bridgewater downtown & waterfront master plan

32
Bridgewater Downtown & Waterfront Master Plan Principles Presentation November 22, 2012 Friday, 23 November, 12

Upload: others

Post on 09-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanPrinciples Presentation

November 22, 2012Friday, 23 November, 12

Page 2: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Introduction

• Study Process

• What We’ve Heard

• Downtown Design Principles

• What’s Next?

• Questions & Comments

Presentation Overview

Friday, 23 November, 12

Page 3: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanConsulting Team

• Ekistics Planning and Design

• Colliers International

• SNC-Lavalin

• Form:Media

Friday, 23 November, 12

Page 4: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Prepare a comprehensive long-term plan for the Downtown and Waterfront which will guide development and open space and provide detailed strategies for achieving improvements.

Project Goal

Friday, 23 November, 12

Page 5: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 6: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 7: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 8: Bridgewater Downtown & Waterfront Master Plan

Monday, November 19 Tuesday November 20 Thursday November 2210 - 11:30 amSteering Committee Meeting

Bridgewater Days Inn

12 - 1:30 pmDowntown WalkaboutThe public is invited to join the design team on a walking tour of the downtown and waterfront.(weather permitting)Meet at King Street Court

6:30 - 8:30 pmPublic Visioning WorkshopThe public is invited to participate in a Visioning Workshop to dream ideas for the Design TeamBridgewater Days Inn

MorningYouth Visioning WorkshopA workshop will be held with students to better understand the desires of Bridgewater’s young citizens.

Bridgewater Jr/Sr High School

4:00- 5:30 pmFocus Group Workshop

Workshop for Downtown merchants, landowners, and interested organizations.Bridgewater Days Inn

6:30 - 8:30 pmPublic Open HouseThe public is invited to hear the results of the workshop and design forums.

Bridgewater Fire Hall

The Town of Bridgewater has initiated an exciting process to gather input from the community to develop a Comprehensive Downtown & Waterfront Master Plan. The consultation will include the following events:

Bridgewater Downtown & Waterfront Master Plan

Wednesday, November 219 am - noonDesign Drop-In

2 - 5 pmOne on One InterviewsThe study team will be conducting one on one interviews with key stakeholders.Locations TBD

6 - 7:30 pmTown Council VisioningWorkshop for Town Councillors and senior staff.Bridgewater Days Inn

The public is invited to drop in and visit with the Design Production Team to discuss and review the plans as they take shape.

Bridgewater Mall (Concourse)

Eric Shaw, Town of Bridgewater902.541-4368 ~ [email protected]

Jill Robertson, Ekistics Planning & Design902.461-2525 ext. 103 ~ [email protected]

For more information on the public consultation, or to learn how you can become involved, please visit our website:

www.bridgewater.ca/downtownplan

or contact:

Consultation Week

Friday, 23 November, 12

Page 9: Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 10: Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 11: Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 12: Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 13: Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 14: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Council’s Community Plan (Bridgewater Town Council, 2010)

• Municipal Planning Strategy (Town of Bridgewater, 1997)

• Municipal Land Use By-Law (Town of Bridgewater, 1997)

• Heritage Property Act (1980, amended 1990)

Planning Context: Policy Framework and Vision

Friday, 23 November, 12

Page 15: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Bridgewater Downtown Revitalization Plan Master’s student project (Bluenose Planning & Design, 2012)

• Riverfront Renaissance Concept & Cost Plan (BDA, 2010)

• Active Transportation and Connectivity Plan (Terrain, 2008)

• Downtown Parking Study (CBCL Ltd., 2008)

• The Bridgewater Downtown Development Strategy (Ratcliffe et. al., 1989)

• Downtown Development Plan (Sperry Associates et al., 1981)

Planning Context: Past Plans and Studies

Friday, 23 November, 12

Page 16: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Ecology & Environment

• Traffic/Circulation/Parking

• Programming & Activities

• Recreation/Open Space

• Signage/Identity/Tourism

Visioning Workshop

Friday, 23 November, 12

Page 17: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Discussion Questions

• Define the Downtown (draw a line around the box)

• What are the 5 biggest challenges or obstacles?

• What are the 5 biggest opportunities?

• What three words describe Bridgewater?

Visioning Workshop

Friday, 23 November, 12

Page 18: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Walkability

• Visibility of Open Space

• Where IS Downtown?

• Building Facades & Appearance

• Momentum for Change

• LOVE for Bridgewater

What We’ve Heard:

Friday, 23 November, 12

Page 19: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Importance of the River

• Effectively Two Downtowns

• A Tale of Two Parkades

• Sustainable Bridgewater

• Importance of Programming

What We’ve Heard:

Friday, 23 November, 12

Page 20: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 21: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

Friday, 23 November, 12

Page 22: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• History

• Connection

• Sustainability

• Identity

• Activity

• Design

Bridgewater Downtown Principles

Friday, 23 November, 12

Page 23: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• history as urban design inspiration

• preserve & enhance remaining built heritage

• reconnect to the river

• celebrate landmarks

History

Friday, 23 November, 12

Page 24: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanConnection

• Physical

• across the river

• topography

• to major destinations

• Social

• places to gather

Friday, 23 November, 12

Page 25: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanConnection

• Visual

• river

• parks

• downtown / mall

Friday, 23 November, 12

Page 26: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanSustainability

• water quality of the river

• stormwater management

• ‘green’ Bridgewater

• erosion control & shoreline ecology

• planning for climate change

Friday, 23 November, 12

Page 27: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanIdentity

• what IS the identity of Bridgewater?

• European Heritage

• The River

• Green Bridgewater

• Heritage

Friday, 23 November, 12

Page 28: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanActivity

• success of existing programs (i.e. sustainability festival)

• central gathering spaces

• flexibility of programmed and non-programmed places

• focus on year-round activity

Friday, 23 November, 12

Page 29: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanDesign

• streetscape improvements

• consistent material palette

• integrate Bridgewater’s identity into the urban design

• activate spaces in the downtown through design

• architectural guidance & policy

Friday, 23 November, 12

Page 30: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master PlanDesign

• parking needs careful consideration

• public spaces should be diverse and occur on a variety of scales

• urban beautification!

Friday, 23 November, 12

Page 31: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

• Comments & Questions

• Follow up Interviews

• Online Survey & Study Website

• Framework Plan

• Draft Presentation (February)

• Final Presentation (March)

Next Steps

Friday, 23 November, 12

Page 32: Bridgewater Downtown & Waterfront Master Plan

Bridgewater Downtown & Waterfront Master Plan

[email protected]

• 902.461.2525 ext. 103

• www.bridgewater.ca/downtownplan

• www.surveymonkey.com/s/downtownplan

Questions/Comments

Friday, 23 November, 12