1

Building Codes and Mitigation ActivitiesRelated to Weather Catastrophes

NAIC Center for Insurance and Policy ResearchSymposium – Kansas City, MO, October 7, 2014

Tim ReinholdSr. VP for Research, Chief Engineer

Page 2: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

2

Areas where Building Codes Require Engineering Based High-Wind

Residential Construction

Plus:American Samoa, Guam, Hawaii – special wind regions,Puerto Rico, Virgin Islands

Location of Wind Damage Reports in the US, 2012*

There were 14,351 “Wind Damage” reports through Dec. 31, causing

extensive damage to homes and,

businesses

Hurricane Sandy resulted in a large

volume of wind damage reports

Page 3: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

3

Location of Large Hail Reports in the US, 2012*

There were 7,033 “Large Hail”

reports through Dec. 31, 2012,

causing extensive damage to homes,

businesses and vehicles

Location of Tornadoes in the US, 2012*

1,119 tornadoes killed 68 people through Dec. 31

Page 4: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

4

Engineering Based High-Wind Codes Can Make a Difference in Certain Areas

Plus:American Samoa, Guam, Hawaii – special wind regions,Puerto Rico, Virgin Islands

Claim Frequency by Age of Home

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

Ye a r of C onst r uc t i on

Average = 41%

Average = 17%

1995 High Wind Standards

Page 5: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

5

Effect of Engineering Based Design and Construction on Claim Frequency and Severity - Residential

Pre 1996:

$24/sf

1996 - 2004:

$14/sf

-42%

Pre 1996:

41 claims/100 policies

1996 - 2004:

17 claims/100 policies

-60%

Pre 1996:

4,453 Policies

1,843 Claims

1996 – 2004:

1151 Policies

192 Claims

Amount of Roof Damage

4%

20%

51%

25%

14%

48%

33%

5%

0%10%20%30%40%50%60%70%80%90%

100%

% of

Total Claims

Pre 1996 1996 - 2004Building Code Category

No Roof Damage Partial Covering Whole Covering Whole Covering with Decking

* Includes claims with known damage types only, except for partial covering/partial decking.

Page 6: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

6

Interior Damage and ALE by Year of Construction

29%

51%

9%11%

44%

47%

9%0%

0%10%20%30%40%50%60%70%80%90%

100%

% Total Claims

Pre 1996 1996 - 2004

Building Code Category

Interior Damage,ALE ≥ 1 Month

Interior Damage,ALE < 1 Month

Interior Damage,No ALE

No Interior Damage

The Good News fromHurricane Research

• Newer engineering-based wind design standards can produce buildings that perform well structurally– In Hurricane Charley

• No loss of whole roofs on homes built to new standards

• No documented loss of roof sheathing from homes built in the last 5 years

• No structural failures except for screen enclosures, carports and add-on structures

• No post 1997 homes where families out for > 1 month

Page 7: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

7

The Bad News about Building Performance in Hurricanes

Building Envelope Performance Issues Remain Key to Further Reductions in Losses

Roof coverings are still a major problem area (95+% of homes with claim had roof covering damage)

75% of homes with claims had some soffit damage (vinyl and aluminum soffits)

When gust wind speeds exceeded 120 mph, approximately 1/3 of homes without shutters had at least one broken window – UF study of Hurricane Charley Damage.

Characteristics of an Extreme Weather Resistant Building

• Properly installed wind/impact rated building envelope products

• Minimize water intrusion • Protection of openings – windows and

doors (primarily hurricane)• Continuous load path from roof to

foundation

Page 8: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

8

Helpful Provisions of Building Codes Used in the Middle of the Country (weather related)• Wind rated asphalt shingles required (2003 and

later editions of IRC)

• Pressure ratings of windows, doors, & garage doors may be checked (enforcement?)

• Minimal strapping requirement for roof-to-wall connection if trusses are used (2006 & 2009 IRC)

• Appropriate strapping required for roof-to-wall connections when loads >200 lbs (2012 IRC)

When Engineering Based High-Wind Standards are not Used

• Current construction practices produce brittle buildings that are very poorly connected– Strength already paid for is wasted– Typical construction = a house of cards– Little or no attention to selecting wind rated

products or to careful installation

Page 9: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

10

Continuous load path

Re-Roofing = Opportunity for Improvement

• Roof cover is first Line of defense against many natural hazards

• Is part of building that gets replaced / repaired most frequently

• When roof cover is replaced - simple but significant low-cost improvements are possible– Re-fasten sheathing– Seal roof deck– Installing wind-resistant, fire-resistant and/or

impact-resistant roof cover

Page 10: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

11

Loss of Roof Sheathing Allows a Tremendous Amount of Water to Enter

Roof Sheathing Attachment

• Older Attachment Schedules were Grossly Inadequate

• New High-Wind Schedules Still Inadequate• What to do if you are replacing your roof

covering• Options if you have access to your attic

Page 11: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

12

Re-nailing Deck

Roof Covering Failures

95% of Homes w/ Claims

52% of $ in Claims

Page 12: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

13

Water Intrusion: Exposed Roof Sheathing

Water Intrusion Video

Page 13: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

14

Duplex damage estimatesUnsealed roof deck side = $16,935

Sealed roof deck side = $5,408

Wind-Driven Water Intrusion Research

Sealed Roof Deck

© Insurance Institute for Business & Home Safety

Page 14: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

15

Sealed Roof Deck

© Insurance Institute for Business & Home Safety

Sealed Roof Deck

© Insurance Institute for Business & Home Safety

Page 15: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

16

Sealed Roof Deck

© Insurance Institute for Business & Home Safety

Water Intrusion through Soffits

Open

Covered

Page 16: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

17

Water Intrusion: Gable End Vent

At a wind speed of 30 mph+ Water Entry Rate for Open Vent = Wind-driven Water Deposition Rate

Achieving Shared GoalsGetting consumers, designers, builders, contractors, policyholders, and lenders to recognize the benefits of resilient construction.

FORTIFIED homes can lower the total cost of ownership and reduce risk for vulnerable clients.

Page 17: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

18

IBHS Voluntary, Superior Construction Standards

Page 18: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

19

• FORTIFY Roof and Attic Ventilation System

• FORTIFY the Openings

• FORTIFY the Structure

Designation Level Basics - Hurricane

Why FORTIFIED? … Because little things matter

Page 19: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

20

FORTIFIED Roof –Roof Covering Shingles

Meets standards Does not qualifyFORTIFIED Gable Ends

Meets standards Does not qualify

Page 20: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

21

FORTIFIED Estimate Using Xactimate

• Comparing code compliant re-roof with FORTIFIED Roof – Pricing for Tampa– 1400 s.f. roof– Simple Gable with

turned gable– Shingle roof cover

Difference approx. +$700

4/27/2012 41

FORTIFIED Home™ Project Cost: Actual

Upgrading to FORTIFIED

Bronze on this home

cost less than $800

© Insurance Institute for Business & Home Safety

Page 21: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

22

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Pre 1994 Construction

Bronze 1

Bronze 2

Silver 1

Silver 2

Gold 1

Gold 2

2002 FBC

Fortified... for Safer Living

Wind Mitigation Relativity

IBHS FORTIFIED for Existing Homes Program Windstorm Loss Relativities in RMS US Hurricane Model

Analysis of wood or masonry residential construction in high-hazard areas in Florida. Relativities for other locations and configurations may be different than those shown here.

High Wind CommercialConstruction Test

Full-scale, strip mall-type structures

Test was designed to demonstrate that building performance can besignificantly improved in several key areas with relatively modest

increases in costs.

Page 22: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

23

Focus areas included:

Perimeter edge flashing and roof membrane anchorage

Load path and connections

Roof-mounted equipment anchorage

Roll-up door wind resistance

High-WindCommercial Construction Test

Flashing and membrane attachment enhancements: $850

Roll-up Door – wind locks: $350

Wall reinforcing and concrete (to code): $1,250

Anchorage of roof top equipment: $650

TOTAL (without “to code” costs) $1,850

Cost Differences to Create Stronger Building

Page 23: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

24

Page 24: Building Codes and Mitigation Activities Related to Weather … · 2016-06-09 · Microsoft PowerPoint - NAIC-CIPR Symposium Reinhold Presentation October_7_2014.pptx Author: shall

11/4/2014

25

DHS Pilot Program

FORTIFIED is only qualifying standard for Pilot

Pilot began Q1 2014

www.disastersafety.org