bridges (excepting log or timber stringer structures) · routine condition inspection form bridges...

3
Routine Condition Inspection Form BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) (First Span, for additional spans use form FS1337B-2) GENERAL INFORMATION Page 1 of 3 LEFT/RIGHT APPROACHES (as seen facing downstream) E = excellent; G = good; F = fair; P = poor; N/A = not applicable; U = unrated Alignment U P F G E Item Present Condition Comments (comment mandatory if condition 'Poor' or 'Unrated' is selected) 0 1 2 Bridge Ahead Signs Missing Yes No Brushing Required Delineator Missing Left Delineator Missing Right 0 1 2 0 1 2 Posted Load Rating (tonnes) Log/Timber Cribs Comments (comment mandatory if condition 'Poor' or 'Unrated' is selected) Present Condition Item LEFT/RIGHT ABUTMENTS (as seen facing downstream) Fender Condition G F P None U E E G F P U Road Surface Tie-Backs Bin Wall E G F P N/A U Concrete (cast in place, lock blocks, precast) E G F P U Caps or Sills E G F P N/A U Piles or Posts (piles numbered from upstream side) E G F P U Ballast Wall E G F P N/A U Wing Wall E G F P U N/A Bracing E G F P N/A U Hardware E G F P U Fill E G F P N/A U Riprap FS1337B-1 WV 1.1 Aug. 9, 2013 U N/A P F G E U P F G E Bearings Corrosion Protection U P F G E U N/A P F G E U N/A P F G E Notes: Link to CBR Definitions OR UTM Zone Longitude (ddd mm ss.s) UTM Easting Latitude (dd mm ss.s) UTM Northing *Crossing Name *km (from POC) *Project File ID *Branch User km *District Permanent Bridge Temporary Bridge *Type/Class: *Structure #: *Site #: *FSR Name

Upload: others

Post on 12-Mar-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) · Routine Condition Inspection Form BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) (First Span, for additional spans

Routine Condition Inspection Form BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES)

(First Span, for additional spans use form FS1337B-2)

GENERAL INFORMATION

Page 1 of 3

LEFT/RIGHT APPROACHES (as seen facing downstream) E = excellent; G = good; F = fair; P = poor; N/A = not applicable; U = unrated

Alignment UPFGE

Item Present Condition Comments (comment mandatory if condition 'Poor' or 'Unrated' is selected)

0 1 2Bridge Ahead Signs Missing

Yes NoBrushing Required

Delineator Missing Left

Delineator Missing Right

0 1 2

0 1 2

Posted Load Rating (tonnes)

Log/Timber Cribs

Comments (comment mandatory if condition 'Poor' or 'Unrated' is selected)Present ConditionItem

LEFT/RIGHT ABUTMENTS (as seen facing downstream)

Fender Condition G F P None UE

E G F P URoad Surface

Tie-Backs

Bin Wall

E G F P N/A UConcrete (cast in place, lock blocks, precast)

E G F P UCaps or Sills

E G F P N/A UPiles or Posts (piles numbered from upstream side)

E G F P UBallast Wall

E G F P N/A UWing Wall

E G F P UN/ABracing

E G F P N/A UHardware

E G F P UFill

E G F P N/A URiprap

FS1337B-1 WV 1.1 Aug. 9, 2013

UN/APFGE

UPFGE

Bearings

Corrosion Protection

UPFGE

UN/APFGE

UN/APFGE

Notes:

Link to CBR Definitions

OR UTM Zone

Longitude (ddd mm ss.s)

UTM Easting

Latitude (dd mm ss.s)

UTM Northing

*Crossing Name

*km (from POC)

*Project File ID *Branch

User km

*District

Permanent Bridge Temporary Bridge*Type/Class:*Structure #:*Site #:

*FSR Name

Page 2: BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) · Routine Condition Inspection Form BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) (First Span, for additional spans

Page 2 of 3Span 1 of

DECK

SUPERSTRUCTURE

Comments (comment mandatory if condition 'Poor" or 'Unrated" is selected)Present ConditionItem

(number consecutively starting from the left abutment); Use "Additional Spans" sheet for Multiple Spans.

Running Surface (N/A if running surface is gravel or timber planks)

Running Planks

Sub-deck

Ties

Nails

Deck to Girder Bolts

E G F P N/A UConcrete Deck

E G F P N/A UGrout Pockets

E G F P UN/ADeck Joints

Est. Present Water Level Depth (m) Est. Present Water Level Width (m) *Est. High Water Level Clearance (m)

Yes No Yes No Yes No Yes No

High Water? Scour? Ice? Debris? Aggradation?

Yes No

UPFGE

UN/APFGE

UPFGE

E G F P N/A USteel Deck Plate

E G F P N/A UGravel Surface

E G F P UCurb Rails/Blocks/Posts

E G F P N/A UHandrails/Walkouts

E G F P N/A UHardware

E G F P UOverall Deck Condition

UPFGEGirders

Comments (comment mandatory if condition 'Poor' or 'Unrated' is selected)Present ConditionItem

UPFGEDiaphragms

UN/APFGEBracing

UN/APFGEUnder-trussing

UN/APFGEHardware

UN/APFGEWelded / Grouted Shear Connectors

STREAM CHANNEL

STREAM HAZARDS

Comments:

UPFGE

UPFGE

E UN/APFG

FS1337B-1 WV 1.1 Aug 9, 2013

Gravel Deck Depth(in metres)

Page 3: BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) · Routine Condition Inspection Form BRIDGES (EXCEPTING LOG OR TIMBER STRINGER STRUCTURES) (First Span, for additional spans

Page 3 of 3

FS1337B-1 WV 1.1 Aug. 9, 2013

2

1

MonitorItem #

*Monitor Description

PHOTO LOG

Description (*if "other" selected)

INSPECTOR TO COMPLETE THIS SECTION

Inspector's Comments:

PROFESSIONAL ENGINEER TO COMPLETE THIS SECTION

*Current Load Rating (GVW (tonnes):

Reviewed by - PEng's NameDate Reviewed (yyyy/mm/dd)

P.Eng. Reviewer's Comments:

*Photo View *Photo #

Description (*if "other" selected)*Photo View

*Monitoring Frequency

3

1

3

5

9

7

2

4

6

8

10

Notes: Site location and inventory forms FS1342 "Site Inventory Data Form" and FS 1343 "Structure Inventory Data Form: Bridges" may be required to be completed in conjunction with an inspection form. An asterisk (*) denotes mandatory information for CBR - may not be readily available or known in the field.

*Photo #

3 LMH

LMH2

1 LMH

Repair Item #

*Priority (H = High, M = Medium, L = Low)

*Estimate ($) *Repair Description

REPAIRS

MONITORING ITEM

Recommended Not Required

Recommended Not Required

Reviewed by - PEng's Signature

*Inspection Company Name

Light Vehicle Traffic (year)

Full Log Haul Traffic (year)

P Eng Inspection Required?

* Date of Inspection (yyyy/mm/dd) *Inspector's Name

Inspector's Estimate of Replacement Dates (Year) for: (PEng. to review and evaluate inspector's estimate and to update in CBR as necessary)

Inspector's Signature

As-Built Drawings Checked?

No NoYesYes

*Date of Next Planned Inspection (yyyy/mm/dd):