boq control building slab roof matambo
TRANSCRIPT
-
7/23/2019 BOQ Control Building Slab Roof Matambo
1/145
Reference No. Description
1 ! "#s
B1-3.6.2.15 page 49 1.1Geotechnical report (bore logs, trial pits, so
!"escription and li#its o$ %arious soil la&e
!'a#ple taen
!'* results
!+ater le%els
!"epth o$ boreholepitsounding
B1-3.6.2.14 page 4 1.2 *opographic sur%e& (1 #eter grids and .5
!/btain topographic sur%e& #aps
!0nsure position and ele%ation o$ all ors
1.3
1.4
1.5
1.6*e#porar& latrines and sanitar& (alloed 1
1.*e#porar& $ence around site establish#ent
1.1*e#porar& gate
1.11*e#porar& ater connection
1.12*e#porar& electricit& connectiongenerator
1.13 +ater usage
1.14 0lectricit&petrol or diesel
1.15*e#poar& site sign board
1.16 'uper%ision 7abour
1.1 8ealth and 'a$te& - sa$et& signs and 0 ac
1.1: 'ecurit& guard (allo 1 person $or da& a
1.19 "e-establish#ent o$ site ca#p and stores
B1-4.9..14 page 152 2SITE $%R&S ' ()T*%R+
2.1
2.2 ;ate $or o%erhaul per #3 o$ spoil $or a dis
2.3 "ig up and re#o%e concrete $oundation
2.4;e#o%e &ard stone and to be stored $or lat
2.5 ;e-instate &ard stone
B2-4.6. page 3
nal&
-
7/23/2019 BOQ Control Building Slab Roof Matambo
2/145
Reference No. Description
'and
Aillers
@oncrete cubes
3.1 eeping all $oundations $ree o$ ater
3.2 ;is o$ collapse to sides o$ all eca%ations
3.3 132 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)
3.4 132 Fsolator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)
3.5 132 @urrent *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1 4 9 1 1
-
7/23/2019 BOQ Control Building Slab Roof Matambo
3/145
Reference No. Description
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundationB1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.6 132 oltage *rans$or#er
-
7/23/2019 BOQ Control Building Slab Roof Matambo
4/145
Reference No. Description
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3. 132 'urge rrestor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.: 132 7o ost Fnsulator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB tB1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1 4 2 1 66 G i $ 8" B lt (>2 E 4)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
5/145
Reference No. Description
3.9 132 @able 'ealing 0nd
B1-4.9..14 page1520ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1 66 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)
3.11 33 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
-
7/23/2019 BOQ Control Building Slab Roof Matambo
6/145
Reference No. Description
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1:Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 6)
3.12 33 @urrent *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.13 11 uto ;ecloser
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
3.14 11 Fsolator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
3.15 uillar&
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
-
7/23/2019 BOQ Control Building Slab Roof Matambo
7/145
Reference No. Description
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts
3.16ard >arshalling ios
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts
5C)(E TRENCH ,refer to 0ra7in8 no. 9
4.1 0ca%ation in insitu #aterial
4.2 Bacill ith 5## si$ted clean sand and co
4.3 Bacill ith si$ted clean sand in depth o$ 15
4.4Bacll ith eca%ated insitu #aterial in d
4.5 @ast insitu concerte bloc (1# .225
4.6 @ #arer tape
4. @ast insitu cable route #arer ith recess $
;)RD $%R&S
B1-4.9..1 page 11 5.1
B1-4.9..14 page 155 5.2repare and co#pl& ith an appro%ed ee
B1-4.9..14 page 156 5.3
*he co#plete, suppl& and installation o$ a sgates etc. 2# 8igh dia#ond #esh plastic c
ra
-
7/23/2019 BOQ Control Building Slab Roof Matambo
8/145
CHINTHECHE 132/66/33kV Substation
nit
unding logs) and to include
1 Fte#
s
#eter %ertical inter%als)
1 Fte#
are correct
1 Fte#
1 Fte#
1 Fte#
$or BB oce) 2 #onth
1 Fte#
2 Fte#
1 Fte#
(2) 1 Fte#
1 >onth
1 >onth
1 Fte#
1 >onth
cording to BB specications 1 Fte#
ch and 1 person $or night atch) 2 >onth
1 Fte#
14
ance greater than 1# - rate per # 1 #
5 Ho
r use 14
14
$or per$or#ance o$ the or 1 *est
3 *est
1 *est
o$ >aterial= is re?uired 3 *est
3 *est2 *est
2 *est
although not specied, is re?uired to co#plete the
rip 2## o$ topsoil to be stocpiled on site $ored at a site located b& the e#plo&er ithin 1#
#2
#2
#2
3of 4
$or each second la&er o$ =Baclling andor
-
7/23/2019 BOQ Control Building Slab Roof Matambo
9/145
CHINTHECHE 132/66/33kV Substation
nit
2 *est
2 *est
3 *est
1 Fte#
1 Fte#
3.62
.21
ber) 4.2
r) 2.91
2.6
b 6. #
1.13
pths o$ 15## to 9D >od '8*/ 1.:5
aa&) 1.
2. g
suppl& bolts) 1. Ho
.6
: Ho
2.21
.13
ber) 3.36
r) 2.16
1.2:
b 4.: #
.2
pths o$ 15## to 9D >od '8*/ .94
aa&) 1.2
9. g
suppl& bolts) 1 Ho
.4
: Ho
1.3
.6 ber) 1.96
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
10/145
CHINTHECHE 132/66/33kV Substation
nit
.1
b 2.: #
.49pths o$ 15## to 9D >od '8*/ .36
aa&) .6
4. g
suppl& bolts) 1 Ho
.2
4 Ho
#3
#2
#3
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
11/145
CHINTHECHE 132/66/33kV Substation
nit
1.3
.6
ber) 1.96
r) 1.32
.1
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .36
aa&) .6
4. g
suppl& bolts) 1 Ho
.2
4 Ho
1.3
.6
ber) 1.96
r) 1.32
.1
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .36
aa&) .6
4. g
suppl& bolts) 1 Ho
.2
4 Ho
1.3
.6 ber) 1.96
r) 1.32
.1
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .36
aa&) .6
4. g
suppl& bolts) 1 Ho.2
4 H
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
12/145
CHINTHECHE 132/66/33kV Substation
nit
.6.6
ber) .2
r) .36
.56
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .14
aa&) .52
3:. gsuppl& bolts) 4 Ho
.2
4 Ho
2.43
.14
ber) 3.92
r) 3.:
1.54
b 5.6 #
.9:
pths o$ 15## to 9D >od '8*/ .4
aa&) 1.69
:6. g
suppl& bolts) 1 Ho
.5
: Ho
1.23
.14
ber) 2.4
r) -
1.64
b 6.: #
2.3
pths o$ 15## to 9D >od '8*/ -
aa&) 1.23
#
3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
13/145
CHINTHECHE 132/66/33kV Substation
nit
13. g
suppl& bolts) 1. Ho
.146. Ho
.:5
.5
ber) 1.96
r) 1.2
.64
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .26
aa&) .59
4. g
suppl& bolts) 1. Ho
.2
4. Ho
1.2
1.2
aa&) 1.2
1.2
1.2
aa&) 1.2
.49
.1
ber) 2.24
r)
.:
b 5.6 #
1.96
pths o$ 15## to 9D >od '8*/ .aa&) .49
#
3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
14/145
CHINTHECHE 132/66/33kV Substation
nit
suppl& bolts) 1 Ho
.1
4 Ho
.13
.3
ber) .96
r)
.19
b 3.2 #
.63
pths o$ 15## to 9D >od '8*/ .aa&) .13
g
suppl& bolts) Ho
.3
Ho
99 :25'2'CHE4
66.
#pact to 9:D >od '8*/ 3.
## and co#pact to 9:D >od '8*/ 15.
pths o$ 15## and co#pact to 9D >od '8*/ 46.::
.5#) 1 #
1 #
or brass pla?ue 3 Ho
42 #
control and spread o%er cable sealing end &ard 14.
14.
Subtota
Vat 16?
*ina Tota
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#3
#3
ecurit& $ence, including earthing o$ all #etal parts,oated gal%anised steel ire and 3##Cat rap
sts o$ a %ertical post ith 45 degree inclination at$oundation
#2
, 2## deep,including le%elling and rolling to#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
15/145
Nuber Rate Tota
1 I 1,. I 1,.
1 I 2. I 2.
1 I 5. I 5.
1 I 1,. I 1,.
1 I 3,. I 3,.
6 I 5. I 9,.
1 I :,. I :,.
1 I 2. I 4.
1 I 5. I 5.
1 I 5. I 5.
6 I 5. I 3,.
6 I 1,. I 6,.
1 I 5. I 5.
6 I 1,. I 6,.
1 I -
6 I 15. I 1,:.
1 I 1,. I 1,.
I .: I :3.2
I 2. I 2.
I 45. I 225.
I .: I :3.2
I 1.5 I 156.
I 2. I 2.
I 2. I 6.
I 2. I 2.
I 2. I 6.
I 2. I 6.I 1. I 2.
I 1 I 2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
16/145
Nuber Rate Tota
I 1. I 2.
I 1. I 2.
I 2. I 6.
I 1. I 1.
I 1. I 1.
1 I . I 25.32
1 I 19. I 4.42
1 I 3. I 126.
1 I 25. I 2.5
1 I 265. I 546.96
1 I 4. I 24.
1 I 5. I 5.63
1 I . I 12.92
1 I . I 12.39
1 I 3. I 621.
1 I 5.5 I 5.5
1 I . I .39
1 I 5. I 4.
9 I . I 139.23
9 I 19. I 222.3
9 I 3. I 9.2
9 I 25. I 4:6.
9 I 265. I 3,62.34
9 I 4. I 12.:
9 I 5. I 32.4
9 I . I 59.22
9 I . I :.1
9 I 3. I 2,133.
9 I 5.5 I 49.5
9 I . I 2.2
9 I 5. I 36.
3 I . I 21.6
3 I 19. I 34.493 I 3. I 16.4
-
7/23/2019 BOQ Control Building Slab Roof Matambo
17/145
Nuber Rate Tota
3 I 265. I 561.2
3 I 4. I 33.6
3 I 5. I .353 I . I .56
3 I . I 14.4
3 I 3. I 423.
3 I 5.5 I 16.5
3 I . I .51
3 I 5. I 6.
-
7/23/2019 BOQ Control Building Slab Roof Matambo
18/145
Nuber Rate Tota
3 I . I 21.6
3 I 19. I 34.49
3 I 3. I 16.4
3 I 25. I 99.
3 I 265. I 561.2
3 I 4. I 33.6
3 I 5. I .35
3 I . I .56
3 I . I 14.4
3 I 3. I 423.
3 I 5.5 I 16.5
3 I . I .51
3 I 5. I 6.
6 I . I 43.2
6 I 19. I 6:.9
6 I 3. I 352.:
6 I 25. I 19:.
6 I 265. I 1,122.54
6 I 4. I 6.2
6 I 5. I 14.
6 I . I 15.12
6 I . I 2:.:
6 I 3. I :46.
6 I 5.5 I 33.
6 I . I 1.3
6 I 5. I 12.
5 I . I 36.
5 I 19. I 5.4:5 I 3. I 294.
5 I 25. I 165.
5 I 265. I 935.45
5 I 4. I 56.
5 I 5. I 12.25
5 I . I 12.6
5 I . I 23.4
5 I 3. I 5.
5 I 5.5 I 2.55 I . I .:6
5 I 5 I 1
-
7/23/2019 BOQ Control Building Slab Roof Matambo
19/145
Nuber Rate Tota
6 I . I 2.956 I 19. I 6:.9
6 I 3. I 35.2:
6 I 25. I 54.45
6 I 265. I :::.:1
6 I 4. I 6.2
6 I 5. I 14.
6 I . I 6.5
6 I . I 21.9
6 I 3. I 6:4.6 I 5.5 I 132.
6 I . I 1.3
6 I 5. I 12.
2 I . I 34.3
2 I 19. I 54.34
2 I 3. I 235.2
2 I 25. I 1:9.
2 I 265. I :1:.32
2 I 4. I 44.:
2 I 5. I 9.:
2 I . I 1.42
2 I . I 23.62
2 I 3. I 516.
2 I 5.5 I 11.
2 I . I .69
2 I 5. I :.
1 I . I :.6
1 I 19. I 25.94
1 I 3. I 61.2
1 I 25. I -
1 I 265. I 434.
1 I 4. I 2.2
1 I 5. I 13.65
1 I . I -
1 I . I : 61
-
7/23/2019 BOQ Control Building Slab Roof Matambo
20/145
Nuber Rate Tota
1 I 3. I 39.
1 I 5.5 I 5.5
1 I . I .961 I 5. I 3.
3 I . I 1.:5
3 I 19. I 2:.5
3 I 3. I 16.4
3 I 25. I 9.
3 I 265. I 511.19
3 I 4. I 33.6
3 I 5. I .35
3 I . I 5.46
3 I . I 12.39
3 I 3. I 36.
3 I 5.5 I 16.5
3 I . I .51
3 I 5. I 6.
5 I . I 42.
5 I 265. I 1,59.
5 I . I 42.
6 I . I 5.4
6 I 265. I 1,9:.
6 I . I 5.4
1 I . I 3.43
1 I 19. I 1:.62
1 I 3. I 6.2
1 I 25. I -
1 I 265. I 2.6
1 I 4. I 22.4
1 I 5. I 9.:
1 I . I -1 I . I 3.43
-
7/23/2019 BOQ Control Building Slab Roof Matambo
21/145
Nuber Rate Tota
1 I 5.5 I 5.5
1 I . I .69
1 I 5. I 2.
1 I . I .::
1 I 19. I 5.99
1 I 3. I 2:.:
1 I 25. I -
1 I 265. I 5.9
1 I 4. I 12.:
1 I 5. I 3.15
1 I . I -1 I . I .91
1 I 3. I -
1 I 5.5 I -
1 I . I .22
1 I 5. I -
I . I 462.
I -
I -
I . I 32:.13
I -
I -
I -
2. I :,4.
1. I 14.
15.I 1,56.
I 112,2:.12
I 1,953.3
I 13,161.41
-
7/23/2019 BOQ Control Building Slab Roof Matambo
22/145
Reference No. Description
1 ! "#s
B1-3.6.2.15 page 49 1.1 Geotechnical report (bore logs, trial pits, so
!"escription and li#its o$ %arious soil la&e
!'a#ple taen
!'* results
!+ater le%els
!"epth o$ boreholepitsounding
B1-3.6.2.14 page 4 1.2 *opographic sur%e& (1 #eter grids and .5
!/btain topographic sur%e& #aps
!0nsure position and ele%ation o$ all ors
1.3
1.41.5
1.6*e#porar& latrines and sanitar& (alloed 1
1.*e#porar& $ence around site establish#ent
1.1*e#porar& gate
1.11*e#porar& ater connection
1.12*e#porar& electricit& connectiongenerator
1.13 +ater usage
1.14 0lectricit&petrol or diesel
1.15*e#poar& site sign board
1.16 'uper%ision 7abour1.1 8ealth and 'a$te& - sa$et& signs and 0 ac
1.1: 'ecurit& guard (allo 1 person $or da& a
1.19 "e-establish#ent o$ site ca#p and stores
B1-4.9..14 page 152 2 SITE $%R&S
2.1
2.2 Breaing up and re#o%ing concrete $ounda
2.3 ;ate $or o%erhaul per #3 o$ spoil $or a dis
2.4 Bul eca%ations (cut) in insitu #aterial
2.5 0tra o%er bul ea%ations in cla& and blac
2.6 0tra bul eca%ations in inter#ediate #at
2. 0tra o%er bul eca%ations in hard roc
2.: 7e%el and co#pact nal cut la&er to 95D >
2.9
B1-4.9..14 page 155 2.1
!ctual ground le%el
@osts $or obligations, e?uip#ent or labour,
re?uire#ents
plugs and lights)
;e#o%e all bushes, shrubs and trees and s$or later use. ll #aterial not used ill be dithin 1# $ro# site
Bacll (ll) ith insitu #aterial and co#paco#pacting to 95D >od '8*/ densit&
Bacll ith i#ported G5 #aterial and co#co#pacting to 95D >od '8*/ densit&
-
7/23/2019 BOQ Control Building Slab Roof Matambo
23/145
Reference No. Description
3
nal&
-
7/23/2019 BOQ Control Building Slab Roof Matambo
24/145
Reference No. Description
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)
3.5 132 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)
3.6 132 @urrent *rans$or#er
-
7/23/2019 BOQ Control Building Slab Roof Matambo
25/145
Reference No. Description
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3. 132 oltage *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stuB1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.: 132 8igh ost Fnsulator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
-
7/23/2019 BOQ Control Building Slab Roof Matambo
26/145
Reference No. Description
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)
3.9 132 7o ost Fnsulator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartinB1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1 132 'urge rrestor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.11 33 Gantr&
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
-
7/23/2019 BOQ Control Building Slab Roof Matambo
27/145
Reference No. Description
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>36 E :)
3.12 33 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 6)
3.13 33 @urrent *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.14 33 oltage *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
-
7/23/2019 BOQ Control Building Slab Roof Matambo
28/145
Reference No. Description
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB tB1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.15 33 'urge rrestor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stuB1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.16 33 "isconnetor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E 4)
3.1*rans$or#er linth (2)
B1-4.9..14 page 152 E@caAations in insitu ateriaB
'trip eca%ations
'u#p eca%ations
linth
'ur$ace bed
-
7/23/2019 BOQ Control Building Slab Roof Matambo
29/145
Reference No. Description
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d
'toc pile insitu surplus #aterial ($or cartin
B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B'trip Aooting concrete
'u#p @oncrete
linth
'ur$ace bed
B1-4.9..1 page 163 Concrete ' 3a 1 StoneB
'trip Aooting concrete
'u#p @oncrete
linth
'ur$ace bed
art o$ the road
B1-4.9..1 page 1 *or7orkB
'#ooth Aor#or
'u#p alls
linth
;ough Aor#or
'trip $ooting
B1-4.9..1 page 1 25 25## @ha#$er to sides o$ plinth
B1-4.9..1 page 1 Concrete nis- 7oo0oatB
'ur$ace bedlinth
B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B
'ur$ace bed
linth
Sun0riesB
5 to 1## "ia#eter gra%el to ll oil drai
B1-4.9..22 page 1:1 Bricor (including stairs)
B1-4.9..22 page 1:4Bric$orce 12## ide (e%er& second la&e
B1-4.9..1 page 165 @onstructionepansion Joints beteen con
5 3 Cat copper bend to suit connection
/ne set o$ rails on tran$or#er plinth
Benching the inside o$ the su#p ith 2#
aint 2 la&ers o$ bitu#en to sur$ace
3.1: C%NTR%( >I(DIN"
ReoAa of E@istin8 $ork
*aing out and re#o%ing doors, indos, e
'teel single door and $ra#e'teel double door and $ra#e
Gl d t l i d
'u#p $ra#e - 3 3 57g cast in and gal
-
7/23/2019 BOQ Control Building Slab Roof Matambo
30/145
Reference No. Description
Fnternal plaster $ro# alls and colu#ns
0ternal plaster $ro# alls and colu#ns
+akin8 "oo0 to E@istin8 $ork
@oncrete roo$ to be repaired ith appro%ed
@oncrete Coor slab
Ne7 $ork
Trenc-
6## *hic checered plate o%er internal tr
)uiniu *raesB+indos
*&pe +1 2 19## Ara#e including
*&pe +2 9 9## Ara#e including 4
Stee *raesB
"oors
*&pe "3 ::5 25## Ara#e and door in
*&pe "1 12 25## Ara#e and door i
*&pe "2 12 25##Ara#e and door i
Interna 7a nis-esB
+alls to be plastered and painted to #atchE@terna 7a nis-B
5## strip to be plastered and painted t
3.19 ">)RD H%>SE
ReoAa of E@istin8 $ork
*aing out and re#o%ing doors, indos, e
'teel single door and $ra#e
Fnternal plaster $ro# alls and colu#ns
0ternal plaster $ro# alls and colu#ns
Ne7 $ork
Stee *raesB
"oors
*&pe "3 ::5 21## Ara#e and door in
Interna 7a nis-esB+alls to be plastered and painted to #atch
E@terna 7a nis-B
8acing upoK and re#o%ing cer#aic tiles i$ro# concrete or bricor and preparing s
8acing upoK and re#o%ing cer#aic tiles i$ro# concrete or bricor and preparing s
*&pe "3 ::5 25## Ara#e and steel dco#plete (eternal)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
31/145
Reference No. Description
5## strip to be plastered and painted t
5 E)RTH +)T
B1-4.9..14 page 152 4.1 0ca%ate 3## (idth) 1## (dept
B1-4.9..14 page 154 4.2
C)(E TRENCH ,refer to 0ra7in8 no. 9
B1-4.9..1: page 1: 5.1
B1-4.9..1: page 1: 5.2 @oncrete trench co%er $or 1## ide tr
B1-4.9..1: page 1: 5.3
B1-4.9..1: page 1: 5.4 @oncrete trench co%er $or 5## ide tre
B1-3.6.2.12 page 46 6 DR)IN)"E
6.1
6.2
6.3
6.4
6.5
6. %i trap ,refer to 0ra7in8 no. 999 :25'
0ca%ation in insitu #aterial
Blinding - 2#a (5## thic)
'#ooth Aor#or (to be steel or sound ti#
Baclling to earthing grid and co#pact thco#pacting to 95D >od '8*/ densit&
*he eca%ation in insitu #aterial $or constrinsitu rein$orced concrete trenches includindia#eter @ drain pipe at 4# centres at t
*he eca%ation in insitu #aterial $or constrinsitu rein$orced concrete trenches includindia#eter @ drain pipe at 4# centres at t
'ubsoil "rain'uppl&, la& and Joint 2 16#
11## belo HG7 in trench hich is to b6) and bacll ith 5 to 5## dia#etersupport o$ sides, eeping eca%ations dr&,
@onstruct cast insitu concrete #anhole it#aterial, te#porar& support o$ sides, eepidraing no. LLL :24-2)
'uppl&, la&, Joint and bed 3## dia#eterseer pipes including necessar& bends andseparator
'uppl&, la&, Joint and bed 45## dia#eterseer pipes including necessar& bends and
'uppl&, la&, Joint and bed 11## "ia#etetees
-
7/23/2019 BOQ Control Building Slab Roof Matambo
32/145
Reference No. Description
@oncrete - 35#a, 19## 'tone
25 25## @ha#$er to sides o$ concrete to
1## "ia#eter concrete cut out
+ood Coat top o$ concrete slab
'toc pile insitu surplus #aterial ($or cartin
;ein$orcing - 'uppl& Ai onl&
16## "ia#eter gal%anised iron steps 165
8ea%& dut& #anhole co%ers
2## "ia#eter steel pipe
1## "ia#eter %entilator @ pipe ith
1## "ia#eter concrete pipe
aint 2 la&ers o$ bitu#en to internal sur$a
F R%)D
.1 )ccess roa0
B1-4.9..14 page 152 0ca%ation in insitu #aterial
B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D
B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pact
B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #a
.2 Interna roa0B1-4.9..14 page 152 0ca%ation in insitu #aterial
B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D
B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pact
B1-4.9..15 page 15: +earing course o$ bitu#en #acada# grad
B1-4.9..15 page 156 .3
B1-4.9..15 page 159 .4
.5 erbing including bends and end pieces
B1-4.9..1 page 146 .6
'top sign
ield sign
ainting o$ paring lines
:;)RD $%R&S
B1-4.9..1 page 11 :.1
tees
;oad crossing o%er 5# ide road $or cable9 6## and the internal alls to be
'eg#ented pa%ing - 'uppl& and la& : #### sand bed (#a 3 ##)M edge restraint'trength 25 >pa
Roa0 arkin8sB
*he co#plete, suppl& and installation o$ a sparts, gates etc. 2# 8igh dia#ond #esh pl3## Cat rap ra
-
7/23/2019 BOQ Control Building Slab Roof Matambo
33/145
Reference No. Description
B1-4.9..1 page 11 :.2 5# +ide #otorised electric $ence, ith a $r
B1-4.9..1 page 11 :.3 1# +ide pedestrian gate ith a $ra#e heig
B1-4.9..14 page 155 :.4 repare and co#pl& ith an appro%ed eeB1-4.9..14 page 156 :.5
B1-4.9..2 page 13 :.6 @onstruct a re e?uip#ent bricor ios
B1-3.6.2.13 page 46 :.
'uppl& and application o$ 25## stone, 2including le%elling and rolling to co#pact t
7andscaping - lanting o$ #ediu#-high gro0#plo&er)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
34/145
(>$IN") 132/66/33kV Substation
nit Nuber
unding logs) and to include
1 Fte# 1
s
#eter %ertical inter%als)
1 Fte# 1
are correct
1 Fte# 1
1 Fte# 11 Fte# 1
$or BB oce) 2 #onth :
1 Fte# 1
2 Fte# 1
1 Fte# 1
(2) 1 Fte# 1
1 >onth :
1 >onth :
1 Fte# 1
1 >onth :cording to BB specications 1 Fte# 1
ch and 1 person $or night atch) 2 >onth :
1 Fte# 1
4,423.6
tions 1. Ho
ance greater than 1# - rate per # 1. #
1,5.
cotton 15.
rial 15.
5.
od '8*/
1,5.
663.54
although not specied, is re?uired to
rip 15## o$ topsoil to be stocpiled on siteu#ped at a site located b& the e#plo&er #2
#3
#3
#3
#3
ct the ground sur$ace in depths o$ 3###3
pact the ground sur$ace in depths o$ 3###3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
35/145
(>$IN") 132/66/33kV Substation
nit Nuber
$or per$or#ance o$ the or 1. *est
3. *est1. *est
o$ >aterial= is re?uired 3. *est
3. *est
2. *est
2. *est
2. *est
2. *est
3. *est
1. Fte# 1. Fte#
1.5 9
.51 9
ber) 5.4 9
r) 3.:4 9
4.:4 9
b 5.6 # 91.96 9
pths o$ 15## to 9D >od '8*/ 5.: 9
aa&) 4.96 9
26. g 9
suppl& bolts) 1 Ho 9
.1 9
: Ho 9
2.21 33
.13 33
ber) 3.36 33
r) 2.16 33
1.2: 33
b 4.: # 33
.2 33
pths o$ 15## to 9D >od '8*/ .94 33
aa&) 1.2 33
9. g 33
suppl& bolts) 1 Ho 33
3of 4
$or each second la&er o$ =Baclling andor
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
36/145
(>$IN") 132/66/33kV Substation
nit Nuber
.4 33
: Ho 33
3.62 4
.21 4
ber) 4.2 4
r) 2.91 4
2.6 4
b 6. # 4
1.13 4
pths o$ 15## to 9D >od '8*/ 1.:5 4aa&) 1. 4
2. g 4
suppl& bolts) 1. Ho 4
.6 4
: Ho 4
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
37/145
(>$IN") 132/66/33kV Substation
nit Nuber
1.3 12
.6 12
ber) 1.96 12r) 1.32 12
.1 12
b 2.: # 12
.49 12
pths o$ 15## to 9D >od '8*/ .36 12
aa&) .6 12
4. g 12
suppl& bolts) 1 Ho 12
.2 124 Ho 12
1.3 12
.6 12
ber) 1.96 12
r) 1.32 12
.1 12
b 2.: # 12.49 12
pths o$ 15## to 9D >od '8*/ .36 12
aa&) .6 12
4. g 12
suppl& bolts) 1 Ho 12
.2 12
4 Ho 12
3.:3 1
4.1 1
ber) 3.92 1
r) 3.12 1
2.4 1
b 5.6 # 1
.9: 1
pths o$ 15## to 9D >od '8*/ 2.24 1
aa&) 1.6 1
12: g 1
suppl& bolts) 1 Ho 1
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
38/145
(>$IN") 132/66/33kV Substation
nit Nuber
: Ho 1
1.3 1
.6 1
ber) 1.96 1
r) 1.32 1
.1 1
b 2.: # 1
.49 1
pths o$ 15## to 9D >od '8*/ .36 1
aa&) .6 14. g 1
suppl& bolts) 1 Ho 1
.2 1
4 Ho 1
1.3 9
.6 9
ber) 1.96 9
r) 1.32 9
.1 9
b 2.: # 9
.49 9
pths o$ 15## to 9D >od '8*/ .36 9
aa&) .6 9
4. g 9
suppl& bolts) 1. Ho 9
.2 9
4. Ho 9
5.:
.24
ber) 5.4
r) 2.64
3.22
b 5.6 #
1.96
pths o$ 15## to 9D >od '8*/ 1.62
aa&) 3.46
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
39/145
(>$IN") 132/66/33kV Substation
nit Nuber
suppl& bolts) 1. Ho
.1
:. Ho
1.23 2
.14 2
ber) 2.4 2
r) - 2
1.64 2
b 6.: # 2
2.3 2
pths o$ 15## to 9D >od '8*/ - 2aa&) 1.23 2
13. g 2
suppl& bolts) 1. Ho 2
.14 2
6. Ho 2
.:5
.5
ber) 1.96
r) 1.2
.64
b 2.: #
.49
pths o$ 15## to 9D >od '8*/ .26
aa&) .59
4. g
suppl& bolts) 1. Ho
.2 4. Ho
.:5 2
.5 2
ber) 1.96 2
r) 1.2 2
.64 2
b 2.: # 2
.49 2
pths o$ 15## to 9D >od '8*/ .26 2
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
40/145
(>$IN") 132/66/33kV Substation
nit Nuber
aa&) .59 2
4. g 2
suppl& bolts) 1. Ho 2 .2 2
4. Ho 2
.:5 2
.5 2
ber) 1.96 2
r) 1.2 2
.64 2
b 2.: # 2 .49 2
pths o$ 15## to 9D >od '8*/ .26 2
aa&) .59 2
4. g 2
suppl& bolts) 1. Ho 2
.2 2
4. Ho 2
1.: 5
.1 5
ber) 3.36 5
r) 1.: 5
1.13 5
b 4.: # 5
.2 5
pths o$ 15## to 9D >od '8*/ .69 5
aa&) 1.9 5
:3. g 5suppl& bolts) 1. Ho 5
.4 5
4. Ho 5
:.32
.5:
.35
9.
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#2
#2
#3
#2
#3
#3
#3
#3
#3
#3
#3
-
7/23/2019 BOQ Control Building Slab Roof Matambo
41/145
(>$IN") 132/66/33kV Substation
nit Nuber
pths o$ 15## to 9D >od '8*/ 4.54
aa&) 2.:
.6
.3
1.5
2.2
3.2
.33
12.6
4.544.41
2.24
11.4
13.46
19 #
45.3621
45.36
42
45.36
n 4.54
31.2:
r) 125.12 rete and bric 2.22
n trans$or#er points :. #
2.1 #
benching render 1 Fte#
5
c $ro# bric to de#olished
1. Ho 3. Ho
11 H
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#2
#2
#2
#2
#2
#2
#2
anised. 25 5## Cat 17g shtail lugs #2
#3
#2
#2
#2
#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
42/145
(>$IN") 132/66/33kV Substation
nit Nuber
29.
14.3
sealant and bitu#en 21.
21.
nch co#plete 3.4
3: #
4## double glass co#plete . Ho
# double glass co#plete 4. Ho
cluding all iron#onger& co#plete 1. Ho
ncluding all iron#onger& co#plete 1. Ho
cluding all iron#onger& co#plete 2. Ho
eisting 29.
#atch eisting 14.3
c $ro# bric to de#olished
2. Ho
.1
36.
1. Ho
cluding all iron#onger& co#plete 1. Ho
eisting .1
ncluding re#o%ing #ortar bed or adhesi%eur$aces $or ne screed, plaster tiles nish
#2
#2
#2
#2
#2.
#2
#2
ncluding re#o%ing #ortar bed or adhesi%eur$aces $or ne screed, plaster tiles nish
#2
#2
or including stainless steel iron#onger&
#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
43/145
(>$IN") 132/66/33kV Substation
nit Nuber
#atch eisting 36.
) $or earth grids 6.
6.
99 :25'24
1. #
nch (ith #ai#al eight o$ 5 g each) 59. Ho
41 #
ch (ith #ai#al eight o$ 5 g each)13. Ho
:4 #
4 Ho
12 #
35 #
45 #
24
9.
3.45
ber) 235.
#2
#3
ground sur$ace in depths o$ 3###3
ction o$ 1## ide 5## deep castg bends and Junctions to include 1##e botto# o$ the trench
ction o$ 5## ide 5## deep castg bends and Junctions to include 1##e botto# o$ the trench
dia#eter pre$erated u@ pipe to be laidlined ith geo$abric #aterial (bide# gade
stone, including eca%ation, te#porar&o#plete (re$er to draing no. LLL :24-2)
lid and including eca%ation in insitung eca%ations dr&, co#plete (re$er to
class 5" spigot and socet ended concretetees $ro# trans$or#er to oil ater
class 5" spigot and socet ended concretetees
@ pipe including necessar& bends and
#3
#3
#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
44/145
(>$IN") 132/66/33kV Substation
nit Nuber
45.
t co%ers 12.: #
2. Ho
46.13
aa&) 9.
52. g
## long :. Ho
4. Ho
1. #
end 1. Ho
.5 #
46 #
ces o$ separator 259.9:
:1
>/" '8*/ 4.5
ed to 9:D >/" '8*/ 36.
cada# grade 6 penetration :.4
226.:
>/" '8*/ 113.4
ed to 9:D >/" '8*/ 9.2
6 penetration 21.6
1. Ho
11.
234. #
3 Fte#
1 Fte#
5 #
4:1.2 #
#3
#2
#3
#
2
#3
#3
#3
#3
#3
#3
#3
#3
rench.recast concrete cul%et (si
-
7/23/2019 BOQ Control Building Slab Roof Matambo
45/145
(>$IN") 132/66/33kV Substation
nit Nuber
#e height that #atch the $ence. 1. Ho
ht that #atches the $ence 1. Ho
control and spread o%er substation 6,21:.36
6,21:.36
1. Fte#
621.:4
Subtota
Vat 16?
*ina Tota
#2
## deep, to one #eter be&ond $ences,e stone la&er. #
2
ing plants and grass ('ubJect to appro%al o$#2
-
7/23/2019 BOQ Control Building Slab Roof Matambo
46/145
Rate Tota
I 1,. I 1,.
I 2. I 2.
I 5. I 5.
I 1,. I 1,.I 3,. I 3,.
I 5. I 12,.
I :,. I :,.
I 2. I 4.
I 5. I 5.
I 5. I 5.
I 5. I 4,.
I 1,. I :,.
I 5. I 5.
I 1,. I :,.I -
I 15. I 2,4.
I 1,. I 1,.
I .:
I 3,53:.::
I 45. I 45.
I 2. I 2.
I . I 1,5.
I . I 1,5.
I :. I 1,2.
I 2. I 1,5.
I . I 1,5.
I . I 4,644.:
-
7/23/2019 BOQ Control Building Slab Roof Matambo
47/145
Rate Tota
I 2. I 2.
I 2. I 6.I 2. I 2.
I 2. I 6.
I 2. I 6.
I 1. I 2.
I 1. I 2.
I 1. I 2.
I 1. I 2.
I 2. I 6.
I 1. I 1.I 1. I 1.
I . I 6.3:
I 19. I :5.52
I 3. I 1,36.:
I 25. I :64.
I 265. I 11,533.:6
I 4. I 21.6I 5. I ::.2
I . I 365.15
I . I 312.23
I 3. I ,29.
I 5.5 I 49.5
I . I 6.1
I 5. I 36.
I . I 51.51
I 19. I :15.1
I 3. I 3,326.4
I 25. I 1,:2.
I 265. I 11,22:.5:
I 4. I 633.6
I 5. I 11:.:
I . I 21.14
I . I 293.3
I 3. I ,:21.
I 5.5 I 1:1.5
-
7/23/2019 BOQ Control Building Slab Roof Matambo
48/145
Rate Tota
I . I :.32
I 5. I 1,32.
I . I 11.2
I 19. I 161.69
I 3. I 54.
I 25. I 291.
I 265. I 2,1:.:4
I 4. I 96.
I 5. I 22.5
I . I 51.I . I 49.5
I 3. I 2,4:4.
I 5.5 I 22.
I . I 1.5:
I 5. I 16.
-
7/23/2019 BOQ Control Building Slab Roof Matambo
49/145
Rate Tota
I . I :6.39
I 19. I 13.94
I 3. I 5.6I 25. I 396.
I 265. I 2,245.:
I 4. I 134.4
I 5. I 29.4
I . I 3.24
I . I 56.15
I 3. I 1,692.
I 5.5 I 66.
I . I 2.6I 5. I 24.
I . I :6.39
I 19. I 13.94
I 3. I 5.6
I 25. I 396.
I 265. I 2,245.:
I 4. I 134.4I 5. I 29.4
I . I 3.24
I . I 56.15
I 3. I 1,692.
I 5.5 I 66.
I . I 2.6
I 5. I 24.
I . I 26:.35
I 19. I ,9.
I 3. I 1,16.
I 25. I :.
I 265. I 5,43.35
I 4. I 224.
I 5. I 49.
I . I 156.49
I . I 111.:6
I 3. I 3,:4.
I 5.5 I 55.
-
7/23/2019 BOQ Control Building Slab Roof Matambo
50/145
Rate Tota
I 5. I 4.
I . I 122.39
I 19. I 195.42
I 3. I 999.6
I 25. I 561.
I 265. I 3,1:.53
I 4. I 19.4
I 5. I 41.65
I . I 42.:4
I . I 9.55I 3. I 2,39.
I 5.5 I 93.5
I . I 2.92
I 5. I 34.
I . I 64.:
I 19. I 13.46
I 3. I 529.2
I 25. I 29.
I 265. I 1,6:3.:1
I 4. I 1.:
I 5. I 22.5
I . I 22.6:
I . I 42.12
I 3. I 1,269.
I 5.5 I 49.5
I . I 1.54
I 5. I 1:.
I . I 249.2
I 19. I 321.:6
I 3. I 1,5:.4
I 25. I 462.
I 265. I 5,965.6:
I 4. I 156.:
I 5. I 6:.6
I . I 9.3:
I . I 169.54
-
7/23/2019 BOQ Control Building Slab Roof Matambo
51/145
Rate Tota
I 5.5 I 3:.5
I . I 4.:
I 5. I 2:.
I . I 1.2
I 19. I 51.:
I 3. I 122.4
I 25. I -
I 265. I :6:.14
I 4. I 54.4
I 5. I 2.3
I . I -I . I 1.22
I 3. I 61:.
I 5.5 I 11.
I . I 1.91
I 5. I 6.
I . I -
I 19. I -
I 3. I -
I 25. I -
I 265. I -
I 4. I -
I 5. I -
I . I -
I . I -
I 3. I -
I 5.5 I -
I . I -I 5. I -
I . I 11.9
I 19. I 19.
I 3. I 11.6
I 25. I 6.
I 265. I 34.9
I 4. I 22.4
I 5. I 4.9
I . I 3.64
-
7/23/2019 BOQ Control Building Slab Roof Matambo
52/145
Rate Tota
I . I :.26
I 3. I 24.
I 5.5 I 11.I . I .34
I 5. I 4.
I . I 11.9
I 19. I 19.
I 3. I 11.6
I 25. I 6.
I 265. I 34.9
I 4. I 22.4I 5. I 4.9
I . I 3.64
I . I :.26
I 3. I 24.
I 5.5 I 11.
I . I .34
I 5. I 4.
I . I 62.1:
I 19. I 99.2:
I 3. I 54.
I 25. I 225.
I 265. I 1,49:.5:
I 4. I 96.
I 5. I 1:.
I . I 23.9:
I . I 3:.2
I 3. I 1,245.I 5.5 I 2.5
I . I 1.26
I 5. I 1.
I . I 5:.21
I . I 4.3
I . I 51.45
I . I 63.5
-
7/23/2019 BOQ Control Building Slab Roof Matambo
53/145
Rate Tota
I . I 31.5
I . I 145.45
I 19. I 143.64
I 19. I 6.:
I 19. I 199.5
I 19. I 43.92
I 26. I :6.24
I 26. I :5.2
I 26. I 3,26.
I 26. I 1,19.36
I 26.
I 2. I 44.:
I 2. I 22:.
I 2. I 269.2:
I 2. I 3:.
I :. I 362.::I :. I 16:.
I :. I 362.::
I :. I 336.
I 4. I 1,:14.4
I 19. I :6.1:
I 1. I 31.2:
I 1. I 125.12I 1. I 222.
I 15. I 1,2.
I 15. I 3,15.
I 5. I 5.
I 1. I 5.
1 I 1.1 I 3.
1 I 11
-
7/23/2019 BOQ Control Building Slab Roof Matambo
54/145
Rate Tota
2 I 594.14
2 I 29.46
3 I 6,3.
25 I 5,25.
I -
I -
I :9. I 6,23.
I 265. I 1,6.
I 1. I 1.
I 12. I 12.
I 12. I 24.
I 9. I 2,63.63
I 9. I 132.5
1 I 2.
I 2. I 141.41
I 2. I 2.
I 1. I 1.
I 1. I 1.
I 9. I 636.35
-
7/23/2019 BOQ Control Building Slab Roof Matambo
55/145
Rate Tota
I 9. I 324.
I . I 4,2.
I .I 4,2.
I 1. I 1,.
I 6. I 35,4.
I 1. I 41.
I 6. I :,22.
I 1. I :,4.
I 265. I 1,6.
I 15. I 1:.
I 1. I 3,5.
I 1:. I :1.
I . I 69.
I 19. I 656.26
I 33. I ,55.
-
7/23/2019 BOQ Control Building Slab Roof Matambo
56/145
Rate Tota
I 19. I :,55.
I 1. I 12.:
I 2. I 4.
I 5.3 I 244.49
I 6. I 5:2.
I 2.5 I 1:,:.
I 225. I 1,:.
I 12. I 4:.
I 45. I 45.
I 2. I 2.
I 2. I 1.
I 6. I 26.
I 5. I 1,299.9
I . I 56.
I 25. I 1,12.5
I 2. I 2.
I 19. I 159.6
I . I 1,5:.6
I 25. I 2,:35.
I 2. I 1,944.
I 19. I 41.4
I 3. I 3.
I 5. I 55,.
I 2. I 46:.
I 1. I 3.
I 1. I 1.
I 2. I 1.
I 2. I 96,344.
-
7/23/2019 BOQ Control Building Slab Roof Matambo
57/145
Rate Tota
I 5. I 5.
I 1. I 1.
I 1. I 6,21:.36
I 15. I 93,25.4
1,. I 1,.
I 1,. I 621,:36.
G 12F21:.F:
G 12F21:.F:
-
7/23/2019 BOQ Control Building Slab Roof Matambo
58/145
NE$ $EN"> 132/6
Reference No.Description
1 ! "#s
B1-3.6.2.15 page 49 1.1Geotechnical report (bore logs, trial pits, sounding logs) and to include
!"escription and li#its o$ %arious soil la&ers
!'a#ple taen
!'* results
!+ater le%els
!"epth o$ boreholepitsounding
B1-3.6.2.14 page 4 1.2*opographic sur%e& (1 #eter grids and .5 #eter %ertical inter%als)
!/btain topographic sur%e& #aps
!0nsure position and ele%ation o$ all ors are correct
1.3
1.4
1.5
1.6*e#porar& latrines and sanitar& (alloed 1 $or BB oce)
1.*e#porar& $ence around site establish#ent
1.1*e#porar& gate
1.11*e#porar& ater connection
1.12*e#porar& electricit& connectiongenerator (2)
1.13+ater usage
1.140lectricit&petrol or diesel
1.15*e#poar& site sign board
1.16'uper%ision 7abour
1.18ealth and 'a$te& - sa$et& signs and 0 according to BB specications
1.1:'ecurit& guard (allo 1 person $or da& atch and 1 person $or night atch)1.19"e-establish#ent o$ site ca#p and stores
B1-4.9..14 page 152 2SITE $%R&S ' ()T*%R+
2.1;e#o%e and treat anthills
2.2
2.37e%el and co#pact nal cut la&er to 95D >od '8*/
2.4;ate $or o%erhaul per #3 o$ spoil $or a distance greater than 1# - rate per #
2.5Bul eca%ations (cut) in insitu #aterial
2.60tra o%er bul eca%ations in cla& and blac cotton
2.0tra bul eca%ations in inter#ediate #aterial 2.:0tra o%er bul eca%ations in hard roc
2.97e%el and co#pact nal cut la&er to 95D >od '8*/
2.1
B1-4.9..14 page 155 2.11
B2-4.6. page 3
nal&od '8*/ densit&
TESTS ,s-a be perfore0 for eac- 3of 4
"ensit& o$ soil in place o$ sandcone #ethod $or each second la&er o$ =Baclling and
-
7/23/2019 BOQ Control Building Slab Roof Matambo
59/145
NE$ $EN"> 132/6
Reference No.Description
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)
3.5132 @ircuit Breaer
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)
3.6132 @urrent *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.132 oltage *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
60/145
NE$ $EN"> 132/6
Reference No.Description
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1132 'urge rrestor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1266 Gantr&
B1-4.9..14 page152 0ca%ation in insitu #aterialB1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>36 E :)
3.1366 Fsolator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1466 @ircuit Breaer
-
7/23/2019 BOQ Control Building Slab Roof Matambo
61/145
NE$ $EN"> 132/6
Reference No. Description
3.1566 @urrent *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1666 oltage *rans$or#er
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.166 'urge rrestor
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)
3.1:66 8igh ost Fnsulator
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1 4 9 19 page 19 ;ein$orcing 'uppl& Ai onl&
-
7/23/2019 BOQ Control Building Slab Roof Matambo
62/145
NE$ $EN"> 132/6
Reference No. Description
3.2ard >arshalling ios
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)
B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)
B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone
B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub
B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&
B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)
B1-4.9..2 page 1: Grout - 35#a to top o$ stub
B1-4.2.1 page 66 Greasing o$ 8" Bolts
3.21*rans$or#er linth (1)
B1-4.9..14 page152 E@caAations in insitu ateriaB
'trip eca%ations
'u#p eca%ations
linth
'ur$ace bed
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B
'trip Aooting concrete
'u#p @oncrete
linth
'ur$ace bedB1-4.9..1 page 163 Concrete ' 3a 1 StoneB
'trip Aooting concrete
'u#p @oncrete
linth
'ur$ace bed
B1-4.9..1 page 1 *or7orkB
'#ooth Aor#or
'u#p alls
linth
;ough Aor#or
'trip $ooting
B1-4.9..1page 1 25 25## @ha#$er to sides o$ plinth
B1-4.9..1page 169 Concrete nis- 7oo0 oatB'ur$ace bed
linth
B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B
'ur$ace bed
linth
Sun0riesB
5 to 1## "ia#eter gra%el to ll oil drain
B1-4.9..22 page 1:1 Bricor (including stairs)
B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)
B1-4.9..1 page 165 @onstructionepansion Joints beteen concrete and bric
5 3 Cat copper bend to suit connection on trans$or#er points
Benching the inside o$ the su#p ith 2## benching render
'u#p $ra#e - 3 3 57g cast in and gal%anised. 25 5## Cat 17g shtail luto angle (5## llet) at 5## cc. *o t in the open grid hich is 16## ide it4.5## bearer bars, and 4 4## openings ($ull& banded)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
63/145
NE$ $EN"> 132/6
Reference No.Description
3.22*rans$or#er linth (2)
B1-4.9..14 page 152 E@caAations in insitu ateriaB'trip eca%ations
'u#p eca%ations
linth
'ur$ace bed
B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B
'trip Aooting concrete
'u#p @oncrete
linth
'ur$ace bed
B1-4.9..1 page 163 Concrete ' 3a 1 StoneB
'trip Aooting concrete'u#p @oncrete
linth
'ur$ace bed
art o$ the road
B1-4.9..1 page 1 *or7orkB
'#ooth Aor#or
'u#p alls
linth
;ough Aor#or
'trip $ooting
B1-4.9..1 page 1 25 25## @ha#$er to sides o$ plinth
B1-4.9..1 page 1 Concrete nis- 7oo0oatB
'ur$ace bedlinth
B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B
'ur$ace bed
linth
Sun0riesB
5 to 1## "ia#eter gra%el to ll oil drain
B1-4.9..22 page 1:1 Bricor (including stairs)
B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)
B1-4.9..1 page 165 @onstructionepansion Joints beteen concrete and bric5 3 Cat copper bend to suit connection on trans$or#er points
/ne set o$ rails on tran$or#er plinth
Benching the inside o$ the su#p ith 2## benching render
aint 2 la&ers o$ bitu#en to sur$ace
3.23Aire +all
B1-4.9..14 page152 0ca%ation in insitu #aterial
B1-4.9..1 page 163 Blinding - 2#a (5## thic)
B1-4.9..1 page 163 Aoundation all (35>a concrete)
B1-4.9..1 page 1 ;ough $or#or
B1-4.9..1 page 163 @oncrete $oundation slab - 35#a, 19## 'tone
B1-4.9..1 page 163 @a%it& concrete all (35>a)
B1-4.9..22 page 1:1 11## bricall
B1-4.9..1 page 1 +ood Coat top o$ concrete $oundation
recast concrete copings
B1 4 9 14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/
'u#p $ra#e - 3 3 57g cast in and gal%anised. 25 5## Cat 17g shtail luto angle (5## llet) at 5## cc. *o t in the open grid hich is 16## ide i4.5## bearer bars, and 4 4## openings ($ull& banded)
-
7/23/2019 BOQ Control Building Slab Roof Matambo
64/145
NE$ $EN"> 132/6
Reference No.Description
B1-4.9..3 page 13: 3.24 @ontrol Building
E@caAations in insitu ateriaB
'trip $oundation
B1-4.9..14 page 155 repare and spar& ith an appro%ed anti-ter#ite control under building
'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..1 page 1 *or7orkB
;ough $or#or (to be steel or sound ti#ber) to sides o$ $oundations
'#ooth $or#or (to be steel or sound ti#ber) to sides o$ bea#s
'#ooth $or#or (to be steel or sound ti#ber) to sides o$ colu#ns
B1-4.9..1 page 163 ConcreteB
Blinding - 2#a (5## thic)
;ein$orced concrete - 35#a, 19## 'tone to sur$ace bed
;ein$orced concrete - 35#a, 19## 'tone to $oundations
;ein$orced concrete - 35#a, 19## 'tone to colu#ns
;ein$orced concrete - 35#a, 19## 'tone to bea#srestresse0 fabricate0 concrete intesB
Fn lengths not eceeding 3#
B1-4.9..19 page 19 Reinforcin8B
;ein$orcing #esh re$. 395
;ein$orcing - 'uppl& Ai onl&
B1-4.9..22 page 1:1
B1-4.9..22 page 1:1 2## *hic blocor
B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)
B1-4.9..22 page 1:3 "@ ("a#p proo$ course)
B1-4.9..22 page 1:3 "> ("a#p proo$ #e#bra#e)
B1-4.9..1 page 1 +ood Coat top o$ concrete
*oor *inis-esB
B1-4.9..21 page 1:
B1-4.9..21 page 1:Gla
-
7/23/2019 BOQ Control Building Slab Roof Matambo
65/145
NE$ $EN"> 132/6
Reference No. Description
@upboards (to door cupboard ith di%iding shel%es )
irconditioner central unit in control building
llo one double door cupboard ith shel%es underneath sin $or itchenB1-4.9..23page 191 *o plate electric cooer
B1-4.9..23page 1:: RoofB
225 15## B' ce#ent barge board
B1-3.6.2.12 page 46
B1-3.6.2.12 page 46 re-painted alu#iniu# 1 1## don pipes, including holderbats, bracets etc
Ceiin8B
B1-4.9.4.1 page 131 'uppl& and install appro%ed roo$ insulation
B1-4.9..4 page 139 0ternal steel ladder ith sa$et& cage to access roo$
B1-9..1 page145 ubin8B
+@ ith all necessar& connections, ttings and piping co#plete and toilet paper hold
Orinal ith all necessar& connections, ttings and piping co#plete
'in ith all necessar& connections, ttings, gulle& and piping co#plete
'hoer ith all necessar& connections, ttings and piping co#plete
B1-4.9..2 page 13 E@tras
'uppl& and install re alar#
B1-4.9..4 page 139 3.25 Guard 8ouse
E@caAations in insitu ateriaB
'trip $oundation
B1-4.9..14 page 155 repare and spar& ith an appro%ed anti-ter#ite control under building
'toc pile insitu surplus #aterial ($or carting aa&)
B1-4.9..1 page 1 *or7orkB
;ough $or#or (to be steel or sound ti#ber) to sides o$ $oundations
'#ooth $or#or (to be steel or sound ti#ber) to sides o$ bea#s
'#ooth o$ sides o$ colu#ns (to be steel or sound ti#ber)
B1-4.9..1 page 163 ConcreteB
Blinding - 2#a (5## thic);ein$orced concrete - 35#a, 19## 'tone to $oundations
;ein$orced concrete - 35#a, 19## 'tone to sur$ace bed
;ein$orced concrete - 35#a, 19## 'tone to colu#ns
;ein$orced concrete - 35#a, 19## 'tone to bea#s
restresse0 fabricate0 concrete intesB
Fn lengths not eceeding 3#
B1-4.9..19 page 19 Reinforcin8B
;ein$orcing #esh re$. 395
;ein$orcing - 'uppl& Ai onl&
B1-4.9..22 page 1:1
B1-4.9..22 page 1:1 2## thic bloc or
B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)
B1-4.9..22 page 1:3 "@ ("a#p proo$ course)
B1 4 9 22 page 1:3 "> ("a#p proo$ #e#bra#e)
@orrugated appro%ed roo$ sheeting - .6## gauge to be tted inculding all necessattings co#plete
+elded roo$ trusses o$ 3 degrees angle ra$ters, t ie bea#s, rails, struts, braces, cleapurlins, etc and Cat bearer, gusset and connection plates, bolted to steel ith an o%lenghth o$ 12.69# and height o$ 3.66# (*here are 9 trusses)
re-painted alu#iniu# 15 15## bo gutters including necessar& collared and sepansion Joints
'uspended ceiling cha#pered and groo%ed acoustic panels on concealed suspensioincluding hangers etc
Basin ith all necessar& connections, ttings and piping co#plete ith soap dispens#irror
'uppl& and install re 9g @/2etinguisher ith sign
@a%it& all - inner sin to be hollo blocor ith insulation and outer sin to be cbricor
-
7/23/2019 BOQ Control Building Slab Roof Matambo
66/145
NE$ $EN"> 132/6
Reference No.Description
B1-4.9..23 page 1:: RoofB
B1-3.6.2.12 page 46
B1-3.6.2.12 page 46 re-painted alu#iniu# 1 1## don pipes, including holderbats, bracets etc
225 15## B' ce#ent barge board
Ceiin8B
B1-4.9.4.1 page 131 'uppl& and install appro%ed roo$ insulation
'uppl& and install 12 B*O airconditioner
B1-9..1 page 145 ubin8B
+@ ith all necessar& connections, ttings and piping co#plete and toilet paper hold
B1-4.9..2 page 13 E@tras
'uppl& and install re alar#
5E)RTH +)T
B1-4.9..14 page 152 4.1 0ca%ate 3## (idth) 1## (depth) $or earth grids
B1-4.9..14 page 154 4.2
C)(E TRENCH ,refer to 0ra7in8 no. 999 :25'24
B1-4.9..1: page 1: 5.1
B1-4.9..1: page 1: 5.2@oncrete trench co%er $or 1## ide trench (ith #ai#al eight o$ 5 g each)
B1-4.9..1: page 1: 5.3
B1-4.9..1: page 1: 5.4@oncrete trench co%er $or 5## ide trench (ith #ai#al eight o$ 5 g each)
B1-3.6.2.12 page 46 6DR)IN)"E
6.1
6.2
6.3
6.4
6 5
@orrugated appro%ed roo$ sheeting - .6## gauge to be tted including all necessa
ttings co#plete
+elded roo$ trusses o$ 3 degrees angle ra$ters, tie bea#s, rails, struts, braces, cleapurlins, etc and Cat bearer, gusset and connection plates, bolted to steel ith an o%lenghth o$ 4.2# and height o$ 1.6# (*here are 3 trusses)
re-painted alu#iniu# 15 15## bo gutters including necessar& collared and sepansion Joints
'uspended ceiling cha#pered and groo%ed acoustic panels on concealed suspensioincluding hangers etc
Basin ith all necessar& connections, ttings and piping co#plete ith soap dispens#irror
'uppl& and install re 9g @/2etinguisher ith sign
Baclling to earthing grid and co#pact the ground sur$ace in depths o$ 3## co#to 95D >od '8*/ densit&
*he eca%ation in insitu #aterial $or construction o$ 1## ide 5## deep crein$orced concrete trenches including bends and Junctions to include 1## dia#edrain pipe at 4# centres at the botto# o$ the trench
*he eca%ation in insitu #aterial $or construction o$ 5## ide 5## deep carein$orced concrete trenches including bends and Junctions to include 1## dia#edrain pipe at 4# centres at the botto# o$ the trench
'ubsoil "rain'uppl&, la& and Joint 2 16## dia#eter pre$erated u@ pipe to be laid 11
belo HG7 in trench hich is to be lined ith geo$abric #aterial (bide# gade 6) anbacll ith 5 to 5## dia#eter stone, including eca%ation, te#porar& support oeeping eca%ations dr&, co#plete (re$er to draing no. LLL :24-2)
@onstruct cast insitu concrete #anhole ith lid and including eca%ation in insitu #te#porar& support o$ sides, eeping eca%ations dr&, co#plete (re$er to draing no.:24-2)
@onstruct cast insitu septic tan o%erall si
-
7/23/2019 BOQ Control Building Slab Roof Matambo
67/145
NE$ $EN"> 132/66
Reference No.Description
1## "ia#eter %entilator @ pipe ith bend
1## "ia#eter concrete pipe
'uppl&, la&, Joint and bed 16## "ia#eter u@ pipe including necessar& bends an
aint 2 la&ers o$ bitu#en to internal sur$aces o$ separator
F $)TER S>(;
B1-4.9..23 page 1:9 .1
B1-4.9..23 page 1:9 .2
8ot ater dispenser capacit& :7
B1-4.9..23 page 1:9 .35## "ia#eter @ pipeB1-4.9..23 page 1:9 .425## "ia#eter @ pipe
B1-4.9..23 page 1:9 .515## "ia#eter @ pipe
: R%)D ' )CCESS )ND INTERN)(
:.1 )ccess roa0
B1-4.9..14 page 152 0ca%ation in insitu #aterial
B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D >/" '8*/
B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pacted to 9:D >/" '8*/
B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #acada# grade 6 penetration
:.2 Interna roa0
B1-4.9..14 page 152 0ca%ation in insitu #aterial
B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D >/" '8*/
B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pacted to 9:D >/" '8*/
B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #acada# grade 6 penetration
:.3
B1-4.9..15 page 156 :.4
B1-4.9..15 page 159 :.5
B1-4.9..3 page 139 :.6
B2-4..9 page :1 :.erbing including bends and end pieces
B1-4.9..1 page 146 :.:
'top sign
ield sign
ainting o$ paring lines
;)RD $%R&S
9.1
B1-4.9..1 page 11 9.2
B1-4.9..1 page 11 9.35# +ide #otorised electric $ence, ith a $ra#e height that #atch t