budget control in dynamics ax 2012

12
Budget Control In Dynamics AX 2012 Ahmed Yakan Regional Manager Traxconsulting [email protected]

Upload: alessa

Post on 11-Jan-2016

128 views

Category:

Documents


5 download

DESCRIPTION

Budget Control In Dynamics AX 2012. Ahmed Yakan Regional Manager Traxconsulting [email protected]. Agenda. Budget Control In AX 2012. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Budget Control In Dynamics AX 2012

Budget Control In Dynamics AX 2012Ahmed YakanRegional [email protected]

Page 2: Budget Control In Dynamics AX 2012

Agenda

Budget Control Definition

Budget Control Setups

Procurement With Budget Control

Q&A

Page 3: Budget Control In Dynamics AX 2012

Budget Control In AX 2012

The budget control keeps monitoring the budget funds that are available for planned and actual purchases and expenditures and to not exceed this budget fund in certain period.

Page 4: Budget Control In Dynamics AX 2012

Integrated Modules With Budget Control

General Ledger

Procurement & Sourcing

Travel & Expense

Project accounting

Fixed Assets

Supply Chain Management

Page 5: Budget Control In Dynamics AX 2012

Budget Control In AX 2012

BudgetControl

Main Topics

Budget Codes

Budget Cycles

Budget Models

Dimensions For Budget

Budget Control Configuration

Budget Register Entry

Simple Budget Checking Cycle

Page 6: Budget Control In Dynamics AX 2012

Budget Control In AX 2012

Budget Codes • Original • Transfer• Revision• Encumbrances• Pre encumbrances

Budget Models• Sub model• Total model

Page 7: Budget Control In Dynamics AX 2012

Budget Configuration

Budget Permissions

Fund Available

Source Document

Page 8: Budget Control In Dynamics AX 2012

Budget Funds Available

Amount to sum

Amount to

subtract

Actual Expenditure

s

Encumbrances

Original Budget

Page 9: Budget Control In Dynamics AX 2012

Budgeting in AX 2012

Budget account entry for 602190-Dept-CC: 1000.00

Budget funds available for Dept-CC: 1000.00

Purchase requisition line for training

602190-Dept-CC: 400.00

Budget reservation for pre-encumbrance for Dept-CC:

400.00

Budget funds available for Dept-CC: 600.00

Purchase order line for training

602190-Dept-CC: 400.00

Budget reservation for encumbrance for Dept-CC:

400.00

Budget funds available for Dept-CC: 600.00

Vendor invoice line for training

602190-Dept-CC: 410.00

DR: 602190-Dept-CC: 410.00CR: 212500-Dept-CC: 410.00

Budget reservation for actual expense for Dept-CC: 410.00

Budget funds available for Dept-CC: 590.00

Relieves Relieves

Procurement Process with Budget Control

Page 10: Budget Control In Dynamics AX 2012

Free Training Voucher Question

Which parameter must be selected to monitor the draft purchase requisitions to not exceed a specific budget amount?

Page 11: Budget Control In Dynamics AX 2012

Simple Cycle for checking budget on Microsoft Dynamics AX 2012

Demo

Page 12: Budget Control In Dynamics AX 2012

Q&A