brian taliesin director of project management & knowledge management 09 ... · director of...

15
Vaccine traceability in Tanzania Brian Taliesin Director of Project Management & Knowledge Management 09-May-2018

Upload: others

Post on 06-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Vaccine traceability in TanzaniaBrian TaliesinDirector of Project Management & Knowledge Management09-May-2018

Page 2: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Barcode use showing demonstrated benefits but barriers remain

BenefitsReduction in • Excess inventory• Time to manage inventory• Waste

While improving • Ability to identify and mobilize in response

to adverse event• Product availability

Barriers• Changing product packaging at point of

manufacture• Deploying stock management software to

capture data when scanned • Obtaining hardware appropriate for

environmental conditions

2

Page 3: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Tanzania has been leading the way on barcode adoption

2012 Discussions with Gavi, the Vaccine Alliance, to partner on barcode pilot

2013 Country-wide evaluation of immunization supply chain processes and opportunities for barcode use

2014 Proof of principle completed demonstrating qualitative evidence for scale

2015 Seven manufacturers shipping vaccine supplies containing GS1 DataMatrix (pilot)

2016 Barcode libraries and interfaces added to electronic Logistics Management Information System (eLMIS)

2017 Costing study for vaccine stock management

3

Page 4: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

2016—Barcode libraries and interfaces added to electronic Logistics Management Information System (eLMIS)

• The Tanzania eLMIS for vaccines scaled nationally

• Barcode scanning has been incorporated in the entire Arusha region of Tanzania (~1mm doses per year)

• Approximately 85% stock keeping units have barcodes

• Automating data capture of packaging data including product, lot #, expiry

4

Page 5: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

2017—Costing study for vaccine stock management

Focused on barcode use at the Regional Vaccine Store (RVS) and District Vaccine Stores (DVS) in Arusha, and eLMIS use at the RVS and 2 DVS in the Mwanza region.• Observed key vaccine stock management

activities pre and post barcode implementation via time motion studies and interviews

• Conducted pre and post implementation questionnaires with RVS and DVS in several regions

• Compared pre and post implementation data and evaluated impact of barcodes on vaccine supply chain management labor costs

5

Page 6: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Paper based system

535 minutes

Barcode + eLMIS system90 minutes

Monthly physical inventory process

Begin Physical Inventory

Remove vaccines from

refrigerator(s)

Count # of full boxes of vaccine and loose vials

Record batch # and expiry date

Create page to capture data

Replace vaccines in refrigerator(s)

Sort vaccines by batch #

Calculate doses

Use phone calculator to total doses

from boxes of vaccines

Update vaccine ledgers and make

any corrections needed

Manually update doses in VIMS, DVDMT or SMT

End Physical Inventory

Remove vaccines from

refrigerator(s)

Scan barcodes on boxes

Open VIMS Barcode Physical

Inventory app

Replace vaccines in refrigerator(s)

Enter # of boxes and loose vials (if

not scanned)

6

Page 7: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Paper based system

250 minutes

Barcode + eLMIS system

86 minutes

Quarterly resupply process

DVS needs vaccine

DVS sends request to RVS

Requisition is delivered

by hand, phonecall

may precede

RVS receives and reviews

request

RVS creates

issue vouchers

Vaccines are pick

and packed

Vaccines are delivered

Vaccines are inspected and

stored

Capture of shipment

data

Vaccine, quantity,

manufacture date, expiry

date, VVM type, VVM stage,

batch #, Manufacturer

Data transferred to

vaccine ledgers

Data input into SMT Vaccines ready

for distribution

Data is recorded as

unloaded

Issue voucher is reviewed

Requisition voucher created

AND Order is sent via

SMT

Order is created through

VIMS

Request is sent to RVS via VIMS

RVS receives and reviews

request

Vaccines are pick

and packed

Vaccines are delivered

Issue voucher # scanned into

VIMS

Vaccines are inspected and

stored

DVS signs off on requisition

electronically

VIMS / barcode database has all vaccine data, no

need to input

Requesting vaccines

Receiving vaccines

7

Page 8: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Efficiency of barcodes on the immunization supply chainBarcode + electronic logistics system can save up to $2,287 per year in labor costs per district on average

• Validate lot approved for distribution

• Enforce FEFO to reduce waste of expired vaccines

• Reduce typing and handwriting errors

• Reduce stockout with accurate inventory

• Avoid emergency order with accurate inventory

8

0

50

100

150

200

250

300

paper-based eLMIS eLMIS + barcodes

Hour

s per

yea

r

District stock management

Stock management Ordering for district Receiving vaccines Issuing vaccines

256

118

53

138 hrs

65 hrs

Page 9: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

We still have more work to do before we scale in Tanzania, but…

9

Page 10: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Promising signals

The Gambia• USAID• Gavi• WHO PQS

Vaccine Visibility System deployment

10

Page 11: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Promising signals

The Gambia USAID• Gavi• WHO PQS

Global Health Supply Chain Program sets timelines for GS1 implementation• Tertiary trade items Dec-2018• Secondary trade items Jun-2020• Serialization Jun-2022

11

Page 12: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Promising signals

The Gambia USAID Gavi• WHO PQS

Renewed interest in implementing GS1 in the Immunisation Supply Chain• policy mandating implementation of

GS1 standards for all Gavi-funded vaccines and supplies

• commit funds to help offset costs to UNICEF, suppliers, freight forwarders, and countries

12

Page 13: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Promising signals

The Gambia USAID GaviWHO PQS

Performance, Quality and Safety catalog • Standardized Global Individual Asset

Identifier (GIAI) to track cold-chain equipment at country level with location and maintenance

• UNICEF feedback to Target Product Profile (TPP) requirements

• Industry understanding reliability of their existing products

13

Page 14: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

PATH/Brian Taliesin 14

Page 15: Brian Taliesin Director of Project Management & Knowledge Management 09 ... · Director of Project Management & Knowledge Management. 09-May-2018. Barcode use showing demonstrated

Brian TaliesinDirector of Project Management & Knowledge ManagementEmail: [email protected]: btaliesin

15