book vincent de grave
TRANSCRIPT
BAC 2 / November 2014 - December 2014
Extension for school at la Hulpe The project is located on the edge of a park
in La Hulpe, it includes five classrooms and a
workshop room. Gaps are made to
magnify the entrance and to bring light.
Bricks compose the façade material to
match the site.
BAC 2 / September 2014 - October 2014
Living space for 4 children and 1 adult The common area is located on the lowest part of the building,
whereas the children’s rooms are placed above and connected
with each others via stairs.
The inside and outside wall system contains many holes, inspired
by the foliage of a tree and allowing light and views across the
whole volume.
BAC 3 / November 2014 - December 2014
9 collective housings, a district hall and a vegetable garden at Gray Street
The project is composed of two volumes: one smaller to fit more with the street, in terms of volume and hight anda second one larger to interact with the bridge over which passes an avenue.The circulation system is placed in the central articulation point and allows access central articulation point and allows access to the adjoining park.A district hall is present on the ground floor of the first volume.
BAC 3 / November 2014 - December 2014
Urbanism – Project to revitalise the Rasquinet park in Brussels
The rasquinet park is hidden whithin a traditionnal block of houses including a school at its end.The project includes a new entrance which allows to cross it. A new gym makes the link between the school and the park. The existing entrance is redensified in order to ensure a good social control. The existing entrance is redefined in order to ensure a better social control for the inhabitants of the zone.The two entrances have also been redefined in terms of soil treatment in order to reinforce the vigilance and enhance a better urban activity into the whole area.
BAC 3 / March 2015 - April 2015
Historic restoration – part of Chateau d’Havré
This historic restoration takes place in the castle of Havré (13th century).
This project consists of a gateway making a new link between the two towers
and referring to the previous missing stone wall. The lightweight structure of the
bridge contrasts with the massive structure of existing towers. Trees are placed
on the outskirts to accentuate the natural look that these ruins have.
BAC 3 / February 2015 - June 2015
Rural area re-densification – 100 lodging in Pont-à-Celles