KEGIATAN : REVITALISASI INFRASTRUKTUR SARANA DAN PRASARANA PENYELENGGARAAN PEKAN OLAHRAGA DAERAH ( PORDA ) JAWA BARATPEKERJAAN : REVITALISASI INFRASTRUKTUR SARANA PRASARANA OLAH RAGA SOR TAMAN MALUKU LOKASI : JL. MALUKU KOTA BANDUNGTAHUN : 2010
HARGA SAT.PEKERJAAN (Rp)
1 3 4 5 6 = 4 X 5IIA PEKERJAAN PERSIAPAN -
1 Pek Papan Nama m² 0.960 8,250.00 7,920.00
2 Pek Dokumentasi dan Prijinan ls 1.000 750,000.00 750,000.00
3 Pek Pengadaan air dan listrik kerja ls 1.000 750,000.00 750,000.00
2 Pek. Pengukuran Leveling Lantai m² 424.000 1,749.00 741,576.00
3 Pek. Bongkaran Lapisan Beton Lap. Tenis m³ 361.760 173,243.00 62,672,387.68
64,921,883.68 B PEKERJAAN LANTAI KONSTUKSI BETON -
1 LAPISAN DASAR KE - 1 - a Pek lapisan 1 Beton m² 258.400 1,100.00 284,240.00
Spec. Kain Kasa L = 16 cm, Aquaproof, Lemkra D. 105 -
-
2 LAPISAN DASAR KE - 2 - a Pembesian / Penulangan kg 13,625.280 9,075.00 123,649,416.00
Spec, BRC/Wiremesh M7 1 lapis 72 Lembar -
-
3 LAPISAN DASAR KE - 3 - a Peninggian Lantai, Pengaturan Elevasi m³ 361.760 247,615.00 89,577,202.40
Cor Lantai Beton, Finish Plesteran -
Spec : -
- Tebal Beton Rata-rata 14.27 cm -
- Kemiringan Lantai 0.87 % -
- Beton Ready Mix, K. 275 -
-
213,510,858.40 C PEKERJAAN FINISHING -
1 LAPISAN FINISHING KE - 1 - a Asphalt Dasar 1 / Hotmix Screening T = 2 cm m² 2,584.000 12,309.00 31,806,456.00
b Asphalt Dasar 1 / Hotmix Sand Sheet T = 1 cm m² 2,584.000 8,426.00 21,772,784.00
c Pemadatan Lapisan Hotmix dengan Wales ( 4 - 6 ton ) m² 2,584.000 550.00 1,421,200.00
-
2 LAPISAN FINISHING KE - 2 - a Pek. Lapisan Acrylic Filler Coat ACRONAL m² 2,584.000 11,750.00 30,362,000.00
Spec : -
- Acronal Latex Sintesis -
- Pasir Silika -
-
3 LAPISAN FINISHING KE - 3 - a Top Coat Playing Surface Sekw. Rebound Ace m² 2,584.000 16,500.00 42,636,000.00
- Areal Permainan Warna Hijau -
- Areal Luar Permainan Warna Merah -
b Acrylic Line Marking m² 30.120 15,710.00 473,185.20
Spec : -
- Coat Warna Putih lebar garis 5 cm -
- Pasir Silika -
-
128,471,625.20 D PEKERJAAN LAIN-LAIN -
1 Pembersihan Area Pekerjaan ls 1.000 1,500,000.00 1,500,000.00
2 Pek. Perbaikan Saluran Drainase 25 % m' 14.761 36,511.00 538,929.74
3 Pas. Grill Besi Penutup Saluran m' 14.761 3,085.00 45,536.91
4 Pek. Pengecatan Grill Besi m² 25.979 18,370.00 477,232.76
5 Pek. Perbaikan Rangka Tower Lampu kg 284.690 4,281.00 1,218,757.89
6 Pek. Pengecatan Besi Tower Lampu m² 136.430 18,370.00 2,506,219.10
-
6,286,676.41 413,191,043.69
RENCANA ANGGARAN BIAYA ( RAB ) ( BQ )
NO URAIAN PEKERJAAN SAT. VOL. JUMLAH
2PERBAIKAN LAPANGAN TENIS
Sub. Jumlah II.A
Sub. Jumlah II.B
Sub. Jumlah II.C
Sub. Jumlah II.D
JUMLAH II ( PEKERJAAN PERBAIKAN LAPANGAN TENIS )