Page 1: Bridging India A Tiscon Readybuild Case Study

Bridging IndiaA TISCON READYBUILD CASE STUDY

Page 2: Bridging India A Tiscon Readybuild Case Study

Project Site: East Delhi

Page 3: Bridging India A Tiscon Readybuild Case Study

The Background

Page 4: Bridging India A Tiscon Readybuild Case Study

One of our clients undertook a project to construct a 978 metre long over bridge in the Nandnagari area in order to replace an existing

railway crossing.

Page 5: Bridging India A Tiscon Readybuild Case Study

This bridge is being built keeping in mind the requirements of ensuring higher standards of safety for citizens, better traffic

monitoring, and enabling the use of the upcoming service roads for access to the nearby Rajiv Gandhi Speciality medical Centre and

GTB Hospital.

Page 6: Bridging India A Tiscon Readybuild Case Study

Accessibility in over-populated urban areas is always a matter of the highest priority and needs to be attended to with whatever

solutions that can be conceived.

Page 7: Bridging India A Tiscon Readybuild Case Study

The Specifics

Page 8: Bridging India A Tiscon Readybuild Case Study

The width of this bridge is 7.5m and provides 2*2 carriageways for vehicles to move in either direction. The customer needed the

project to be completed in exactly a year’s time.

Page 9: Bridging India A Tiscon Readybuild Case Study

One of the biggest problems that this project faced was posed by space constraints.

This lead the customer to take the decision to use the advanced fully precast concrete deck technology, a first of

its kind in the country, in the construction of this bridge.

Page 10: Bridging India A Tiscon Readybuild Case Study

The Challenge

Page 11: Bridging India A Tiscon Readybuild Case Study

Traffic density and overcrowded urban landscape was one of the greatest challenges faced by our client while they were

building this bridge within the stipulated timeframe.

So our client preferred not to set up a Cut and Bend yard in their casting yard.

Page 12: Bridging India A Tiscon Readybuild Case Study

What they noticed was that their Bar bending schedules of deck slabs were repetitive and conducive for procuring steel in ready-

to-use form.

Page 13: Bridging India A Tiscon Readybuild Case Study

The question that they were faced with was where to procure such ready-to-use form of

steel so that uninterrupted and quality supplies were assured.

Page 14: Bridging India A Tiscon Readybuild Case Study

The Tiscon Readybuild Solution

Page 15: Bridging India A Tiscon Readybuild Case Study

Tiscon Readybuild intervened through several meetings with the client’s representatives to fully comprehend the customers’

requirement and to decide on the methodology of executing the Cut and Bend orders.

Page 16: Bridging India A Tiscon Readybuild Case Study

In order to maintain effective co-ordination the two companies nominated co-ordinators to clarify the BBS (Bar Bending Schedule) measurement, the due date of

each lot and confirmation on dispatch of materials.

Page 17: Bridging India A Tiscon Readybuild Case Study

Ensuring close interaction among the client’s team and ours ultimately went on to help the customer obtain delivery of lots as per construction plan in error-free dimensions and also covered incorporation of last-

minute modifications.

Page 18: Bridging India A Tiscon Readybuild Case Study

Tiscon Readybuild ensured that material was dispatched as a full kit (set wise) for all

structures. All dispatches to the client were prioritised whenever required.

Page 19: Bridging India A Tiscon Readybuild Case Study

This led the client to source more than 90% of their rebar requirement for the project in ready

to use form.

Page 20: Bridging India A Tiscon Readybuild Case Study

The Aftermath

Page 21: Bridging India A Tiscon Readybuild Case Study

The delivery of precise and correct dimensions helped the customer obtain quick approvals from DTTDC which reduced delays in

construction.

There was no requirement to manage offcuts/scrap at the site. Value was created through the assurance of delivery as per construction

plan.

Page 22: Bridging India A Tiscon Readybuild Case Study

The client was able to double their output of the casting yard for producing precast deck slabs with the help of ready-to-use steel.

Finally the client was able to deliver and complete the project just on time making this project a huge success.

Page 23: Bridging India A Tiscon Readybuild Case Study

For More Information, log on tohttp://readybuild.tatatiscon.co.in/