS DR. LOOKING WEST

CORP YARDCORP YARD

GLEN MOR HOUSINGGLEN MOR HOUSING

1 21

2

43

6

65

3

45

Page 9: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

9

CONTEXT:SITE PLAN

S T E M H I G H S C H O O L S I T E

E N V I R O N M E N TA L H E A LT H A N D

S A F E T Y E X P A N S I O N

P E N T L A N D H I L L S R E S I D E N C E H A L L

G L E N M O RH O U S I N G

S I N G L E FA M I LY R E S I D E N T I A L

S I N G L E FA M I LY R E S I D E N T I A L

G L E N M O RH O U S I N G

P A R K I N G S T R U C T U R E

A R R O Y O

P E D E S T R I A N B R I D G E

P E D E S T R I A N B R I D G E

L O T H I A N R E S I D E N C E H A L L

L O T 2 3

L O T 2 1 L O T 2 0

L I N D E N S T.

W AT K I N S D R .

PE

NT

LA

ND

WY

.

VA

LE

NC

IA H

ILL

DR

.

C O R P YA R D

M E T R O L I N K P E R R I S L I N E

C E Q A S E T T L E M E N T B E R M

LEGEND

SCIENCE LAB CONNECTION 1

SCIENCE LAB CONNECTION 2

SCIENCE LAB CONNECTION 3

FUTURE PEDESTRIAN & BICYCLE ONLY STREET

PROJECT BOUNDARY

Page 10: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

10

232 METHODS AND ANALYSIS

OPEN SPACEOpen space is composed of paths and places. Paths move people from place to place, and at edges connect to the surrounding landscape and neighborhood. Places encourage people to stay and gather. These outdoor rooms serve many of the same programmatic functions as buildings – academic, social and environmental. The best of these places are memorable, and form lasting impressions on those who experience the University. Richness in a campus open space network comes from a mix of open space types – formal and informal. Informal spaces, like Picnic Hill, tend to be related to nature, along hillsides and streams. Formal spaces like the Carillon Mall make clear connections between buildings and districts.

Buildings shape path and place, and vice-versa, thus a thoughtful configuration of buildings is critical to the development of a successful open space network. On the UC Riverside campus, buildings which frame open spaces tend to be opaque and inactive at the ground floor. In many cases, buildings block views to the surrounding landscape and to internal landmarks. Buildings which are only one or two stories high lack the physical presence to effectively define open space.

Chapter 4 focuses specifically on campus open space, studying climate-adaptive landscaping, pedestrian connectivity, and relationships to buildings, among other specific topics.

Figure 2.6 EXISTING CAMPUS OPEN SPACE FRAMEWORK

Carillon Mall & Library Mall

Pedestrian Mall Courtyard/Plazas Hillside & Arroyos

Gage CanalUC Riverside Property LineLEGEND

PP

0 250 500 750ft

NI-215 / SR-60

MARTIN LUTHER KING BOULEVARD

LINDEN STREET

VALE

NCI

A H

ILL

DRI

VE

BLAINE STREET

CAN

YON

CRE

ST D

RIVE

WATKINS DRIVE

UNIVERSITY AVENUE

ABER

DEE

N D

RIVE

EAST

CA

MPU

S D

RIV

E

NORTH CAMPUS DRIVE

EUCALYPTUS DRIVE

CA

NYO

N C

REST

DRI

VE

SOUTH CAMPUS DRIVE

WEST CA

MPUS DRIVE

Pedestrian Mall

Courtyard

Carillon Mall and Library Mall

Heritage Open Space and Garden

Existing Open Space

BIG SPRINGS ROAD

PICNIC HILL

SCIE

NC

E M

ALL

BARN

MA

LL

0 250 500 750ft

N

CONTEXT:STREET TREE DIAGRAM

Existing naturalized berm with Canary Island Pines

Continuation of native and naturalized trees

Existing Hybrid Mexican Fan Palm and continuation of Tipuana tipu

RUSD STEM

3 2

1

LINDEN ST. PALM TREE LINED AXIS UCR ARROYO

VALENCIA HILL DR. CEQA BERM

1 3

2

Page 11: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

11

SITE PROGRAM

CEQA SETTLEMENT

BERM

CEQA SETTLEMENT

BERM

SEATING

AMPHITHEATRE

CAFE SEATING

EVENT SEATING

GARDEN BEDS

COM-POST

OUTDOOR ROBOTIC TESTING AND MOCK

COMPETITION SPACE

TEACHING ORCHARD

900 SFGREEN HOUSE

FITNESS

FITNESS

FITNESS

FITNESS

SERVICE YARD

LECTURE

LECTURE

DROP-OFF

DROP-OFF

ENTRY PLAZA

LINDEN STREET PLAZA

BUS WATING AREA

GATEWAY

LEGEND

ENTRY & ARRIVAL

STEM COMMUNAL SPACE

LECTURE / EDUCATION SPACE

RECREATION / FITNESS

AGRICULTURAL PROGRAM

CEQA

Page 12: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

12

LANDSCAPEINSPIRATIONAL IMAGES

GREEN HOUSE AND PLANTERS RAISED GARDEN BEDS TEACHING ORCHARDOUTDOOR ASSEMBLY SEATING

EVENT AND SCHOOL GATHERING SPACE FITNESS & RECREATION ENGINEERING TESTING & ROBOTICS INDOOR/OUTDOOR CLASSROOM

Page 13: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

13

SITE PLANOPTION 1

2

3

45

6

7

1

VA

LE

NC

IA H

ILL

DR

.

W AT K I N S D R .

LOT 1

FACULTY PARKING LOT 1

FACULTY PARKING LOT 2

CEQ

A S

ETTL

EMEN

T B

ERM

O P T I O N 1Site PlanN

ST

UD

EN

T D

RO

P-O

FF

Page 14: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

14

SITE PLANOPTION 2

O P T I O N 2

2

4

6

5

7

3

1

ST

UD

EN

T D

RO

P-O

FF

VA

LE

NC

IA H

ILL

DR

.

W AT K I N S D R .

Site PlanN

LOT 1

FACULTY PARKING LOT 1

FACULTY PARKING LOT 2

CEQ

A S

ETTL

EMEN

T B

ERM

Page 15: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

15

SITE PLANOPTION 3

2

3

4

7

6

5

1

ST

UD

EN

T D

RO

P-O

FF

B U S D R O P - O F F

BU

S A

CC

ES

S L

AN

E

LOT 1

FACULTY PARKING LOT

VA

LE

NC

IA H

ILL

DR

.

Site PlanN

O P T I O N 3

W AT K I N S D R .

CEQ

A S

ETTL

EMEN

T B

ERM

Page 16: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

16

CONCEPT 1 BOX SPRINGS MOUNTAINS

Natural mountain terrain, vegetation and trails. Lush natural landscape in organic arrangements contrasted by clean lined hardscape.

Landscaped mounds alongside hardscape encouraged interaction with the outdoor environment.

Hard seating nestled into the landscape. Teaching spaces (amphitheater) carved out and incorporated into the landscape.

Page 17: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

17

CONCEPT 2ARROYO

Natural arroyo landscape. Boulders integrated into natural arroyo.

Drainage clearly expressed and integrated into circulation paths to offer teaching opportunities.Site drainage meanders throughout the site, interacting with paths and outdoor teaching spaces.

Page 18: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

18

LANDSCAPEPLANTING FRAMEWORK

WATKINS DR.

VA

LEN

CIA

HIL

L D

R.

GLEN MOR APARTMENTS

ARROYO CREEK BEDS, WITH VARIED GRASSES, NATIVE SHRUBS AND BOULDERS

ENTRY GARDEN WITH SOFT DESERT TEXTURES AND COLORFUL ACCENTS

TOPOGRAPHIC LANDFORMS WITH TEXTURAL BUFFER PLANTING

EDUCATIONAL FRUIT AND VEGETABLE GARDEN

Entry garden with soft desert textures and colorful accents.

Arroyo creek beds with varied grasses, native shrubs and boulders.

Topographic landforms with textural buffer planting.

Educational fruit and vegetable garden.

Page 19: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

19

LANDSCAPETREE FRAMEWORK

WATKINS DR.

VA

LEN

CIA

HIL

L D

R.

GLEN MOR APARTMENTS

PARKINSONIA ACULEATA

CITRUS SINENSIS

QUERCUS AGRIFOLIA

TIPUANA TIPU

PLATANUS RACEMOSA

WASHINGTONIA ROBUSTA HYBRID (EXISTING)

EXISTING POPULUS FREMONTII

EXISTING CEQA BERM TREES

Platanus Racemosa

QuercusAgrifolia

ParkinsoniaAculeata

Tipuana Tipu

Citrud Sinensis Washingtonia Robusta Hybrid (Existing)

Exisiting Populus Fremontii

Exisiting CEQA Berm Trees

Page 20: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

20

LANDSCAPETREE SELECTION

Parkinsonia Aculeata Citrus Sinensis Washingtonia Robusta (Hybrid)Acacia Podalyriifolia

Arbutus Marina Quercus Agrifolia Tipuana Tipu Platanus Racemosa

Page 21: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

21

LANDSCAPEUNDER STORY PLANTING

ARROYO

ENTRY GARDEN MUHLENBERGIA DUBIA

CAREX DIVULSA

BACCHARIS PILULARIS 'TWIN PEAKS'

FESTUCA MAIREI

CHONDROPETALUM TECTORUMDIETES BICOLOR

SALVIA POZO 'BLUE' RHAMNUS UMBULATA 'MINOR'ROSMARINUS OFFICINALIS'TUSCAN BLUE'

LANTANA 'GOLD' MUHLENBERGIA LINHEIMERII

ALOE AGAVE 'BLUE GLOW' YUCCA FILAMENTOSA ANIGOZANTHOS 'BUSH SUNSET'

SENECIO SERPENS

LANDFORMS & BUFFER

Muhlenbergia DubiaENTRY GARDEN

ARROYO

LANDFORMS & BUFFER

Carex Divulsa

Festuca Mairei Salvia Pozo ‘Blue’ Rosmarinus Officinalis ‘Tuscan Blue’

Rhamnus Umbulata ‘Minor’Baccharis Pilularis ‘Twin Peaks’

Chondropetalum Tectorum Dietes Bicolor Lantana ‘Gold’ Muhlenbergia Linheimerii

Aloe Agave ‘Blue Glow’ Yucca Filamentosa Anigozanthos ‘Bush Sunset’ Senecio Serpens

Page 22: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

22

SITE COMPARISON

FutureCurrent

Light Pollution

Noise

Traffic

Direct light and glare spill from lights will be contained on the site.

Limited noise impacts from outdoor activities except for limited hours of the day on North and South side of the building.

Nighttime noise should be virtually eliminated.

Through traffic will bypass school because of school zone speed limits.

Signalized intersection will make for safer traffic movements in and around school zone.

Page 23: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

23

CONCEPTUAL RENDERINGEXTERIOR

Page 24: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

24

CONCEPTUAL RENDERINGMAIN ENTRANCE

Page 25: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

25

CONCEPTUAL RENDERINGEXTERIOR

Page 26: Building for the Future - Office of the Provost...Noise Traffic Direct light and glare spill from lights will be contained on the site. Limited noise impacts from outdoor activities

26

CONCEPTUAL RENDERINGINTERIOR