bp080-pms-v1.1
TRANSCRIPT
RAILTEL / Wipro Confidential Page i of 35
BP.080
FUTURE PROCESS MODEL
RAILTEL
Oracle Human Resources – Performance Management System
Author: Amitesh Singh
Creation Date: March 08, 2013
Last Updated:
Release Date:
Document Ref: RCIL_BP080_PMS
Version: Version 1.0
Doc Ref: Confidential Page ii of 35 Wipro/RAILTEL
Document Control
Change Record
Date Author Version Change Reference
08-Mar-13 Amitesh Singh 1.0 Initial Version
Reviewers
Name Position
Swarup Ghoshal Project Manager
Amit Kumar Gupta Program Manager
Distribution
Copy No.
Name Location
1 RAILTEL Gurgaon, India
2 Wipro Ltd Bangalore, India
Note To Holders:
If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes.
If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.
Doc Ref: Confidential Page iii of 35 Wipro/RAILTEL
Contents
Document Control ............................................................................................................... ii
Introduction ........................................................................................................................... 5
Purpose ............................................................................................................................ 5 Approach ......................................................................................................................... 5 Dependency on Other Modules ............................................................................... 5
Event Catalog ....................................................................................................................... 6
PMS Process Description ........................................................................................... 6
Objective Library ................................................................................................................. 7
Competency Repository .................................................................................................... 9
Goal Setting ........................................................................................................................ 11
Competency Setting ......................................................................................................... 13
Goal Sheet Changes ......................................................................................................... 15
KRA Sheet Review ............................................................................................................ 17
Mid Year Review ................................................................................................................ 19
Year End Appraisals .......................................................................................................... 21
Performance Management Plans ................................................................................. 25
Appraisal Template ........................................................................................................... 27
Future State for Actual achievement value of KRAs ............................................ 29
Reports .................................................................................................................................. 30
Alerts ...................................................................................................................................... 32
Annexure-1 Approval Matrix ......................................................................................... 33
Open and Closed Issues for this Deliverable .......................................................... 35
Doc Ref: Confidential Page iv of 35 Wipro/RAILTEL
Open Issues.................................................................................................................. 35 Closed Issues ............................................................................................................... 35
Doc Ref: Confidential Page 5 of 35 Wipro/RAILTEL
Introduction
Purpose
The purpose of this document is to define the future business model related to Oracle Performance Management (PMS) & to map RAILTEL business requirements, as established in the discussions with the RAILTEL Oracle HR (PMS) implementation team members and to map it to standard Oracle functionality and best practices. Further, this document aims to highlight gaps (high level GAP analysis) wherever they exist and to agree on workarounds or customized solutions, if any.
In addition to the system functionality, the Future Design model for the PMS module takes into account the evaluation and understanding of the Current Business Baseline that was discussed during the requirement gathering sessions. The future design will enhance current processes in order to have more timely, efficient and relevant data.
During this process, Wipro and RAILTEL team members will attempt to map RAILTEL’s business processes to enable the best practices. This means that based on inherent processes available within Oracle applications, RAILTEL will decide whether or not to adopt these practices or what alternative to implement.
Note: A ‘workaround’ may involve solutions ranging from using the Oracle Applications in a non-standard way or changed business policies and procedures.
Approach
The project is divided into Five Stages – viz. Plan, Analyze, Design, Develop and Go-Live. The future state processes have been designed on the basis of the requirements/ future state discussions.
Dependency on Other Modules
Oracle Performance Management has dependencies with Oracle Core HR, Self Service HR and Learning Management system modules.
Oracle PMS shares the employee data, work structure, band, position, jobs, locations, Organizations, Competencies, Learning Courses etc. with the other modules.
Doc Ref: Confidential Page 6 of 35 Wipro/RAILTEL
Event Catalog
This component lists all events to which the business responds.
PMS Process Description
Event ID Name Type Description Frequency
HR_PMS_01 Objective Library Internal Objective Library Creation for standardized KRAs
As and When Required
HR_PMS_02 Competency Library Internal Creation of Competencies in Library As and When Required
HR_PMS_03 Goal Setting Internal Goal Setting, Approval and Tracking As and When Required
HR_PMS_04 Competency Setting Internal Managerial & Functional/Competency Setting
As and When Required
HR_PMS_05 KRA Sheet Change Internal Change in KRA sheet during the Year As and When Required
HR_PMS_06 Bulk Review of KRAs Internal KRA sheet review by Function Heads and P&A department
As and When Required
HR_PMS_07 Mid Year Review Internal Mid Year Performance Review As and When Required
HR_PMS_08 Annual Appraisal Internal Annual Performance Appraisal As and When Required
HR_PMS_09 Performance Management Plan
Internal Performance Management Plans, creation/ update
As and When Required
HR_PMS_10 Appraisal Template Internal Appraisal Templates, creation/ update As and When Required
Actual achievement and KRA Mapping
Future State for Actual achievement value of KRAs
As and When Required
Reports Internal PMS Reports As and When Required
Alerts Internal PMS Alerts As and When Required
Doc Ref: Confidential Page 7 of 35 Wipro/RAILTEL
Objective Library
RAIL TEL Process: Objective Library
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_01 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_01
Description: This process covers the creation of reusable KRAs in the common Objective Library.
Event
Description: This process is triggered every year before the Performance Management Plan is run for Goal Settings. Also Objective library can be updated as and when required based upon KRA changes.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_01.01 Standardized goals and weight age are determined for each cadre (level) and function based on organizational goals along with Quantifiable targets & weightage wherever possible against the goals. Scales are defined for each goal and clear guidelines on evaluation as per scale are communicated to all concerned to make the appraisal process more objective.
Manual NA RAILTEL Management board and P&A Department.
HR_PMS_01.02 Finalized Standard Goals creation in the Objective Library before the kick off of performance appraisal cycle for each of the RAILTEL functions along with weightage & Target wherever it’s possible. This can be either bulk upload of KRAs or individual KRA creation in the library.
System Oracle PMS Administrator Objective Library
P&A Department
HR_PMS_01.03 Updating Objective Library KRA’s attributes e.g. KRA Name, Weightage, Targets & other Details.
System Oracle PMS Administrator Objective Library
P&A Department
HR_PMS_01.04 Report for the KRAs in the library with KRA Details System Oracle PMS Administrator Reports(Customized)
P&A Department
Doc Ref: Confidential Page 8 of 35 Wipro/RAILTEL
Process Number: HR_PMS_01 Objective Library
Performance Management System HR_PMS_01
Ob
jective
Lib
rary
Ob
jective
Lib
rary
HR_PMS_01.01
Finalization of
Standardized KRAs
Start
HR_PMS_01.02
Upload/Create
Finalized KRAs in
the Library
HR_PMS_01.03
Update KRA attributes
(name, weightage etc.) in
library
HR_PMS_01.04
Review KRAs of the
library on the report
Stop
Doc Ref: Confidential Page 9 of 35 Wipro/RAILTEL
Competency Repository
RAIL TEL Process: Competency Repository
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_02 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_02
Description: This process covers the creation of reusable Competencies(Functional, Managerial, Values & Potential) in the common Competency repository
Event
Description: This process is triggered every year before the Performance Management Plan is run for next Year. Also Competency Repository can be updated as and when required based upon Competency attribute changes.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_02.01 Standardized Functional/Technical, Managerial & Potential competencies are determined for each cadre (level) and functions based on organizational competence requirements.
Manual NA RAILTEL Management board and P&A Department.
HR_PMS_02.02 Finalized Standard Competencies creation in the Competency Repository before the kick off of performance appraisal.
System Oracle PMS Administrator Competence
P&A Department
HR_PMS_02.03 Updating Competency attributes in Competency Repository e.g. Name, Description, Behavioral Indicator.
System Oracle PMS Administrator Competence
P&A Department
HR_PMS_02.04 Report for the Competencies in the repository with all the configured details
System Oracle PMS Administrator Reports(Customized)
P&A Department
Doc Ref: Confidential Page 10 of 35 Wipro/RAILTEL
Process: HR_PMS_02 Competency Repository
Performance Management System HR_PMS_02
Co
mp
ete
ncy R
ep
osito
ryC
om
pe
ten
cy R
ep
osito
ry
HR_PMS_02.01
Finalization of
Standardized
Competencies
Start
HR_PMS_02.02
Upload/Create Finalized
Competencies in the
Library
HR_PMS_02.03
Update Competency
attributes in Repository
HR_PMS_02.04
Review Competencies of
on the report
Stop
Doc Ref: Confidential Page 11 of 35 Wipro/RAILTEL
Goal Setting
RAIL TEL Process: PMS Goal Setting, Approval & Tracking
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_03 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_03
Description: This process covers the creation of Goal Sheet. Cascading and Transfer of Goal Sheets and it’s updates approvals.
Event
Description: This process is triggered every year when the Performance Management Plan is run for Goal Settings.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_03.01 Add KRAs From Objective Library & edit as required System Oracle PMS Employee Self-Service PMP Tasks
Employee
HR_PMS_03.02 Create New KRAs which are not available in Objective Library & input weightage/Targets as agreed with Manager.
System Oracle PMS Employee Self-Service PMP Tasks
Employee
HR_PMS_03.03 Review KRA Sheet & Submit for Approval System Oracle PMS Manager Self-Service PMP Tasks
Employee
HR_PMS_03.04 Review KRAs sheet submitted by the employee System Oracle PMS Manager Self-Service PMP Tasks
Manager
HR_PMS_03.05 Send back KRA sheet to employee if any correction required e.g. change in KRA values, Deletion/addition of any KRA required
System Oracle PMS Manager Self-Service PMP Tasks
Manager
HR_PMS_03.06 Approve finalized KRA sheet. System Oracle PMS Manager Self-Service PMP Tasks
Manager
HR_PMS_03.07 Post Approval, the goals can be updated to update the Completion% & Achievement date. Completion% of the goals will be updated by the employees before the Mid Year/Annual review and applied in the system.
System Oracle PMS Employee Self-Service PMP Tasks
Employee
HR_PMS_03.08 Goal Sheet Freeze Date reached. i.e. no update allowed on the Goal sheet.
System Oracle PMS India HRMS Manager Performance Management Plan
HR
HR_PMS_03.09 New Joinees will be enrolled in the plan automatically during the year and will update have to finalized KRAs as per deadlines set by HR team. All the KRA sheet finalization process remains same i.e. (HR_PMS_03.01 to HR_PMS_03.07)
System Oracle PMS Employee/Manager Self-Service PMP Tasks
Employee/Manager
Doc Ref: Confidential Page 12 of 35 Wipro/RAILTEL
Process: HR_PMS_03 Goal Setting
Performance Management System HR_PMS_03
Vie
w &
Tra
ck K
RA
Pro
gre
ss (
Em
plo
ye
e/
Ma
na
ge
r)
Vie
w &
Tra
ck K
RA
Pro
gre
ss (
Em
plo
ye
e/
Ma
na
ge
r)M
an
ag
er
Ma
na
ge
rE
mp
loye
eE
mp
loye
e
Start
HR_PMS_03.03
Verify KRA Details & submit for Manager’s Approval
HR_PMS_03.01-.02
Copy KRAs from Objective Library & Create New KRAs.Add/Update-KRA Start Date-Target Date- Target Value
HR_PMS_03.04
Review KRAs Submitted by the
employee
Approve /
Return For
Correction
HR_PMS_03.06
KRA sheet finalized
Approve
HR_PMS_03.07
Update KRA Completion% &
Achivemnet date to track the progress
Stop
HR_PMS_03.08
Goals Sheet Freeze date
reached
Return For Correction
Doc Ref: Confidential Page 13 of 35 Wipro/RAILTEL
Competency Setting
RAIL TEL Process: Competency Setting Approval & Tracking
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_04 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_04
Description: This process covers the creation of competency Profile & approvals.
Event
Description: This process is triggered every year before the Performance Management Plan but there is no restriction it can be set any time before Annual Appraisal review start.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_04.01 Add Functional/Technical (Min 3 - Max4) in addition to 1 pre-existing Functional/Technical Competency from predefined Competency Repository.
System Employee Self-Service Competency Profile
Employee
HR_PMS_04.02 Add Managerial (Min 1 – Max6) in addition to 6 pre-existing Managerial Competency from predefined Competency Repository.
System Employee Self-Service Competency Profile
Employee
HR_PMS_04.03 Review Competency Profile & Submit for Approval System Employee Self-Service Competency Profile
Employee
HR_PMS_04.04 Review Competency sheet submitted by the employee System Manager Self-Service Competency Profile
Manager
HR_PMS_04.05 Send back Competency sheet to employee if any correction required System Manager Self-Service Competency Profile
Manager
HR_PMS_04.06 Approve finalized Competency sheet. System Oracle PMS Manager Self-Service PMP Tasks
Manager
Doc Ref: Confidential Page 14 of 35 Wipro/RAILTEL
Process: HR_PMS_04 Competency Setting
Performance Management System HR_PMS_04
Ma
na
ge
rM
an
ag
er
Em
plo
yee
Em
plo
yee
Start
HR_PMS_04.03
Verify Competency Details & submit for Manager’s Approval
HR_PMS_04.01-.02
Add Functional/technical & Managerial Competencies from
the Competency repository.
HR_PMS_04.04
Review Competencies
Submitted by the employee
Approve /
Return For
Correction
HR_PMS_04.06
Competency Profile finalized
Approve
Return For Correction
Stop
Doc Ref: Confidential Page 15 of 35 Wipro/RAILTEL
Goal Sheet Changes
RAIL TEL Process: Goal Sheet Changes
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_05 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_05
Description: This process covers the changes in the finalized KRA sheet of the employee
Event
Description: This process will be triggered on the approval of Function/Department head and Manager of the employee if there are any changes required in the already frozen KRA sheet or KRA setting deadline has already passed.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
E HR_PMS_05.01 Employee will submit request in the system to enable the KRA sheet for editing to Manger.
System Employee Self-Service > PMP Task
Employee
HR_PMS_05.02 Manger will verify the request and submit to Department Head for further approval.
System ERP Notification Manager
HR_PMS_05.03 Department Head will review the request and post approval from department head, intimation will go to HR department for unlocking the KRA sheet.
System ERP Notification Department Head
HR_PMS_05.04 HR Team reopens the KRA sheet of the employee For editing System Oracle PMS Administrator Reopen KRA sheet
HR Department
HR_PMS_05.05 Rest of the Process flows as per Goal Setting Process (HR_PMS_03) System Employee/Manager Self-Service PMS Task
Employee/Manager
Doc Ref: Confidential Page 16 of 35 Wipro/RAILTEL
Process: HR_PMS_05 Goal Sheet Changes
Performance Management System HR_PMS_05
Dep
artm
ent H
ead
Dep
artm
ent H
ead
Man
ager
Man
ager
HR
/Em
ploy
eeH
R/E
mpl
oyee
Em
ploy
eeE
mpl
oyee
Start
HR_PMS_05.01
Employee submits request in ERP to enable the KRA sheet along
with justification.
HR_PMS_05.04-5
Unlocks Employee’s KRA Sheet & Rest
procees flows as per HR_PMS_03
Stop
Stop
Approve /
Return For
Correction/
Reject
HR_PMS_05.02
Review Employee Request
Reject
Return For Correction
Approve
Approve /
Return For
Correction
Stop
HR_PMS_05.03
Review Employee Request
Approve
Reject
Doc Ref: Confidential Page 17 of 35 Wipro/RAILTEL
KRA Sheet Review
RAIL TEL Process: KRA Sheet Review
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_06 Mapping Team: Wipro Process Owner: Human Resources Department & Function Heads
Process Number: HR_PMS_06
Description: This process covers the review of KRA sheet for any specific Department/entire RAILTEL.
Event
Description: This process will be triggered during or after the KRA setting period by the Function Heads and P&A department. If there are any changes required in KRA sheet managers/employees will be communicated accordingly.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_06.01 Department/Function Head Or HR department will review the Consolidated KRA sheet for a particular function in ERP during or after the KRA setting period.
ERP Oracle PMS Administrator KRA Report
Function/Department Head Or HR Department
HR_PMS_06.02 If changes required, HR Team reopens the KRA sheet of the employee for editing
System Oracle PMS Administrator Reopen KRA sheet
HR Department
HR_PMS_06.03 Rest of the Process flows as per Goal Setting/Goal sheet changes Process (HR_PMS_03 & HR_PMS_05)
System Employee/Manager Self-Service PMS Task
Employee/Manager
Doc Ref: Confidential Page 18 of 35 Wipro/RAILTEL
Process: HR_PMS_06 Goal Sheet Review
Performance Management System HR_PMS_06
De
pa
rtm
en
t H
ea
d/H
RD
ep
art
me
nt H
ea
d/H
RH
R/E
mp
loye
eH
R/E
mp
loye
e
HR_PMS_06.02-03
Unlocks Employee’s KRA Sheet & Rest
procees flows as per HR_PMS_03
Stop
Start
HR_PMS_06.01
Review of KRA sheets of all the employees by
Department Heads & HR Team
Change
Required in
KRAs
Yes
StopNo
Doc Ref: Confidential Page 19 of 35 Wipro/RAILTEL
Mid Year Review
RAILTEL Process: Mid Year Review
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_07 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_07
Description: This process covers the Mid Year review in Oracle PMS.
Event
Description: This process is triggered by the Performance Management Plan based upon the Midyear review dates being set by the HR team. When the Mid Year Start Date is reached, the PMP generates Mid Year reviews for the employees. Employees login to their Employee Self Service and initiate the Reviews to their Managers.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_07.01 HR department initiates the Mid Year Review Process(PMP Plan)
System Oracle PMS PMS Administrator Performance Management Plan
HR Department
HR_PMS_07.02 Employee initiates self review
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_07.03 Reviews existing KRAs. Give Self review Ratings( Ahead of Target, On Target & Behind Target) and comments if any against each of the assigned KRAs
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_07.04 Submit for Review to Manager
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_07.05 Manager Reviews the details submitted by employee and return for the correction to employee if required.
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_07.06 Manager gives the rating and comment against each KRA and submits the review process for completion
System Oracle PMS Manager Self Service PMP Tasks
Manager
Doc Ref: Confidential Page 20 of 35 Wipro/RAILTEL
Process: HR_PMS_07 Mid Year Review
Performance Management System HR_PMS_07
Em
plo
ye
eE
mp
loye
eH
RHR
Ma
na
ge
rM
an
ag
er
Start
HR_PMS_07.01
‘Mid Year Review’ Process Kick off by
HR team by publishing PMP plan
HR_PMS_07.02
Self Appraisal Initiation by Employee
HR_PMS_07.03
Self assessment on each of the KRAs
(On Target, Ahead of Target & Behind
Target)
HR_PMS_07.04
Review self assessment details
and submit to manager
HR_PMS_07.05
Review details submitted by
employee
Correction
required by
employee
Yes
HR_PMS_07.06
Assess employee’s KRA & submit review
for completion.
NoStop
Doc Ref: Confidential Page 21 of 35 Wipro/RAILTEL
Year End Appraisals
RAILTEL Process: Annual Appraisals
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_08 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_08
Description: This process covers the Annual Appraisal functions in Oracle PMS.
Event
Description: This process is triggered by the Performance Management Plan. When the Annual Appraisal Start Date is reached, the PMP generates Employee Appraisals. Employees login to their Employee Self Service and initiate the Appraisals to their Managers.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_08.01 HR department initiates the Annual Appraisal Process(PMP Plan)
System Oracle PMS PMS Administrator Performance Management Plan
HR Department
HR_PMS_08.02 Employee initiates self review
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_08.03 Reviews existing KRAs. Provide Self Assessment (Actual Achievement value) by the employees & Reasons for short fall in the target, if any.
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_08.04 Submit for assessment by the Manager
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_08.05 Manager Reviews the details submitted by employee and return for the correction to employee if required.
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.06 Provide Assessment (Actual Achievement by the employee ) against each of the KRAs & also the Reasons for short fall in the target, if any.
System will automatically calculate the Marks for each KRA and also the overall KRA score as per calculation formula
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.07 Provide assessment on the Functional/Technical Competencies on the rating scale of (1-2-3-4-5)
System Oracle PMS Manager Self Service PMP Tasks
Manager
Doc Ref: Confidential Page 22 of 35 Wipro/RAILTEL
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
System will automatically calculate the overall Technical/Functional Competencies score as per calculation formula
HR_PMS_08.08 Provide assessment on the Managerial Competencies on the rating scale of (1-2-3-4-5)
System will automatically calculate the overall Managerial Competencies score as per calculation formula
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.09 Provide assessment on the RAILTEL Core Values on the rating scale of (1-2-3-4-5)
System will automatically calculate the overall Core Values score as per calculation formula
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.10 Provide assessment on the Potential Competencies on the rating scale of (1-2-3-4-5)
System will automatically calculate the overall Potential Competencies score as per calculation formula
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.11 Provide Assessment on ‘Part-V General’
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.12 System will Display summarized score & also the Overall classification (Rating) based upon the Performance assessment given by manager in each sections.
System Oracle PMS Manager Self Service PMP Tasks
HR_PMS_08.13 Provide Integrity inputs (Beyond Doubt/Doubtful) and also the details in case of ‘Doubtful’
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.14 Review entire appraisal details and submit to reviewing authority
System Oracle PMS Manager Self Service PMP Tasks
Manager
HR_PMS_08.15 Review appraisal details submitted by the Manager. Return for Correction if any changes required else fill the required details and to submit the appraisal to Accepting Authority,
System Oracle PMS Appraisal Notification
Reviewing Authority
HR_PMS_08.16 Review appraisal details submitted by the Reviewer. Return for Correction if any changes required else fill the required details and to submit the appraisal to complete the Appraisal and enable it for
System Oracle PMS Appraisal Notification
Accepting Authority
Doc Ref: Confidential Page 23 of 35 Wipro/RAILTEL
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
Appraisee Feedback.
HR_PMS_08.17 Appraisee views appraisal details and submit feedback.
System Oracle PMS Employee Self Service PMP Tasks
Employee
HR_PMS_08.18 Appraisee Feedback review by Department Head & HR team and take action accordingly.
Manual NA Department Head/HR Department
HR_PMS_08.19 Finalized Rating changes by HR team Post steering committee meeting on appraisee feedback
System Oracle PMSPMS Administrator
HR Team
Doc Ref: Confidential Page 24 of 35 Wipro/RAILTEL
Process: HR_PMS_08 Annual Appraisal
Performance Management System HR_PMS_08
Acc
eptin
g
Aut
horit
y
Acc
eptin
g
Aut
horit
yR
evie
win
g
Aut
horit
y
Rev
iew
ing
Aut
horit
yM
anag
erM
anag
erE
mpl
oyee
Em
ploy
eeH
RHR
Fee
dbac
k
Pro
cess
Fee
dbac
k
Pro
cess
Start
HR_PMS_08.01
‘Mid Year Review’ Process Kick off by HR team by publishing
PMP plan
HR_PMS_08.02
Self Appraisal Initiation by Employee
HR_PMS_08.03
Self assessment on each of the KRAs (Input actual achievement
values & Reason shortfall)
HR_PMS_08.04
Review self assessment details and submit to
manager
Yes
No
Correction
required by
employee
HR_PMS_07.06-.13
Assessment by Manager on KRAs, Competencies, Values, Potential, General questionnaire & Integrity.
HR_PMS_07.14
Review entire Appraisal Details and submit to Reviewing
Authority
HR_PMS_08.05
Review details submitted by employee
Correction
required
Yes
HR_PMS_07.15
Review Appraisal Details.
HR_PMS_07.15'
Input required comments & submit to
accepting autority
NO
HR_PMS_07.17
Appraisee views the appraisal details and
submits feedback
Correction
required
HR_PMS_07.16
Review Appraisal Details.
HR_PMS_07.16'
Input required comments & submit to
accepting autority
HR_PMS_08.18
Discussions on appraisee Feedback in steering committee.
HR_PMS_07.19
Rating Change by HR
team if required
Stop
Yes
Doc Ref: Confidential Page 25 of 35 Wipro/RAILTEL
Performance Management Plans
RAILTEL Process: Performance Management Plans
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_09 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMP_01
Description: This process covers the creation of Performance Management Plans in Oracle PMS.
Event
Description: This process explains the creation of Performance Management Plans in Oracle PMS. The Performance Management Plans are created to initiate the Goal Setting and Annual Appraisals of the Employees automatically thru the plan enrollments. Eligibility criteria are defined at the plan level and the eligible employees are enrolled in the plan/ their appraisals initiated.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_09.01 Enter Plan General Info: Enter Plan Name, Administrator Name, Plan Start Date & Plan End Date.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_09.02 Enter Plan Population Info: Hierarchy Type, Organization Hierarchy, Hierarchy Version, Top Organization.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_09.03 Enter Plan Process: Goal Settings. Include Objective setting in progress. Enter Start Date, Deadline. Select Method as Cascading, notify plan population, enable automatic allocation.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_09.04 Enter Plan Process: Annual Appraisals. Enter Appraisal template. Enter Start Date, End Date, Enter Task Start Date, Task End Date, Initiator, Appraisal Type and Appraisal Purpose.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_09.05 Publish the Performance Management Plan
System Oracle PMS PMS Administrator Performance Management Plans
HR
Doc Ref: Confidential Page 26 of 35 Wipro/RAILTEL
Process: HR_PMS_09: Performance Management Plan
Performance Management System HR_PMS_09
Pe
rfo
rma
nce
Ma
na
ge
me
nt P
lan
Pe
rfo
rma
nce
Ma
na
ge
me
nt P
lan
Start
HR_PMS_09.01
Enter Plan General Info: Enter Plan Name, Administrator
Name, Plan Start Date & Plan End Date.
HR_PMS_09.02
Enter Plan Population Info: Hierarchy Type, Organization Hierarchy, Hierarchy Version,
Top Organization.
HR_PMS_09.03
Enter Plan Process: Goal Settings. Include Objective setting in progress. Enter Start Date, Deadline. Select Method as
Cascading, notify plan population, enable automatic allocation.
HR_PMS_09.04
Enter Plan Process: Annual Appraisals. Enter Appraisal
template. Enter Start Date, End Date, Enter Task Start Date, Task End Date, Initiator, Appraisal Type
and Appraisal Purpose.
Publish the Performance
Management Plan
Sop
Doc Ref: Confidential Page 27 of 35 Wipro/RAILTEL
Appraisal Template
RAILTEL Process: Appraisal Template
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_10 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_01
Description: This process covers the creation/ update of Appraisal Template in Oracle PMS.
Event
Description: This process explains the creation/ updation of Appraisal templates in Oracle PMS. Appraisal templates are created and attached to the Performance Management Plans. The Annual Performance Appraisal is performed in the appraisal templates. The Appraisal template consists of the Objective Template, Objective Calculation fast formulae and Total Score formula.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_10.01 Enter Appraisal template details: Template Name, Valid From, Instructions for Appraisal Participants, Appraisal Total Score Formula.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_10.02 Configure Appraisal Template: Assess Objectives, include Objective template and include learning path.
System Oracle PMS PMS Administrator Performance Management Plans
HR
HR_PMS_10.03 Publish Appraisal Template
System Oracle PMS PMS Administrator Performance Management Plans
HR
Doc Ref: Confidential Page 28 of 35 Wipro/RAILTEL
Process: HR_PMS_10: Appraisal Template
Performance Management System HR_PMS_10
Ap
pra
isa
l T
em
pla
teA
pp
rais
al T
em
pla
te
Start
HR_PMS_10.01
Enter Appraisal template details: Template Name, Valid
From, Instructions for Appraisal Participants, Appraisal Total
Score Formula.
HR_PMS_10.02
Configure Appraisal Template: Assess Objectives, include
Objective template and include learning path.
Publish the Performance
Management PlanStop
Doc Ref: Confidential Page 29 of 35 Wipro/RAILTEL
Future State for Actual achievement value of KRAs
RAILTEL Process: Actual Achievement of KRA Targets
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_11 Mapping Team: Wipro Process Owner: Human Resources Department
Process Number: HR_PMS_11
Description: This process covers reflection of Actual achievement against KRAs in PMS wherever it will be mapped across the module.
Event
Description: This process covers reflection of Actual achievement against KRAs in PMS wherever it will be mapped across the
module.
Process ID # Description
Mode
Requirement Fulfillment using ERP Approach
Responsibility
HR_PMS_11 In the current review mechanism employee & Manager will be filling Actual achievements and the scores will be calculated based upon the achievement value filled by Manager.
But going forward such mechanism will be developed where KRA targets will be mapped to some ERP system values and while filling the assessment those values will reflect as actual achievement in the PMS application.
e.g. If For KRA ‘Sales Taaget’ , system will pull the actual sales made by that person in the financial year and will be available as actual achievement on the PMS form.
Above mapping will strengthen the entire review process.
System ERP RAILTEL/WIPRO
Doc Ref: Confidential Page 30 of 35 Wipro/RAILTEL
Reports
RAILTEL Process: Reports
Business Function: HR Date: 08-Mar-2013
Control Number: HR_PMS_REP Mapping Team: Wipro Process Owner: Human Resources Department
The Human Resource department will need specific reports to cater to the business reporting requirement. The most commonly used reports are mentioned below:
- Goal Setting Status Report (HR Team) - Competency Setting Status Report (HR Team) - Consolidated KRA Report (HR Team/Department Head) - Mid Year Review Completion Status Report - Annual Appraisal Completion Status Report - Annual Appraisal Report as per APAR. - KRA Library’s KRA details report
Doc Ref: Confidential Page 31 of 35 Wipro/RAILTEL
RReeppoorrttss –– GGeenneerraattiioonn ooff RReeppoorrttss Reports
Reports –
Generation of
Reports process
Doc Ref: Confidential Page 32 of 35 Wipro/RAILTEL
Alerts
S# Alert Alert Type Recipients
1 Appraisal initiation Alert. Inform the Employees that their Appraisals /Reviews have been initiated by the Performance Management Plan.
Periodic Employees,Managers
2 Goal Sheet Due Date intimation Alert. Inform the employees and Managers about the Goal Sheet due date and that the Goal Sheet will become non-editable post the due date.
Periodic Employees, Managers
3 Escalation Alert to the 1o1 Manager that the Appraisal of an
employee has not been completed by a specific date.
Periodic 1o1 Manager
4 Escalation Alert to the 1o1 Manager that the Goal Sheet of an
employee has not been completed by a specific date.
Periodic 1o1 Manager
5 Competency Profile Completion Alert Periodic Employees, Managers
6 Appraisee Feedback submission alert for closure of Year End
Appraisal Process
Periodic Employees, Managers
AAlleerrttss –– TTrriiggggeerr ooff AAlleerrttss
Doc Ref: Confidential Page 33 of 35 Wipro/RAILTEL
Annexure-1 Approval Matrix
As of now Appraisals Approvals will route to respective Reviewing authority & Accepting authority as per below supervisor hierarchy. This will be reviewed further by RAILTEL management.
Channel of submission/writing of APARs
(A): Applicable for the Executives working in Regions
Post Reporting Officer Reviewing Officer Accepting Officer
1 2 3 4
AM DM/Mgr. Ch.Mgr./DGM JGM/AGM/GM
DM Mgr/Ch.Mgr DGM/JGM/AGM/GM RGM
Manager Ch.Mgr DGM/JGM/AGM/GM RGM
Ch.Manager DGM JGM/AGM/GM RGM
AGM/JGM/DGM GGM countersigned by RGM Director concerned MD
GGM/GM RGM Director concerned MD
RGM All Directors MD MD
Note: 1) In respect of those AGM/JGM/DGM who are looking after both marketing and project activities reviewing officer will be D/POM, countersigned by D/NPM. 2) Whereever the prescribed level of officer is not posted/available, the available officer at a higher level can exercise power as Reporting/Reviewing or both authorities.
(B): Applicable for the Executives working in CO
Post Reporting Officer Reviewing Officer Accepting Officer
1 2 3 4
AM DM/Mgr Ch.Mgr./DGM JGM/AGM/GM
DM Mgr./Ch.Mgr. DGM/JGM/AGM GGM/GM
Manager Ch.Mgr/DGM GGM/GM Director concerned
Ch.Manager DGM/JGM GGM/GM Director concerned
DGM/JGM/AGM GGM/GM Director concerned MD
ED/GGM/GM Director concerned MD MD
Doc Ref: Confidential Page 34 of 35 Wipro/RAILTEL
Note: Whereever the prescribed level of officer is not posted/available, the available officer at a higher level can exercise power as Reporting/Reviewing or both authorities.
(C): Applicable for the Executives working directly under MD
Post Reporting Officer Reviewing Officer Accepting Officer
1 2 3 4
CVO MD Chairman CVC
Company Sectt. and others, if any
MD MD MD
Note: the level of posts stated above is - AM (E-0), DM (E-1), Mgr (E-2), Ch.Mgr (E-3), DGM (E-4), JGM (E-5), AGM (E-6), GM (E-7), GGM (E-8), RGM (E-8/E-9), ED (E-9)
Doc Ref: Confidential Page 35 of 35 Wipro/RAILTEL
Open and Closed Issues for this Deliverable
Open Issues
ID Issue Resolution Responsibility Target Date
Impact Date
1 SLA incorporation for the processes wherever it’s required.
RAILTEL HR Team/Wipro
2
Closed Issues
ID Issue Resolution Responsibility Target Date
Impact Date