Page 1: Branch Capital Improvement Feasibility Update

1San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Branch Capital Improvement Feasibility Update

Ocean ViewMission

Chinatown

Page 2: Branch Capital Improvement Feasibility Update

2San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Work to date -Conducted a Survey MonkeyDesign charrettes for each branchIssue charrette findingsConceptual feasibility analysis for each branch –early 2017

Page 3: Branch Capital Improvement Feasibility Update

3San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Ocean View Branch [Built in 2000]

June 2000 Present day

Page 4: Branch Capital Improvement Feasibility Update

4San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Ocean View Branch

Present day Info Desk Present day Reading Room

Page 5: Branch Capital Improvement Feasibility Update

5San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

First Floor

Second Floor

Page 6: Branch Capital Improvement Feasibility Update

6San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Mission Branch [Built in 1915, Seismic Retrofit 1999]

Built 1915, picture 1940’s Present dayOriginal Main Entry

on 24th StreetPresent Main Entry

Page 7: Branch Capital Improvement Feasibility Update

7San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Mission Branch

Interior 1915 Interior present day

Page 8: Branch Capital Improvement Feasibility Update

8San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Second Floor (Main Reading)

Page 9: Branch Capital Improvement Feasibility Update

9San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Chinatown Branch [Built in 1921, Seismic Retrofit 1996]

Built 1921, picture 1960’s Present dayPresent First Floor EntryOriginal First

Floor Entry

Page 10: Branch Capital Improvement Feasibility Update

10

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Chinatown Branch

Built 1921 (*Photo is Sunset Branch, similar plan) Interior present day

Page 11: Branch Capital Improvement Feasibility Update

11

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

M e z z a n i n e A b o v eM e z z a n i n e A b o v e

Second Floor (Main Reading)

Page 12: Branch Capital Improvement Feasibility Update

12

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Survey Findings

Page 13: Branch Capital Improvement Feasibility Update

13

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Ocean View Branch Library – staff survey

• Need more space for sitting and shelving

• Create a more flexible Community Room • Storage rooms on 2nd floor using up valuable space

• Interior spaces need to be more flexibility• Exterior needs secure seating and equipment close by• Better space allocation: children’s area; defined teen areas; study room

• More functional circulation• Technology hubs for group learning & creative projects• Privacy in the staff room; comfortable break room

• The Exterior needs refreshing & vegetation maintenance

Page 14: Branch Capital Improvement Feasibility Update

14

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Mission Branch Library – staff survey• Need more space• Relocate Entry to 24th street…people don’t know it’s a library

• We need More bathrooms and computers

• We need a Program Room/Makers Space• Stairs to children's area are difficult with strollers• Lounge Area and study space needed

• A Separate Teen Area is needed

• Better Circulation and use of existing space• Outdoor Play Area for children• Staff Area not adequate

• Develop a Garden Area on the side or roof

Page 15: Branch Capital Improvement Feasibility Update

15

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Chinatown Branch Library – staff survey

• The space is OUTDATED• It is NOISYwith the open walls from the top floor; voices echo

• We need NEW ELEVATORS, constant issues causes problems for seniors

• We need MORE RESTROOMS, complaints of cleanliness

• The LIGHTING is not great in the library

• Bad HVAC system

• A dedicated TEEN AREA is needed

• More ELECTRICAL OUTLETS for laptops and personal devices

• We need to CONCEAL SEISMIC UPGRADES

Page 16: Branch Capital Improvement Feasibility Update

16

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Charrettes with Library

Page 17: Branch Capital Improvement Feasibility Update

17

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Why a charrette with the Library?

• Branch staff represent their community well• Branch staff know their facility best• Managers and branch staff have open

discussions about branch facility

Page 18: Branch Capital Improvement Feasibility Update

18

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Charrette Takeaways

What are the challenges?Ideas for improvement?

Page 19: Branch Capital Improvement Feasibility Update

19

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Ocean View Branch Library – challenges• Very small building• Second Floor too separate – hard to oversee• Floor plans too “chopped up”, poor sight lines• Entry & building function hard to discern from street• Insufficient staff work areas in many locations• Computer Lab – difficult to monitor• Underutilized Program Room• Not designed for two language collections

Page 20: Branch Capital Improvement Feasibility Update

20

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Ocean View Branch Library – ideas• Improve entry – more visible and better location• Improve site lines across floor plan• Create flexible Program Room, open to street• Visually connect Second Floor, open up the stair• Consolidate Staff Work Areas near service points• Possibly add service point on 2nd floor• Add computers with laptop lending kiosk• Enlarge rest rooms

Page 21: Branch Capital Improvement Feasibility Update

21

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Mission Branch Library - challenges• Very heavily used by diverse community• No Meeting Room or Children’s Program Room• 100 kids at storytime – shuts down Children’s Room• Large collection but lacks program and engagement

space• Insufficient teen area• Many pinch points in floor plan, underutilized “nooks”• Poor stair location, wayfinding, and sight lines• Flooding at Building Entry when it rains• Only one public toilet, none at 2nd floor

Page 22: Branch Capital Improvement Feasibility Update

22

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Mission Branch Library - ideas• Restore historical building entrance?• Restore historical central staircase?• Create flexible use Program Room• Rotate seasonal collections, utilize compact storage• Improve efficiency of floor plan• Add rest rooms - public and staff• Improve access to Children’s Room, stroller parking• Improve Info Desk at 2nd floor – too “monumental”• Provide dedicated Teen Area• Improve and connect fenced outdoor area

Page 23: Branch Capital Improvement Feasibility Update

23

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Chinatown Branch Library – challenges• Very heavily used branch – “community living room”• Many shelves, not enough seating• Large Chinese language reference collection• Program Room - not suitable for after hours use• Children’s Storytime Room - too small, no windows• Poor connection between floors• Underused Mezzanine and Roof Terrace• Inefficient staff area layout • Seismic bracing disregards historic architecture• Entry to First Floor is unattractive

Page 24: Branch Capital Improvement Feasibility Update

24

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Chinatown Branch Library – ideas• Restore historic Reading Room, could be “quiet room”• Remove Mezzanine from historic Reading Rm• Single flexible use Program Room at First Floor

• Consolidate with Children’s Storytime• Add Program Room at 2nd Floor

• For classes, teens, acoustical separation• Consolidate staff work areas – Info/Circ• Improve First Floor entrance and lobby• Consider moving scholarly collections to archival

facility

Page 25: Branch Capital Improvement Feasibility Update

25

San Francisco Public Library Commission

Branch Capital Improvement Feasibility Update | December 15, 2016Building Design & Construction

Next steps -Conceptual feasibility analysisCommunity engagement and feedbackEstablish priorities and options