bridging the gap between design, construction, and fm with bim mr. peter wu, president, bimanywhere...
Upload: the-hong-kong-institute-of-building-information-modelling-hkibim
Post on 26-Jun-2015
206 views
DESCRIPTION
Bridging the Gap between Design, Construction, and FM with BIM Mr. Peter Wu, President, BIManywhere Ms. Alice Leung, Project Engineer, DPR Construction HKIBIM-CIC BIM Conference 2014 Date: 29-Oct-2014 (Wed) Time: 9:30 a.m. – 5:00 p.m. Venue: Room 201 B & C, Asia World Expo, Hong Kong International Airport, Lantau, Hong Kong Organizers: The Hong Kong Institute of Building Information Modelling (HKIBIM) http://www.hkibim.org Co-organizers: The Construction Industry Council http://www.hkcic.org HKTDC Hong Kong International Building and Hardware Fair http://www.hktdc.com/fair/hkbdh-en/HKTDC-Hong-Kong-International-Building-and-Decoration-Materials-and-Hardware-Fair.html The HKIBIM - CIC BIM Conference 2014 is the 5th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced AEC professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers will illustrate lessons learned in practical projects so that others can improve their efficient use of BIM and advance practical knowledge.TRANSCRIPT
WE EXIST TO BUILD GREAT THINGS
Bridging the Gap Between Design and
Construction with BIM
Peter Wu - BIManywhere
Alice Leung - DPR Construction
BIM DESIGN CONSTRUCTION
HK BIM Conference| Hong Kong| Wednesday, October 29th, 2014
WE EXIST TO BUILD GREAT THINGS
BIManywhere Background
• Cloud and mobile BIM solutions
• Designed from ground up
• Collaborative effort with leading GCs
• Fast moving and highly complex projects
WE EXIST TO BUILD GREAT THINGS
Current BIM Practice
Design Construction
Coordination Facilities
3D? 3D
4D
5D
6D 3D?
WE EXIST TO BUILD GREAT THINGS
Technical and Social Challenges
“If it ain’t broke, don’t fix it”
“BIM is for the BIM Specialist”
“You need a $5,000 computer”
“I don’t have time to learn how
to use BIM”
WE EXIST TO BUILD GREAT THINGS
Old New
Collaboration
WE EXIST TO BUILD GREAT THINGS
Old New
Model Access
WE EXIST TO BUILD GREAT THINGS
Cultural Shift
• Intuitive & easy to use
• Collaborative virtual environment
• Relevant information where it is needed
• Economical minimal hardware required
WE EXIST TO BUILD GREAT THINGS WE EXIST TO BUILD GREAT THINGS
CASE STUDY: UCSF Medical Center San Francisco, California
Alice Leung
WE EXIST TO BUILD GREAT THINGS
ICDC since 2009
As-Built Model
Handover
3 Buildings:
878,000-sf
260+ Patient Beds
PROJECT BACKGROUND
UCSF Medical Center at Mission Bay
WE EXIST TO BUILD GREAT THINGS
Half a Floor ~200 MB+
3D Model Sizes Greater than 200MB
Struggle with 3D Model Viewer on iPad
MODEL SIZE AND BREAKDOWN
FIELD
WE EXIST TO BUILD GREAT THINGS
Collaborative Environment: ICDC
Bringing Field Experience into BIM
Building Trust
Field-Office Relationship
BIM tools: iPads + BIManywhere
ROADMAP TO SUCCESS
WE EXIST TO BUILD GREAT THINGS
INCREMENT 4 & 6 TEAM
17 Imaging Rooms, ~40,000-sf
WE EXIST TO BUILD GREAT THINGS
CATH PEDS IN-WALL
WE EXIST TO BUILD GREAT THINGS
OVERHEAD
WE EXIST TO BUILD GREAT THINGS
Tim Racine + Brian Bangs
BIM proficiency + Ease
Navisworks vs. BIManywhere
DPR PROJECT ENGINEERS
@ UCSF Mission Bay
WE EXIST TO BUILD GREAT THINGS
Not proficient in
Navisworks
MEP Coordination
Experience
Supporter/Promoter of
BIM
DPR PROJECT MANAGER
Steve Sheahan
WE EXIST TO BUILD GREAT THINGS
Field Coordination w/o Alice
Self-Sufficient
Work Sequencing
Measurements
DPR SUPERINTENDENTS
Joe Duca + Ali Sabbagh
“With BIManywhere [on a mobile
device] an issue that could have taken a
full day can be resolved in 20 minutes”
– Ali Sabbagh
WE EXIST TO BUILD GREAT THINGS
GF + F (x2)
2D + 3D
Field Coordination w/o DPR
No detailer down-time
ELECTRICAL SUBCONTRACTOR
Rosendin Electric @ UCSF Mission Bay
“The model is finally simple
enough to use that it’s easy for
my crew to start interacting
with the model”
WE EXIST TO BUILD GREAT THINGS
Ex-Official Model Navigator
Connection with the Field
Teach BIM
Spread BIM
ALICE’S GAINS
@ UCSF Mission Bay
WE EXIST TO BUILD GREAT THINGS
3D Model Usage Increase by 80%
Time Savings from Field-Office
Accuracy of As-Built Conditions
INCREMENT 4 & 6 GAINS
WE EXIST TO BUILD GREAT THINGS
THANK YOU!
Questions? Demo?
Peter Wu – [email protected]
Alice Leung – [email protected]