broadway l-train mitigation - nyc.gov · nyc.gov/dot •broadway is a vision zero corridor with 21...

2

Upload: phungdieu

Post on 29-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • BROADWAY L-TRAIN MITIGATION

    June 12, 2018

    1

    Presentation to Brooklyn CB 1

  • nyc.gov/dot 2

    Project Background

  • nyc.gov/dot

    PROJECT BACKGROUND

    3

    N

    Citi Bike station

  • nyc.gov/dot

    Broadway is a Vision Zero Corridor with 21 KSI/mile

    Both Broadway at Hooper St and Broadway at Flushing are Vision Zero Intersections

    Project scope is within a Vision Zero Area

    PROJECT AREA AND SAFETY DATA

    4

    Total

    Injuries

    Severe

    Injuries Fatalities KSI

    Pedestrian 70 9 4 13

    Bicyclists 59 11 0 11

    Motor Vehicle

    Occupant 203 1 0 1

    Total 332 21 4 25

    Broadway, Hooper St to Flushing Ave, BK Injury Summary, 2012-2016 (5 years)

    1 7

    7 13

    1 1 11

    20 1 3

    2 7

    4 2

    1 21

    3 84

    23 3

    3 14

    14

    12

    18

    11 9

    1

    16

    1 1

    21

    7

    KSI: Killed or Severely Injured N

  • nyc.gov/dot

    Project Issues and Solutions

    5

  • nyc.gov/dot

    PROJECT LOCATIONS

    6 Improve access to stations

    Un

    ion

    Ave

    N

  • nyc.gov/dot

    HOOPER ST EXISTING ISSUES

    Multiple missing crosswalks

    Inconsistent street network

    on Hooper St

    7

    1

    2

    EXISTING

    1

    2

    1

    1

    N

    1 1

  • nyc.gov/dot

    HOOPER ST PROJECT PLAN

    Convert one block of Hooper St

    to one-way southbound

    Close slips on Division Ave and

    Broadway in paint

    Add a right turn lane on Hooper

    St at Harrison Ave

    Build out and extend concrete

    triangle and adjacent corners

    8

    1

    2

    3

    4

    2

    3

    4

    2

    EXISTING

    PLANNED

    N

    N

    Slip Closure in Paint Street Conversions

    1

  • nyc.gov/dot

    MONTROSE AVE EXISTING ISSUES

    9

    Missing crossing on S 5th St

    Long crossings along Union Ave

    Redundancies in vehicular network create conflict for all roadway users

    1

    2

    3

    EXISTING

    1

    2

    3

    N

    3

    2

  • nyc.gov/dot

    MONTROSE AVE PROJECT PLAN

    10

    Convert one block of

    Montrose Ave to one-

    way westbound

    Extend sidewalks in

    paint along S 5th St

    1

    2

    1

    2

    EXISTING

    PLANNED

    N

    N Painted Sidewalk Extensions

    Street Conversions

  • nyc.gov/dot

    UNION AVE EXISTING ISSUES

    11

    Long pedestrian crossing

    distances

    Acute right turns from Union onto

    Broadway are not geometrically

    possible for heavy vehicles

    1

    2

    EXISTING

    1

    2

    2

    N

  • nyc.gov/dot

    UNION AVE PROJECT PLAN

    12

    1

    2

    Restrict the right turns onto

    Broadway from Union Ave

    Extend sidewalks in paint

    1

    2

    2

    1

    EXISTING

    PLANNED

    N N

    EXAMPLE OF PAINTED CURB EXTENSIONS

  • nyc.gov/dot

    THROOP AVE EXISTING ISSUES

    13

    Missing crosswalks and ADA compliant access along Broadway and across Throop Ave

    Unclear vehicular and pedestrian movements

    1

    2

    EXISTING

    N

    1 2

  • nyc.gov/dot

    THROOP AVE PROJECT PLAN

    14

    Close the slip from Middleton

    St to Broadway in paint

    Install a painted sidewalk

    extension on Throop Ave at

    Broadway

    Add crosswalks along the

    southern side of Broadway

    1

    2

    3

    EXISTING

    PLANNED

    N

    N

    Slip Closure in Paint Painted Sidewalk

    Extensions

  • nyc.gov/dot

    DEBEVOISE ST EXISTING ISSUES

    Crosswalk behind the bus

    stop making pedestrians

    less visible to vehicles

    Crosswalk does not match

    pedestrian desire line or the

    existing ramp

    15

    1

    2

    1

    2

    EXISTING

    N

    2

  • nyc.gov/dot

    DEBEVOISE ST PROJECT PLAN

    Add painted curb extension

    on the northern side of

    Debevoise St

    Realign crosswalk to be in

    front of the bus stop

    16

    1

    2

    1

    2

    EXISTING

    PLANNED

    N

    N

    EXAMPLE OF PAINTED CURB EXTENSIONS

  • nyc.gov/dot

    FLUSHING AVE EXISTING ISSUES

    Crosswalk does not lead

    to the station stairs

    Left turns from Flushing

    Ave westbound onto

    Broadway and Graham

    Ave northbound create

    an unsafe condition

    17

    1

    2

    1

    2

    EXISTING

    N

  • nyc.gov/dot

    FLUSHING AVE PROJECT PLAN

    Flare the crosswalk on

    Flushing Ave and

    Broadway

    Install hardened centerline

    to calm turns from

    Flushing onto Broadway

    18

    1

    2

    1

    2

    EXISTING

    PLANNED

    N

    N

    Hardened Centerline

  • nyc.gov/dot

    THANK YOU!

    Questions?

    19

    NYC DOT NYC DOT nyc_dot NYC DOT

  • nyc.gov/dot

    Appendix

    20

  • nyc.gov/dot

    HOOPER ST - EXISTING

    21

    EXISTING

    N

  • nyc.gov/dot

    HOOPER ST PROJECT PLAN

    Convert one block of Hooper St

    to one-way southbound

    Close slips on Division Ave and

    Broadway in paint

    Add a right turn lane on Hooper

    St at Harrison Ave

    Build out and extend concrete

    triangle and adjacent corners

    22

    1

    2

    3

    4

    2

    3

    4

    2

    EXISTING

    PLANNED

    N

    N

    Slip Closure in Paint Street Conversions

    1

  • nyc.gov/dot

    EXAMPLES OF CARS FAILING TO YIELD

    23

    Examples of cars failing to yield to pedestrians on the Division Ave slip

  • nyc.gov/dot

    DIVERSION DIAGRAM HOOPER ST

    24

  • nyc.gov/dot

    MONTROSE AVE - EXISTING

    EXISTING

    N

  • nyc.gov/dot

    MONTROSE AVE PROJECT PLAN

    26

    Convert one block of

    Montrose Ave to one-

    way westbound

    Extend sidewalks in

    paint along S 5th St

    1

    2

    1

    2

    EXISTING

    PLANNED

    N

    N Painted Sidewalk Extensions

    Street Conversions

  • nyc.gov/dot

    DIVERSION DIAGRAM MONTROSE AVE

    27

  • nyc.gov/dot

    UNION AVE - EXISTING

    Long pedestrian crossing distances

    Columns impact visibility of pedestrians

    Acute turns are not possibly for heavy vehicles

    28

    EXISTING

    N

  • nyc.gov/dot

    UNION AVE PROJECT PLAN

    29

    1

    2

    Restrict the right turns onto

    Broadway from Union Ave

    Extend sidewalks in paint

    1

    2

    2

    1

    EXISTING

    PLANNED

    N N

    EXAMPLE OF PAINTED CURB EXTENSIONS

  • nyc.gov/dot

    DIVERSION DIAGRAM UNION AVE

    30

  • nyc.gov/dot

    THROOP AVE - EXISTING

    31

    EXISTING

    N

  • nyc.gov/dot

    THROOP AVE PROJECT PLAN

    32

    1

    2

    3

    Close the slip from Middleton

    to Broadway in paint

    Install a painted sidewalk

    extension on Throop Ave at

    Broadway

    Add crosswalks along the

    southern side of Broadway

    1

    2

    3

    EXISTING

    PLANNED

    N

    N

    Slip Closure in Paint Painted Sidewalk

    Extensions

  • nyc.gov/dot

    THROOP AVE VEHICULAR MOVEMENTS

    33

    EXISTING

    PLANNED

    EXISTING CAR TURNING OUT OF SLIP

    EXISTING CAR TURNING INTO SLIP

  • nyc.gov/dot

    DIVERSION DIAGRAM THROOP AVE

    34

  • nyc.gov/dot

    DEBEVOISE ST - EXISTING

    Column splits the

    roadway on Debevoise

    St

    Bus stop is in front of

    crosswalk, impacting

    visibility

    Pedestrian fatality in

    2012

    35

    EXISTING

    N

  • nyc.gov/dot

    DEBEVOISE ST PROJECT PLAN

    36

    1

    2

    1

    2

    EXISTING

    PLANNED

    N

    N

    EXAMPLE OF PAINTED CURB EXTENSIONS

    Add painted curb extension

    on the northern side of

    Debevoise St

    Realign crosswalk to be in

    front of the bus stop

  • nyc.gov/dot

    FLUSHING AVE EXISTING

    37

    EXISTING

    N

  • nyc.gov/dot

    1

    2

    FLUSHING AVE PROJECT PLAN

    38

    1

    2

    EXISTING

    PLANNED

    N

    N

    Hardened Centerline

    Flare the crosswalk on

    Flushing Ave and

    Broadway

    Install hardened centerline

    to calm turns from

    Flushing onto Broadway