bridge preservation in asset management - amazon web services · no inspector priorities were...

20
Bridge Preservation in Asset Management FROM BRIDGE INSPECTION TO BRIDGE PRESERVATION

Upload: others

Post on 20-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Bridge Preservation in Asset Management FROM BRIDGE INSPECTION TO BRIDGE PRESERVATION

Page 2: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Presentation Outline

FDOT Process

FDOT District 2

District 2 FARC Meeting

Office of Maintenance Role

Conclusions

Page 3: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

FDOT Process

Decentralized – Varies between Districts

Inspectors make Recommendations

Feasible Action Review Committee (FARC) reviews

Determination of Actions Routine Maintenance (Preservation)

Repair (Preservation)

Rehabilitation or Replacement

Appropriate Feedback provided to Inspectors

Page 4: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

FDOT Work Order Priorities

Priority 1 Emergency – Perform in 60 days

Priority 2 Urgent – Perform in 180 days

Priority 3 Routine – Perform in 365 days

Priority 4 Informational – no time limit

Priority 4 Work Orders may be used to build contracts

Page 5: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

FDOT District 2

Page 6: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

D2 Northeast Florida

Approximately 29 Million square feet of bridge deck

14 states have less bridge deck area than District 2

Page 7: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

District 2 Stats

1236 State Bridges and 692 Local Government Bridges

6 Movable Bridges

2 Major Steel Trusses

1 Cable Stay Bridge

1 Suspension Bridge

1 Steel Tied Arch

6 Segmental Bridges

Page 8: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

D2 FARC Meeting 2/23/16

Page 9: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

FARC Members

District Structures Maintenance Engineer

Engineering Section Manager

Bridge Inspection Supervisor

Fixed Bridge Manager

Movable Bridge Manager

Consultant Inspection Program Manager

Page 10: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Preparation

Inspection Reports and 5 year Work Program Reviewed by Engineering Section Manager

Bridge Inspection Supervisor

Agenda Created consisting of all Inspector Recommendations Priority Proposed by Inspector

Inspector Recommendation

Relevant Inspection Notes

Committee members review agenda prior to meeting

Page 11: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Inspector Recommendation Example

Replace strip seal with pourable seal at Pier 4

Priority 3

Inspector Notes – Strip Seal is leaking at Pier 4

Page 12: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Meeting Details

Held every 2 weeks

9 of 18 bridge inspections had inspector recommendations

30 inspector recommendations

Page 13: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Meeting Results

3 recommendations were given to roadway maintenance

No inspector priorities were changed

Feedback to inspectors was required in 1 area

1 recommendation required additional investigation

1 recommendation required engineering analysis

No Work Program (Major Repair, Rehabilitation or Replacement) needs identified

Page 14: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Inspector Feedback

Sealing in Some Slope Pavement Joints not required

Page 15: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Further Investigation Required

MSE Wall Issues

Page 16: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Engineering Review

Spalled concrete at Pot Bearing

Page 17: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Possible Preventative Maintenance (PM)

Certain recurring deficiencies may result in PM

Accumulated Debris in deck drains or deck joints

Schedule PM every 6 months

Page 18: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Office Of Maintenance Role

Provides Budget

Makes Policies and Procedures

Conducts annual Quality Assessment Reviews What gets measured gets done

Provides assistance upon request

Page 19: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Conclusions

Decision Making at District Level

Involvement of Inspection and Engineering Staffs

Good Communications between all parties

Page 20: Bridge Preservation in Asset Management - Amazon Web Services · No inspector priorities were changed Feedback to inspectors was required in 1 area 1 recommendation required additional

Questions?

Richard I. Kerr, P.E.

Bridge Management Inspection Engineer

[email protected]