brewery yard - major projects

5
Jeppe Aagaard Andersen & Turf Design Studio Landscape Architects Denmark | Sydney | p: +61 2 9527 3380 | f: +61 2 9527 2307 95 PUBLIC DOMAIN Jeppe Aagaard Andersen + Turf Design Studio BREWERY YARD STATE SIGNIFICANT DEVELOPMENT APPLICATION JULY 2020 | REVISION E CENTRAL PARK Sydney Client: Chris Lock, IP Generation

Upload: others

Post on 11-Jul-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BREWERY YARD - Major Projects

J e p p e A a g a a r d A n d e r s e n & Tu r f D e s i g n S t u d i o

L a n d s c a p e A r c h i t e c t s D e n m a r k | S y d n e y | p: +61 2 9527 3380 | f: +61 2 9527 2307 95

P U B L I C D O M A I N J e p p e A a g a a r d A n d e r s e n + T u r f D e s i g n S t u d i o

B R E W E R Y YA R D

S T A T E S I G N I F I C A N T D E V E L O P M E N T A P P L I C A T I O N

J U LY 2 0 2 0 | R E V I S I O N E

C E N T R A L P A R K S y d n e y

C l i e n t : C h r i s L o c k , I P G e n e r a t i o n

Page 2: BREWERY YARD - Major Projects

Date

Page No.

Scale

Dwg Status

Document TitleProject Revision no. Project No.

E

2nd July 2020CENTRAL PARKBREWERY YARD

0721Landscape ArchitectArchitect

SSDA

Client

2J e p p e A a g a a r d A n d e r s e n & Tu r f D e s i g n S t u d i o

L a n d s c a p e A r c h i t e c t s D e n m a r k | S y d n e y | p: +61 2 9527 3380 | f: +61 2 9527 2307 95

T z a n n e s C h r i s L o c k ,

I P G e n e r a t i o n PROJECT DESCRIPTION

P R O J E C T D E S C R I P T I O N SITE CONTEXT

The Brewery Yard (block 4B) is located in the heart of the Central Park precinct framed by the DUO and The Steps, Chippendale Way and Chippendale Green. A brick paved courtyard is proposed to provide breakout opportunities for the new upgraded Brewery Building. This Significant Development Application (SSDA) will also include a renewed through site link, connecting from the forecourt to the southern open space. The new publicly accessible courtyard and through site link will be characterised by active building frontages, visually striking trees, planting features and a detailed brick paving palette.

CONNECTIVITY

Centrally located within the Central Park precinct, the Brewery Yard will be an important gateway for those travelling from the DUO site, Broadway, UTS, Kensington Street and the Main Park. It is expected that the most pedestrian traffic will be coming from the DUO through site link and Main Park via the Brewery courtyard and through site link.

ACCESS

Permeability and accessibility of the streetscape and public domain is seen as a key aspect of the design. Universal access to AS1428 has been incorporated into the streetscape, connecting walkways and building entries without compromising design quality.

PLANTING Evergreen trees proposed within key planters to the centre of the courtyard, west of the building. These trees will provide shade all year round and visual nodes for this industrial space. To complement the trees and the site wide character, lush vibrant coloured understorey species were proposed.

MATERIALS

The proposed design include a simplified palette that stitch together the historic character of the brewery building and footprints of modernity across Central Park. New herringbone brick paving intend to share the flavours of the new bustling Kensington Street and Spice Alley. Steel planters emphasises the industrial character of the Brewery building while connecting with the neighbouring public forecourt between DUO and The Steps.

Page 3: BREWERY YARD - Major Projects

Date

Page No.

Scale

Dwg Status

Document TitleProject Revision no. Project No.

E

2nd July 2020CENTRAL PARKBREWERY YARD

0721Landscape ArchitectArchitect

SSDA

Client

3J e p p e A a g a a r d A n d e r s e n & Tu r f D e s i g n S t u d i o

L a n d s c a p e A r c h i t e c t s D e n m a r k | S y d n e y | p: +61 2 9527 3380 | f: +61 2 9527 2307 95

T z a n n e s C h r i s L o c k ,

I P G e n e r a t i o n PUBLIC DOMAIN PLAN1:200@A3

L E G E N D

CE

NT

RA

L P

AR

K A

VE

NU

E

Brewery Yard site boundary

Concrete unit paving match existing

Brick stairs, handrails and TGSIs

Steel raised planters. Powdercoated finish. Refer to page 5 for planting information.

Main Western entrance with Architectural awning over.

Stairs access with intermediate planters

Steps and breakout terrace mediating levels between public domain and internal FFL.

Future signage location for further approval. Design development required.

Hatch access to Trigen plant below basement. Infill lid to match adjacent surface finish.

Existing structures to be clad to complement site. Architect to specify.

Pedestrian ramp dimensions have been adopted from City of Sydney’s technical specification for concrete unit paving, drawing No:2.3.6, revision D, Dated 1 December 2019

Vehicular crossing dimensions have been adopted from City of Sydney’s technical specification for concrete unit paving, drawing No: 2.3.9, revision D, Dated 1 December 2019

Removable bollards to allow for restricted access only

DDA compliant access from building east. Refer to Architectural plans. Design development required.

Through site link. After hours security gates to be provided.

DDA compliant access ramp in accord with AS1428.1.

Notes:

• All works that interfaces with heritage fabric are to be carried out in accordance with the Schedule of Conservation Works prepare by Urbis.

• Public Domain Area : 1490 m2 area excludes existing building, foyer and 3x existing structures (8).

• Public Art to be installed in courtyard. Artwork by others. Final location to be determined in consultation with City of Sydney, client and artist.

• Existing pit to be in-filled to match surrounding pavement where applicable.

Removable bollards to protect existing pipeworks

Proposed feature trees

Brick banding, stretcher pattern

Brick paving, herringbone pattern

1

3

4

5

6

7

8

9

2

THR

OU

GH

SIT

E L

INK

1

4

1

3

5

6

7

9

9

8

8

11 11

10

10

10

11

12

13

14

11

1212

13

14

2

C E N T R A L PA R K A V E N U E

BREWERY BUILDING 26

BREWERY BUILDING 22BREWERY BUILDING 23

BREWERY BUILDING 30

Page 4: BREWERY YARD - Major Projects

Date

Page No.

Scale

Dwg Status

Document TitleProject Revision no. Project No.

E

2nd July 2020CENTRAL PARKBREWERY YARD

0721Landscape ArchitectArchitect

SSDA

Client

4J e p p e A a g a a r d A n d e r s e n & Tu r f D e s i g n S t u d i o

L a n d s c a p e A r c h i t e c t s D e n m a r k | S y d n e y | p: +61 2 9527 3380 | f: +61 2 9527 2307 95

T z a n n e s C h r i s L o c k ,

I P G e n e r a t i o n LEVELS & GRADING PLAN1:200@A3

L E G E N D

13.83+

13.62+ +13.67 +TK12.78(e)

+TK13.10(e)

+13.55

1:40

1:14

13.47+

12.92+

12.92+

13.02+

13.21+

+12.85

13.30+

14.00+

14.03+

+14.38

14.00+

13.82+

marry into existing levels

marry into existing levels

mar

ry in

to e

xist

ing

leve

ls

+13.31 +13.33

(e)12.80+

+12.86(e)

+13.65(e) +14.37(e)

+13.01(e)

+13.92

+13.62

+14.40(e)

+14.40

+14.33

+13.75 14.14+

13.82+

+13.86 (planter)

+13.79 (planter)

+13.60

+13.70+13.97(e)

13.25+

BREWERY BUILDING 26FFL 13.83

BREWERY BUILDING 22FFL 13.83

BREWERY BUILDING 23FFL 13.69

BREWERY BUILDING 30FFL 14.40

1:49

Brewery Yard site boundary

Existing surveyed levels.

Proposed levels

Proposed grade1:40

+12.80

1:14

C E N T R A L PA R K A V E N U E

CE

NT

RA

L P

AR

K A

VE

NU

E

Page 5: BREWERY YARD - Major Projects

Date

Page No.

Scale

Dwg Status

Document TitleProject Revision no. Project No.

E

2nd July 2020CENTRAL PARKBREWERY YARD

0721Landscape ArchitectArchitect

SSDA

Client

5J e p p e A a g a a r d A n d e r s e n & Tu r f D e s i g n S t u d i o

L a n d s c a p e A r c h i t e c t s D e n m a r k | S y d n e y | p: +61 2 9527 3380 | f: +61 2 9527 2307 95

T z a n n e s C h r i s L o c k ,

I P G e n e r a t i o n

Brick banding - match existing banding.

Raised planter - powdercoat finish Steel handrails + TGSI.AS1428.1 compliant

PAVING & STAIRS

FURNITURE & FIXTURES

S t r e e t e l e m e n t s & F u r n i t u r e P l a n t i n g p a l e t t e

Ty p i c a l P l a n t e r S e c t i o n

Removable bollard

STREET ELEMENTS & PLANTING PALETTE

Brick paving - Bowral Hamlet Blue Paver 230 x 76 x 55mm

Suggested species: TreeFicus benjamina

UnderstoreyAlcantarea ‘Rubra’

Buxus microphylla

Gardenia florida

Murraya ‘Min-A-Min’

Raphiolepis ‘Oriental Pearl’

Ground coverTrachelospermum jasminoides

Plectranthus neochilus

Notes:

Trees to be installed at >400L pot.

All understorey plant to be installed at 300mm pot and 400mm spacing to provide immediate visual impact.

Minimal mulch exposure.

Alcantarea imperialis ‘Rubra’

Ficus benjamina

Buxus microphylla ‘Microphylla’

Murraya ‘Min-A-Min’

Plectranthus neochilusRaphiolepis ‘Oriental Pearl’

Trachelospermum jasminoides

Gardenia augusta ‘Florida’

CoS Concrete Unit Paving - match existing

Granite Setts - loading bay

Brick stairs - indicative brick arrangement.