Presentation Flow
1. GENERATION : Accelerated Growth
2. PROBLEM : Matching Power Demand
3. OPTIMISING : Load Generation Mix
4. BYPLs Innovation
Renewable EnergyAssistedPump
ModularIntegratedDistribution Automation System
DRONA Training Simulator
5. Sum Up :Electronics in Power Distribution.
2 BSES Yamuna Power Ltd.
-
7/27/2019 bses electrical
3/15
GENERATION : accelerated growth
3
Installed capacity as on Nov12 : 2,10,937 MW
YEAR 1991-92: Liberalization Policy by Govt. of India
New Policy Framework to fosterAccelerated Growth in Power.
Private / FDI participation for the Generation Sector
BSES Yamuna Power Ltd.
-
7/27/2019 bses electrical
4/15
4
Installed Capacity : 2,10,937 MW
Grid Demand : 135,453 MW
PROBLEM : Power Demand Constraints
BSES Yamuna Power Ltd.
Poised for Huge Growth & Investments
Suppressed Demand :
1. Huge piling of the New connection pendency (other than private utilities)
2. More than 30% of the 2 Crs pumpset run on DG Sets
3. Majority of the un-electrified railway corridors (other than main trunk lines)
4. Unavailability of efficient Public transport system : Metro, Monorail etc.
5. Majority of un-electrifed / partially electrified 5 lac villages.
-
7/27/2019 bses electrical
5/15
Optimizing Load Generation Mix
Usage Based Customer Segmentation
1) PUMPING LOAD:
Brief : 19.6 Million pumps / As & When required / ~45% of total capacity
Preferred Gen Mode : Renewable(Solar)/ Hydro / Thermal
2) LIGHTING LOAD:
Brief : Off Peak Load / ~18% of total installed capacity
Preferred Gen Mode : Renewable(Biomass) / Hydro / Thermal
5 BSES Yamuna Power Limited.
-
7/27/2019 bses electrical
6/15
Usage Based Customer Segmentation
3) DRIVES/TRACTION
Brief : Industrial & Tractions / RTC Load / ~40% of total installed capacity
Preferred Gen Mode : Thermal, Nuclear/ Hydro / Renewable
4) HEATING/COOLING :
Brief : Off Peak Load / ~20 % of total installed capacity
Preferred Gen Mode : Renewable(Biomass/ Bagasse)/ Hydro / Thermal
6BSES Yamuna Power Ltd.
Optimizing Load Generation Mix
-
7/27/2019 bses electrical
7/15
BYPLS INNOVATION
7 BSES Yamuna Power Ltd.
-
7/27/2019 bses electrical
8/15
IIT - Delhi
8 BSES Yamuna Power Limited.
Specially designed pump powered by a solar panel connected to a water tank
USAGES :
Pumping requirements : Urban & Rural setup
Portable drinking water solution for remote villages.
ACCREDITATIONS :
SP 2B' grading by CARE ( 'HIGH' performanc e ; 'Moderate' f iscal streng th)
MNRE Approved (Channel Partner for of f -gr id so lar programm e under JNNSM )
RENEWABLEENERGYASSISTEDPUMP [REAP]
-
7/27/2019 bses electrical
9/15
9BSES Yamuna Power Ltd.
Long Operating Life.
Eco friendly.
Easy to operate and maintain.
Freedom from hikes in electricity tariff
Quick Payback ( ~ 3 Years) with 0 Operating Cost
RENEWABLEENERGYASSISTEDPUMP [REAP]
-
7/27/2019 bses electrical
10/15
10 BSES Yamuna Power Limited.
Centralized Health Monitoring of the HT Network & Equipments
FRTU(developed in collaboration with IIT-Delhi),
Sensors, Fault Passage Ind icator s, Modem
Compatible w ith s/w like OMS & oth er IT Platfo rms like SAP, GIS etc
Modular Integrated Distribution Automation System
-
7/27/2019 bses electrical
11/15
11BSES Yamuna Power Ltd.
Condition MonitoringLoad imbalances, Power Factor, Oil Level, Temperature etc
Meter data ManagementAnalytics, Energy Audit, Theft Control, Network Planning.
Intrusion Control.
Automatic notification & Escalation
P R E D E C T I V E Maintenance Tool
Modular Integrated Distribution Automation System
For Utility Savings :reduced breakdowns, manpower / man-hour
Improved reliability
Condition monitoring of assets
Network analysis & control For Consumer
Minimum outages
Improved quality supply
-
7/27/2019 bses electrical
12/15
12BSES Yamuna Power Ltd.
DRONA Training Simulator
Web based application for imparting Distribution Business Domain Knowledge
In form at ion in the form of 3-D Anim at ion, presentat ions, technic al specs, Videos etc
Interact ive learning throug h n umerous Qu izzes & Puzzles .
Standardized Train ing for exist ing emp loyees & new joinees.
Exhaustive Coverage :
1) EQUIPMENTS functions, features & SoPs
2) PROCESSFLOWS SoPs, timelines & statutory guidelines
-
7/27/2019 bses electrical
13/15
13BSES Yamuna Power Ltd.
DRONA Training Simulator
1. Outage Management2. Preventive Maintenance
3. Enforcement
4. Meter Management
5. Power Management
6. Protection7. Customer Care
8. Technical Diary
9. Tools
10. Meter to Cash
To exercise the operational teams ability to evaluate,
prioritize and respond to problems in an integrated manner
within a time critical environment.
To provide procedures to be used in performing fault /
recovery of the operations performed during the breakdown/
maintenance phase
Discoms Classroom of the Future
1 0M O D U L E
-
7/27/2019 bses electrical
14/15
14BSES Yamuna Power Ltd.
Electronics in Power Distribution.
IT & ELECTRONICS form DISCOMS BACKBONE..Operations / Biz / System Support
Pertinent Issues :
1) Want for Research & Development (R&D)
Scope : Product & IT based Applications
Focusing Minimal Manual Intervention
A U T O M A T I O N
2) Integration
More Focus on Application side rather than on Hardware
Seamless handshake (Hardware & IT ) : SCADA / DMS / SAP / GIS / DMS
TRANSITION : Basic Infra Mgmt Advanced System Automation
-