IntroductionIntroduction

Foundation Construction Group Ltd. (FCG) with its subsidiaries has been established to serve andsubsidiaries has been established to serve and

support developers, consultants and contractors in the specialist field of geotechnical engineering,

ground improvement and foundation construction.

FCG is a technically driven ground improvement company that offers an unparalleled range of

services to meet our client’s diverse soil/foundation d O h t t fneeds. Our company has a strong team of

experienced geotechnical engineers, geologists, equipment designers, project managers, and

dedicated field personnel with an aggregate of worldwide experience.

Services OfferedServices OfferedServices Offered

Depending on the needs of our clients, FCG and its subsidiaries can provide a wideFCG and its Affiliates…FCG and its Affiliates… and its subsidiaries can provide a widespectrum of services ranging from design-level ground improvement consultancy and project-specific assessments, to turn-key design built solutions to meet the performance and budget criteria of the project. On a case to case basis, we also offer assisted equipment rental services;

hi h b l bl ti f

FCG and its Affiliates…

• Foundation Construction Group Ltd (FCG)

• Foundation Construction Equipment FZE (FCE)

• Foundation Equipment Specialists L.L.C. (FES) –

• Foundation Equipment and Construction

Services (P) Ltd, India (FECS)

FCG and its Affiliates…

• Foundation Construction Group Ltd (FCG)

• Foundation Construction Equipment FZE (FCE)

• Foundation Equipment Specialists L.L.C. (FES) –

• Foundation Equipment and Construction

Services (P) Ltd, India (FECS)which can be a very valuable option forclients who already have equipment and construction material resources onsite; therefore, minimizing external party markups, and overall reducing the cost of a ground improvement solution.

• Foundation Construction Group (Australia) Pty

Ltd (FCGA)

• Foundation Construction Group (Vietnam) Ltd

• Foundation Construction Group (Thailand) Ltd

• Foundation Construction Group Ltd. Special

Projects Division (FCG:SP)

• Foundation Construction Group (Australia) Pty

Ltd (FCGA)

• Foundation Construction Group (Vietnam) Ltd

• Foundation Construction Group (Thailand) Ltd

• Foundation Construction Group Ltd. Special

Projects Division (FCG:SP)

Page 3: Brochure

We strive to offer to our clients soil improvement and Earthworks value added solutions from the conceptual stage to the execution phase of the

Our MissionOur MissionOur Mission

conceptual stage to the execution phase of theproject by delivering comprehensive solutions to our client‘s projects that meet or exceed the peformance criteria of the project with significant cost savings to the client thanks to the teaming effort made with our task-specific subsidiaries and the deep collaboration of local contractors, consultants and equipment and materials providers.

As a specialist foundation constructionsupport company, FCG offers a variety ofspecialized services ranging fromgeotechnical support and consultancy toconstruction assistance and full support andmaintenance of specialty soil improvementequipment.

We are also able to carry out contractingworks in the field of foundation constructiontypically under a joint venture withreputable local / International geotechnicalconstruction companies.

Page 4: Brochure

What we do...

In addition to the supply of equipment and JV contracting works we are also able to g

offer a full technical and operational support service together with design

backup for Earthworks. Project management services may also be

provided if required.

We have a fully dedicated team ofexperienced professionals to take the mostchallenging geotechnical works. Our fullyequipped workshops and repair facilities inthe Jebel Ali Free Zone, Dubai and inThailand allows us to assemble new soilimprovement equipment and carry out repairsand maintenance to equipment currently inuse in the UAE and abroad. Our free zonefacility is ideal for the preparation ofequipment to be exported to other countriesq p pand Dubai has excellent onward sea and airtransportation options.

Page 5: Brochure

Experience

In a very short period of its availability in the market, FCG is already the major ground improvement contracting support company and equipment supplier for the contractors working in the Palm Jebel Ali and Palm Deira projects in

APCC – Palm Deira and Palm Jebel Ali Project, Dubai

L & T – Parbati HE Project, India

Van Oord – Palm Deira Project, Dubai

Ecosoil – Palm Jebel Ali & Palm Deira Project, Dubai

Pinnacle – Stone Columns, Um Suqeim, Dubai

Al Dolphin – Stone Columns, Dubai

APCC – Palm Deira and Palm Jebel Ali Project, Dubai

L & T – Parbati HE Project, India

Van Oord – Palm Deira Project, Dubai

Ecosoil – Palm Jebel Ali & Palm Deira Project, Dubai

Pinnacle – Stone Columns, Um Suqeim, Dubai

Al Dolphin – Stone Columns, Dubai Jebel Ali and Palm Deira projects inDubai. Following are some of the prestigious projects for which FCG provided its services by means of Equipment Sale / Rental, Maintenance and Service, Technical Assistance, Project Management, Joint Venture Contacting Services.

Univ. Piling – Stone Columns, Sharjah

Gulf Pack. Ind. – Stone Columns, Saudi Arabia

DEWA/ETA –Stone Columns, Dubai

FBCC - Stone Columns, Saudi Arabia

Masdar - Stone Columns, Abu Dhabi

Univ. Piling – Stone Columns, Sharjah

Gulf Pack. Ind. – Stone Columns, Saudi Arabia

DEWA/ETA –Stone Columns, Dubai

FBCC - Stone Columns, Saudi Arabia

Masdar - Stone Columns, Abu Dhabi

Palm Jumeirah - Vibro Compaction Works

Palm Jumeirah was the first of the trilogy of Palm projects which have

succesfully been reclaimed and compacted . For the Pal Jumeirah

project, our Client, APPC, utilized our fleet of powerful and effective deep-soil

vibrators.

Page 6: Brochure

The assistance and equipment was suppliedin various stages to meet the clients

Palm Deira- Vibro Compaction Works

gdemand and to facilitate the extremelyurgent programme requirements.

At the peak of production in excess of 60vibroflots were being used on site in order tocompact 140Mm³ of sand in a time period of18months.

Treatment depth varied from 15m to 30mTreatment depth varied from 15m to 30mdepending on the location and a triangularcompaction grid spacing of 4.5m was used.

Jubail , KSA– Stone Column works

FCG designed and constructed a grid of Stone Columns to enhance the soil bearing capacity to 150 kPa and limit total and differentialto 150 kPa and limit total and differentialsettlements.

Stone Columns were installed over an area of approx. 6,000m² for the BOPP factory line-2 adjacent to the existing line-1for Gulf Packaging Industries

To achieve the design criteria 936 stone gcolumns of 0.80 m diameter were installed on a 2.50 m x 2.50 m grid. The depth of the stone columns reached a depth between 7 m and 10 m.

Two Full Scale Load Tests (FSLT) were performed to verify the design criteria and to prove the success of the soil improvement.. At a design load of 125kPa in FSLT 1 thea design load of 125kPa in FSLT-1 thesettlement recorded was 6.03mm, in FSLT-2 6.25mm

Page 7: Brochure

DEWA/ETA, Dubai– Stone Columns

Design-Built project for the soil improvement with stone columns for three new DEWA substation projects in Dubai. Performance criteria consisted on soil’s Net Bearing Capacity 270 kPa (safety factor included) and differential settlement of less than 25 mmthan 25 mm.

Some of the challenges of this project included the installation of the stone columns under the constraints of existing adjacent structures and vital lines such as water pipelines and the Dubai Metro. FCG proposed the monitoring of vibrations to sensitive structures.

100

Al Wasl Site. Vibration monitoring, March 15-18, 2009

10

100

loci

ty (m

m/s

ec)

x value

y value

Critical vibration threshold for onshore structuresCritical vibration threshold for onshore structures

11 10 100

Part

icle

Vel

Frequency, Hz

Page 8: Brochure

Project ExperienceProject ExperienceProject Experience

It D t Cli t S i P id d P j t L t C tItem Date Client Service Provided ProjectReference

Location

Country

1 Jan 2007 APCC Ground Improvement Design, Technicalassistance, site service support, Project Management services, Repair and maintenance of Vibroflots.

Jebel Ali Palm Vibrocompaction140million m³

Dubai United Arab Emirates

of Vibroflots.

2 March2007

EcosoilOst

Technical assistance, site service support

Jebel Ali Palm, Vibrocompaction15million m³

Dubai United Arab Emirates

3 May2007

APCC Project management services, Technical assistance, Site service support

Palm Deira, Vibrocompaction140million m³

Dubai United Arab Emirates

4 J l 2007 V D i i t P l D i D b i U it d A b4 July 2007 VanOord

Design assistance,Technical Assistance,Site servise support, Repair and maintenance of Vibroflots

Palm Deira,Vibrocompaction50million m³

Dubai United ArabEmirates

5August 2007 APCC

Geotechnical Review,Technical assistance, site service support, Project management services

Palm Deira, Vibrocompaction140million m³

Dubai United Arab Emirates

6 August 2007 Ecosoil OstGeotechnical review anddesign, Project management services, site service support

Palm Deira, Vibrocompaction40million m³

Dubai United Arab Emirates

7 October2007

Larson &Tubro

Geotechnical site assistance,site service support, equipment operators

Parbati HE Project Stage 3, Dam core construction by Diaphragm wall

Parbati India

8 Decembe APCC Geotechnical review and Palm Deira Dubai United Arab8 ece ber 2007

CC Geotec ca e e a dassistance, Technical support, Site service support, Project management services

a e a uba U ted abEmirates

9 March 2008

FESL.L.C.

Geotechnical review and assistance, Technical support

Various Projects in Dubai

Dubai UAE

10 July 2008

PinnacleConsultancyCo

Technical Assistance,Method Assistance and P. Management

Foundation for Villa for H.H.Sheikh Al Maktoum, Dubai.7596 LM Stone Columns

Dubai UAE

Page 9: Brochure

# Date Client Service Provided Project Reference Location Country

Project ExperienceProject ExperienceProject Experience

j y

11 October2008

CDM Consulting Service Pangkor Laut Dubai UAE

12October 2008

Amana Steel Consultancy

Technical Assistance,Method Assistance and Project Management Support

Foundations for Warehouse and office for M/S crescent Petroleum, Sharjah

Dubai UAE

pp , j

13 November2008

Al DolphinFoundation Drilling Co.

Vibro Equipment and technical/project assistance

Vibroflot Al Ras 2 UAQDubai UAE

14 November 2008 Van Oord

Joint Venture Operations together with EcosoilGCC

Palm Deira, Vibrocompaction25million m³

Dubai UAE

Gulf Geotechnical Ground BOPP Factory for

15 November2008

Packaging Industries LTD. (FBC LTD)

Geotechnical Groundimprovement Design, Method Statement

Line-2.9900 LM StoneColumns

Jubail, KSA Saudi Arabia

16 December 2008 ETA

Geotechnical Design and MSfor 3 ETA substations, P. Mgmt

DEWA ContractSubstations (Jadaf, Al Wasel, Consulate).14,886 LM Stone Columns

Dubai UAE

17 June 2009 Arabian Foundation

Stone Columns, Dry Top Feed

Masdar Development.625 m2 Abu Dhabi UAE

18 June 2009AlfanarConstruction Co.

Stone columns, Wet Top Feed

Construction of new115/13.8kV SaihatSubstation. 5154 LM Stone Columns

Saihat Saudi Arabia

19 September2009

OgerE i t Vibro Compaction

Compaction of 500,000 m3 of

Sowwah, Abu UAE9 2009 Emirates b o Co pact o 500,000 m3 of

reclaimed FillAbuDhabi

U

20 Sept-Oct2009

NationalMarineDredgingCompany

Vibro CompactionCompaction of 800,000 m3 of reclaimed Fill

EcoIsland,AbuDhabi

UAE

21 Feb 2010 KleindienstProperties

Geotechnical Ground improvement Design, Vibro Compaction

Compaction of 270,000m3 of reclaimed fill

World Island,Dubai

UAE

Page 10: Brochure

TechniquesTechniquesTechniques

Vibro Replacement (Stone Columns)

Vibro Compaction

Dynamic Compaction

Jet Grouting

Diaphragm wall construction

Bored pilingBored piling

Soil Mixing

Surface Compaction

Earthworks

Geotechnical Investigation

Page 11: Brochure

Vibro Replacement (Stone Columns)

Eff ti t h i f i t f ft l i d d it f l iltEffective technique for improvement of soft clays, mixed deposits of clay, siltand sand with fines more than 10% and fine sands. Reduces the liquefaction potential of fine sands where the ground water table is at a shallow depth.

Suitability & Applications

Effective in Soft clays, mixed deposits of clay, silt and sandand in fine sandsand in fine sands

Principle Replacing the soft material with well gradedcompacted stones with the help of Vibro flots.The replacement acts as reinforcement for softsoils and also improve the drainage properties

QA / QC By continuous SPT or CPTU and plate / zonel d t tload tests

Common applications Embankments, Warehouses, Buildings, BridgeAbutments and in Storage tanks

Max depth 40m

Page 12: Brochure

Vibro-CompactionVibro-CompactionVibro-Compaction

Effective in Loose coarse grained soil with silt / clay

Vibro-compaction is an effective technique for improvement of loose granular soils with fines content less than 10%. Vibro-compaction is the rearrangement of soil particles into a denser configuration by the use of powerful depth vibrators.

Suitability & Applications

Effective in Loose coarse grained soil with silt / claycontent less than 10%

Principle Densification by special vibration equipments called Vibroflots or pokers

QA / QC By continuous SPT or CPTuCommon applications Buildings, Man made islands, pipelines,

road and rail embankmentsMax depth 60m

Page 13: Brochure

Dynamic Compaction

Dynamic compaction is a method that is used to increase the density of the soil when certain subsurface constraints make other methods inappropriate. It is a method that is used to increase the density of soil deposits.

Suitability & Applications

Effective in Sands and silty sands can be improved with dynamic compaction. Old fills and granular soils are most often treated. The soils that are below the water table have to be treated carefully to permit emission of the excess pore water pressure that is created when the weight is dropped onto the surface. Method is not effective in clays.

Principle Compaction of loose granular fills by means of dropping a heavy weight repeatedly on the ground at regularly spaced intervals. The weight and the height determine the amount ofand the height determine the amount ofcompaction hat would occur.

QA / QC By continuous SPT or CPTuCommon applications Buildings, Man made islands, pipelines, road

and rail embankments, mining, etcMax depth 9m

Page 14: Brochure

Jet GroutingJet GroutingJet Grouting

Jet grouting is a method of grouting that uses very high pressure streams (6,000 psi or 40 MPa) of grout to erode replace mix and cement soils Jet grout constructionor 40 MPa) of grout to erode, replace, mix, and cement soils. Jet grout constructionuses a rotating and rising drill rod with small nozzles that direct the grout horizontally to form columns of soilcrete or soil-cement. Typical column diameters are 2 to 6 ft. Jet grouting is the only type of grouting that is capable of treating all types of soils from clays to gravel. Jet grouting is also useful in grouting isolated zones of soil and for grouting around and below buried utilities.

Suitability & Applications

Effective in All kind of soilsPrinciple Chemical Stabilization and reinforcement by means of

injecting soil cement mixture with special kind of equipments manufactured for this purpose

QA / QC By continuous SPT or CPTU Commonapplications

Soil Stabilization, Excavation Support Systems, Structural Underpinning, Seepage Barrier/Cutoff Walls, Environmental Remediation

Max depth 35m

Page 15: Brochure

Diaphragm WallsDiaphragm WallsDiaphragm Walls

Diaphragm walls are underground structural elements commonly used for retentionDiaphragm walls are underground structural elements commonly used for retentionsystems and permanent foundation walls. They can also be used as deep groundwater barriers. Diaphragm walls can be constructed in all types of soil, even below the ground water table.

Suitability & Applications

Effective in All kind of soilsP i i l P idi b i t ti t t flPrinciple Providing a barrier or retention to prevent flow

of groundwater or sliding of soils by means of underground structural elements made of reinforced concrete or plastic concrete material.

Common applications Strengthening of existing foundation, cut off wall constructions, cut and cover methods for ,underground canal constructions

Page 16: Brochure

Earthworks

FCG is undertaken various aspects of Earthworks:

Filling works

Surface compaction (see next page)

Profiling and re-shaping

ExcavationExcavation

Page 17: Brochure

Surface CompactionSurface CompactionSurface Compaction

Compaction of a soil surface is achieved by means of an impact roller designed for thispurpose. Effective in granular soils with fines content less than 10% or in soils whichare suitable for the Vibro compaction.

Suitability & Applications

Effective in Granular soils which are suitable for Vibrocompaction

Principle Compaction of loose granular fills by means ofPrinciple Compaction of loose granular fills by means ofan impact roller which has a movable, wheeled carriage and an impact roller coupled resiliently to the carriage so as to move together with the carriage. The impact roller has one or more out-of-round compactor masses designed to apply periodic impact blows to the soil surface.

QA / QC Nuclear density, CPTU Common applications Industrial land, Brownfield sites, raised land or

land fills, mine haul roads and bulk earth works.

Max depth 3 to 4m

Picture showing the Impact roller designed by “Broons” in operation

Page 18: Brochure

Geotechnical Investigation

Before and after Ground Improvements Geotechnical Investigations have to be done. FCG is able to do CPT-Testing (Cone Penetration Test) worldwide using his own CPT – Truck which is operated by professional staff.

The CPT is the worldwide most used in situ testing method used to determine the geotechnical engineering properties of the soil and the stratigraphy of the soil.

Page 19: Brochure

FOUNDATION CONSTRUCTION GROUPEuropean Business Centre, Office 172

Dubai Investment ParkDubai, U A E.

PH: +971 4 813 5260PH: +971 4 813 5260Fax: +971 4 813 5263

Email: [email protected]

FOUNDATION CONSTRUCTION GROUP COMPANIES

Foundation Construction Group Ltd. (FCG)

Foundation Equipment Specialists LLC. (FES)

Foundation Construction Equipment FZE (FCE)

Foundation Construction Group (Thailand) Ltd

Foundation Construction Group (Australia) Pty Ltd

Foundation Equipment and Construction Services (P) Ltd. India (FECS)

Contact :

ou dat o qu p e t a d Co st uct o Se ces ( ) td d a ( CS)

Foundation Construction Group (Vietnam) Ltd

Contact :

Managing Director : Mr. Steve Jones ([email protected])Technical Manager: Mr. Francisco Baez, P.E ([email protected])

Address: 172, European Business CentreDubai Investment ParkDubai, UAE.

Phone: +971 4 8135260Fax: +971 4 8135263