brochure of major projects (pdf)

4
MAPPING SERVICES, INC. L T P.O. Box 472168 Tulsa, OK 74147 | Ph 918 249-0422 | Fax 918 249-0442 | [email protected] MAJOR PROJECTS ONEOK Gas-Gathering System Maps – 17,000+ miles FERC to Granite Enogex McClure Centrahoma Stonewall Carrera Madill Woodford Shale Atlas to Sweetwater GIS Database & PODS Conversion Kelton Bridgeport to Chico Ongoing Miscellaneous Projects Petrohawk Haynesville Shale – 300+ miles of gathering systems Enable Midstream Ongoing Miscellaneous Projects Centerpoint Energy (subsidiary) – Transmission Lines & Compressor Sites New Dominion, LLC Ongoing Miscellaneous Projects Enbridge Energy Development of the “Rule 36” Mapping System H2S Contingency Mapping Gas-Gathering Mapping P&ID Drawings for 22 Plants Terrace III Expansion – 110 miles of 36” pipeline East Texas Pipeline – North & South – H 2 S Emergency Evacuation Plan NGL Lines Ozark Pipeline - Remapping Plant Tagging - Louisiana and Oklahoma Plants Ongoing Miscellaneous Projects

Upload: lamtuong

Post on 10-Jan-2017

224 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Brochure of Major Projects (PDF)

MAPPING SERVICES, INC.LT

P.O. Box 472168 Tulsa, OK 74147 | Ph 918 249-0422 | Fax 918 249-0442 | [email protected]

MAJOR PROJECTS

ONEOKGas-Gathering System Maps – 17,000+ milesFERC to GraniteEnogex McClureCentrahoma StonewallCarrera MadillWoodford ShaleAtlas to SweetwaterGIS Database & PODS ConversionKeltonBridgeport to ChicoOngoing Miscellaneous Projects

PetrohawkHaynesville Shale – 300+ miles of gathering systems

Enable MidstreamOngoing Miscellaneous Projects Centerpoint Energy (subsidiary) – Transmission Lines & Compressor Sites

New Dominion, LLCOngoing Miscellaneous Projects

Enbridge EnergyDevelopment of the “Rule 36” Mapping SystemH2S Contingency MappingGas-Gathering MappingP&ID Drawings for 22 PlantsTerrace III Expansion – 110 miles of 36” pipelineEast Texas Pipeline – North & South – H2S Emergency Evacuation PlanNGL LinesOzark Pipeline - RemappingPlant Tagging - Louisiana and Oklahoma PlantsOngoing Miscellaneous Projects

Page 2: Brochure of Major Projects (PDF)

MAPPING SERVICES, INC.LT

P.O. Box 472168 Tulsa, OK 74147 | Ph 918 249-0422 | Fax 918 249-0442 | [email protected]

MAJOR PROJECTS

Sempra Energy InternationalCameron Interstate Pipeline (CIP) Phases I & II – Alignment sheets, property plats, USGS quad maps for FERCCIP ExpansionCameron LoopLiberty Pipeline - Alignment sheets, property plats, USGS quad maps for FERCLiberty Plant SitePort Arthur Pipeline – Crossed Intercoastal Ship Channel, Port Arthur Ship Channel, Lake Sabine, Houston River Channel, Little River and West Calcasieu River; provided aerial photography, alignment sheets, property plats, permit drawings, USGS quad sheets, right-of-way details and pipe data.Port Arthur Terminal – Relocation of highway and 3 pipelinesDeveloped Survey and Mapping Standards for all Sempra projectsOngoing Miscellaneous Projects

Kinder Morgan – Sempra EnergyRockies Express Pipeline – 1,340 miles total project, the longest pipeline constructed in the lower 48 states. LTMS was chosen as one of four �rms for this project, providing 20 survey crews + 2 survey supervisors; mapping sta� provided support for Gulf Interstate Engineering for production of over 300 property plats for right-of-way acquisition in a two-week time frame to meet client’s schedule.

Regency EnergyH2S Contingency Mapping – updated every 2 years as required by FERCGIS Mapping - Ongoing

Tristream EnergyH2S Contingency Mapping – updated every 2 years as required by FERCGIS Mapping - OngoingComo Maps - Ongoing

Plains Pipeline, L.P.Cushing to Caney Pipeline – Preliminary, construction staking, as-built survey and mapping for a 100-mile 16” pipeline from Cushing, OK to Caney, KS. Included 19 directional drill locations, crossing of the Cimarron River, Keystone Lake (6,000’ drill) and Skiatook Lake (4,900’ drill); provided permit drawings for state and federal agencies, county permits for 7 counties, aerial photo alignment sheets and plats for right-of-way acquisition.Ongoing Miscellaneous Projects

Page 3: Brochure of Major Projects (PDF)

MAPPING SERVICES, INC.LT

P.O. Box 472168 Tulsa, OK 74147 | Ph 918 249-0422 | Fax 918 249-0442 | [email protected]

CLIENTELE AND MAJOR PROJECTS

Targa Resources (formerly Dynegy Midstream)Chio – 34 miles of 16” and 8” pipelinesVenice Plant – P&ID veri�cationGIS System Pilot Program – 230+ miles Converted & developed Arcview GIS System Maps for Gas-Gathering SystemsSandhills – 1,300 milesVersado – 1,700 milesNorth Versado – 2,300 milesLake Charles – 500 milesT-4 Permit Drawings – 4,800+ miles of Gas-Gathering Systems for Texas Railroad CommissionGas-Gathering – 300+ miles – Mapping and Aerial Photography53 Plant Sites – Risk Management ProgramDeveloped H2S Contingency Plan

Grand River Dam Authority (GRDA)Transmission PolesMiami School EasementsProvide on-going survey and mapping for various projects throughout NE Oklahoma

URSCIP Compressor Stations and Pipeline

John Chance, Inc.Kinder Morgan Pipeline – 100 miles as-builtTexas Express PipelineDenberry Pipeline – 300 miles of 24” CO2Crosstex Pipeline

Select EngineeringMagellan RelocateCushing ProjectBig Springs

Sanders EngineeringResidentialOngoing Miscellaneous Projects

A&P SupportWhiteside Waste Water Facility

Page 4: Brochure of Major Projects (PDF)

MAPPING SERVICES, INC.LT

P.O. Box 472168 Tulsa, OK 74147 | Ph 918 249-0422 | Fax 918 249-0442 | [email protected]

CLIENTELE AND MAJOR PROJECTS

Williams Energy GroupAspen Pipeline – 240 milesPipeline Relocations throughout the United States

Scissortail Energy, Inc.Southern Dome Pipeline – Preliminary and as-built survey and mappingStatewide Gas Transmission System

Oklahoma Natural GasOklahoma System Maps – 1,035 miles

Superior Pipeline CompanyDevelopment of System Map in SE Oklahoma

WilTel CommunicationsPreliminary, construction staking and as-built survey and mapping for more than 5,000 miles of �ber routes within public and railroad rights-of-way.