Bridge River – The Powerhouse Project
![Page 2: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/2.jpg)
1900’s Initial Development Plan
![Page 3: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/3.jpg)
The Bridge River – The Powerhouse Project1912-1947 – Initial Concept1920s – Project saves the P.G.E.1933 – The King Vein Strike in Bralorne*1940’s – The Transmission Line Project1948 – Opening Day1950s – The Hydro Tote RoadYesterday & Today: So That We Could Have Power.
![Page 4: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/4.jpg)
![Page 5: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/5.jpg)
Bridge River Project Saves PGE – 1920’s Initial Construction
![Page 6: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/6.jpg)
The King Vein Strike, Bralorne B.C. 1933
![Page 7: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/7.jpg)
The Transmission Line Project
![Page 8: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/8.jpg)
Opening Ceremony - 1948
![Page 9: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/9.jpg)
The Speech Mr. Dal Grauer, president of B.C. Electric presents G. Downton with a gold watch at the
1948 ceremony
![Page 10: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/10.jpg)
The Hydro Tote Road
![Page 11: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/11.jpg)
So That We Could Have Power
![Page 12: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/12.jpg)
Yesterday & Today
Geoffery Downton
![Page 13: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/13.jpg)
The Refurbishment Project 2015 & Beyond
![Page 14: Bridge River August 4th](https://reader036.vdocuments.site/reader036/viewer/2022062420/55d30a00bb61ebd4278b4639/html5/thumbnails/14.jpg)
Museum Connection
Geoffery Downton
Marjory Gimse 1st museum president,
and daughter of Geoffery Downton