  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    1/12

    development through partnership

    GUIDELINES FORCONTRACTOR REGISTRATIONThank you for your interest in being registered as a contractor on the cidb Register of Contractors.To ensure successful registration and avoid delays please ensure that you furnish the cidb with all

    the necessary information and supporting documents when you apply.

    The Construction Industry Development Board

    V-2 : 2011

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    2/12

    Grade

    1

    2

    3

    45

    6

    7

    8

    9

    Tender value less than or equal to R)

    200 000

    650 000

    2 000 000

    4 000 0006 500 000

    13 000 000

    40 000 000

    130 000 000

    No limit

    The extension, installation, repair, maintenance or renewal, or removal of asphalt

    The development, extension, installation, removal and dismantling, as relevant, associated with building excavations, shaft

    sinking and lateral earth support

    The development, extension, installation, repair, renewal, removal or alteration of corrosion protection systems (cathodic,

    anodic and electrolytic)

    Demolition of buildings and engineering infrastructure and blasting

    The development, extension, installation, renewal, removal, renovation, alteration or dismantling of fire prevention and

    protection infrastructure (drencher and sprinkler systems and fire installation)

    The development, extension, installation, renewal, removal, renovation, alteration or dismantling of glazing, curtain walls

    and shop fronts

    The development, extension, installation, maintenance, renewal, removal, alteration or dismantling, as relevant, oflandscaping, irrigation and horticultural works

    The development, extension, installation, repair, maintenance, renewal, removal, renovation, alteration or dismantling of lifts,

    escalators, travellators and hoisting machinery

    The development, installation, removal, or dismantling, as relevant, of piles and other specialised foundations for buildings

    and structures

    The installation, renewal, removal, alteration or dismantling, as relevant, road markings and signage

    The development, extension, installation, renewal, removal, renovation, alteration or dismantling of structural steelwork

    and scaffolding

    Timber buildings & structures

    The extension, installation, repair, maintenance, renewal, removal, renovation or alteration, as relevant, of the waterproofing

    of basements, roofs and walls using specialist systems

    The development, extension, installation, renewal, removal, alteration, or dismantling or demolition of water installations and

    soil and waste water drainage associated with buildings (wet services and plumbing)

    The development, extension, installation, repair, removal, alteration, dismantling or demolition of precast concrete, security

    fencing or steel security fencing

    TYPES OF WORKS THAT CONTRACTORS CAN REGISTER FOR:

    SPECIALIST WORKS

    Works identified and defined by the Board that involve specialist capabilities for their execution

    SB

    SC

    SD

    SE

    SF

    SG

    SH

    SI

    SJ

    SK

    SL

    SM

    SN

    SO

    SQ

    ApplicationReceived

    Compliant?

    ApplicationRegistered within21 Working Days

    AnnualConfirmation

    Received?

    RegistrationUpdated

    3 Year RenewalReceived

    RegistrationRenewed

    Non-CompliantLetter sent

    allowing 60days beforeCancellation

    Registrationsuspended after

    three monthsgrace period

    Registrationremoved fromthe registeron the date

    of expiry

    WHO MUST APPLY?

    All contractors seeking to participate in public sector infrastructure delivery must be registered onthe cidb Register of Contractors.

    Contractors who are exempted from registration are:

    Home builders, unless they also wish to tender for other kinds of public sector construction work. Those who undertake contracts consisting substantially of the provision of labour. Those who undertake contracts consisting substantially of the provision of supplies.

    WHY REGISTER?

    According to the CIDB Act 38 of 2000 no public sector client may award construction contracts toa contractor who is not registered.The Register grades and categorises contractors according totheir capability to carry out construction projects. There are 9 different grading levels according towhich contractors can be registered. A grade determines the maximum Rand value of a project as

    well as the type of construction works a contractor is capable to perform.

    TABLE 1(A): TENDER VALUE RANGES

    1

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    3/122

    TABLE 1(B): MORE CLASSES OF CONSTRUCTION WORKS (Schedule 3 of the regulations)

    ELECTRICAL ENGINEERING WORKS - BUILDING EB) - lectrical certificate Required

    ELECTRICAL ENGINEERING WORKS - INFRASTRUCTURE EP)

    GENERAL BUILDING WORKS GB)

    MECHANICAL ENGINEERING WORKS ME)

    CIVIL ENGINEERING CE)

    DEFINITION BASIC WORKS TYPES EXAMPLES

    Construction Works primarily concerned with materials such

    as steel, concrete, earth & rock & their application in the

    development, extension, installation, maintenance, removal,renovation, alteration, or dismantling of building and

    engineering infrastructure

    Water, sewerage, roads, railways,

    harbours and transport, urban

    development & municipal services

    Structures such as cooling tower, bridge, culvert, dam, grand stand,

    road, railway, reservoir, runway, swimming pool, silo or tunnel.

    The results of operations such as dredging, earthworks and

    geotechnical processes.

    Township services, water treatment and supply, sewerage works,

    sanitation, soil conservation works, irrigation works, storm-water and

    drainage works, coastal works, ports, harbours, airports and pipelines

    Construction Works that are primarily concerned with the

    installation, extension, modification or repair of electrical

    installations in or on any premises used for the transmission

    of electricity from a point of control to a point of

    consumption, including any article forming part of such an

    installation

    All electrical equipment forming an integral

    and permanent part of buildings and/or

    structures, including any wiring, cable

    jointing and laying and electrical overhead

    line construction

    Electrical installations in buildings

    Electrical reticulations within a plot of land (erf) or building site

    Standby plant and uninterrupted power supply

    Verification and certification of electrical installations on premises

    Construction Works that are primarily concerned with

    development, extension, installation, removal, renovation,

    alteration or dismantling of engineering infrastructure:

    a) relating to the generation, transmission and distribution

    of electricity; or

    b) Which cannot be classified as EB

    Electrical power generation, transmission,

    control and distribution equipment &

    systems

    Power generation

    Street & area lighting

    Substations & protection systems

    Township reticulations

    Transmission lines

    Construction Works that:

    a) are primarily concerned with the development, extension,

    installation, renewal, renovation, alteration, or dismantling

    of a permanent shelter for its occupants or contents; or

    b) cannot be categorised in terms of the definitions provided

    for civil engineering works, electrical engineering works,

    mechanical engineering works, or specialist works

    Building & ancillary works other than those

    categorised as:

    civil engineering works

    electrical engineering works

    mechanical engineering works

    specialist works

    Buildings for domestic, industrial, institutional or commercial

    occupancies

    Car ports

    Masonry (brick, block or stone) and lightly reinforced or

    unreinforced cast in-situ concrete walls and timber fences

    Stores

    Wal ls

    Construction Works that are primarily concerned with the

    development, extension, installation, removal, alteration,

    renewal of engineering infrastructure for gas transmission

    and distribution, solid waste disposal, heating, ventilation

    and cooling, chemical works, metallurgical works,manufacturing, food processing and materials handling

    Machine systems including those relating

    to the environment of building interiors

    Gas transmission and distribution systems

    Pipelines

    Materials handling, lifting machinery,

    heating, ventilation and cooling, pumps

    Continuous process systems, chemical

    works, metallurgical works, manufacturing,

    food processing such as that in

    concentrator machinery and apparatus, oil

    and gas wells, smelters, cyanide plants,

    acid plants, metallurgical machinery,

    equipment and apparatus, and works

    necessary for the beneficiation of metals,

    minerals, rocks, petroleum and organic

    substances or other chemical processes

    Air-conditioning & mechanical ventilation

    Boiler installations & steam distribution

    Central heating

    Centralised hot water generation

    Compressed air, gas & vacuum installations

    Conveyor & materials handling installations

    Continuous process systems involving chemical works,

    metallurgical works, oil and gas wells, acid plants, metallurgical

    machinery, equipment and apparatus, and works necessary for the

    beneficiation of metals, minerals, rocks, petroleum and organic

    substance and other chemical processes

    Dust and sawdust extraction

    Kitchen equipment

    Laundry equipment

    Refrigeration & cold rooms

    Waste handling systems (including compactors)

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    4/123

    CAN A CONTRACTOR BE REGISTERED IN DIFFERENT GRADES?

    A contractor may apply to be graded in one or several grades. However a contractor can only be registered in 1 grade per class of works.

    PROVIDING SUFFICIENT EVIDENCE TO SUPPORT YOUR APPLICATION

    The cidb evaluates applications for grading and registration based on evidence of works and financial capability provided by thecontractor. Evidence is then used to determine which grade and class of works a company qualifies for. Once a grade has beendetermined and approved by the Board a contractor is then able to tender for construction contracts within the approved grade. Shoulda contractor fail to provide sufficient evidence to support the grade applied for the cidb will determine an appropriate grade based onthe information at its disposal.

    A contractor has the right to appeal the decision of the cidb.

    To determine grading the cidb evaluates a contractors financial and works capability.

    FINANCIAL CAPABILITY REQUIREMENTS:

    To determine financial capability the cidb takes into consideration:

    1. The best annual turnover over the two financial years immediately preceding the application and available capital.

    2. Available capital. The cidb calculates available capital by adding any financial sponsorship to the sum of the net asset value of acontractor as indicated in the most recent financial statements. Net Asset Value is the difference between the total assets and totalliabilities of a company as reflected in the company's most recent financial statements.

    3. Financial sponsorship. Financial sponsorship must be a collectable financial guarantee by one person (a sponsor) to another, (thebeneficiary). Financial sponsorship must be:

    A determined amount to support operations of the contractor concerned in order to complete projects. Any sponsorship from anothercompany other than a financial institution may not exceed 15% of the sponsor's net asset value;

    Available to the beneficiary as and when required;

    If applicable, it must be available to a third person, such as a bank, to advance funds or such as a supplier, to advance a line of credit;

    If applicable, it must be in a form acceptable to any financial institution in South Africa as defined in the Financial Services Board Act,97 of 1990; and

    Please note that:

    a) where the sponsor is a registered contractor or owns 50 percent or more of the applicant contractor, sponsorship may constituteup to 100 percent of the total required available capital;

    b) where the sponsor is not a registered contractor and owns 25 percent or more of the applicant contractor, sponsorship may notexceed 75 percent of the total required available capital; and

    c) where the contractor is not a registered contractor and the sponsor owns less than 25 percent of the applicant contractor,sponsorship may not exceed 50 percent of the total required available capital.

    WORKS CAPABILITY REQUIREMENTS EXPLAINED:

    Works capability is determined by:

    The largest contract undertaken and completed in the relevant class of construction works within the 5 years immediately precedingthe application;

    The total number of full time registered professionals employed (See Table 3 and 4)

    The fulfillment of relevant statutory requirements.

    TYPES OF GRADING METHODS USED:

    There are two methods that a contractors grade may be assessed on (see Table 2 below):

    Method A is based on financial capacity and works capability and is applicable to all grades.

    Method B is based on available capital and the number of registered professionals employed and is only applicable for grades 5 - 9.(There are no turnover and track record requirements for Method B). The requirement for available capital and registered professionalsfor Method B is higher than the requirement for Method A.

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    5/12

    Works Capability

    TABLE 2: FINANCIAL & WORKS CAPABILITY REQUIREMENTS FOR METHOD A AND METHOD B

    4

    The minimum number of registered professionals per grade for method A and B is indicated below in Table 3 and table 4 respectively:

    TABLE 3: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED(BASED ON METHOD A)

    Available capital

    (R)

    Grade

    2

    3

    4

    5

    6

    7

    8

    9

    Maximum tender

    value (R)

    650 000

    2 000 000

    4 000 000

    6 500 000

    13 000 000

    40 000 000

    130 000 000

    No limit

    Best Annual turnover

    (R) over 2 years

    immediately

    preceding application

    0

    1 000 000

    2 000 000

    3 250 000

    7 800 000

    24 000 000

    90 000 000

    270 000 000

    Available capital

    (R)

    0

    OR 100 000

    OR 200 000

    650 000

    1 300 000

    4 000 000

    13 000 000

    40 000 000

    Largest contract (R)

    over 5 years

    immediately

    preceding application

    150 000

    500 000

    1 000 000

    1 600 000

    3 250 000

    10 000 000

    32 500 000

    100 000 000

    Method BMethod A

    N/A

    N/A

    N/A

    1 300 000

    2 600 000

    8 000 000

    26 000 000

    80 000 000

    6

    7

    8

    9

    13 000 000

    40 000 000

    130 000 000

    No Limit

    R

    R

    R

    N/A

    1

    2

    3

    N/A

    1

    2

    3

    1

    2

    3

    4

    1

    2

    3

    4

    1

    2

    3

    4

    Designation Maximum Value of

    Contract that a

    contractor isconsidered capable

    of performing

    General Building

    (GB)

    Civil

    Engineering

    (CE)

    Electrical

    Engineering

    (EB & EP)

    Mechanical

    Engineering

    (ME)

    Specialist Works

    Minimum Number of Full-Time Equivalent Registered Professional(s) Required for

    Registration in a Class of Construction Works

    5

    6

    7

    8

    9

    6 500 000

    13 000 000

    40 000 000

    130 000 000

    No Limit

    R

    R

    R

    R

    1

    2

    4

    6

    8

    1

    2

    4

    6

    8

    1

    2

    4

    6

    8

    1

    2

    4

    6

    8

    1

    2

    4

    6

    8

    Works Capability

    Designation Maximum Value of

    Contract that a

    contractor is

    considered capable

    of performing

    General Building

    (GB)

    Civil

    Engineering

    (CE)

    Electrical

    Engineering

    (EB & EP)

    Mechanical

    Engineering

    (ME)

    Specialist Works

    Minimum Number of Full-Time Equivalent Registered Professional(s) Required forRegistration in a Class of Construction Works

    TABLE 4: MINIMUM NUMBER OF REGISTERED PROFESSIONALS REQUIRED(BASED ON METHOD B)

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    6/125

    The contractor must employ the minimum number of registered professionals permanently (full time) or the equivalent number ofpersons on a part time basis (totalling 40 hours a week).

    The "full-time equivalent" means that, for example, two part time engineers, each working 20 hours a week, would equal onefull-time engineer.

    A registered professional is recognised by virtue of his or her training and experience as having the necessary qualifications to undertakeconstruction works in a specific class. All registered professionals (e.g. architects, quantity surveyors, etc.) employed by a contractor arerequired to be registered with relevant built environment councils:

    The following classes of construction works require professionals who are registered in accordance with the following councils:

    Civil Engineering, Electrical Engineering and Mechanical Engineering Engineering Profession Act 46 of 2000 (Council: ECSA) or Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP)

    General Building and Specialist Works Project and Construction Management Professions Act 48 of 2000 (Council: SACPCMP) or Engineering Profession Act 46 of 2000 (Council: ECSA) or Architectural Profession Act 44 of 2000 (Council: SACAP) or Quantity Surveying Profession Act 49 of 2000 (Council: SACQSP) or Landscape Architectural Profession Act 45 of 2000 (Council: SACLAP)

    ELECTRICAL ENGINEERING

    All contractors applying for the EB class of works must provide the cidb with an originally certified copy of their Electrical contractor'scertificate, issued by the Electrical Contractors Board.

    It is important that the Electrical contractors' certificate is in the name of the company applying and it must still be valid at the time ofregistration. A valid, originally certified copy of the Electrical contractors' certificate must be provided to the ci db annually.

    SUPPORTING DOCUMENTS

    Please note that:

    All financial statements for a private company must be audited. The cidb may, for other forms of company where the financial statementsare not audited, request supporting evidence of that contractor's turnover. Such evidence would be in the form of the South AfricanRevenue Services Form VAT 201 (return for value added tax) and proof of payment of that value added tax;

    A contractor's records may be transferable from one enterprise to the other where the same entity either: a) Changes name, b) converts

    to a close corporation, c) amalgamates with another company, d) is taken over by another company or e) changes membership ormember's interest of a close corporation

    An original tax clearance certificate is a compulsory requirement for all applications. If a foreign enterprise has not yet performed

    contracts in South Africa but wants to register it must provide proof that it has paid all taxes due to the government of its origin.

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    7/126

    JOINT VENTURES

    A joint venture is a grouping of two or more contractors who jointly and severally undertake to perform a construction works contract.Once-off joint ventures do not have to register. However, each partner of the joint venture must be registered separately and the leadingpartner must have a contractor grading designation in the relevant class of construction works.

    The cidb has developed a calculator to enable assessment of joint ventures. This calculator is available on the ci db website at

    www.cidb.org.za.

    POTENTIALLY EMERGING ENTERPRISES

    Contractors may also apply to be recognized as Potentially Emerging (PE) contractors. "Emerging enterprise" means an enterprise whichis owned, managed and controlled by previously disadvantaged persons and which is overcoming business impediments arising from thelegacy of apartheid. A registered, potentially emerging contractor may be awarded a contract at one level higher than the enterprise'sregistered contractor grading designation, if the client or employer:

    is satisfied that such a contractor has the potential to develop and qualify to be registered in that higher grade; and

    ensures that financial, management or other support is provided - in the context of a targeted development programme to enable thecontractor to successfully execute that contract.

    HOW TO APPLY:

    All applications must be submitted on an approved registration form, which may be collected at any of our nationwide ConstructionContact Centres, or downloaded from our website at www.cidb.org.za

    Contractors applying for Grade 2 - 9 must use the application form CRS F006.

    Contractors applying for Grade 1 must use the application form CRS F007.

    Contractors who submit incomplete applications have a 60 day grace period from the date of application in which to submitoutstanding information and supporting documents. Failure to comply will result in cancellation of the application. Administration fees arenon-refundable.

    Registration is valid for a three year period, subject to payment of an annual fee and subject to compliance with the code of conduct forcontractors as published by the cidb in the Government Gazette no. 25656 of 2003. To prevent fraud the cidb no longer prints contractorregistration certificates. Clients and other stakeholders must consult the cidb website www.cidb.org.za to verify a contractor's grade.

    Please ensure that your application meets all cidb requirements together with the relevant documentary evidence for the grades

    applied for. For comprehensive requirements to apply in each grade please consult the cidb Checklist for Contractor Registration included

    in this guideline.

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    8/127

    TABLE 5: REGISTRATION FEES

    2

    3

    4

    5

    6

    7

    8

    9

    650 000

    2 000 000

    4 000 000

    6 500 000

    13 000 000

    40 000 000

    130 000 000

    No Limit

    R

    R

    R

    R

    R

    R

    R

    450

    750

    750

    750

    750

    750

    750

    750

    R

    R

    R

    R

    R

    R

    R

    R

    250

    350

    900

    1 750

    3 500

    9 000

    29 000

    55 000

    R

    R

    R

    R

    R

    R

    R

    R

    Contractor Grading

    Designation

    Upper limit of

    Tender Value Range

    Designation

    Administration / Renewal Fee

    in respect of each

    Grade applied for

    Annual Fees Payable in respect

    of the Highest Contractor

    Grading Designation

    Note:

    Please use your enterprise name as the reference when making payment.Contractors already registered with the cidb, should please use their cidb registration number (CRS number) as the reference.Please note that the cidb does not accept cash payments and cheques over the counter.

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    9/12

    APPLYING FOR GRADE 1

    Grade 1 contractors can register over the counter at any of the provincial Construction Contact Centers. It takes 48 hours for a Grade 1registration to be approved by the cidb, and to become visible on our website under the approved contractors listing. Registration is validfor a period of three years and there are no annual fees payable. Grade 1 contractors are not required to submit proof of financialcapability or track record of projects previously completed.

    REQUIRED DOCUMENTATION FOR GRADE 1 APPLICATIONS

    Application form. Proof of Payment. Company Registration documentation. Identity Documents for a maximum of 20 principals. Tax Clearance certificate. Electrical Contractors License (for EB class of works only).

    Note that the payment for grade 1 class of works is R450 per class of works, valid for 3 years. (For example, an application for1CE = R450.00 whereas an application for both 1CE and 1ME = R900.00)

    APPLYING FOR GRADES 2 - 9

    Applications for registration in grades 2 - 9 are assessed in terms of both financial and works capability requirements.

    REQUIRED DOCUMENTATION FOR GRADE 2 - 9 APPLICATIONS

    All required documents for Grade 1 PLUS

    Financial statement for the two years immediately preceeding the application. (used to determine the financial capability)

    Track Record documents (used to determine the works capability) Letter of Award Certificate of Completion Final / latest payment certificate

    Registered Professionals certificate s) with a relevant built environment council (used to determine the works capability). See table 3 & 4

    on page 4.

    Consult the checklist on page 10 for a comprehensive list of registration requirements.

    REGISTRATION FEES (FOR GRADE 2 - 9 APPLICATIONS ONLY)

    Registration fees are mandatory, and required for all initial application, as well as amendments to existing registrations. Registrations arevalid for a 3 year period, whereafter a re-application for registration is required.

    A payment is made up of two parts, An admin payment which is payable for each class of works applied for. An annual payment which is payable in advance for the highest class of works applied for, and required as an annual obligation.

    Payment should be made to the cidb in the following instances.

    1. Initial registration with the cidb

    a.Admin fees for each class of works applied for.b.Annual fees only for the highest grade applied for.

    2. Annual update

    a.Annual fees only for the highest grade.

    3. 3 Year renewal

    a.Admin fees for each class of works applied for.b.Annual fees only for the highest grade applied for.

    4. Upgrade

    a.Admin fees for each class of works to be upgraded.b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (pro-rata for

    the remainder of the annual period).

    5. Additional class of works.

    a.Admin fees for each class of works to be added.b. The difference in the Annual fees from the highest grade currently registered in and the highest grade applied for (if the additional

    class of works is a higher grade), pro-rata for the remainder of the annual period.

    8

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    10/12

    CONDITIONS OF REGISTRATION

    The contractor must:

    confirm particulars provided on his application form annually on or before the anniversary date of his registration;

    pay the relevant administration fee(s), as well as the stipulated annual fee;

    notify the cidb of any change of particulars relating to an existing registration;

    be free from any restrictions to tender;

    comply with the Code of Conduct for All Parties Engaged in Construction Procurement, as published by the cidb in the GovernmentGazette no. 25656 of 2003. (Also available at: www.cidb.org.za)

    annually provide a valid, original tax clearance certificate, upon expiry of the previous certificate; and

    renew registration every three years for requalification of grades.

    Please note that false information provided or a false declaration is a punishable offence in terms of the cidb ACT, Construction Industry

    Development Regulations and other applicable laws.

    WHO IS THE cidb?

    The cidb has been established in terms of the Construction Industry Development Board Act 38 of 2000. It has the mandate to lead the

    construction industry stakeholders in construction development and to facilitate regulation and development of the construction industry.The cidb is required in terms of the Construction Industry Development Board Act to establish the Register of Contractors. The Registergrades and categorises contractors according to their capability to carry out construction projects. All contractors seeking to participate inpublic sector infrastructure delivery must be registered on the cidb Register of Contractors.

    9

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    11/1210

    CHECKLIST

    SECTION B (i): Enterprise Particulars

    Close Corporation (latest CK1 / CK2) Company:

    Certificate of Incorporation (CM1)

    List of all active directors (CM29)

    Share certificates

    All name change certificates (CM9) (if applicable)

    Partnership (partnership agreement)

    Trust ( a copy of the trust deed or JM21)

    Other:

    SECTION B (ii): Principals and Ownership / Interest

    Attach originally certified copies of Identity Documents (for a maximum of 20 principals)

    SECTION D (i): Annual Best Turnover

    Attach a complete set of financial statements (compliant with GAAP or IFRS) for the 2 financial years immediately preceding the application:

    Public / Private company - Audited

    Trust - Audited Close Corporation - compiled by an accounting officer

    Partnership - compiled by an accounting officer

    Sole Traders - compiled by a bookkeeper / accounting officer

    SECTION D (ii): Available Capital

    Description and proof of financial sponsorship(s)

    Financial institution sponsorship

    OR

    Letter of sponsorship undertaking in the form of a members resolution from a CC and a board resolution from a Company

    If sponsor is not a financial institution please attach the sponsors latest set of financial statements (compliant with GAAP or IFRS)

    SECTION E: Track Record

    For each class of works applied for, attach copies of:

    Letter of award; and

    Certificate of completion; and

    Final payment certificate indicating the contract value.

    Maintenance contractors may provide client payment certificate indicating the value of work done to date;

    Joint Venture agreement (if applicable);

    Sub-contract agreement and corresponding bank statements (if applicable).

    SECTION E (iv): Transfer of Track Record

    Attach particulars of changes in name or company type

    OR

    Auditors letter confirming changes in company structure

    SECTION F (i): Registered Professional(s)

    Certificate of registration with the relevant built environment council / Ensure that the declaration is signed and ensure that the registered professionals sign

    SECTION F (ii): Requirements for Registration in Electrical Engineering for EB class of works

    Attach originally certified copy of the enterprise's valid Electrical Contractor's certificate / Ensure that the declaration is signed and ensure that the

    registered professionals sign

    SECTION H: Payment of Fees

    Attach proof of Payment

    (please use your company name or CRS number as the reference number when making payment).

    SECTION I: Declaration

    Attach valid, original Tax Clearance Certificate and;

    Attach signed declaration of the contractor and;

    Attach signed declaration of the registered professional(s) (if applicable).

  • 8/11/2019 Brochure CIDB Contractor Registration Guidelines

    12/12

    cidb HELP LINE: 0860 103 353

    cidb FRAUD HOTLINE: 0800 112 432

    cidb CONSTRUCTION CONTACT CENTRES (CCC's):

    Eastern Cape

    Department of Public Works

    Qhasana Building

    Independence Avenue

    Bisho

    Tel: 0861 222 327

    Fax: 086 674 2908

    Free State

    Medford Building

    St. Andrews Street

    Ground Floor

    Bloemfontein

    Tel: 0861 377 222

    Fax: 086 552 8692

    Gauteng

    Blocks N & R

    SABS Campus

    2 Dr Lategan Road

    Groenkloof, Pretoria

    Tel: 0861 428 222

    Fax: 086 680 8569

    North West

    Department of Public Works

    Old Parliament Building

    Modiri Molema Road

    Gate House

    Mmabatho

    Tel: (018) 387 2150 / 2435

    Fax: 086 743 3193

    Northern Cape

    Regional Department of Transport,

    Roads and Public Works

    45 Schmidtdrift Road

    Kimberley

    Tel: 0861 222 627

    Fax: 086 690 6295

    Western Cape

    140 Long Street

    Cnr Long & Dorp Street

    Cape Town

    Tel: 0861 927 222

    Fax: 086 674 0293

    KwaZulu Natal

    Department of Public Works

    428 Blink Bonnie Road

    Mayville, Durban

    Tel: 0861 596 222

    Fax: 086 856 6024

    Limpopo

    Department of Public Works

    1st Floor, Works Tower Building

    43 Church Street

    Polokwane

    Tel: 0861 222 765

    Fax: 086 678 9184

    MpumalangaNelcity Building

    Office No. G15

    Cnr Samora Machel &

    Paul Kruger Street

    Nelspruit

    Tel: 0861 678 222

    Fax: 086 685 6733