bpa rtu winter operation presented to: rtug august 2010 presented by: kathryn hile, the cadmus group...

41
BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

Upload: lenard-stevens

Post on 12-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

BPA RTU Winter OperationPresented to:

RTUGAugust 2010

Presented by:Kathryn Hile, The Cadmus Group

Howard Reichmuth, New Buildings Institute

Page 2: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Winter Analysis Overview

Improvements to analysis template

Downloading and organizing data

Fan operation – schedules

Gas pack operation

Heat pump operation

Winter economizing (or cooling)

Additional opportunities

Lessons learned

2

Page 3: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Winter Sample

45 serviced RTUs

– 32 at 3 sites in Puget Sound area

– 13 at 3 sites in Tri-Cities area

4 baseline RTUs in Tri-Cities: serviced spring 2010

3

RTU Type Number of Units Subtractions Units Analyzed

All Electric 1 1

Gas Pack 34 5 29

Heat Pump 10 0 10

Page 4: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Analysis Template Improvements

All winter data in one spreadsheet (at hour level) Much smaller analysis files Automation with SAS and VBA Time series dynamic graph Both SA min and SA max plotted in time series

4

Page 5: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

5

Downloading and Cleaning Data HOBOlink

Excel

Visual Basic

SAS

Page 6: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Data Preparation Process

Download zip file from HOBOlink with data from all HOBOs

Organize by HOBO Create one file for each HOBO, based on power,

one sheet for each two-week period Import to SAS with keys for CT size, WattNode

scale factor, fan low and fan high

6

Page 7: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Data Preparation

Calculate hourly and daily minimums, maximums, totals and averages

Export to Excel Only full 24 hour days used to create energy

signature View data in hourly compressor map, dynamic

time series and energy signature

7

Page 8: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Data Collection Issues

Some (not many) sensors failed last winter, and four sites required troubleshooting to fix– Splitters– AC adapter – battery failure

Downloaded data– One site: two units had nonsensical data– One site: three sensors just disappeared from

HOBOlink – result of the AT&T upgrades last fall?

8

Page 9: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Calculating Percent Outside Air

9

Page 10: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Winter Operation

Schedules – fan ON or AUTO

Fan kW, duty, base load

Typical signatures

10

Page 11: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Fan Mode = ON Winter numbers similar to pilot data

11

Winter Data Summer Pilot Post-Servicing DataRTU Fan kW Fan Duty Base Load Fan kW Fan Duty Base Load

RTU6 0.69 91% 15.11 0.65 88% 13.68 HP15 0.65 100% 15.66 0.63 100% 15.06 HP17 1.40 100% 33.51 1.48 87% 30.96 GP5 0.96 99% 22.90 0.87 96% 20.13 GP6 2.69 99% 63.73 2.63 99% 62.53

AC10 0.89 100% 21.38 0.92 100% 22.19 AC6 2.66 38% 24.13 2.94 25% 17.42

RTU1 1.49 99% 35.28 1.46 93% 32.82 RTU3 0.93 100% 22.35 0.91 94% 20.35 RTU6 1.73 40% 16.43 1.73 35% 14.43

Page 12: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Fan Mode = AUTO Small sample Fan kW very close; fan duty and base load differed

12

Winter Data Summer Pilot Post-Servicing DataRTU Fan kW Fan Duty Base Load Fan kW Fan Duty Base Load

RTU5 1.84 76% 33.48 2.12 85% 43.40

RTU3 2.06 5% 2.68 2.01 28% 13.50

HP2 0.60 8% 1.20 0.69 100% 16.45

GP7 1.28 26% 7.86 1.29 61% 18.71

GP8 1.35 2% 0.76 1.23 14% 4.07

AC9 1.22 5% 1.46 1.22 100% 29.31

Page 13: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Signatures

24 of 32 energy signatures were as expected 8 needed more investigation to understand

performance

13

Page 14: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Typical Signature 1

14

0 10 20 30 40 50 60 70 80 90 100 1100

10

20

30

40

50

60

70

80

90

Energy Signature

Average Daily Outside Air Temperature (F)

To

tal

Da

ily

En

erg

y (

kW

h)

Operates same set schedule each day

Page 15: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Compressor Map

Same RTU as previous slide

15

10 20 30 40 50 60 70 800

0.5

1

1.5

2

2.5

3

3.5

4

RTU Hourly Avg kWh and Max kW

RTU2_Hourly_kWh_Graph RTU2_Max_Hourly_kW_Graph

Average Hourly Outside Air Temperature (F)

Ho

url

y k

Wh

an

d M

ax

kW

Page 16: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Time Series

16

Page 17: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Typical Signature 2

17

0 10 20 30 40 50 60 70 80 90 100 1100

20

40

60

80

100

120

Energy Signature

Average Daily Outside Air Temperature (F)

To

tal

Da

ily

En

erg

y (

kW

h)

Operates slightly longer at lower temperatures

Page 18: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Compressor Map Same RTU, compressor map

18

0 10 20 30 40 50 60 70 80 90 1000

1

2

3

4

5

6

7

RTU Hourly Avg kWh and Max kW

RTU2_Hourly_kWh_Graph RTU2_Max_Hourly_kW_Graph

Average Hourly Outside Air Temperature (F)

Ho

url

y kW

an

d k

Wh

Page 19: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Typical Signature 3

19

0 10 20 30 40 50 60 70 80 90 100 1100

20

40

60

80

100

120

140Energy Signature

Average Daily Outside Air Temperature (F)

To

tal

Da

ily

En

erg

y (

kW

h)

Two signatures – Monday – Saturday, and Sunday Unit may have reached setback temperatures when average daily

temperatures below 40

Page 20: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Gas Pack Findings

Fan power calculated this winter was close to metered pilot data in almost all cases

Fan duty was close to metered pilot data in units with fan scheduled ON

Fan duty and base load were difficult to predict from summer metered data when fan ran in AUTO mode

20

Page 21: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Winter Heat Pump Operation

Heat pumps were trickier Smaller sample, all at a notorious site Units served either offices or fabrication

(manufacturing) spaces Four units did not have economizers

21

Page 22: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heat Pump Typical Operation Energy increases as temperatures decrease Steeper slope than for cooling

22

0 10 20 30 40 50 60 70 80 90 1000

10

20

30

40

50

60

70

80

90

Energy Signature

Average Daily Outside Air Temperatures (F)

To

tal D

aily

En

erg

y (

kW

h)

Page 23: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heat Pump Compressor Map Same unit as previous slide

23

0 20 40 60 80 1000

5

10

15

20

25

RTU Hourly Avg kWh and Max kW

HP15_Hourly_kWh_Graph HP15_Max_Hourly_kW_Graph

Average Hourly Temperature (F)

Ho

url

y E

ne

rgy

(k

Wh

)

Page 24: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heat Pump Time Series

24

Page 25: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heat Pump Findings

Typical heat pumps will have a second sloped line

Need summer data (spring was not warm enough) to connect winter and summer usage

Will use that to calculate and predict total annual energy use, not just cooling and fan

25

Page 26: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Winter Economizing Some units modulate dampers to take advantage of free cooling. SA min and SA max track OAT Three speed fan?

26

Page 27: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heating to Economizing Fan operates at different power when heating or

economizing

27

Page 28: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Atypical Performance

Balance point below the range of monitored temperatures

Cooling at low temperatures Units serving the same space Two units with bad data

28

Page 29: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Low Balance Point

29

0 10 20 30 40 50 60 70 80 90 100 1100

20

40

60

80

100

120

140

160Energy Signature

Average Daily Outside Air Temperature (F)

To

tal D

aiy

En

erg

y (

kW

h)

Page 30: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Cooling at Low Temperatures

Mechanical cooling at 25 degrees

30

0 10 20 30 40 50 60 700

2

4

6

8

10

12

RTU Hourly Avg kWh and Max kW

GP6 Hourly kWh GP6 Hourly Max kW

Average Outside Air Temperature (F)

Ho

url

y kW

h a

nd

kW

Page 31: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Cooling at Low Temperatures

31

Page 32: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Heating a.m., Cooling p.m. Two different max kW, at 3.5 kW, cooling (SA min

at 55) and heating 4.5 kW (SA max at 90)

32

Page 33: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Someone’s Been in my RTU…

33

Page 34: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

…Twice!

34

Page 35: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Economizer Findings

Cooling at temperatures below 40 degrees. Why? Controls? Or dampers didn’t modulate because broken? Bad sensor? Comments? Significant savings opportunity?

Cooling in the 50-60 degree F. Could economizer changeover temperature be increased for additional savings?

Winter is a good (better than summer?) candidate for economizer savings

35

Page 36: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Preliminary Annual Signature

Winter:– Standard, flat gas pack– Standard, sloped – but could we just take an average

and keep slope at 0?– Gas pack with two occupancy schedules– Heat pump – is this signature messier than it would be

during summer cooling? TBD.

Atypical.

36

Page 37: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Ex: AC w/Elect Resistance Heating

37

Page 38: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

AC Compressor Map

38

Page 39: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

AC Time Series

39

Page 40: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Next Steps in Research

Draft annualized savings methodology with separate characterizations of annual operation for summer and winter

Data block interval analysis Recommendations regarding fan schedule persistence Additional persistence analysis Measure life implications from the data Updated M&V protocol recommendations

40

Page 41: BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

Web-Enabled Thermostats

Test the web-enabled thermostat as an M&V tool as a substitute for data-loggers– Data-friendliness?– How complete is it?– What does it look like?

Use the current analysis protocol and modify it for these data

41