Page 1: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

1

BP North Sea business update

27th November 2014

UK-Norway Oil & Gas Technology Partnerships

SE

CT

ION

DIV

IDE

R

Tim Smith, Vice President – Communications & External Affairs

Page 2: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

UKCS basin-wide outlook

Production Operating cost

Exploration activity Project investment

Page 3: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Keeping the UKCS competitive

UKCS Sanctioned

UKCS Unsanctioned

Non UKCS Projects

NPV

Bubble size proportional to total Capital

UKCS projects in BP portfolio

IRR

UKCS vs. other mature basins

• Mature North Sea basin faces challenges

• BP UKCS projects need to compete for global resources

– Materiality (NPV) and Quality (IRR)

Source: data and peer group taken from the Wood Mackenzie Exploration Service mature basins

Page 4: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Wood Review

• Agreed objective of Maximising Economic Recovery (MER)

from UKCS

• Need for greater resourced and more proactive regulator

• Significantly improved asset stewardship

• Far greater constructive collaboration between operators

• Six industry strategies

Industry

New

regulator:

Oil and

Gas

Authority

• Exploration strategy

• Asset stewardship strategy

• Regional development strategy

• Infrastructure strategy

• Technology strategy

• Decommissioning strategy

Page 5: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Fiscal review • Announced by HM Treasury in December 2013:

.

“To ensure that the UK’s tax treatment of the

UKCS continues to incentivise economic

recovery as the basin matures”.

• Consultation launched in July.

• Industry requested action on:

- Headline rate

- Single uniform capex allowance

- Cashable tax credit for exploration

- PRT

• Initial report at Autumn Statement, December.

• New tax legislation: post 2015 general election.

Page 6: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

BP North Sea strategy

6

• Risk reduction

• Quality portfolio

• Area development

planning

• Production efficiency

• Renewal of existing

infrastructure

• New wells

• EOR

Focus Maximise the Base

• Major Projects

• Exploration

• Resource Appraise

• Relationships

Invest for the Future

Page 7: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

High value upstream assets

Focus

• Quality portfolio following selective divestments

• Increased equity in operated assets

• Area development planning, e.g. Valhall

Renewal of existing infrastructure

• Offshore – Valhall, Andrew, Magnus & ETAP

• Onshore - SVT & FPS

High value projects

• Kinnoull

• Quad 204

• Clair Ridge

Continued exploration and appraisal

• 27th & 28th round (UKCS) and 22nd round (NCS)

• Snadd and Vorlich discoveries

• Clair appraisal wells

Key - Areas

Norway

Shetland

Central NS

Page 8: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Clair field – 40 yrs young

‘74 ‘77 ‘06 ‘16 ’50 ‘96 Appraisal wells & seismic Appraisal wells & seismic

Page 9: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Life Extension Projects

2014

1982 ETAP Magnus

Scope Increased bed space;

critical OE

improvements; integrity

management scopes;

planned maintenance.

Accommodation

refurbishment/expansion;

upgrade drilling rig, replace

BOP; fabric maintenance;

power generation; repair.

Value Aimed to deliver OE of

90%; enable rate

adding well work;

protect proven

reserves.

Return to drilling; step-

change in platform

capability; helping

production to continue into

the next decade.

Spend £0.4bn gross £0.3bn gross

Status Define Execute

Page 10: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Other work Projects

• Quad 204 Enhanced Oil Recovery (EOR); SVT Gas Sweetening; FPS Enhanced Gas Separate Project

(EGSP); Laggan Tormore condensate pipeline.

• Skarv Well Annuli Pressure Management (SWAPM); Valhall IP platform Crestal Gas Lift (CGL); Ula fire

and gas upgrade – P, Q & D platforms; Butch tie back to Ula.

Operations

• Marine gas oil provision (SVT, Aberdeen and possibly Hound Point)

- RFP expected March 2015.

• Marine consultancy (UK vessel assurance; marine HSE consultancy and general marine consultancy)

- RFP expected February 2015.

• UK North Sea platform supply vessel services 2015/16

- Sourcing strategy being agreed internally. Approach to market likely in 2015.

• Norwegian North Sea engineering, maintenance modifications

- RFP expected in January.

• Scatsta Airport licence holding

- Potential suppliers identified and RFP expected Q1 2015.

Page 11: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

North Sea technology needs

- Integrity management and validation

- Lower cost well access

- EOR in mature water flood fields

- Improving plant efficiency – current industry focus

- Water management

- Decommissioning

Existing BP innovation

Seismic imaging and monitoring of reservoirs

- Seabed Arrays over Valhall and Clair

Enhanced oil recovery

- Gas injection in Ula and Magnus

- LoSal™ water flooding built into Clair Ridge

- Polymer-capabale FPSO for Quad 204

Page 12: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

“Longer, deeper relationships with fewer suppliers”

BP Supply Chain Process Sp

en

d $

Criticality/Complexity

Supplier Engagement Matrix

- Develop long-term relationships

- Become customer of choice

- Leverage BP’s scale and spend

The way BP engages with suppliers is either:

- Direct contractual relationship

- Indirect relationship via 3rd parties

Category specialists cater for specific supply

chain sub-sectors

Page 13: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Planning for the long term

Page 14: BP North Sea business update › rus › content › download › 22778 › 158708 … · upgrade drilling rig, replace BOP; fabric maintenance; power generation; repair. ... •

Questions?