Business Release Quality (BRQ)BRQ Office Operationalization FrameworkMay 8, 2013
Confidential and Proprietary Information NOT FOR DISTRIBUTION 2
Business Imperatives
Improve Business Release Quality (BRQ) and meet BlueChip and SDO commitments.
Create forum for continuous quality improvement to eliminate critical failures experienced in functional deployments.
Reduce release defects and support costs.
Enhance HCSC competitive positioning.
Ensure the portfolio delivers strong strategic alignment and business value.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 3
BRQ Office – Why are we here?
BRQ Office Purpose
Ensure transparency, adherence to standards, on-time delivery and quality for members, providers and partners.
BRQ Office Guiding Principles
Focus, Accountability, Engagement, Customers
BRQ Office Vision Enable HCSC to exceed BlueChip commitments and Business Release Quality (BRQ) targets by providing the leadership, partnerships and resources for success.
BRQ Office Mission
• Operationalize portfolio and release management processes across SDO Tech targeting on time delivery, within scope and approved budget.
• Enable process discipline through collaboration across key stakeholders.
BRQ Office Operating Goals
Establish a singularly articulated and commonly referred to framework across BlueChip to:• Manage the “Request-to-Release” project cycle.• Establish and enforce a collaborative governance framework across the
entire project lifecycle for all Tier 1-4 projects impacting the BlueChip ecosystem.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 4
BRQ Office – Why are we here? (Updated 04.24.13)
BRQ Office Purpose
Ensure transparency, adherence to standards, on-time delivery and quality for members, providers and partners.
BRQ Office Guiding Principles
Focus, Accountability, Engagement, Customers
BRQ Office Vision Improve the Business Release Quality (BRQ) targets by providing the leadership, partnerships and resources for success.
BRQ Office Mission
• Operationalize portfolio and release management processes across SDO Tech targeting on time delivery, within scope and approved budget.
• Enable process discipline through collaboration across key stakeholders.
BRQ Office Operating Goals
Establish a singularly articulated and commonly referred to framework across BlueChip to:• Manage and provide oversight of SDO Tech engagement across the
“Request-to-Release” project cycle.• Establish and enforce a collaborative governance framework across the
entire project lifecycle for all Tier 1 – 4 projects impacting BlueChip ecosystem.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 5
Problem Summary
Processes exist but aren’t universally understood and applied.
Release processes and reporting are redundant across teams.
Roles and responsibilities are not clearly defined – ownership of each step of the Request-to-Release process is unclear.
Processes and tools are inconsistent across SDO, ITG and PMO/PPM - which impedes collaboration.
Governance structure is unclear and often circumvented.
Controls and accountabilities don’t ensure process compliance and enforcement.
No traceability/audit trail between release components and business requirements/capabilities.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 6
Understanding the Capability
Request-to-Release Cycle
Portfolio Requirements
Design / Build Test Business
Readiness Implement
ITG Team Members
SDO Team Members
The success of the Request-to-Release cycle is dependent upon collaboration across many
teams within ITG and SDO.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 7
Request-to-Release Cycle
Implement a collaboratively managed Request-to-Release process.
• ITG and SDO jointly own the management and outcome of the process. However, primacy of ownership shifts between ITG and SDO throughout.
• The BRQ Office directly owns the beginning and end of the process.
Portfolio Requirements Design / Build
Business ReadinessTest Implement
BRQ Office Team MembersITG Team Members
Confidential and Proprietary Information NOT FOR DISTRIBUTION 8
Implement a common portfolio management process across for projects impacting the SDO/BlueChip “ecosystem”.
Implement a resource estimation methodology and tools to more precisely assess staffing needs and balance demand with supply.
Enforce project management disciplines from Request-to-Release. Establish the BRQ Release Manager as the single-point of contact to
control and monitor business aspects of the release, on behalf of SDO. Build partnerships and collaboration among key stakeholders in the
Request-to-Release cycle. Clearly define roles and responsibilities for all stakeholders. Establish a clear governance / decision-making structure with a
common change control process.
The BRQ Office will operationalize the Request-to-Release process.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 9
Introducing the BRQ Office Team
• Portfolio Team - Manages the inputs and prioritization of project requests coming into the release cycle and ensures requirements are signed off.
• Release Planning and Management - Plans and manages the business aspects of the releases; works closely with BA, QA and ITG.
• Business Readiness – Delivers release related communication requirements and training.
• PIT - Supports production and defect management.
Request-to-Release Cycle
Portfolio Requirements Design / Build Test Business Readiness
Implement
ITG Team Members
SDO Team MembersJack
PortfolioEric
Release Planning & Mgt.Ramona
OCMNikiPIT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 10
Portfolio Management – In Context
Performance Dashboards
PM Processes & Controls
Measurement & Reporting
Guidance & Priorities
Strategy Capabilities ExecutionLeadership
Initiate, Plan, Execute, Monitor & Control, Close
Project Management Execution
PMO & ITG
TestDesign/Build DeployRequirements
Software Development Lifecycle
Portfolio FunnelIdentificationCategorizationEvaluationSelectionPrioritizationBalancingAuthorization
Confidential and Proprietary Information NOT FOR DISTRIBUTION 11
Portfolio Management Sequence – “ICESPBA”
Identification: Create an up-to-date list of new and in-progress components (initiatives) classified by work type (program, project, non-project)
Categorization: Group components into relevant business groups which are based on the strategic plan
Evaluation: Evaluate individual components, using scoring models with weighted criteria, so they can be compared through the selection process
Selection: Compare evaluated components and recommend a short list for prioritization
Prioritization: Rank selected components within each strategic, business or funding category
Portfolio Balancing: Develop the portfolio mix based on priority, risk, portfolio performance and capacity: add new components and identify existing components to be suspended or terminated
Authorization: Formally communicate and allocate funds and resources to execute balancing decision
Portfolio Review and Reporting: Regular review of portfolio execution and determining whether to continue, reprioritize or terminate components
Strategic Change: Review impacts to portfolio in the event of a change in strategy
Confidential and Proprietary Information NOT FOR DISTRIBUTION 12
Portfolio Management – In Context
Strategic Change
AuthorizationBalance
PrioritizationSelection
EvaluationCategorization
Identification
Initiate Plan Execute Close
Monitor & ControlReview & Report
Project & Program ManagementPortfolio Management
Pre-Project (Planning) Project (Execution)
Portfolio Governance
Confidential and Proprietary Information NOT FOR DISTRIBUTION 13
Objectives Manage the evaluation, prioritization and inventory of demand impacting the BlueChip systems and
business process ecosystem. Provide a transparent and strategically aligned portfolio of scheduled demand to SDO and enterprise
customers and partners. Represent SDO in the evaluation and feasibility assessment of new ideas and opportunities through
the funding and approval process.
Method Own the BlueChip demand portfolio and BlueChip release scope definitions. Govern and coordinate the evaluation and assessment of new ideas and opportunities impacting
Blue Chip from a business perspective (i.e., Business Impact Assessment process). Govern and coordinate the requirements management process.
Structure• Centralized team within the Business Release Quality (BRQ) Office
Partner closely with BlueChip Production Implementation Team (PIT), BRQ Audit and BRQ Release Management Team.
Share Release Scope/Contents and Change Control processes with BCAG Release Management.• Matrix organization with governance and process ownership
Provide standards, tools and processes for Business Analyst teams across SDO Tech. Coordinate with SDO Tech Business Analysts and other Portfolio teams for consistent requirements and
portfolio management operations.
BlueChip Portfolio Management
Confidential and Proprietary Information NOT FOR DISTRIBUTION 14
Establish one portfolio management process for the BlueChip “ecosystem”.
• Participate in the PPM evaluation Process and Gate Reviews (Tier 1-3)
• Review all PPM Funding Request Document (Tier 1-3)
• Review SSO Tier 4 Opportunity Document
• Assess impact of requests on SDO systems and business processeso Localo Nationalo Shared Serviceso Bus Councils/FSU
• Categorize for Evaluationo Tiero Programo Systems Impactedo Bus Capabilityo Defect Fix vs. New
• Assess Business Benefit and Impactso Quantifiableo Non-quantifiable
• Apply a scoring model with weighting criteria to facilitate comparison
• Assess ROM Size & Costo Resource required
• Assess/Consider Timingo Customer Requesto Release Schedule
Impact• Select candidate “short list”
for prioritization• Set preliminary release
target• Ensure Clarity is updated
• Review candidates with stakeholder body to be held responsible for prioritization.o SDO reps from Local,
National and Shared Services
o Business Council repso BET (Tier 1-4 projects)
• Force-rank selected candidates for prioritization
• Agree on priority projects and provide requirements gate funding
• Assign BA and ITG Lead resources and begin business requirements
• Re-assess release schedule impact
• Complete business requirements
• Conduct requirements reviews and obtain sign-offs
• Determine Estimates to Complete (ETC) and assess business and ITG resource capacity
• Assign resources at named staff level
• Schedule project for release• Establish release baseline
contents with ITG• Ensure Planning and Kick-
Off meetings are held
IdentifyCategorize
EvaluateSelect
PrioritizeBalance
Authorize
Assumes Tier 1-3 Projects are already evaluated, selected and prioritized.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 15
BRQ Portfolio Management Process
Req
uest
or /
Cus
tom
erB
RQ
Por
tfolio
ITG
& Q
AP
PM
& B
ET
SD
O T
ech
BA
Approve Impact to Claims?
Yes
Demand Triage:Assess, Assign,
Review & ValidateImpacts to Claims
Processing
YesStage 1 or Tier 4
Approved?
No
UG
Portfolio Prioritization &
Release Planning
Preliminary Release Scope
Approved Release Scope incorporates input from SDO Tech, Customers and ITG leadership. Parties agree that scope can be completed for a given release.
Provide Release Candidates to BA,
ITG, QA and Customer
Approved Release Scope
Opportunity Document or
Funding Request
Baseline Release Scope
& Hand-Over to Release
Management
BC Business Release User Group(Includes Enterprise Councils)
SC
UG
BC Business Release Steering Committee
UG SC
Requirements Walk-Throughs with QA, ITG,
Delivery Partners and Customers
EP
MO
Document Blue Chip System Functional
Requirements
Refine or Add Business Impacts
(if necessary) Requirements Review
UG SC
Tier 1-3
Tier 1-3
Define prioritized preliminary release scopes & impacts taking into consideration the following:-New Requests-Existing Requests & Carry-over-Production Defects-Maintenance Items-Mandates / New Business-Other Council Projects
Assign Business Analyst(s) &
Refine Business Impacts
No
UG
Document Stakeholder Needs and Customer
Requirements
Stage 2 Approved?
UG
No
Tier 1-3StagedFunding
AssessmentOptions
Yes
Schedule&
ReleaseNeeds
Approved Projects
UG
Provide Project
Schedule and Release Needs
Provide Approved Customer
Requirements
Identify New or Refined Impacts or
Adjustments to Schedule
Estimate High-Level Costs and Impacts
Assess Preliminary
Scope & Engage
Reviewers
Re-Estimate Detailed Costs & Assign
Resources
Tier 1-3
Assess Preliminary
Scope & Provide
Feedback
Estimate High-Level Costs and
Business Impacts Tier 4
Tier 4
UG
RefinedBusinessImpacts
Blue Chip Portfolio ManagementDetailed Standard Operating Procedure
15
Triage Demand
Prioritize
Plan Release
Confidential and Proprietary Information NOT FOR DISTRIBUTION 16
Blue Chip Portfolio ManagementDetailed Standard Operating Procedure Cont.
16
1.0 Receive opportunity
document from Requestor
1.1 Save to personal drive and
add to submitter
metrics log
1.2 Review for completeness
and priority
1.3 Work with Requestor to understand
request and get all necessary
data
Does the idea have business
merit?
Should the idea move forward?
1.4 Entry into Clarity move Op
Doc to Repository
Yes Yes
No, reject and notify requestor
2.3 Score projects and share with
Management
2.1 Update submitter metric log
2.2 Update Blue Chip Master
Portfolio 2.4 Share Projects
with Enterprise Service Stewards
Scores Approved Scores Approved 2.5 Assign Target Release Dates Yes
No, refine score data with requestor
Yes
No, cancel or move to list B and notify requestor
3.1 Create Preliminary
Release Scope3.2 Give to
Scope Coordinator
3.3 SME at release planning
meetings
3.4 Verify accuracy of release plan
3.5 Notify Requestor and Other Councils when project is
scheduled
3.6 Update submitter metric log
3.7 Monitor Clarity data accuracy
2.6 Notify Requestor
·Po
rtfol
io M
anag
emen
t –
Rele
ase
Plan
ning
·Po
rtfol
io M
anag
emen
t – P
riotiz
atio
n·
Portf
olio
Man
agem
ent -
De
man
d Tri
age
Confidential and Proprietary Information NOT FOR DISTRIBUTION 17
Blue Chip Portfolio & Release PlanningKey Deliverables
17
•Completed Opportunity Documents or Funding Requests required
•Opportunities will be scored according to value to help determine priority
•Projects evaluated prior to approval and entry into Portfolio
Portfolio
•Based on value, mix and timing, candidates are identified for further work through requirements
•Additional candidates can be identified after milestone, but same vetting must occur
Preliminary Scope •Once requirements are
completed, approved and accepted, a project can be enter the baseline release
•Adds or withdrawals from an existing baseline release scope must happen via release change control
Baseline Scope
There are three key deliverables to be aware of within Portfolio Management and its intersection with Release Planning:
1. Portfolio2. Preliminary Scope3. Baseline Scope
Confidential and Proprietary Information NOT FOR DISTRIBUTION 18
Summary of Actions Required to Operationalize Portfolio Management Implement a single portfolio process for all BlueChip-impacting project requests. Rigorously enforce entry criteria. Define/address the staffing needs and implement the Portfolio Management
Team. Clearly define roles and responsibilities of all process participants jointly with
BCAG-ITG. Implement a methodology to align project candidates to business architecture
and strategy. Implement a common, objective scoring model that can be applied to force-rank
all project candidates. Implement a Portfolio Business Council with cross-organizational representation
that’s empowered to prioritize Tier 4 project candidates. Implement methodology and tools to:
Better estimate project resource requirements. Assign staff based on availability and skills. Manage actual resource consumption and estimates-to-complete.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 19
Portfolio Organization and Staffing Recommendation
Portfolio Manager
Strategic Alignment
Portfolio Architect 1
Operational Maintenance
Portfolio Architect 2
Portfolio Architect 3 Data & Rptg. Analyst
Requirements Management
Resource Coordinator
Portfolio Coordinator
Portfolio Architect(s)Manages inputs to the process and assesses and evaluates requests. Ensures projects align to strategic objectives and business architecture plan.
Requirements Analyst(s)Manages requests thru the business requirements process. Ensures SOP compliance and tool support (QC).
Resource CoordinatorWorks with ITG and SDO to estimate and assign resources to approved projects based on availability of specific staff with required skills.
Data & Reporting AnalystImplements portfolio reporting tools and dashboards. Ensures data inputs and data integrity.
Portfolio CoordinatorCoordinates and gathers the inputs and updates to the portfolio across Portfolio Strategy, Resource, Data, Requirements and Release Mgmt.
(BA 18)(BA 17)(BA 15-16)
Req Analyst 1
Req Analyst 2(BA 16-17)
(BA 16-17)
Ops Lead(Sr. Sup. - Unit Mgr.)
(Mgr. – Sr. Mgr.)
Portfolio Operations LeadOversees the day-to-day maintenance of the portfolio and requirements management.
Portfolio ManagerManages and is accountable for the strategic alignment and operational maintenance of the BlueChip Portfolio.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 20
Launch Two Recurring Portfolio Meetings
Portfolio Business Council – Operating level• Business Owners are the primary attendees• Review evaluated and “scored” Tier 4 project requests• Gain awareness of Tier 1-3 projects and impacts • Force-rank and prioritize Tier 4 projects• Agree on and approve additions to the portfolio• Review status of “Authorized” projects
Portfolio Review Meeting – Executive level• Senior SDO and ITG Leaders are the primary attendees• Inform on portfolio status• Inform on new approved additions• Inform on category alignment and release schedule• Validate against business strategy• Inform on issues and risks• Seek direction and resolution as required - “Court of Last Resort”
Confidential and Proprietary Information NOT FOR DISTRIBUTION 21
Implement a resource management process to balance demand with supply. Perform resource assignment and capacity planning before a project is
committed to and begun. For both ITG and Business resources Partner with ITG and business resource owners Leverage existing Clarity tool to estimate, assign and manage resource
needs at the named resource and skill level Project should not be recognized beyond the “Idea/Opportunity” stage
until staffed at the level appropriate per it’s status in the portfolio funnel. Manage Forecast-to-Actual, with periodic assessment to ensure
against over-allocation of staff. Utilize Clarity. Collaborate across Bus Ops., SDO Tech and ITG teams to ensure
realistic and transparent allocation of resources to each project.
Key Objective – Continuously manage and reconcile demand against supply at the project level
Confidential and Proprietary Information NOT FOR DISTRIBUTION 22
Release Planning and Management
Responsibility for release management to be shared between ITG and BRQ.
ITG Team Members
BRQ Office Team Members
The ITG team oversees the technical aspects of the release while the BRQ team oversees the business aspects of the release.
Business Aspects of the Release: Business capabilities, scope and change control, business communication of release milestones and project status, SDM adherence re: requirements and test, business risk and implications of testing, defect impact and workarounds, overall impact of projects on business deployment plan.
Technical Aspects of the Release: SDM adherence, coordination of design, build and test, environment management, code moves, migration to production, impact of SDM status on release schedule, scope and change control, communication of release milestones and project status across ITG organization.
Portfolio Requirements Design / Build
Business ReadinessTest Implement
Confidential and Proprietary Information NOT FOR DISTRIBUTION 23
Release Management Involves Planning and Execution of all Releases.
Release Planning Routinely review Portfolio to ensure new projects are aligned to a release. Coordinate with ITG to ensure technical environments/paths are available. Finalize/adjust projects to reach baseline release dates and milestones. Partner with ITG to produce and update the Release Planning document.
Release Management Ensure projects are aligned to releases and managed throughout all phases. Provide release milestones to project managers and stakeholders. Engage project leads to report weekly status, milestones progress and health. Identify, track and mitigate all risks and issues associated with the release. Ensure communication across all releases and audiences is consistent and effective. Provide various reports and metrics across most major phases of a release.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 24
The BRQ Release Coordinators will manage the business aspects of the release.
• Engage with Portfolio Manager to address independent project and release scope along with change requests.
• Manage, understand and effectively communicate plans, risks, resource needs and interdependencies.
• Proactively manage/monitor/control sign-offs and checkpoints. • Own/attend release status and governance meetings.• Ensure required documentation is complete, catalogued and available.• Facilitate Communications (upward/downward/sideways) and escalate.• Serve as focal point for release information and process, including
status, dashboards, risk mitigation and process improvement.• Ensure all artifacts and documents required to demonstrate release
quality and reliability are properly completed and stored.
The BRQ Release Coordinator, working jointly with the ITG Release Coordinator, ensures overall release quality and reliability.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 25
Release Coordinators (ITG and SDO) will act as single points of contact for their respective areas.
BRQ Release Coordinator
ITG Release Coordinator
PIT Team
PMs and IT Leads
Business Owners and Leads
Portfolio Team
BRQ Release Coordinator
Enterprise Release Mgt.
Enterprise Change Mgt.
IT Developers
ITG Support Teams
Environment Team
ITG Release Coordinator
BAs
QAs
BRQ Process Partners
Communications/OCM
• Serves as single-point of contact for business aspects of releases.
• Coordinates and monitors release activities with business impact.
• Escalates issues and risks and drives resolution.
• Serves as single-point of contact for technical aspects of releases.
• Coordinates and monitors release activities with technical impact.
• Escalates issues and risks and drives resolution.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 26
SDO Release Management will focus on all Project Execution activities.
Accountable Portfolio Manager
BA SME (Liaison)
IT Lead QA SME (Liaison)
OCM Release Managers
Responsible
• Portfolio Mgr.• Business Owner• BA• Portfolio Analyst• IT Sponsor
• SDO Tech Domain Mgr.
• BA• Business Lead• IT Lead• PM
• IT Lead• ITG Project Team• PM• Developer
• QA Test Mgr.• QA/Test Lead• BA• Bus. Lead• Defect Mgr.• PM / IT Lead• Developer
• OCM• PIT• BA• Defect Mgr.
• BA• Business Lead• Defect Mgr.• IT Leads• BRQ Rel.
Coordinator• ITG Rel.
Coordinator• PIT
Consult• Resource
Analysts• IT Lead• ITG Group
• Business Owner• QA/Test Lead(s)
• Business Lead• BA• Test Leads
• Business Owner• IT Lead
• Business Lead • Business Owner• ITG Stakeholders
Inform
• Business Owner• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• IT Sponsor• PM• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• OCM
Portfolio Requirements Design / Build
Business Readiness
Test Implement
------------Project Execution------------
Confidential and Proprietary Information NOT FOR DISTRIBUTION 27
Partnering with SDO BA and QA Teams to drive release quality.
Request-to-Release Cycle
ITG Team Members
BRQ Office Team Members
Portfolio Requirements Design / Build
Business ReadinessTest Implement
BA SMEs QA SMEs
The BRQ Office will ensure adherence to process and standards through a matrixed partnership with BA and QA teams.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 28
Who Are the BA and QA SMEs?
Who are the SMEs? Understand the business process model Support the lines of business
How will they interface with the BRQ Office? SMEs will continue to reside in their respective areas. SMEs will be matrixed to the BRQ Office to ensure key activities
are supported at a detailed level. • Support BA activities from Portfolio to Implementation. • Support SDO owned test activities.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 29
BA SMEs will:• Provide oversight of the requirements
process - across the release. • Ensure quality and completeness of
project requirements.• Develop standards and provide input
into BA capability improvements.
Portfolio• Business Impact Assessment• Bus Arch Strategy - partner to review
training outline for the supported business process.
Project Execution• Partner with business owner and
project to define requirements and future state.
• Requirement Walk through - support review with the project Team.
• Test Case Review- Participate and ensure traceability to business requirements.
BA / QA SMEs – What will they do?
QA SMEs will:• Provide oversight of the SDO owned
testing process - across the release. • Ensure quality and completeness of
test plans and scripts.• Ensure test plans are executed and
defects resolved.• Develop standards and provide input
into QA capability improvements.
Portfolio• Understand and anticipate projects
coming through Portfolio and plan for staffing.
Project Execution• Develop a release-level test strategy to
address redundancies in project-level test plans.
• Provide defect management oversight through engagement with Defect Board.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 30
Ensure that everyone knows what they are supposed to do and hold them accountable.
Define roles and responsibilities at each step of the process.
Formalize hand-offs with go/no-go checkpoints.• Clear understanding of who should be involved and when • Clearly articulated criteria for hand-off and documentation• Sign-off process and tools to ensure auditability
Establish “Rules of Engagement” - Identify and formalize cross-organizational interactions/communications to further collaboration.
View roles and responsibilities in terms of capabilities rather than the organization chart, i.e., don’t let the org chart get in the way.
Address skill gaps proactively rather than implementing workarounds to circumvent deficiencies – BAs, QAs, ITG, Release Coordinators etc.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 31
The Request-to-Release Process is jointly owned and collaboratively managed.
Accountable Portfolio Manager
BA SME (Liaison)
IT Lead QA SME (Liaison)
OCM Release Managers
Responsible
• Portfolio Mgr.• Business Owner• BA• Portfolio Analyst• IT Sponsor
• SDO Tech Domain Mgr.
• BA• Business Lead• IT Lead• PM
• IT Lead• ITG Project Team• PM• Developer
• QA Test Mgr.• QA/Test Lead• BA• Bus. Lead• Defect Mgr.• PM / IT Lead• Developer
• OCM• PIT• BA• Defect Mgr.
• BA• Business Lead• Defect Mgr.• IT Leads• BRQ Rel.
Coordinator• ITG Rel.
Coordinator• PIT
Consult• Resource
Analysts• IT Lead• ITG Group
• Business Owner• QA/Test Lead(s)
• Business Lead• BA• Test Leads
• Business Owner• IT Lead
• Business Lead • Business Owner• ITG Stakeholders
Inform
• Business Owner• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• IT Sponsor• PM• BRQ Rel. Mgr.• ITG Rel. Mgr.• BRQ Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• OCM
Portfolio Requirements Design / Build
Business Readiness
Test Implement
---------------- Project Execution ----------------
Confidential and Proprietary Information NOT FOR DISTRIBUTION 32
The Request-to-Release process must be jointly owned and collaboratively managed.
Accountable Portfolio Manager BA SMEsBRQ
IT Lead QA SMEsBRQ
OCM Release Managers
Responsible
• Portfolio Mgr.• Business Owner• BA• Portfolio Analyst• IT Sponsor
• BA• Business Lead• IT Lead• PM
• IT Lead• ITG Project Team• PM• Developer
• QA/Test Lead• BA• Bus. Lead• Defect Mgr.• PM / IT Lead• Developer
• OCM• PIT• BA• Defect Mgr.
• BA• Business Lead• Defect Mgr.• IT Leads• SDO Rel.
Coordinator• ITG Rel.
Coordinator• PIT
Consult• Resource
Analysts• IT Lead• ITG Group
• Business Owner• QA/Test Lead(s)
• Business Lead• BA• Test Leads
• Business Owner• IT Lead
• Business Lead • Business Owner• ITG Stakeholders
Inform
• Business Owner• SDO Rel. Mgr.• ITG Rel. Mgr.• SDO Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• SDO Rel. Mgr.• ITG Rel. Mgr.• SDO Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• SDO Rel. Mgr.• ITG Rel. Mgr.• SDO Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• SDO Rel. Mgr.• ITG Rel. Mgr.• SDO Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• IT Sponsor• PM• SDO Rel. Mgr.• ITG Rel. Mgr.• SDO Rel.
Coordinator• ITG Release
Coordinator• OCM• ITG Stakeholders
• Business Owner• ITG Sponsor• Portfolio Mgr.• OCM
Portfolio Requirements Design / Build
Business Readiness
Test Implement
----------- Project Execution -----------ITG/SDO Evaluate P2 Model post 06.01.13
* While depicted sequentially, once projects are initiated key stakeholder activities are supported in parallel
Confidential and Proprietary Information NOT FOR DISTRIBUTION 33
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
Business Sponsor
• Executive-level business leader who provides the strategy and objectives supporting the capabilities requested.
• Highest level advocate for the project within HCSC.
PPMPortfolio ManagerBusiness Owner
• Alignment to business strategy and imperatives
• Priorities of the Senior Leadership Team
• Funding• Sits on Business Councils
Business OpsFSU’sITOC
Business Owner
• Represents the Business Sponsor’s organization.
• Initiates or assumes responsibility for the project.
• Supports addition to the portfolio evaluation process.
PPMPortfolio ManagerBusiness LeadITG Sponsor
• Business case and high level business requirements.
• Project initiation and closure.
Business OpsFSU’sITOC
ITG Sponsor • Director-level person in ITG who has ultimate responsibility for technical project delivery.
• Owns delivery from ROM assessment thru Release.
Business SponsorBusiness OwnerPortfolio Manager PPMIT LeadTest Lead
• Solution design, application build, unit and system test , non-functional requirements implementation
• Project initiation and closure.• Project delivery
ITG
Business Lead • Represents the initiating organization. • Owns project execution from the
Business Operations perspective from ”Request-to-Release”.
Portfolio ManagerBAPM/PCAIT LeadTest LeadsBRQ Rel. CoordinatorBA SME
• Business case and high-level business requirements.
• Sign-off on detailed requirements and UAT.
Business OpsFSU’sITOC
Confidential and Proprietary Information NOT FOR DISTRIBUTION 34
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
Portfolio Manager
• Manages projects thru evaluation, prioritization, requirements and release baseline.
• Monitors status from “Request-to-Release” to understand portfolio impact.
Business OwnerPPMBAPM/PCAIT LeadTest LeadsBRQ Release ManagerBA and QA SME’s
• Project Portfolio “One List”• Portfolio status reports to
Mgmt.• Baseline Release• Portfolio Review Meetings
BRQ
Project Manager (PM) Tier 1-3
ITG Lead for Tier 4
• Develops resource and project plans for Projects.
• Monitors and reports status of project-level execution from authorization to inclusion in Release
• Escalates Issues and Risks for resolution.
Everybody • Project and Resource Plans• Project Status Reports and
Meetings• Issues and Risks for
escalation.
EPMOITG
Business Analyst (BA)
• Creates and secures sign-off of detailed business requirements
• Assists in developing test plans and scripts
• Identifies operational impacts• Supports business deployment• Contributes to defect resolution
Portfolio ManagerBusiness LeadIT LeadTest LeadsBRQ Release Manager BA and QA SMEsOCMPIT
• Detailed business requirements at level required for solution design
• Requirements traceability to final release.
• Revised business processes
SDO
IT Lead • Evaluates and approves detailed business reqt’s on behalf of ITG.
• Executes or oversees execution of design, build and unit test and performance test.
• Executes ITG owned SIT
BATest LeadsPortfolio ManagerPMBRQ Release CoordinatorITG Release Coordinator
• Solution design alternatives and recommendations
• Unit Tested application that is SIT/UAT-ready
• Completed performance test and ITG-owned SIT
ITG
Confidential and Proprietary Information NOT FOR DISTRIBUTION 35
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
IT Test Lead *New Role*
• Ensures completion of SIT and Performance Test
SDO Test LeadBAIT LeadPMBRQ Release Coordinator
• Completed test plan, execution and sign-off.
• Documented defects and resolution
ITG
SDO Test Lead (QA)
• Ensures completion of:o System Integration Testo Functional Testo Regression Testo UAT
BABusiness LeadIT LeadPMBRQ Release CoordinatorBA and QA SMEsITG Rel. Coordinator IT Test Lead (?)
• Completed test plan• Execution and sign-off• Documented defects and
disposition and resolution
SDO
BRQ Release Manager
• Ensures integrity and execution of all releases.
• Communicates business related impacts on status and strategy to business operations
• Jointly manages Change Control and co-chairs CCB with ITG
Portfolio ManagerITG SponsorBusiness OwnerITG Release ManagerSDO Leadership
• Authorize changes to release content and schedule
• Coordinate release additions/changes with Portfolio team
• Escalate issues to PSR
BRQ
ITG Release Manager
• Ensures integrity and execution of all releases.
• Communicates technical/SDM status/strategy to all stakeholders
• Jointly manages Change Control and co-chairs CCB with BRQ
Portfolio ManagerITG SponsorBusiness OwnerBRQ Release ManagerITG Leadership
• Authorize changes to release content and schedule
• Coordinate release additions/changes with Portfolio team
• Escalate issues to PSR
ITG
Confidential and Proprietary Information NOT FOR DISTRIBUTION 36
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
BRQ Release Coordinator
• Serves as single-point of contact for business aspects of releases
• Coordinates and monitors release activities with business impact
• Escalates issues and risks and drives resolution.
ITG Release CoordinatorsPortfolio TeamRelease ManagersSDO Test LeadBAPM / IT LeadPITOCMBusiness LeadBA and QA SMEs
• Release Dashboard (PSR)• Release Schedule - ?• Milestone sign off and
tracking audit trail• Regular Release Meetings –
Planning, Management
BRQ
ITG Release Coordinator
• Serves as single-point of contact for technical aspects of releases
• Coordinates and monitors release activities with technical impact
• Escalates issues and risks and drives resolution.
Enterprise Release MgtPMs and IT LeadsBRQ Release CoordinatorEnterprise Change Mgt.IT DevelopersITG Support TeamsPortfolio TeamEnvironment TeamBusiness LeadsPIT TeamBA and QA SME’s
• Release Dashboard and metrics
• Release Schedule• Milestone sign off and
tracking audit trail• Regular Release Meetings –
Planning, Management• Release implementation plan
ITG
Production Impact Team (PIT) Manager
• Ensures capabilities delivered are deployed and adopted by Business Operation
• Identifies defects in production and performs impact analysis
• Ensures defects are addressed via workarounds or fixes
• Contributes to implementation planning
BRQ Release CoordinatorITG Release CoordinatorDefect ManagerPortfolio ManagerBusiness LeadOCMITG Production Support
• Business Processes• Workarounds• Prioritized Fixes
BRQ
Confidential and Proprietary Information NOT FOR DISTRIBUTION 37
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
BA SME (Liaison)
*New Role*
• Provide oversight of the requirements process - across the release. Review requirements across projects and applications to ensure that gaps, overlaps and conflicts are addressed.
• Ensure quality and completeness of project requirements.
• Provide input into BA capability improvements via training/education.
BAsBusiness LeadIT LeadsPMBRQ Release CoordinatorITG Release CoordinatorPortfolio Manager
• Governance and structure over requirements development and documentation
• Release-level view of requirements to assess cross-project impacts
BRQ
QA SME (Liaison)
*New Role*
• Provide oversight of the SDO owned testing process – across the release.
• Develop a release-level test strategy to eliminate redundancies in project-level test plans.
• Ensure quality and completeness of test plans and scripts.
• Ensure test plans are executed and defects resolved or addressed with the business.
• Provide input into QA capability improvements via training/education.
QA Test LeadBusiness LeadDefect ManagerIT LeadPMBRQ Release CoordinatorITG Release Coordinator
• Governance and structure over test plans and execution
• Release-level view of test strategy to assess cross-project impacts
BRQ
Confidential and Proprietary Information NOT FOR DISTRIBUTION 38
Roles and Responsibilities
Role Responsible For Works With Deliverables Org Alignment
Defect Manager*New Role*
• Review and prioritize defects escalated from Defect Action Boards (DABS).
• Determine next steps and estimated delivery.
• Confirm Defect vs. Change Request.
BAsPITIT LeadsDABSBRQ Release ManagerITG Release ManagerBRQ Release CoordinatorITG Release CoordinatorBA and QA SME’sPortfolio Manager
• Issues for escalation• Business impact• Actions/workarounds• Input to portfolio
BRQ
SDO Resource Analyst*New Role*
• Works with resource functional manager to assign business resources to projects
• Tracks resource availability based on current utilization and estimates-to-complete (ETC)
• Monitors utilization and adjusts
Portfolio ManagerBA Functional LeadsQA Functional LeadsIT Resource AnalystPMBRQ Release Coordinator
• SDO resource estimates• Supply/Demand capacity
Reporting• Resource Maintenance
(allocation, ETC’s, maintenance)
BRQ
Org. Change Manager (OCM)
• Responsible for all communication and training associated with release content and business impacts.
• Implement communication protocols and methods.
BRQ Release ManagerPortfolio ManagerPIT ManagerBusiness Leads
• Release Notes• Training content• Policy and Procedure
documentation• Implementation
communications
BRQ
Confidential and Proprietary Information NOT FOR DISTRIBUTION 39
A clear governance / decision-making structure must be in place.
Establish an appropriate Governance structure for escalation and decision-making (e.g., Operating vs. Executive level). • Charters for each level of governance• Agendas, participants and responsibilities• Cross-functional group that represents interests of all stakeholders
Re-purpose/Rationalize current meetings.• Formalize agendas and objectives – stick to the purpose• Ensure that the right people are in attendance to take action• Capture/assign action items, to dos, risks etc.• Hold people accountable for actions/follow-up
Improve collaboration across SDO/ITG/EPMO through shared responsibility, accountability and decision-making.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 40
Executive Leadership Meetings - Preliminary
BlueChip Steering Committee(Bi-Weekly)
BRQ Executive WorkingGroup
(Weekly)
Purpose
• Advocate for and ensure the stability of BlueChip• Apprise members of Portfolio status (e.g., One List) and projects/candidates and release alignments.
• Apprise Executive Leadership of Portfolio issues and risks• Apprise Executive Leadership of Release status, issues and risks•Escalate issues and risks and solicit direction for resolution.
• Discuss Issues and risks around the BRQ program improvements, measures and effectiveness.
SDOSteve MallonMary WrightElevene Bryant
Stephen ThompsonKyle GearhartJack AshmanKim Hatchett
Steve MallonMary WrightElevene BryantKyle Gearhart
ITG
Bob BurdaTim BechtoldBill MummeryMike JamesOzie Emanuel
Manish GargRick Deyhle Tim Bechtold
Rick Deyhle
Other
Carolyn Roche (SSO)Marla Ludacka (HCM)Justin Capp (Marketing)Don Donahue (SDO O)Jill Firch (SDO O)Dee Moore (FEP)
Tom Tran (Pharma)Paul ScaglioneBrian CarothersJerry KnellerStan Grotkiewicz
Confidential and Proprietary Information NOT FOR DISTRIBUTION 41
Executive Leadership Meetings – Preliminary*Confirmation of participants by 05.17.13 requested
BlueChip Steering Committee(Bi-Weekly)
BRQ Executive WorkingGroup
(Weekly)
Purpose
• Advocate for and ensure the stability of BlueChip• Apprise members of Portfolio status (e.g., One List) and projects/candidates and release alignments.
• Apprise Executive Leadership of Portfolio issues and risks• Apprise Executive Leadership of Release status, issues and risks•Escalate issues and risks and solicit direction for resolution.
• Discuss Issues and risks around the BRQ program improvements, measures and effectiveness.
SDOSteve MallonMary WrightElevene Bryant
Stephen ThompsonKyle GearhartJack AshmanKim Hatchett
Steve MallonMary WrightElevene BryantKyle Gearhart
ITG
Bob BurdaTim BechtoldBill MummeryMike JamesOzie Emanuel
Manish GargRick Deyhle Tim Bechtold
Rick Deyhle
Other
Carolyn Roche (SSO)Marla Ludacka (HCM)Justin Capp (Marketing)Don Donahue (SDO O)Jill Firch (SDO O)Dee Moore (FEP)
Tom Tran (Pharma)Paul ScaglioneBrian CarothersJerry KnellerStan Grotkiewicz
SDO Tech DirectorsITG Directors (TBD Rick Deyhle)
Confidential and Proprietary Information NOT FOR DISTRIBUTION 42
Operational Meetings - Preliminary
Portfolio Meetings Release Management Change Control
Portfolio Business Council
Business Requirements
Review
Release Planning Meeting
Release Kick-off Meeting
Release Management
Meeting (RCB)
Defect Review Board
Change Control Board (SRB)
Meeting Cadence Bi-weekly Bi-weekly Bi-weekly One-time Weekly/ as Req. 2x weekly 2x weekly
Business Sponsor X Business Owners X X X XBusiness Lead X X X X XITG Sponsor X IT Lead X X X X X IT Test Lead X X X X X ITG Release Manager X X X X XITG Release Coordinator X X X X X XPM/PCA X X X Portfolio Manager X X X X XBusiness Analyst X X X X XSDO Test Lead (QA) X X X X X BRQ Release Manager X X X X XBRQ Release Coordinator X X X X X XPIT Manager X X X XBA SME (Liaison) X X X XQA SME (Liaison) X X X XOCM Manager X X Defect Manager X
X denotes meeting owner
Confidential and Proprietary Information NOT FOR DISTRIBUTION 43
Executive Leadership Meetings
Meeting Owner Objective Cadence Participants Outputs
BlueChip Steering Committee
BRQ Director
•Advocate for and ensure the stability of BlueChip
•Apprise members of Portfolio status (e.g., One List) and projects/candidates and release alignments.
•Apprise Executive Leadership of Portfolio issues and risks
•Apprise Executive Leadership of Release status, issues and risks
•Escalate issues and risks and solicit direction for resolution.
Bi-weekly SDO LeadershipITG LeadershipHCSC Leadership
Actions to address issues and risks
BRQ Executive Working Group
BRQ Director
Discuss issues and risks around BRQ program improvements, measures and effectiveness.
Weekly Steve MallonMary WrightElevene BryantKyle GearhartTim BechtoldRick Deyhle
Actions to address issues and risks
Confidential and Proprietary Information NOT FOR DISTRIBUTION 44
Executive Leadership Meetings*Confirm participants by 05.17.13
Meeting Owner Objective Cadence Participants Outputs
BlueChip Steering Committee
BRQ Director
•Advocate for and ensure the stability of BlueChip
•Apprise members of Portfolio status (e.g., One List) and projects/candidates and release alignments.
•Apprise Executive Leadership of Portfolio issues and risks
•Apprise Executive Leadership of Release status, issues and risks
•Escalate issues and risks and solicit direction for resolution.
Bi-weekly SDO LeadershipITG LeadershipHCSC Leadership- see Previous slide
Actions to address issues and risks
BRQ Executive Working Group
BRQ Director
Discuss issues and risks around BRQ program improvements, measures and effectiveness.
Weekly Steve MallonMary WrightElevene BryantKyle GearhartTim BechtoldRick Deyhle
SDO Tech DirectorsITG Directors
Actions to address issues and risks
Confidential and Proprietary Information NOT FOR DISTRIBUTION 45
Operational Meetings - Portfolio
Meeting Owner Objective Cadence Participants Outputs
Portfolio Business Council(Tier 4)
Portfolio Manager
Review and prioritize all Tier 4 project requests that impact systems and business processes in the BlueChip ecosystem.
Bi-weekly The SDO Tech Directors who represent Business Owners • Gena Misouria• Geoff Guitan• Jo Ann Keyes• Flavia Duffy• Chris Marcelle• Chris Hausenbauer• Faye Meyer• Karen Woods• Barbara Barth
• Nicole Antonacci • Lenny Criddle• Eric Kowalik• Vicki Sullivan• Kim Hatchett• Kyle Gearhart
• Force-ranked and prioritized list of Tier 4 project requests
• Agreed-to additions to the Project Portfolio.
• Approval to proceed
Business RequirementsReviews
BAs Review and agree on detailed business requirements to the level required to execute the project
As Required Business LeadIT LeadTest LeadsPortfolio ManagerPMBRQ Release CoordinatorITG Release CoordinatorBA and QA SME’s
• Business requirements sign-off
Confidential and Proprietary Information NOT FOR DISTRIBUTION 46
Operational Meetings – Portfolio* Need to confirm right participants by 05.17.13
Meeting Owner Objective Cadence Participants Outputs
Portfolio Business Council(Tier 4)
Portfolio Manager
Review and prioritize all Tier 4 project requests that impact systems and business processes in the BlueChip ecosystem.
Bi-weekly The SDO Tech Directors who represent Business Owners • Gena Misouria• Geoff Guitan• Jo Ann Keyes• Flavia Duffy• Chris Marcelle• Chris Hausenbauer• Faye Meyer• Karen Woods• Barbara Barth
• Nicole Antonacci • Lenny Criddle• Eric Kowalik• Vicki Sullivan• Kim Hatchett• Kyle Gearhart
• Force-ranked and prioritized list of Tier 4 project requests
• Agreed-to additions to the Project Portfolio.
• Approval to proceed
Business RequirementsReviews
BAs Review and agree on detailed business requirements to the level required to execute the project
As Required Business LeadIT LeadTest LeadsPortfolio ManagerPMSDO Release CoordinatorITG Release CoordinatorBRQ Process Parter
• Business requirements sign-off
Confidential and Proprietary Information NOT FOR DISTRIBUTION 47
Operational Meetings – Release Management
Meeting Owner Objective Cadence Participants OutputsRelease Planning Meeting
BRQ ReleaseManager
ITG ReleaseManager
Determine placement of approved projects and change requests (with resource, schedule and risk impact) in the Release Schedule.
As Required BRQ DirectorPortfolio ManagerSDO QA DirectorITG DirectorITG SponsorBRQ Rel. CoordinatorITG Rel. CoordinatorBA and QA SME’sResource ManagersIT Lead Representative
• Updated Release Plan• Resource assignments
and Estimates to Complete (ETC)
Release Kick-off Meeting
BRQ ReleaseManager
ITG ReleaseManager
Communicate the Release schedule, content and strategy to stakeholders, for a specific release.
Once per Release
Business OwnerBusiness LeadBAsTest Leads (SDO and ITG)PM / IT LeadPortfolio ManagerBRQ Rel. CoordinatorITG Rel. CoordinatorITG SponsorPIT ManagerDefect ManagerOCMBA and QA SME’s
• Release Plan, Roles and Accountabilities
Confidential and Proprietary Information NOT FOR DISTRIBUTION 48
Operational Meetings – Release Management* Need to confirm right participants by 05.17.13
Meeting Owner Objective Cadence Participants OutputsRelease Planning Meeting
BRQ ReleaseManager
ITG ReleaseManager
Determine placement of approved projects and change requests (with resource, schedule and risk impact) in the Release Schedule.
As Required BRQ DirectorPortfolio ManagerSDO DirectorsITG Directors- via RMITG SponsorBRQ Rel. CoordinatorITG Rel. CoordinatorBRQ Process Partner Leads (BA and QA)Resource ManagersIT Lead Representative
• Updated Release Plan• Resource assignments
and Estimates to Complete (ETC)
Release Kick-off Meeting
BRQ ReleaseManager
ITG ReleaseManager
Communicate the Release schedule, content and strategy to stakeholders, for a specific release.
Once per Release
Business OwnerBusiness LeadBAsTest Leads (SDO and ITG)PM / IT LeadPortfolio ManagerBRQ Rel. CoordinatorITG Rel. CoordinatorBRQ Process PartnersITG SponsorPIT ManagerDefect ManagerOCMBRQ Process Partners (BA and QA) Leads
• Release Plan, Roles and Accountabilities
Confidential and Proprietary Information NOT FOR DISTRIBUTION 49
Operational Meetings – Release Management
Meeting Owner Objective Cadence Participants OutputsRelease Management Meeting
Note: Replaces Release Control Board (RCB)
BRQ ReleaseManager
ITG ReleaseManager
• Responsible for day-to-day management of releases, including recommendations to Steering Committee re: scope changes.
• Review and monitor release status against milestones, issues and risks
• Assess overall health of the release.
• Ensure all stakeholders are properly engaged and apprised of release status and issues.
• Evaluate and address all issues and recommendations escalated from the Change Control Board.
• Escalate issues and risks to BlueChip Steering committee, as needed.
• Communicate business related impacts to business operations.
Weekly BRQ DirectorITG DirectorBRQ Rel. CoordinatorITG Rel. CoordinatorIT Lead(s)Test Lead(s)Business Lead(s)Portfolio ManagerPIT ManagerDefect ManagerBRQ OCMSDO QA DirectorBA and QA SME’s
Additional participants will be invited, as needed, to address project specific issues/risksPMs and/or IT Lead(s)SDO or ITG Test Lead(s)Business Lead(s)Other ITG
• Revised release plan• Escalations to BlueChip
Executive Steering committee
• Disposition of change requests
• Actions to remediate red and yellow projects
Confidential and Proprietary Information NOT FOR DISTRIBUTION 50
Operational Meetings – Release Management* Need to confirm right participants by 05.17.13
Meeting Owner Objective Cadence Participants OutputsRelease Management Meeting
Note: Replaces Release Control Board (RCB)
BRQ ReleaseManager
ITG ReleaseManager
• Responsible for day-to-day management of releases, including recommendations to Steering Committee re: scope changes.
• Review and monitor release status against milestones, issues and risks
• Assess overall health of the release.
• Ensure all stakeholders are properly engaged and apprised of release status and issues.
• Evaluate and address all issues and recommendations escalated from the Change Control Board.
• Escalate issues and risks to BlueChip Steering committee, as needed.
• Communicate business related impacts to business operations.
Weekly BRQ DirectorITG DirectorBRQ Rel. CoordinatorITG Rel. CoordinatorIT Lead(s)Test Lead(s)Business Lead(s)Portfolio ManagerPIT ManagerDefect ManagerBRQ OCMSDO QA DirectorBRQ Process Partner Leads (BA and QA)
Additional participants will be invited, as needed, to address project specific issues/risksPMs and/or IT Lead(s)SDO or ITG Test Lead(s)Business Lead(s)Other ITG
• Revised release plan• Escalations to BlueChip
Executive Steering committee
• Disposition of change requests
• Actions to remediate red and yellow projects
Confidential and Proprietary Information NOT FOR DISTRIBUTION 51
Implement a common change control process.
Manage the change control process jointly between SDO and ITG.
Rigorously control changes to project scope and requirements subsequent to requirements lock-down.
Implement Change Control process and meeting cadence to:• Review and approve changes to requirements, scope and deliverables that
materially impact resources and schedule.• Assess risk of changes to schedule and execution quality. • Ensure appropriate understanding and sign-off for changes.
Align with the Portfolio Management process to ensure approved changes are reflected in the portfolio, as needed.
Ensure appropriate impact assessment and sign-off for all changes.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 52
Implement a simple defect and change control process that is understandable.
DEFECTSDefect Review
Board
CHANGESChange Control
Board
PortfolioManagement
Change Control Board: Review/disposition proposed changes that impact the release. Assess risks and timeline impacts (freeze cut-off).
Defect Review Board: Review and prioritize defects escalated from projects that impact the release. Determine next steps and estimated delivery. Confirm defect vs. change request.
Defect Review Meetings: Review and prioritize all defects at the project level. Assess impact on scope and resources.
Projects Level
Local
National
FEP
Proceed – No Action
Proceed – No Action
Defect Review Meetings
ITG
QA
Confidential and Proprietary Information NOT FOR DISTRIBUTION 53
Implement a simple change control process that is understandable. (Working Session underway adding ITG)
DEFECTSDefect Review
Board
CHANGESChange Control
Board
PortfolioManagement
Change Control Board: Review/disposition proposed changes that impact the release. Assess risks and timeline impacts (freeze cut-off).
Defect Review Board: Review and prioritize defects escalated from projects that impact the release. Determine next steps and estimated delivery. Confirm defect vs. change request.
Defect Review Meetings: Review and prioritize all defects at the project level. Assess impact on scope and resources.
Projects Level
Local
National
FEP
Proceed – No Action
Proceed – No Action
Defect Review Meetings
ITG
QA
Confidential and Proprietary Information NOT FOR DISTRIBUTION 54
Defect Management - Understanding the Capability
Request-to-Release Cycle
Portfolio Requirements Design / Build Test Business Readiness Implement
ITG Team Members
SDO Team Members
Defect Management
• Review defect descriptions and determine priorities (Defect Management Board)
• Engage with business partners and ITG to ensure that proper attention and rigor is given to all defects or change requests consistent with their impact.
• Assist defects and change requests through the change control process.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 55
Defect Management Board
Process• Confirms defect vs. change request. • Review and prioritizes defects escalated from projects that impact the
release. • Determine next steps and estimated delivery.
OutputsDefect ListPriority List
Aging Defect ReportChange Request List
MeetingsDefect Review Meeting
Defect to Scope MeetingCR to Change Control
BarriersDefects reported late
Inaccurate reportsPoor documentation
Confidential and Proprietary Information NOT FOR DISTRIBUTION 56
Change Request Flow
Requirement Exist?
Defect
Y
N
Postponed (awaiting decision)
Is this defect going into production?
Change Request
Y
N
Issue Is this code activated in production?Y
Np
DormantDeferred
56
Confidential and Proprietary Information NOT FOR DISTRIBUTION 57
Change and Defect Control Meetings
Meeting Owner Objective Cadence Participants Outputs
Defect Review Meetings
Project Team
• First level defect triage• Review and prioritize all
defects at the project level. • Assess impact on scope
and resources.
3x/week SDOITGPPMEPMOBusiness Lead
• Prioritized defects • Scope impacts• Action plan• Quality Center updates
Defect Management Board
Defect Manager
• Review defect descriptions and determine priorities
• Engage with business partners and ITG to ensure that proper attention and rigor is given to all defects or change requests consistent with their impact.
• Assist defects and change requests through the change control process.
3X weekly from start of functional test through cut-off
BRQ Rel. CoordinatorITG Rel. CoordinatorIT LeadBusiness LeadTest LeadBAPITBRQ Process Partners
• Defect List• Priority List• Aging Defect Report• Change Request List
Change Control BoardNote: Replaces Scope Review Board (SRB)
BRQ Release Manager
ITG Release Manager
• Review/disposition proposed changes that impact the release.
• Assess risks and timeline impacts (freeze cut-off)
2x/Weekly BRQ Rel. CoordinatorITG Rel. CoordinatorBusiness OwnerDomain ExpertsPIT ManagerBAPM/ IT Lead
• Approvals to proceed• Authorize changes to
release schedule• New project referrals to
Portfolio• Escalate to Release
Management
Confidential and Proprietary Information NOT FOR DISTRIBUTION 58
Change and Defect Control Meetings
Meeting Owner Objective Cadence Participants Outputs
Defect Review Meetings
Project Team
• First level defect triage• Review and prioritize all
defects at the project level. • Assess impact on scope
and resources.
3x/week SDOITGPPMEPMOBusiness Lead
• Prioritized defects • Scope impacts• Action plan• Quality Center updates
Defect Review BoardNote: Replaces Release Status & Risk Mitigation Meeting
Defect Manager
• Review and prioritize defects escalated from projects that impact the release.
• Determine next steps and estimated delivery.
• Confirm Defect vs. Change Request.
2x/Weekly BRQ Rel. CoordinatorITG Rel. CoordinatorIT LeadBusiness LeadTest LeadBAPITBRQ Process Partners
* Meetings underway to finalize oversight. Must include ITG.
• Actions and to-do’s• Issues for escalation• Refer to Change Control
Board if scope impacts• Release impact
Change Control BoardNote: Replaces Scope Review Board (SRB)
BRQ Release Manager
ITG Release Manager
• Review/disposition proposed changes that impact the release.
• Assess risks and timeline impacts (freeze cut-off)
2x/Weekly BRQ Rel. CoordinatorITG Rel. CoordinatorBusiness OwnerDomain ExpertsPIT ManagerBAPM/ IT Lead
* Need to confirm right participants by 05.17.13
• Approvals to proceed• Authorize changes to
release schedule• New project referrals to
Portfolio• Escalate to Release
Management
Confidential and Proprietary Information
NOT FOR DISTRIBUTION
Business Release Quality (BRQ) OfficeMeasurement Approach
Draft v0.5
April 30, 2013
Confidential and Proprietary Information NOT FOR DISTRIBUTION 60
• 2013 Shared Goals
• Measurement Framework
• Measurement Definitions
• Measurement Cycle
• Implementation
BRQ Office Measurement Approach
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 61
BRQ Office2013 Shared Goals
Incentive Goals Goal Name SDO ITG MKT CASSIP SSO HCM AIM
Core Metrics: 75%
Manage Performance to Service Performance Scorecard X X X
Availability and Business Release Quality X X
CCSP X X X
Year End Production Ready X X
Regulatory Implementation X X X X X X
Project Delivery Optimization (All Divisions)
Montana Alliance X X X X
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 62
BRQ Office2013 Shared Goals
Description 2-Partially Met Goal (25%)
3-Met Goal (50%)
4-Exceeded Goal (75%)
5-Significantly Exceeded Goal
(100%)
Availability 99.2% 99.3% 99.4%
Management Discretion
Throughput (RTIS / RTIS with RDP)1 76% / 82% 77% / 83%
Performance Guarantee Audits Errors <8.73% <8.23%
1Throughput will be measured monthly averaged over the 9 month period April 2013 – December 2013
Description 2-Partially Met Goal (25%)
3-Met Goal (50%)
4-Exceeded Goal (75%)
5-Significantly Exceeded Goal
(100%)
Awareness and Engagement3
(Survey result improvement) 5% 10% 15%
Management Discretion
Test Environment Readiness3
(On-time setup improvement / Incidents after Milestone, E2E test days delayed - volume reduction)
5% 10% 15%
Common Practice/Process3
(Audit score improvement) 5% 10% 15%
Operational Monitoring3
(Abend, Pend, Recycle - volume reduction) 5% 10% 15%
Business Release and Commitment Quality - (Core)
2 Measures derived from June 2012 Business Release Improvement assessment3 Assumes April 2013 baseline conducted in May 2013. Improvement/reduction period May 2013 – December 2013
Business Release and Commitment Quality - (Improvement)2
Proposed
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 63
Business Release Quality Office 2013 Shared Goals
Description 2-Partially Met Goal (25%)
3-Met Goal (50%)
4-Exceeded Goal (75%)
5-Significantly Exceeded Goal
(100%)
Availability 99.2% 99.3% 99.4%
Management Discretion
Throughput (RTIS / RTIS with RDP)1 76% / 82% 77% / 83%
Performance Guarantee Audits Errors <8.73% <8.23%
1Throughput will be measured monthly averaged over the 9 month period April 2013 – December 2013
Description 2-Partially Met Goal (25%)
3-Met Goal (50%)
4-Exceeded Goal (75%)
5-Significantly Exceeded Goal
(100%)
Awareness and Engagement3
(Survey result Project / Release Kick-off) 5% 10% 15%
Management Discretion
Test Environment Readiness3
(On-time setup improvement / Incidents after Milestone, E2E test days delayed - volume reduction)
5% 10% 15%
Common Practice/Process3
(Audit score improvement) 5% 10% 15%
Operational Monitoring3
(Abend, Pend, Recycle - volume reduction) 5% 10% 15%
Business Release and Commitment Quality - (Core)
2 Measures derived from June 2012 Business Release Improvement assessment3 Assumes April 2013 baseline conducted in May 2013. Improvement/reduction period May 2013 – December 2013
Business Release and Commitment Quality - (Improvement)2ProposedFor BRQ
Confidential and Proprietary Information NOT FOR DISTRIBUTION 64
BRQ Office 2013 Shared Goals – Improvement Drivers
• Overarching Key Theme is Awareness and Engagement• Broaden the Portfolio Management Process to ensure it includes all Tier 1-3 Project that impact or require support from BlueChip• Develop a multi-year BlueChip Portfolio Plan to support enterprise transparency. (Ability and Capacity)• Improve by ensuring all projects are part of the scope document. Projects are tentative until the requirement walkthrough is conducted demonstrating
an end to end solution has been developed. Scope is base lined on requirement sign-off date. RCs to facilitate a Scope Review and Release Kick-Off meeting with full project team.
• Test Leads are expected to be engaged on each project. QA Manager in BRQ is essential for strategy alignment and defect management at the release
• Environment inconsistencies• Most do not mirror or similar to production• Real-time capabilities• Parallel environment• Lack of monitoring, delays in processing test claims, risk completion date• Data Maintenance. Data Governance needed for all the decentralized data used when testing, (i.e. pricing, ODS)
• Adherence to Development Methodology is Mandatory• Business Architecture / Future State is not used on a regular basis. Documents are not ever greened.• Detailed Business Requirements is not always present. Without detailed business requirements, the functional test cases are not detailed• Limited functional test cases will impact the development of a regression test bed• National (Host, Home and Labor) will incorporate DTU into their testing practices. (Cases to be defined)
• Operational Monitoring in test to ensure high performance and functionality • Throughput• Abends• Recycles (Corporate and Response)• Test Data- Creates unexpected results that masks issues• Need to complete the development of production parallels
June 2012 Business Release Improvement Assessment Findings
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 65
• 2013 Shared Goals
• Measurement Framework
• Measurement Definitions
• Measurement Cycle
• Implementation
BRQ Office Measurement Approach
DRAFT
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 66
BRQ Office2013 Measurement Framework
Core Measures(Level 1)
DomainMeasures(Level 3)
Portfolio Management• % of Projects w/
Current/Future State Arch
• Customer Commitment
-additions-removals
Business Analysis• Requirements%
on-time and baselines
• Requirements Volatility after baseline
Quality Assurance• Avg UIT pass score (%)
before SIT start• Avg SIT pass (%) before
UAT start• Avg UAT pass (%) before
Release Approval
Release• Plan vs. Actual
Release duration.• # of Issues (w/
impacted claim volume) identified on release weekend.
• Outstanding Critical/High defect - #, impacted claim volume and financial impact.
• Availability • Throughput • Performance Guarantees
• Awareness and Engagement (Survey)• Test Environment Readiness (On-Time Setup, Milestone delays)• Common Practice/Process (Audit Score)• Operational Monitoring (Abend, Pend, Recycle tracking)
Engagement
Accountability
Focus
ImprovementMeasures(Level 2)
Drives
Results
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 67
BRQ Office2013 Measurement Framework
Core Measures(Level 1)
Domain Measures(Level 3)
Portfolio Management• % of Projects w/
Current/Future State Arch
• Customer Commitment
-additions-removals
Business Analysis• Requirements
% on-time and baselines
• Requirements Volatility after baseline
Quality Assurance• Avg UIT pass score (%)
before SIT start• Avg SIT pass (%) before
UAT start• Avg UAT pass (%)
before Release Approval
Release• Plan vs. Actual Release
duration.• # of Issues (w/ impacted
claim volume) identified on release weekend.
• Outstanding Critical/High defect - #, impacted claim volume and financial impact.
• Availability • Throughput • Performance Guarantees
• Awareness and Engagement (Survey) Project and Release Kick-off• Test Environment Readiness (On-Time Setup, Milestone delays)• Org Standard Practice/Process (Audit Score)• Operational Monitoring (Abend, Pend, Recycle tracking)
Enga
gem
ent
Acc
ount
abili
tyFo
cus
ImprovementMeasures (Level 2)
Drives
Results
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 68
• 2013 Shared Goals
• Measurement Framework
• Measurement Definitions
• Measurement Cycle
• Implementation
BRQ Office Measurement Approach
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 69
BRQ OfficeImprovement (Level 2) Definitions
Goal Measure(s) Target*Awareness and Engagement Improvement
Survey of Key Release Stakeholders (Monthly)• Score based on response rate/response
scores.
Score Improvements - 5% / 10% / 15%**
Test Environment Readiness
• On-Time Setup Completion Improvement - 5% / 10% / 15%**
• Incidents after Milestone• E2E Testing Delays (days)
Incident Reduction - 5% / 10% / 15%**
Common Practice/Process Combined BRQ audit and SDM scores (Monthly)
Audit score improvement - 5% / 10% / 15%**
Operational Monitoring • Monthly Abend Volume• Monthly Pend Volume• Monthly Recycle Volume
Volume reduction - 5% / 10% / 15%**
*Assumes April 2013 baseline conducted May 2013.**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
Measures improvement against June 2012 findings which support Core (Level 1) measures DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 70
BRQ OfficeDomain (Level 3) DefinitionsDomain Goal(s) Measure(s) Target*Portfolio Management
• Improved Customer Engagement and Portfolio Process Execution
• % of Projects w/ Current/Future State Arch (monthly) Improvement - 5% / 10% / 15%
• Customer Commitment-additions (monthly volume)
Reduction - 5% / 10% / 15%
• Customer Commitment-removals (monthly volume)
Reduction - 5% / 10% / 15%
Business Analysis
• Improved Requirements Quality
• Requirements% on-time and baselined Improvement - 5% / 10% / 15%
• Requirements Volatility after baseline Reduction - 5% / 10% / 15%
Quality Assurance
• Improved QA Planning, Execution and Effectiveness
• Enforce stage gate controls.
• Avg UIT pass score (%) before SIT start (Monthly) Improvement - 5% / 10% / 15%
• Avg SIT pass (%) before UAT start (Monthly) Improvement - 5% / 10% / 15%
• Avg UAT pass (%) before Release Approval Improvement - 5% / 10% / 15%
Release • Improved Release Planning and Execution.
• Improved Release Quality
• Plan vs. Actual Release duration (per release) % Variance reduction - 5% / 10% / 15%
• # of Issues (w/ impacted claim volume) identified on release weekend. (per release)
Reduction - 5% / 10% / 15%
• Outstanding Critical/High defect s (measured monthly)a) Count b) Impacted claim volumec) Financial impact
Reduction - 5% / 10% / 15%
*Assumes April 2013 baseline conducted May 2013.**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 71
• 2013 Shared Goals
• Measurement Framework
• Measurement Definitions
• Measurement Cycle
• Implementation
BRQ Office Measurement Approach
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 72
BRQ Office Measurement Cycle
*Assumes April 2013 baseline conducted May 2013.**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
Type Measure Source CycleLevel 1 Availability CFE Report Report @ End of Month
Throughput CFE Report Report @ End of Month
Performance Guarantee Audit Errors CFE Report Report @ End of Month
Level 2 Survey of Key Release Stakeholders (Monthly)
Survey – BRQ Org Change Mgmt Team Collect @ End of Month
• On-Time Setup• Incidents after Milestone• E2E Testing Delays (days)
PSRs – Query through month. Report @ End of Month
Combined BRQ audit and SDM scores Business Process Leads and SDM group Collect @ End of Month
• Monthly Abend Volume• Monthly Pend Volume• Monthly Recycle Volume
PIT Report Collect @ End of Month
Level 3 • % of Projects w/ Current/Future State Arch (monthly)
Portfolio Team Report @ End of Month
• Customer Commitment-additions (monthly volume)
Portfolio Team Report @ End of Month
• Customer Commitment-removals (monthly volume)
Portfolio Team Report @ End of Month
• Requirements% on-time and baselined Business Analysis Team (BRQ) Collect @ End of Month
• Requirements Volatility after baseline Business Analysis Team (BRQ) Collect @ End of Month
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 73
BRQ Office Measurement Cycle
*Assumes April 2013 baseline conducted May 2013.**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
DRAFTType Measure Source CycleLevel 1 Availability CFE Report Report @ End of Month
Throughput CFE Report Report @ End of Month
Performance Guarantee Audit Errors CFE Report Report @ End of Month
Level 2 Survey of Key Release Stakeholders Project / Release Kick-off)
Survey – BRQ Org Change Mgmt Team Collect @ End of Month
• On-Time Setup• Incidents after Milestone• E2E Testing Delays (days)
PSRs – Query through month. Report @ End of Month
Combined BRQ audit and SDM scores Business Process Leads and SDM group Collect @ End of Month
• Monthly Abend Volume• Monthly Pend Volume• Monthly Recycle Volume
PIT Report Collect @ End of Month
Level 3 • % of Projects w/ Current/Future State Arch (monthly)
Portfolio Team Report @ End of Month
• Customer Commitment-additions (monthly volume)
Portfolio Team Report @ End of Month
• Customer Commitment-removals (monthly volume)
Portfolio Team Report @ End of Month
• Requirements% on-time and baselined Business Analysis Team (BRQ) Collect @ End of Month
• Requirements Volatility after baseline Business Analysis Team (BRQ) Collect @ End of Month
Implemented
BRQ Office- SDO Tech
effective 06.01.13.
Environment
Readiness in 2014
influenced by Portfolio
Planning
Analyst specific goals
exist in 2013 / BRQ will
collect data and propose
2014
Confidential and Proprietary Information NOT FOR DISTRIBUTION 74
BRQ OfficeMeasurement Cycle
*Assumes May 2013 baseline**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
DRAFT
Type Measure Source CycleLevel 3 (Con’t)
• Avg UIT pass score (%) before SIT start (Monthly)
Quality Assurance Team (BRQ) Report @ End of Month
• Avg SIT pass (%) before UAT start (Monthly)
Quality Assurance Team (BRQ) Report @ End of Month
• Avg UAT pass (%) before Release Approval
Quality Assurance Team (BRQ) Report @ End of Month
• Plan vs. Actual Release duration (per release)
Release Management Team (BRQ) Report @ End of Month
• # of Issues (w/ impacted claim volume) identified on release weekend. (per release)
Release Management Team (BRQ) Per Release – Reported Monthly
• Outstanding Critical/High defects (measured monthly)
a) Count b) Impacted claim volumec) Financial impact
Production Impact Team (BRQ) Report @ End of Month
Confidential and Proprietary Information NOT FOR DISTRIBUTION 75
BRQ OfficeMeasurement Cycle
*Assumes May 2013 baseline**Measured May-Dec 2013 – Partially Met, Met, and Exceed Thresholds
DRAFTType Measure Source CycleLevel 3 (Con’t)
• Avg UIT pass score (%) before SIT start (Monthly)
Quality Assurance Team (BRQ) Report @ End of Month
• Avg SIT pass (%) before UAT start (Monthly)
Quality Assurance Team (BRQ) Report @ End of Month
• Avg UAT pass (%) before Release Approval
Quality Assurance Team (BRQ) Report @ End of Month
• Plan vs. Actual Release duration (per release)
Release Management Team (BRQ) Report @ End of Month
• # of Issues (w/ impacted claim volume) identified on release weekend. (per release)
Release Management Team (BRQ) Per Release – Reported Monthly
• Outstanding Critical/High defects (measured monthly)
a) Count b) Impacted claim volumec) Financial impact
Production Impact Team (BRQ) Report @ End of Month
Analyst specific goals
exist in 2013 / BRQ will
collect data and propose
2014
Confidential and Proprietary Information NOT FOR DISTRIBUTION 76
• 2013 Shared Goals
• Measurement Framework
• Measurement Definitions
• Measurement Cycle
• Measurement Implementation
BRQ Office Measurement Approach
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 77
BRQ OfficeMeasurement Implementation
1. Confirm Shared Goals/Measures (Level 1 and Level 2) among BRQ Steering Committee
2. Confirm Level 3 measures among BRQ domain areas
3. Confirm Report and Measurement Process Owner
4. Conduct April Baseline
DRAFT
Confidential and Proprietary Information NOT FOR DISTRIBUTION 78
Addendum – Back-up Slides
Business Release Quality (BRQ) Office
Confidential and Proprietary Information NOT FOR DISTRIBUTION 79
BRQ Process Partners will ensure adherence to processes and standards.
BRQ will interface with BA SMEs/Leads to:• Provide oversight of the requirements process - across the
release. Review requirements across projects and applications to ensure that gaps, overlaps and conflicts are addressed.
• Ensure quality and completeness of project requirements.• Develop standards and provide input into BA capability
improvements through staff education and development.• Evaluate demands to assess business impacts and
requirements.
BRQ will interface with QAs SMEs/Leads to:• Provide oversight of the SDO owned testing process -
across the release. • Develop a release-level test strategy to address
redundancies in project-level test plans. • Ensure quality and completeness of test plans and scripts.• Ensure test plans are executed and defects resolved or
addressed with the business. • Develop standards and provide input into QA capability
improvements through staff education and development.• Provide defect management oversight.
ITG Release Management
BRQ Release Management
Portfolio Requirements Design / Build
Business ReadinessTest Implement
BA SMEsMatrix to BRQ
QA SMEsMatrix to BRQ
Confidential and Proprietary Information NOT FOR DISTRIBUTION 80
BA SMEs – What Will They Do?
Provide oversight of the requirements process - across the release.
Ensure quality and completeness of project requirements.
Develop standards and provide input into BA capability improvements.
Portfolio• Business Impact Assessment• Bus Arch Strategy - partner to
review training outline for the supported business process.
Project Execution• Partner with business owner
and project to define requirements and future state.
• Requirement Walk through - support review with the project Team.
• Test Case Review- Participate and ensure traceability to business requirements.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 81
QA SMEs – What Will They Do?
• Provide oversight of the SDO owned testing process - across the release.
• Ensure quality and completeness of test plans and scripts.
• Ensure test plans are executed and defects resolved.
• Develop standards and provide input into QA capability improvements.
Portfolio• Understand and anticipate
projects coming through Portfolio and plan for staffing.
Project Execution• Develop a release-level test
strategy to address redundancies in project-level test plans.
• Provide defect management oversight through engagement with Defect Board.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 82
Release Coordinator Responsibilities
Phase BRQ Release Coordinator (Proposed) ITG Release Coordinator (Current)
Portfolio & Scope
• Awareness of project candidates• Begin tracking release candidates to release, and
ensures carry-forwards and drop-outs are returned to the Portfolio.
• Awareness of Status / Milestones and changes that result after baseline release scope is established.
• Open Issue: Need accurate Tier 4 project management and reporting.
• Awareness of project candidates• Tracks release candidates to release, and ensures
milestones are set and communicated• Awareness of Status / Milestones for release and
associated projects across ITG organization• Maintains release milestones and establishes Change
Order to set milestone dates (for additions)
Requirements • Communicate release milestone dates to PMs/IT Leads (Open Issue: This is redundant with IT – who should be the sole source of communication? Today BCAG sends out milestone “alerts” weekly)
• Interface with all PMs/IT Leads and BAs to ensure they are all on target for the deliverable date.
• Communicate/coordinate with PIT/OCM to ensure that end users have a clear understanding of what is in scope and what’s coming.
• Tracks release candidates to release, brings dropouts back to Portfolio through change control
• Ensure requirements document is approved and in the document repository. Notify ITG BlueChip SDM Team.
• Begins the formal milestone Check-in process - Monitor release milestones using a common tool/source of data or check-in process
• Communicate release milestone dates to PMs/IT and Business Leads from BCAG Release Coordination mailbox (annually)
• Interface with all PMs/IT Leads and Developers to ensure they are on track for code movement
• Awareness from scope management team as release contents change
• Establishes projects in BRAD tool and assigns tasks for tracking (currently done by Louis)
• Monitor release milestones using a common tool/source of data or check-in process (currently BCAG Release Scorecard & BRAD)
Confidential and Proprietary Information NOT FOR DISTRIBUTION 83
Release Coordinator Responsibilities
Phase BRQ Release Coordinator (Proposed) ITG Release Coordinator (Current)
Design/Build • Engage with ITG Build Team re: design status, impact on scheduled releases and escalate for action, as required
• Milestone Check-in Process - Monitor release milestones using a common tool/source of data or check-in process. (Ensure PM is appropriately checking in on milestone progress)
• Communicate/coordinate with Scope Management Team as release contents change
• Interface with all PMs/IT Leads /Developers to ensure they are on track for code movement
• Creates Technical Implementation Plan for Release (including those assigned Tier 1-3 Projects)
• Facilitates and coordination Design and Construction Release Certification Meeting with ITG and Business .
• Monitor release milestones using a common tool/source of data or check-in process (currently BCAG Release Scorecard & BRAD)
• Tracks tasks for code movement through SDLC in common repository (BCAG Release Scorecard & BRAD)
Confidential and Proprietary Information NOT FOR DISTRIBUTION 84
Release Coordinator Responsibilities
Phase BRQ Release Coordinator (Proposed) ITG Release Coordinator (Current)
Testing • Milestone Check-in Process - Monitor release milestones using a common tool/source of data or check-in process.
• Engage with QA Lead re: test status, impact on scheduled releases and escalate for action, as required.
• Ensure test preparation and execution have adequate oversight at project and release level.
• Communicate/coordinate with to Scope Management Team as release contents change
• Tracks tasks for code movement through SDLC in common repository (BCAG Release Scorecard & BRAD)
• Communicate release milestone dates to PMs/IT and Business Leads from BCAG Release Coordination mailbox
• Interface with all PMs/IT Leads /Developers to ensure they are on track for code movement
• Secure and monitor technical Work Flow Tasks for Change Order
• Facilitates Release Implementation Review and Application Work Shop Meetings
• Awareness from scope management team as release contents change
Business Readiness
• Engage with ITG Release Coordinator to ensure al technical activities, environments, risk and issues are addressed.
• Engage with SDO OCM and PIT teams to ensure end users have adequate information re release contents.
• Engage with PMs/IT Leads to ensure final production prep and readiness. Redundant with ITG RC? Eric and Vicki to work out
• Engage with Portfolio Manager to coordinate hand-off of post-production defects back through portfolio.
• Verify pre and post-production defect resolution ? Verify with Nicki
• Engage with all Technical Areas to ensure all technical activities, environments, risk and issues are addressed.
• Facilitates and executes release implementation from beginning to end of release
• Communicates release status during implementation weekend
• Awareness from scope management team as release contents change
Confidential and Proprietary Information NOT FOR DISTRIBUTION 85
Release Coordinator Responsibilities
Phase BRQ Release Coordinator (Proposed) ITG Release Coordinator (Current)
Implementation • Engage with ITG Release Coordinator to ensure all technical activities, environments, risk and issues are addressed.
• Engage with SDO OCM and PIT teams to ensure end users have adequate information re release contents.
• Engage with PMs/IT Leads to ensure final production prep and readiness. Redundant with ITG RC? Eric and Vicki to work out
• Engage with Portfolio Manager to coordinate hand-off of post-production defects back through portfolio.
• Verify pre and post-production defect resolution ? Verify with Nicki
Engage with all Technical Areas to ensure all technical activities, environments, risk and issues are addressed.Facilitates and executes release implementation from beginning to end of releaseCommunicates release status during implementation weekendAwareness from scope management team as release contents change
Release Planning
• Work with Portfolio Manager and ITG to confirm baseline release schedule and contents of each release.
• Jointly coordinate and execute Release Kick-off (with ITG) for each release
• Meet regularly with ITG Release Coordinator to validate release schedule, environments and capacity.
• Communicate changes to release schedule, environments and capacity.
• Participate in release planning with ITG Rlease Coordinator to produce a forward-looking annual release schedule.
• Facilitates Release Strategy Meetings• Jointly coordinate and execute Release Kick-off (with
BRQ) for each release• Meet regularly with SDO Release Coordinator to
validate release schedule, environments and capacity.
• Communicate changes to release schedule, environments and capacity.
• Responsible for release planning activities to maintain a forward-looking ITG Release schedule.
• Coordinates Release Activities with ITG Change Management
• Represents BCAG at ITG Release Management Advisory Committee (RMAC)
• Awareness from scope management team as release contents change
Confidential and Proprietary Information NOT FOR DISTRIBUTION 86
Release Coordinators (ITG and SDO) will act as single points of contact for their respective areas.
BRQ Release
Coordinator
Portfolio Team
PMs and IT Leads
ITG Release
Coordinator
BAs and Business Process Leads
QAs and Quality Process Leads
Production Impact Team
Comms and OCM
Business Owners
and Leads
The BRQ Release Coordinators are not:• Directing work efforts • Managing SDM Governance for each project• Conducting detailed SDM audits of project artifacts
ITG Release
Coordinator
Enterprise Release Mgt
PMs and IT Leads
BRQ Release
Coordinator
Enterprise Change Mgt.
IT Developers
ITG Support Teams
Portfolio Team
Environment Team
Business Leads
Production Impact Team
Confidential and Proprietary Information NOT FOR DISTRIBUTION 87
Accomplishments
Conducted multiple collaborative working sessions with BRQ and ITG team leaders to understand: • Current roles and responsibilities• Current governance, meeting agendas and cadence
Identified issues, weaknesses and gaps
Reached consensus between BRQ and ITG Teams on a high-level and directional “To Be” state• Defined Portfolio Management process and team structure• Defined Release Management team role, as differentiated from ITG
Identified specific recommended actions to “operationalize” the BRQ Office
Confidential and Proprietary Information NOT FOR DISTRIBUTION 88
Activities in Progress
Clarify the role of the BRQ Office - within SDO and with ITG - in the Request-to-Release process.• Collaboratively managed process• Jointly-owned with shifting primacy between SDO and ITG• Formalize and implement team structures for portfolio and release management• Agree on go-forward approach for BA/QA process lead roles
Clearly define roles and responsibilities for all stakeholders – internal and external to BRQ.
Establish and enforce a clear governance/decision-making structure.• Implement a common project change control process• Ensure traceability/audit trail between release components and business
requirements/capabilities.• Establish a Business Council to set priorities for Tier 4 projects• Finalize Steering Committee structure• Repurpose existing governance meetings
Confidential and Proprietary Information NOT FOR DISTRIBUTION 89
Activities in Progress
Address skill gaps within SDO and the BRQ office.• Leadership• Portfolio and Release Teams• Business Analysts• Quality Analysts and Testers• OCM
Implement common tools to manage the request-to-release process and reduce redundancies.• “Single Source of Truth” – common tool for portfolio and release management,
change management, defect management, document repository• Robust communication tools – leverage FYIBlue to facilitate communication
and create common “dashboards” to distribute information
Transform the SDO organization to align with the BRQ purpose. • Provide visible, vocal support for BRQ mission, purpose, and approach across
SDO, ITG and beyond.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 90
Project Attributes for BlueChip Portfolio Management Project Name – Five to 7 descriptive words that are meaningful at a business level. Project Description – Twenty-five to 50 words that describe the project in business-friendly
language. For Tier 1 – 3 projects, describe the elements of the project that are related to or will impact BlueChip. This should be understandable to Director-level and above.
Project Number – Identifier assigned to the project in the Clarity System. Business Sponsor – The Director-level business leader whose business strategy and objectives
require the capabilities requested Project Initiator/Owner – The person in the Director-level business leader’s org who initiated the
project and who will articulate the business objectives, high-level business requirements and potential ROI of the project. This person, or his/her designee, should own the project from the Bus Ops perspective thru to completion.
Requested Implementation Date – The date requested by the Project Initiator/Business Owner for the capabilities encompassed by the project request to be deployed.
Program Reference – Reference to higher-level SDO Program such as “CCSP”, or other Program/Project that requires capabilities, enhancements or integration relative to Blue Chip, such as “NGEN”, “Montana”, “ACA”, et al.
Team Reference – Reference to Business Ops team associated with the project, such as “Service”, “Local”, “National”, “Marketing”, et al.
Tier – Tier 1, 2, 3, or 4.
Business Release Quality (BRQ) OfficePortfolio Management Approach
Confidential and Proprietary Information NOT FOR DISTRIBUTION 91
Project Attributes for BlueChip Portfolio Management ROM Cost – Rough Order of Magnitude (ROM) cost to complete the project. This value should be
updated as the project becomes more well-defined. It should be maintained by the Project Portfolio Owner on Jack’s team and should include all costs (Bus Ops, ITG, Test, Post-deployment readiness)
Project State – The current status of the Project….Idea/Opportunity, Under Evaluation, Pending Approval, Approved, Detailed Requirements Complete, In Design, etc. etc. We can define this more completely with ITG.
ITG Project Owner – The Director or Manager-level person in ITG who has ultimate responsibility for technical project delivery (solution design, build, system test, non-functional requirements, etc.) from ROM assessment thru to Release.
Business Analyst – The person who will ensure detailed business requirements are complete to the level required to facilitate functional and technical system/solution design. This person may be in the ITG org or SDO Tech.
Business Requirements Due Date – Firm date at which detailed business requirements sufficient to enable commencement of solution design and build are due. The BA is the Directly Responsible Individual (DRI) for this milestone.
Project Manager – Fir Tier 1-3 Projects, the PM assigned to the project who will be expected to coordinate and report on all activities associated with the project. (See PMO for further definition?)
Project Portfolio Manager – Works with the Project Initiator/Business Owner to shepherd the project thru the portfolio evaluation and tracking process. This person would also liaison with the appropriate Project Team members (if the project is accepted) to ensure portfolio tracking is executed and that “traceability” thru to Release is performed and monitored
Business Release Quality (BRQ) OfficePortfolio Management Approach
Confidential and Proprietary Information NOT FOR DISTRIBUTION 92
Project Attributes for BlueChip Portfolio Management Build Lead – The person in ITG who will ensure solution design (functional/technical design) and
development are complete and trace-able back to detailed business requirements. Build Completion Date – Firm date at which build will be completed sufficient to enable
commencement of testing. The Build Lead is the Directly Responsible Individual (DRI) for this milestone.
Test Lead – The person who will ensure testing is completed. This includes system/integration testing and UAT. This person will also work with the Business Analyst, the Project Initiator/Business Owner and Project Portfolio Owner on Jack’s team to ensure all defects are resolved (passed or run back thru the portfolio process to be included in a subsequent Project/Release).
Test Completion Date – Firm date at which testing will be completed. The Test Lead is the Directly Responsible Individual (DRI) for this milestone.
Target Release Date – Initial and preliminary Release target date agreed to by the Project Initiator/Business Owner, SDO Tech and the IT Project Owner at the project acceptance stage.
Confirmed Release Date - Final Release date agreed to by the Project Initiator/Business Owner, SDO Tech and the IT Project Owner. This would likely be agreed to once requirements, design and possibly build have proceed to the point at which confidence level in the release date is high.
Actual Release Date – Date the project capabilities were actually released to production and deployed.
Business Release Quality (BRQ) OfficePortfolio Management Approach
Confidential and Proprietary Information NOT FOR DISTRIBUTION 93
Inventory Existing Propjects - Started 2/22 to define to baseline to one Bluechip project list….inventory, scrub, validate Merge spreadsheets to one acknowledged master. Rationalize and define project descriptions, attributes, owners and responsibilities thru
the project lifecycle Partner and engage with ITG thru Vicki Sullivan and Teri Lewis to assist in gathering the
data to complete the portfolio spreadsheet, including adding to it or eliminating dead or redundant items. They will not have all the answers but can help us engage the appropriate folks in ITG who do have them.
Engage with the PMO to re-align the information request already made to the PM's to the updated spreadsheet structure and definitions.
SDO ITG Portfolio will meet daily to effectively manage the requests. Weekly publication to identified stakeholders with any additions to the project portfolio
baseline. Prepare for the 2013-14 BlueChip Portfolio Report. The Blue Chip Release schedule will
be incorporated to ensure awareness of the defined dates.
Business Release Quality (BRQ) OfficePortfolio Management Approach
Confidential and Proprietary Information NOT FOR DISTRIBUTION 94
BRQ “Call to Action” BRQ “Call to Action”• Implement portfolio management governance structure• Champion and support organizational change across the division• Provide a sound, clear and executable process to manage initiatives and
investments going forward• Maximize the value of the portfolio through careful examination of candidate
projects and programs for inclusion in the portfolio• Integrate portfolio process with planning and budgeting policies, processes
and practices• Develop and maintain business architecture and future state architecture• Ensure the IT portfolio for targeted system is included in the main system
portfolio• Evaluate and identify systems that will be impacted by the system deliverables• Improve communication and alignment between technology and
business including leadership and other enterprise portfolio's • Capture and monitor program performance measures• Maintain an enterprise architecture to support and substantiate IT investments
decisions*Preliminary – Subject to change
Confidential and Proprietary Information NOT FOR DISTRIBUTION 95
Confidential and Proprietary Information NOT FOR DISTRIBUTION 96
Next Steps – What We Need to Do
SDO, ITG, EPMO, PPM Collaborate to:• Reconciled perspectives of each team relative to “Request-to-Release”
process and requirements• Understand “white spaces” and hand-offs across teams and address
process disconnects• Agree on how we can leverage/improve existing processes and tools• Develop and agree on a common “Request-to-Release” process• Establish Roles and Responsibility definitions that will improve
accountability and compliance• Make governance recommendations – Guiding Principles
Socialize and get consensus from Senior Leaders on joint recommendations.
Publish process documents and artifacts as new Rules of Engagement Formally establish Governance Model and assign critical roles and
responsibilities
Confidential and Proprietary Information NOT FOR DISTRIBUTION 97
Key Partners Key Activities
Key Resources
Value Proposition CustomerRelationships
Channels
CustomerSegments
Channels ContinuedCost Structure
www.businessmodelgeneration.com
BRQ Current State Business Model
External CustomersOur Members – groups and individualsFSUs and UsersProviders (Healthcare Service Providers)TMGsThe AssociationVendorsGovernment/RegulatoryInternal CustomersMembershipSDO TechITGEnterprise Councils who have project leads
Facilitate delivery of enhancements/functionsEnsure quality and timely deliveryEnsure delivery meets expectations/ agreementsGate-keeperAuditorAdvocateConsistent and repeatableAble to ensure/impact that we influence HCSC’s market position and successSave money for members thru reduced rework and defectsSave lives/familiesProtect lives/familiesGovernance – ensuring that we work on the right things, at the right time for the right reasonsFlexibility in deliveryNimbleStability of channels to continue to provide key services – “there when they need you”.Impact/effect Brand/Reputation/ReliabilityEasy to do business with – “one-stop-shop”, problem solverProcess followed, hand-offs occurred, checks and balancesUnderstand/Assess impact and riskEvaluate feasibility of proposed changes (Future State) through modeling and simulationAccuracy/information
IndirectExchange – self-service modelBrokersGovernment programsCOBRADirectMarketing (direct, selling new products and services)Align sales teams with FSUsBRA delivers thru FSU to
membersWeb
Personal Communications (1:1) with requestor or the person who has the issue (e.g., direct to Nikki). Portfolio questions to JackEmail –production communications one week prior with “what to expect”Personal Relationship with FSU or Business Owner – Project specific discussion after implementation – did you get what you thought you were getting? Close the loop to ensure that the intended benefits were realized.
People – i.e: developers/portfolio Projects/work /requirementsKey decision-makersFundingEngaged workers: common view of target and priorities; with training and abilityHuman Capital: people to workTools and technologiesIncentives, goals and metrics/measures
Follow prescribed processEvolve existing processes thru testing and CICommunicate, collaborateBalance demand and supplyExpose transparencyBuild partnerships and relationshipsCommit to trustworthy dialogueTake ownershipReportIdentify impact – system, processTrainFollow-up
•ITG•PMO•FSUs•EPOG/POG•Helpdesk (technical for major production issues)•Leaning and talent•PPM•Steve Mallon•CPE•SSO•TMG•CM•ECM•Hallmark•Dearborn Life•BCA •Prime•Infrastructure Reliability•Info Security
Goal setting (upward communication)Weekly issue reporting (upward) – executive updateBi-weekly executive update re: portfolioReports sent by emailIn-person meetings with stakeholdersEmail delivery / distribution listWorking sessions (e.g., requirements changes)Meetings
Blue SourceFSU business release user group meetingOperations MeetingsClaims Manger MeetingsFSU Change Agnet (role) – change championNewslettersMailbox direct to customersBusiness Readiness ForumChange Control
Confidential and Proprietary Information NOT FOR DISTRIBUTION 98
The Business Model Canvas
Key Partners Key Activities
Key Resources
Value Proposition CustomerRelationship
Channels
CustomerSegments
Revenue StreamsCost Structure
www.businessmodelgeneration.com
What type of relationship have we established with each of our customer types/segments?
How are we reaching our buyers now?
A revenue stream represents the cash we generate from each customer segment.
What are the revenue streams generated by each customer segment? How much does each revenue stream contribute to overall revenues.
The cost structure describes all the costs incurred to operate the business model.
Think about the most important costs inherent in our business model.
What value do we deliver to the customer?
Which of our customer's problems are we helping to solve?
Which customer needs are we satisfying?
What bundle of products and services are we offering to each customer segment?
For whom are we creating value?
Who are our most important customers?
Remember – Proper segmentation either enables or inhibits differentiation.
The key partnerships describe the network of suppliers and partners than make the business model work
What are the key activities required to make the business model work?
The key resources required by the value proposition--distribution channel; customers, revenue streams, etc.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 99
Build partnerships and collaboration among key SDO stakeholders in the release cycle.
Business Analyst
Liaisons
QA Liaisons
OCMLiaisons
Production SupportLiaisons
Bus
ines
s A
rchi
tect
ure
Capabilities
A
B
C
D
Plan Execute
Release Date
Business Processes (Services)
A
B
C
D
A
B
C
D
A
B
C
D
A
B
C
D
Portfolio Manager
Release Manager (Program/PM Integration) 13.X
BRQ Release Manager/Coordinator will interface with liaisons across capabilities
Confidential and Proprietary Information NOT FOR DISTRIBUTION 100
Blue Chip Portfolio ManagementDetailed Standard Operating Process
BRQ Portfolio Management Process
Req
uest
or /
Cus
tom
erB
RQ
Por
tfolio
ITG
& Q
AP
PM
& B
ET
SD
O T
ech
BA
Approve Impact to Claims?
Yes
Demand Triage:Assess, Assign,
Review & ValidateImpacts to Claims
Processing
YesStage 1 or Tier 4
Approved?
No
UG
Portfolio Prioritization &
Release Planning
Preliminary Release Scope
Approved Release Scope incorporates input from SDO Tech, Customers and ITG leadership. Parties agree that scope can be completed for a given release.
Provide Release Candidates to BA,
ITG, QA and Customer
Approved Release Scope
Opportunity Document or
Funding Request
Baseline Release Scope
& Hand-Over to Release
Management
BC Business Release User Group(Includes Enterprise Councils)
SC
UG
BC Business Release Steering Committee
UG SC
Requirements Walk-Throughs with QA, ITG,
Delivery Partners and Customers
EP
MO
Document Blue Chip System Functional
Requirements
Refine or Add Business Impacts
(if necessary) Requirements Review
UG SC
Tier 1-3
Tier 1-3
Define prioritized preliminary release scopes & impacts taking into consideration the following:-New Requests-Existing Requests & Carry-over-Production Defects-Maintenance Items-Mandates / New Business-Other Council Projects
Assign Business Analyst(s) &
Refine Business Impacts
No
UG
Document Stakeholder Needs and Customer
Requirements
Stage 2 Approved?
UG
No
Tier 1-3StagedFunding
AssessmentOptions
Yes
Schedule&
ReleaseNeeds
Approved Projects
UG
Provide Project
Schedule and Release Needs
Provide Approved Customer
Requirements
Identify New or Refined Impacts or
Adjustments to Schedule
Estimate High-Level Costs and Impacts
Assess Preliminary
Scope & Engage
Reviewers
Re-Estimate Detailed Costs & Assign
Resources
Tier 1-3
Assess Preliminary
Scope & Provide
Feedback
Estimate High-Level Costs and
Business Impacts Tier 4
Tier 4
UG
RefinedBusinessImpacts
Confidential and Proprietary Information NOT FOR DISTRIBUTION 101
Project vs. Program vs. Portfolio
Confidential and Proprietary Information NOT FOR DISTRIBUTION 102
Implement common criteria for portfolio entry and approval
Implement a common request form to describe objectives, benefits, rough order of magnitude (ROM) cost and ROI
Implement an objective project “scoring” and assessment methodology Align evaluation methodology with business imperatives, strategy,
capability requirements and Business Architecture Consider customized evaluation criteria for Tier1/3 vs. Tier 4 Identify appropriate approvers and project stakeholders early in
Portfolio process Get agreement on methodology and day-to-day process for
engagement across all stakeholders …Bus Ops, SDO Tech, ITG Establish a project proposal and portfolio review cadence Ensure key stakeholder review/sign-off prior to material resource
allocation
Confidential and Proprietary Information NOT FOR DISTRIBUTION 103
Include all SDO-impacting Tier 1-3 and Tier 4 projects. Ensure all new requests are properly documented and supported Track and communicate stage and status of each new request or
project (New, Unapproved, Approved, Active). Create a business-driven governance body to review, score and
prioritize project requests on a regular basis. Ensure each project request has identified directly responsible
individuals for each major role e.g., Steward, BA, PM, Build Lead, Test Lead, Deployment Lead, etc.
Confirm each project’s placement in the Release Roadmap. Implement a governance process and accountability to manage inputs
and updates to the portfolio.
Maintain a “Portfolio Inventory” and status of all project requests.
Maintain a Project “Inventory” – Compile and manage an accurate and complete inventory of the current projects in the existing SDO portfolio.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 104
Enforce Project Management disciplines from Request-to-Release. Manage each project thru a mandated set of SDM sign-offs. Ensure
approval for resource assignment (post-Evaluation stage).• Business Requirements• Functional and Technical Design• Build• System and Integration Test• UAT and Acceptance Testing• Release-to-Production
Utilize a common document repository to facilitate collaboration between SDO and ITG, SDM Quality and Audit.
Identify appropriate sponsors and stakeholders at each stage of completion.
Establish project review cadence and transparency to project status. Implement processes and controls to ensure informed sign-offs.
Enforce accountability at each handoff.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 105
Enforce Project Management disciplines from Request-to-Release. Manage each project thru a mandated set of SDM sign-offs. Ensure
approval for resource assignment (post-Evaluation stage).• Business Requirements• Functional and Technical Design• Build• System and Integration Test• UAT and Acceptance Testing• Release-to-Production
Utilize a common document repository to facilitate collaboration between SDO and ITG, SDM Quality and Audit.
Identify appropriate sponsors and stakeholders at each stage of completion.
Establish project review cadence and transparency to project status. Implement processes and controls to ensure informed sign-offs.
Enforce accountability at each handoff.
Confidential and Proprietary Information NOT FOR DISTRIBUTION 106
BRQ Influence and Scope
Controls Influences Out of ReachPortfolio Process Defect Management Business Requirements
Business Readiness Release Process Test/QA
Change Management Change Control Design/Build
Communications Architecture
PIT EPOG / PPM
Training/Learning Tier 1,2,3 Projects
BlueChip - People, Processes and Tools
Confidential and Proprietary Information NOT FOR DISTRIBUTION 107
Next Steps to operationalize governance or each meeting . . . .
Work with meeting owners to define and gain agreement on meeting charter• Purpose• Scope of Authority (and selection criteria, if needed)• Membership – member responsibilities, role, name, voting and non-voting
members• Operating Procedure – inputs (entry criteria), activities/decisions, outputs
(deliverables)• Meeting frequency• Decision-making process• Communication approach
Define the inputs (tools, reports etc) and define/confirm process to deliver. (what does it look like? Who does it? How often? Where does the information come from?)
Define the outputs (tools, reports etc.) and define/confirm process to deliver. Launch meetings