bridge standards & practices
DESCRIPTION
Bridge Standards & Practices. Bridge Design & Drafting Manual (BDDM) Bridge Drawings Upcoming Bridge Training. Overview:. Links to ODOT Bridge Information BDDM – Recent Key Updates Proposing Changes to the Manual Deviations from BDDM Bridge Drawings – Start to Finish - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/1.jpg)
Bridge Standards & PracticesBridge Standards & Practices
• Bridge Design & Drafting Manual (BDDM)
• Bridge Drawings
• Upcoming Bridge Training
![Page 2: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/2.jpg)
Overview:Overview:
• Links to ODOT Bridge Information• BDDM – Recent Key Updates• Proposing Changes to the Manual• Deviations from BDDM• Bridge Drawings – Start to Finish• Bridge Section Training Updates
![Page 3: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/3.jpg)
ODOT Bridge On-Line LinksODOT Bridge On-Line Links
• Bridge Engineering Home Pagehttp://www.oregon.gov/ODOT/HWY/BRIDGE
• Bridge Design & Drafting Manual (BDDM)
• Bridge Standard Drawings
Use “Br. Standards & Manuals” Link
Standard Drawings also via Roadway Engineering Home Page
![Page 4: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/4.jpg)
Bridge Engineering Home Bridge Engineering Home PagePage
![Page 5: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/5.jpg)
Br. Standards & Manuals PageBr. Standards & Manuals Page
![Page 6: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/6.jpg)
ODOT Bridge Example ODOT Bridge Example DrawingsDrawings• ftp://ftp.odot.state.or.us/Bridge/BDDM
In the Example_Drawings folder
Also:
Cell_LibraryBridge_Example_DesignsBDDM_Figures
![Page 7: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/7.jpg)
BDDM Nov. 2005 Selected UpdatesBDDM Nov. 2005 Selected Updates
• 1.1.2.2 Scour Analysis• 1.1.7.2(2) Pedestrian Structures – Live
Load• 1.1.7.4 LRFD Ductility, Redundancy and
Operational Importance Factors• 1.1.7.5 Sidewalk Loading – New section • 1.1.8.4 End Bents – Concrete facing on MSE
walls• 1.1.14.2(1) Stay-in-Place Forms• 1.2 Steel – Various updates• 1.2.1.9 Deck Pouring Sequence
![Page 8: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/8.jpg)
To Propose Changes to BDDM:To Propose Changes to BDDM:
• Go to Introduction, “Revising The Manual”, page INTRO-5
• Follow Step-by-Step procedure
• Not needed for bringing routine errors to our attention (typographical, etc.)
![Page 9: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/9.jpg)
BDDM “Deviation” ProcessBDDM “Deviation” Process
• When you want to do something differently than BDDM policy specifies
• Send E-mail request to Bridge Standards & Practices Committee stating “what” and “why”
• Committee will review and respond
![Page 10: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/10.jpg)
““Deviation” vs. “Exception”Deviation” vs. “Exception”
• Roadway Engineering Design “Exception” process is a more formal request to use geometry, etc. that doesn’t meet operational standards
![Page 11: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/11.jpg)
Bridge Standards & Practices Bridge Standards & Practices CommitteeCommittee
• Bruce Johnson, State Bridge Engineer• Kevin Davidson, Br. Standards & Practices
Engr.• Gary Bowling, Br. Operations Managing
Engineer
• Craig Shike, Concrete• Hormoz Seradj, Steel• Holly Winston, Seismic & Bridge Rails• Jan Six, Foundations
![Page 12: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/12.jpg)
Create CAD Files & DrawingsCreate CAD Files & Drawings
Three Types of CAD Files• Layout File• Sub-structure File• Super-structure File
Layout File Sub-structure File Super-structure File
![Page 13: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/13.jpg)
Drawings are ReviewedDrawings are Reviewed
• Engineer of record reviews drawings• Final Corrections have been made to
CAD Files.
![Page 14: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/14.jpg)
Mylars are CreatedMylars are Created
• “D” size mylars are printed• All parties have signed mylars.• 11” x 17” paper prints are made of
signed mylars.
![Page 15: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/15.jpg)
Plans are sent inPlans are sent in
• “D” size mylars and 11” x 17” paper copies of signed mylars are sent to office of Pre-Letting in Salem Headquarters.
• Office of pre-Letting sends mylars to ODOT Reprographics for printing and scanning.
![Page 16: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/16.jpg)
Contract Documents CreatedContract Documents Created
• ODOT Reprographics sends requested material back to Office of Pre-Letting and sends Bridge mylars and scans to Bridge Engineering Section Headquarters, front office.
• Bridge front office returns signed mylars to original design office.
• Loads scans into the Bridge Data System (BDS).
![Page 17: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/17.jpg)
Project is ConstructedProject is Constructed
![Page 18: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/18.jpg)
As-Constructed DrawingsAs-Constructed Drawings
• Project Manager submits as-constructed comments to design office.
• Engineer of record reviews comments• Drafter places as-constructed comments on
mylar by hand.
![Page 19: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/19.jpg)
Distribution of Distribution of As-Constructed DrawingsAs-Constructed Drawings
• A set of drawings with as-constructed comments are created and distributed to:
Bridge Operations EngineerRegion Bridge Inspector
• Original red line as-constructed drawings are sent back to Project Managers office.
![Page 20: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/20.jpg)
At Completion of ProjectAt Completion of Project
At completion of a project, what information is needed by Bridge Engineering Section Headquarters in Salem.
• Electronic CAD files in Microstation Version 8 format.
• “D” size signed mylars• Calculation books• Project Files• Load Rating of as-constructed bridge
per Load Rating Guidelines• Cost Data
![Page 21: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/21.jpg)
Bridge Mylar FlowchartBridge Mylar Flowchart
![Page 22: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/22.jpg)
Upcoming Upcoming ODOT Bridge Section TrainingODOT Bridge Section Training
• Beginning Seismic Design: March, April, June & July, One day a month for 8 hours each month, total of 32 hrs.
• High Performance Steel and Accelerated Bridge Construction: March 15 & 16
• What’s New in Bridge Design: May 17 & 18th
• LRFD Foundation design: Tentative April or May 2006
![Page 23: Bridge Standards & Practices](https://reader036.vdocuments.site/reader036/viewer/2022062409/568150eb550346895dbf0528/html5/thumbnails/23.jpg)
Questions?Questions?