bpm manage collection agency referrals mdm… · web vieware marked by a word bookmark so that...
TRANSCRIPT
METER DATA MANAGEMENT V 2.0.1
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Creation Date: June 16, 2011Last Updated: March 10, 2012
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
This document is provided for information purposes only and the contents hereof are subject to change without notice. This document is not warranted to be error-free, nor subject to any other warranties or conditions, whether expressed orally or implied in law, including implied warranties and conditions of merchantability or fitness for a particular purpose. We specifically disclaim any liability with respect to this document and no contractual obligations are formed either directly or indirectly by this document. This document may not be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without our prior written permission. Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective owners.
24.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Contents
BRIEF DESCRIPTION.................................................................................................................................................................................................................................... 4BUSINESS PROCESS MODEL PAGE 1............................................................................................................................................................................................................. 5BUSINESS PROCESS MODEL PAGE 2............................................................................................................................................................................................................. 6BUSINESS PROCESS MODEL PAGE 3............................................................................................................................................................................................................. 7BUSINESS PROCESS MODEL PAGE 4............................................................................................................................................................................................................. 8DETAIL BUSINESS PROCESS MODEL DESCRIPTION............................................................................................................................................................................................. 9TEST DOCUMENTATION RELATED TO THE CURRENT PROCESS............................................................................................................................................................................31DOCUMENT CONTROL............................................................................................................................................................................................................................... 32ATTACHMENTS......................................................................................................................................................................................................................................... 33
Initial Load IMD Interval Lifecycle.................................................................................................................................................................................................... 33Initial Load IMD Scalar Lifecycle.......................................................................................................................................................................................................33Manual IMD Interval Lifecycle......................................................................................................................................................................................................... 33Manual IMD Scalar Lifecycle............................................................................................................................................................................................................ 33Estimate IMD Interval Lifecycle........................................................................................................................................................................................................ 33Estimate IMD Scalar Lifecycle.......................................................................................................................................................................................................... 34VEE Group for a MC......................................................................................................................................................................................................................... 34VEE Rules in a VEE Group................................................................................................................................................................................................................. 34VEE Rule Lifetime............................................................................................................................................................................................................................. 34Referred VEE Group for VEE Rule..................................................................................................................................................................................................... 34VEE Group Matrix for a VEE Rule..................................................................................................................................................................................................... 34Error and To Do................................................................................................................................................................................................................................ 35How to Read and Understand Process Diagram .URM Standards. Notations..................................................................................................................................35
34.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Brief DescriptionBusiness Process: 4.2.1.2 MDM.Manage VEE and VEE Exceptions Process Type: Process Parent Process: 4.2.1 MDM. Collect and Process Measurements Sibling Processes: 4.2.1.1 MDM.Upload Device Measurements, 4.2.1.3 MDM.Calculate Usage
This process gets initiated when the IMD is loaded into the system, has passed the VEE Ready state across its life-cycle and is ready for VEE processing. The various types of IMDs (Initial Load, Manual, and Estimation) can have VEE processes invoked either through the system or by users. During the VEE process, various VEE rules are applied sequentially. Each of the rules may be single rule or can refer to another group of VEE Rules through specific selection criteria. These VEE rules fall into different categories such as common validation rules, estimation rules, device type specific rules, along with few rules to check the accuracy of the consumption. Any exceptions encountered, during the VEE process, may lead to either termination of the whole VEE Process or continuation based on the severity of exception, followed by exception processing. With the successful completion of the VEE process, the application normalizes and finalizes IMD and makes processed measurements available for usage calculations.
44.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Process Model Page 1
54.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Process Model Page 2
64.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Process Model Page 3
74.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Process Model Page 4
84.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Detail Business Process Model Description
1.0 Determine VEE Group based on IMD Type and MC
Actor/Role: MDMDescription: MDM determines the VEE Group configured for the Measuring Component derived from the IMD.
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)1.1 Select the VEE Group
Actor/Role: MDMDescription: MDM selects the VEE Group based on the measuring component to perform the VEE process.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)1.2 Select VEE Rule in the Group within Applicable Period
94.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
VEE RulesVEE GroupMeasuring Component
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Actor/Role: MDMDescription: MDM selects the VEE rules configured in the VEE group as per the configured rule sequence and filters the rules based on their applicability.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)1.3 Determine Referred VEE Group
Actor/Role: MDMDescription: MDM determines the VEE Group referred by the VEE Rule.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
104.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
VEE Rules VEE Group
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)1.4 Determine ‘Factor Value’ and ‘Factor Value’ Mapped VEE Group
Actor/Role: MDM Description: MDM shall dynamically determine the factor value for a VEE rule and determines the VEE group mapped to the factor value.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Common Rule(s)1.5 Validate Meter Multiplier, Unit of Measure
Actor/Role: MDMDescription: The MDM applies common rules. Note: Common rules are rules that can be applicable to an IMD irrespective of the type of meter, e.g., scalar or interval. Sample common rules are:
The Meter Multiplier rule ensures that the meter multiplier value of the current measurement data matches the meter multiplier value stored on the measuring component.
114.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
VEE Group for VEE Rule
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
VEE Groups and Factors
4.2.1.2 MDM.Manage VEE and VEE Exceptions
The Unit of Measure rule ensures that the unit-of-measure (UOM) of the incoming data matches the UOM specified on the measuring component
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Replacement Rule(s)1.6 Analyze Existing Measurement with Same Date/Time as Raw Data
Actor/Role: MDMDescription: The MDM system checks if there are any existing measurements for the same period as the current measurement. Furthermore, it checks if the existing measurement is system read or manually edited.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
124.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D2-REGMULCHK (Multiplier Check)D2-UOMCHK (Unit of Measure Check)
D2-RegisterMultiplierCheckD2-UOMCheck
Multiplier CheckUnit of Measure
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D2-INTREPRL (Interval Replacement Rule)D2-SCAREPRL (Scalar Replacement Rule)D2-IntervalReplacementRuleD2-ScalarReplacementRule
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations) Group: Replacement Rule(s)1.7 Validate Replacement of Existing Measurement
Actor/Role: MDMDescription: When the measurement exists with same date/time as the raw data, the rule determines if the raw reading will be rejected completely or rejected only if the existing measurement is manually user-edited.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Estimation Rule(s)1.8 Analyze IMD Type
Actor/Role: MDM Description: The MDM system analyses if the IMD is an Estimate IMD or Manual IMD.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Estimation Rule(s)1.9 Estimate Gaps in IMD
134.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D2-INTREPRL (Interval Replacement Rule)D2-SCAREPRL (Scalar Replacement Rule)D2-IntervalReplacementRuleD2-ScalarReplacementRule
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Actor/Role: MDMDescription: MDM proceeds forward to estimate the gaps in the Initial Load IMD and the Manual IMD.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Estimation Rule(s)2.0 Estimate Missing IMD for Period
Actor/Role: MDMDescription: The application estimates the whole missing Interval IMD for using various estimation techniques.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Estimation Rule(s)2.1 Estimate Scalar Read
Actor/Role: MDM14
4.2.1.2 MDM.Manage VEE and VEE Exceptions Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D2-INTINTEST (Interval Interpolation Estimation)D2-INTAVGEST (Interval Averaging Estimation)D1-InitialLoadIMDIntervalD1-ManualIMDIntervalD2-IntervalInterpolationEstD2-IntervalAveragingEstimation
VEE Group for Estimation
D1-ESTM-VEE (Perform VEE for Estimation IMD)D2-INTINTEST (Interval Interpolation Estimation)D2-INTAVGEST (Interval Averaging Estimation)D1-EstimationIMDIntervalD2-IntervalInterpolationEstD2-IntervalAveragingEstimation
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Description: MDM estimates scalar value using various estimation techniques.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Device Type Specific Rule(s)2.2 Validate Interval Size
Actor/Role: MDMDescription: MDM checks to ensure that the interval size of the initial measurement data matches the defined value in the measuring component type.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Device Type Specific Rule(s)2.3 Check Interval Spike
Actor/Role: MDMDescription: MDM examines the interval data to identify intervals with suspiciously high usage relative to the surrounding intervals.
154.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-ESTM-VEE (Perform VEE for Estimation IMD)D2-SCAPROEST (Estimate Scalar Based on Profile Data)
D1-EstimationIMDScalarD2-ScalarProfileEstimation
D1-INIT-VEE (Perform VEE for Initial Load IMD)D2-INTSIZVAL (Interval Size Validation)
D1-InitialLoadIMDIntervalD2-IntervalSizeValidation (Interval Size Validation)
VEE Group and RulesSPI on Measuring Component
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Common Consumption Rule(s)2.4 Check High/Low Reads
Actor/Role: MDMDescription: MDM checks the Initial Measurement for high or low consumption.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Common Consumption Rule(s)2.5 Check for Negative Consumption
164.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D2-INTSPKCHK (Interval Spike Check)
D1-InitialLoadIMDIntervalD2-IntervalSpikeCheck (Interval Spike Check)
Spike Tolerance Values
D1-INIT-VEE (Perform VEE for Initial Load IMD)D2-HILO-CHK (High/Low Check)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD2-VEERuleHighLowCheck (High/Low Check)
VEE Group and RulesHigh Tolerance or Tolerance FactorLow Tolerance or Tolerance FactorHistorical Percentage RequiredHistorical Pre-WindowHistorical Post-WindowComparison Method (Average / Max)
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Actor/Role: MDMDescription: MDM will check if consumption has any negative values.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Perform VEE Rules for a VEE Group (Initial Load, Manual and Estimations)Group: Common Consumption Rule(s)2.6 Perform Sum Check
Actor/Role: MDMDescription: MDM evaluates whether consumption for the current initial measurement data record is within a tolerance of the sum of the consumption (during the same period) for any related measuring components.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
2.7 Update IMD to “VEE” State
Actor/Role: MDMDescription: MDM updates the IMD to VEE State.
174.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D2-NCON-CHK (Negative Consumption Check)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD2-NegativeConsumptionCheck (Negative Consumption Check)
VEE Group and Rules
D1-INIT-VEE (Perform VEE for Initial Load IMD)D2-SUM-CHK (Sum Check)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD2-SumCheck (Sum Check)
Percentage ToleranceToleranceMeter Multiplier Tolerance
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Normalize Measurements2.8 Analyze MC Type for Any Values to be Derived
Actor/Role: MDMDescription: MDM analyses the measuring component type to determine the measurement BO and populate the data by mapping with Post-VEE raw measurement data. It further checks if there are any algorithms configured to derive other values based on current values.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Normalize Measurements2.9 Derive Values
Actor/Role: MDMDescription: MDM derives other values based on the current measurements.
Process Plug-in enabled (Y/N) Available Algorithm(s):
184.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
F1-AT-RQJ ( Transition to Default Next Status)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-AUTO-NORM (Normalize Measurements)Value Derivation Algorithms
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-AUTO-NORM (Normalize Measurements)Value Derivation Algorithms
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Object (Y/N) Business Object
Group: Normalize Measurements3.0 Evaluate if Measurement(s) Exist for Same Period
Actor/Role: MDMDescription: MDM checks if there exists any finalized measurement whose date/time matches the current measurement.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Normalize Measurements 3.1 Create Normalized Measurement(s)
Actor/Role: MDMDescription: MDM creates normalized measurements
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
194.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-AUTO-NORM (Normalize Measurements)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-AUTO-NORM (Normalize Measurements)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Group: Normalize Measurements 3.2 Update Existing Measurement(s)
Actor/Role: MDMDescription: MDM updates the existing measurement with current measurement.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
3.3 Validate Normalized Data
Actor/Role: MDMDescription: This step is performed if business requires additional data processing or validations while data is normalized. Note: Currently this step is relevant for Scalar IMDs only. System checks if there are any IMDs in error state for related Measuring Components and attempts reprocess these IMDs if required.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Create Subsequent Usage Transaction 3.4 Determine Usage Subscription(s) Linked to Service Point of IMD
Actor/Role: MDMDescription: MDM identifies Usage Subscription(s) linked to the service point.
204.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-AUTO-NORM (Normalize Measurements)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Overwrite Identical Existing Measurement(s)
D1-REP-RLIMD (Reprocess Related Initial Measurement Data(s)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Create Subsequent Usage Transaction 3.5 Select Each Usage Transaction of Each Usage Subscription for the Period
Actor/Role: MDMDescription: MDM determines the Usage Transaction(s) that fall within the period of IMD.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
214.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-TRAN-UT (Transition Usage Transaction(s))
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Device ConfigurationService PointsUsage Subscription(s)Usage Transaction(s)
D1-TRAN-UT (Transition Usage Transaction(s))
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Usage Subscription(s)Usage Transaction(s)
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Group: Create Subsequent Usage Transaction 3.6 Change Usage Transaction State to ‘Subsequent Correction’
Actor/Role: MDMDescription: MDM checks if the usage information has already been sent out to the Recipient. If usage has been already sent to the usage Recipient, it updates the Usage transaction to the ‘Sub-sequent Correction’ state.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
3.7 Update IMD to ‘Complete’ State
Actor/Role: MDMDescription: MDM updates the status of IMD to ‘Complete’.
Business Object (Y/N) Business Object
Group: Initiate Exception Processing 3.8 Analyze Exception
Actor/Role: MDMDescription: When an exception takes place during VEE Processing, MDM analyzes the severity of the exception based on the configuration.
224.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-TRAN-UT (Transition Usage Transaction(s))
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Initiate Exception Processing 3.9 Update IMD to ‘Exception’ State and Log Error
Actor/Role: MDMDescription: If an exception exists with severity ‘Issue’, MDM automatically updates the IMD status to ‘Exception’ and logs an error.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
234.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D1-TRN-EXCP (Transition on Exception)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Exception Severity for VEE Rules
F1-AT-RQJ ( Transition to Default Next Status)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Exception Severity
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Group: Initiate Exception Processing 4.0 Create To Do
Actor/Role: MDMDescription: Once the MDM system logs the errors, it creates a To Do entry. Authorized Users are allowed to review the problem and attempt to fix the error reported by system. User can configure the creation or non-creation of a To Do Entry.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Configuration required (Y/N) Entities to Configure:
Group: Initiate Exception Processing4.1 Log Error
Actor/Role: MDMDescription: MDM logs an error based on an exception of severity ‘Issue’ found during VEE processing.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
24
4.2.1.2 MDM.Manage VEE and VEE Exceptions Copyright © 2012, Oracle. All rights reserved.
D1-CRE-IMDTD (Create To Do)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
Exception TypeException SeverityTo Do RoleTo Do Type
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D1-TRN-EXCP (Transition on Exception)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Group: Initiate Exception Processing4.2 Highlight Info
Actor/Role: MDMDescription: If identified exception severity level is “Info” MDM just highlights the issue and provides relevant information.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
4.3 Analyze Error and Work To Do
Actor/Role: MDM Authorized UserDescription: The MDM Authorized User analyzes the error logged and respective To Do created to determine the corrective action. The MDM Authorized User performs work to resolve the error.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
4.4 Request to ‘Discard’
Actor/Role: MDM Authorized UserDescription: When the IMD is in an ‘Exception’ state and MDM Authorized User decides that the IMD cannot be used, the MDM Authorized User manually discards the record.
254.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-INIT-VEE (Perform VEE for Initial Load IMD)D1-MNOV-VEE (Perform VEE for Manual IMD)D1-ESTM-VEE (Perform VEE for Estimation IMD)D1-TRN-EXCP (Transition on Exception)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-CRE-IMDTD (Create To Do)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Object (Y/N) Business Object
4.5 Complete To Dos
Actor/Role: MDMDescription: MDM finds all non-completed To Do entries and completes them before reprocessing.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
4.6 Update IMD to ‘Discard’ State
Actor/Role: MDMDescription: MDM updates the IMD to the ‘Discard’ state indicating that it cannot be used further. However it remains in the system.
Business Object (Y/N) Business Object
4.7 Request to ‘Force Complete’
264.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-COMP-TD (Complete To Do Entries for Initial Measurement Data)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Actor/Role: MDM Authorized UserDescription: The MDM Authorized User manually approves IMDs in an error state.
Business Object (Y/N) Business Object
4.8 Update IMD to ‘Force Complete’ State
Actor/Role: MDMDescription: MDM updates IMD to ‘Force Complete’ state. Business Object (Y/N) Business Object
4.9 Request to ‘Perform VEE’
Actor/Role: MDM Authorized UserDescription: The MDM Authorized User requests the system to VEE an IMD in an incomplete state.
Business Object (Y/N) Business Object
5.0 Update IMD to ‘VEE’ State and Continue Processing
Actor/Role: MDMDescription: MDM updates the IMD to the VEE state and continues re-processing.
274.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Group: Automated Retry Process5.1 Evaluate Criteria to Run Automated Retry Process
Actor/Role: MDMDescription: The application determines if IMDs requires re-processing.Note: A batch process is configured for this automated retry process.
Process Plug-in enabled (Y/N) Available Algorithm(s):
Business Object (Y/N) Business Object
Customizable process (Y/N) Process Name
5.2 Identify IMD Record in ‘Exception’ State
Actor/Role: MDMDescription: The MDM continuously monitors IMDs to identify records in an ‘Exception’ state.
Process Plug-in enabled (Y/N) Available Algorithm(s):28
4.2.1.2 MDM.Manage VEE and VEE Exceptions Copyright © 2012, Oracle. All rights reserved.
D1-IMD-RETRY (Retry Initial Measurement Data Processing)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
D1-IMD-RETRY (Retry Initial Measurement Data Processing)
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalarIMD Monitor – Physical Devices (D1-IMD)
D1-IMD-RETRY (Retry Initial Measurement Data Processing)
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Business Object (Y/N) Business Object
Customizable process (Y/N) Process Name
294.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
D1-InitialLoadIMDIntervalD1-InitialLoadIMDScalarD1-ManualIMDIntervalD1-ManualIMDScalarD1-EstimationIMDIntervalD1-EstimationIMDScalar
IMD Monitor – Physical Devices (D1-IMD)
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Test Documentation related to the Current Process
ID Document Name Test Type
304.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Document ControlChange Record
1
Date Author Version Change Reference
7/18/2011 Srinivas Rao Kanteti
1.0 Initial Draft
9/13/2011 Srinivas Rao Kanteti
1.0 Update
09/15/2011
Galina Polonsky 1.0 Reviewed.
12/05/2011
Layne Nelson 1.0 Reviewed
03/15/2012
Galina Polonsky 1.1 Edited. Reviewed. Approved
314.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
Attachments
Initial Load IMD Interval Lifecycle
Initial Load IMD Scalar Lifecycle
Manual IMD Interval Lifecycle
Manual IMD Scalar Lifecycle
Estimate IMD Interval Lifecycle
Estimate IMD Scalar Lifecycle
324.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
VEE Group for a MC
VEE Rules in a VEE Group
VEE Rule Lifetime
Referred VEE Group for VEE Rule
VEE Group Matrix for a VEE Rule
Error and To Do
334.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.
4.2.1.2 MDM.Manage VEE and VEE Exceptions
How to Read and Understand Process Diagram .URM Standards. Notations
344.2.1.2 MDM.Manage VEE and VEE Exceptions
Copyright © 2012, Oracle. All rights reserved.